BUILDING INTEGRATION
|
|
- Madeline Hart
- 5 years ago
- Views:
Transcription
1 RETROFIT OF HISTORIC WAREHOUSE TO NEW MEDICAL CLINIC IN TULSA, OK BUILDING INTEGRATION TEAM JACQUELINE BAYER JEFFREY DOWGALA LIAM HENDRICKEN LAUREN MCNALLY APRIL 9, 2010
2 INTRODUCTION ASCE CHARLES PANKOW FOUNDATION ANNUAL ARCHITECTURAL ENGINEERING STUDENT COMPETITION (CIRCA 1927)
3 PROPOSED NEW DESIGN
4 INTRODUCTION GOALS ASCE CHARLES PANKOW FOUNDATION ANNUAL ARCHITECTURAL ENGINEERING STUDENT COMPETITION INNOVATION SUSTAINABILITY DESIGN FOCUS EXISTING STRUCTURE MEDICAL CLINIC NEEDS TORNADO SHELTER TRIAGE CENTER
5 PROJECT MANAGEMENT: DESIGN PROCESS Architectural Design Site Design Structural Design Mechanical Design Tornado Shelter Design Building Integration
6 PROJECT MANAGEMENT: DESIGN PROCESS Concept Design Analytical Model Proposed Design Final Design Architectural Architectural Site Site Structural Structural Mechanical Mechanical Tornado Shelter Tornado Shelter
7 PROJECT REQUIREMENTS DISCIPLINARY COORDINATION ARCHITECTURAL CIVIL STRUCTURAL MECHANICAL HISTORIC PRESERVATION PROVIDE SAFE ENVIRONMENT DERIVED FROM CODES AND GUIDELINES TORNADO SHELTER TRIAGE CENTER
8 CODES & STANDARDS MULTI-DISCIPLINARY IBC, 2006 IEBC, 2006 WIND AND EARTHQUAKE LOADS ASCE 7-05 VENTILATION AND PROCESS LOADS ASHRAE 90.1 ASHRAE 62.1 TORNADO SHELTER REQUIREMENTS FEMA 361 LIFE SAFETY NFPA 101
9 SITE LOCATION TULSA, OK BRADY ARTS DISTRICT SIZE OF SITE ~1 ACRE SITE USE OBJECTIVES PARKING SMALL PARK
10 SITE Park Medical Clinic
11 EXISTING FIRST FLOOR
12 EXISTING SECOND FLOOR
13 COMPETITION PROPOSED FIRST FLOOR
14 FINALIZED FIRST FLOOR Lobby Enhancement Tornado Shelter Fire Stair Tower
15 FINALIZED SECOND FLOOR Community Space Fitness Childcare Mechanical Room Alternative Mdii Medicine Staff Room
16 INNOVATION: MECHANICAL GEOTHERMAL SYSTEM RENEWABLE ENERGY CLOSED LOOP W/ DESUPERHEATER ENERGY RECOVERY DEVICES DESICCANT WHEELS (ERV) HEAT RECOVERY VENTILATORS (HRV)
17 INNOVATION: MECHANICAL WATER SAVING STRATEGIES RAINWATER HARVESTING GREYWATER LOW-FLOW FIXTURES BUILDING ENVELOPE TRIPLE GLAZING SOY-BASED SPRAY INSULATION
18 INNOVATION: STRUCTURAL 2-WAY CONCRETE SLAB REVERSE ENGINEERING CAPACITY ANALYSIS COMPUTER ANALYTICAL MODEL SAP2000 CALIBRATED WITH HAND CALCULATIONS
19 INNOVATION: SUSTAINABILITY LEED V SILVER CERTIFICATION (55 POINTS) EXISTING BUILDING MATERIAL CONSERVATION RAINWATER COLLECTION SYSTEM
20 INTEGRATION AND COLLABORATION BUILDING ENVELOPE LOBBY ENHANCEMENT EXTERIOR STAIR TOWER MECHANICAL EQUIPMENT LOCATION TORNADO SHELTER
21 BUILDING ENVELOPE TRIPLE-PANE WINDOWS STRUCTURAL RETROFIT TO CODE REINFORCED MASONRY SHEAR WALL STEEL STUD WALL SOY-BASED INSULATION
22 Lobby Enhancement LOBBY ENHANCEMENT
23 LOBBY ENHANCEMENT 2-STORY ATRIUM EFFECTIVE COLUMN LENGTH INCREASE INCREASED DAYLIGHTING
24 Fire Stair Tower EXTERIOR STAIR TOWER
25 EXTERIOR STAIR TOWER FIRE PROTECTION/LIFE SAFETY REQUIREMENT REDUCED PENETRATIONS EXTERIOR ENTRANCE TO SECOND FLOOR
26 MECHANICAL EQUIPMENT LOCATION Mechanical Room
27 MECHANICAL EQUIPMENT LOCATION RAINWATER COLLECTION UTILIZES MAJORITY OF ROOF INTERIOR PLACEMENT PROMOTES LONGEVITY SLABS ANALYZED TO CONFIRM ADEQUATE CAPACITY
28 Tornado Shelter TORNADO SHELTER
29 TORNADO SHELTER OPTIONS SAFETY COST STRUCTURAL IMPACT CRITERIA HVAC IMPACT AESTHETICS ACCESSIBILITY (5) (1) (4) (3) (1) (5) TOTAL ADJACENT LOT (ABOVE GROUND) ADJACENT LOT (BELOW GROUND) BASEMENT OF BUILDING 1 ST FLOOR OF BUILDING B
30 TORNADO SHELTER MECHANICAL SELF-CONTAINED REDUCE PENETRATIONS STRUCTURAL WALLS SPAN BETWEEN COLUMNS PENETRATIONS DOORS ELEVATOR LOUVERS
31 TORNADO SHELTER INTERSTITIAL SPACE 4 FEET COLUMN CAPITALS AND MECHANICAL DUCTWORK
32 CLIENT BUDGET BUDGET COST CONSTRUCTION $3,227,825 FURNISHINGS $775,000 DESIGN $330,000 PERMITTING FEES $10, LAWYER & BOND COSTS $50,000 SITE A ACQUISITION $0 TOTAL: $4,400,000
33 BUILDING INTEGRATION COORDINATION A ARCHITECTURAL, S STRUCTURAL, M MECHANICAL, ETC. TORNADO SHELTER AND MULTI-DISCIPLINARY RETROFITS BUILDING INFORMATION MODELING: REVIT 2010 SUSTAINABILITY: LEED 2009 V3
34 RETROFIT OF HISTORIC WAREHOUSE TO NEW MEDICAL CLINIC IN TULSA, OK BUILDING INTEGRATION TEAM JACQUELINE BAYER JEFFREY DOWGALA LIAM HENDRICKEN LAUREN MCNALLY