Jericho Agro Industrial Park

Size: px
Start display at page:

Download "Jericho Agro Industrial Park"

Transcription

1

2 Bill. 1 Excavation Earth Works and Embankment Work 1 Description Unit QTY Price/ Unit Total USD The Contractor shall when pricing the rates of this bill, take into consideration including and allow for the cost or expenses of all requirements stipulated in the preambles, drawings, and technical specifications. The words engineer below means owner's engineer. The rate include the following: 1.1 The price should include hiring a survey engineer to be present on site during the project time Cut in any kind of soil, concrete, asphalt or stone walls to reduce level for site leveling and to reach the desired level according to drawings and site instructions.the price should include the removal of excavated materials from the site to an approved dump location and adjustment store. m Supply and install a 40 cm layer of Wadi aggregates (2 layers 20cm thick each), of second class quality suitable for 20cm layer for the landscaping area. (Material details in accordance to section 3.01 of the attached special specifications). This shall include preparing subgrade, mixing spreading compacting 100% and finishing inclusive all tests required. This item shall be executed all according to specifications, drawings and direction of the site Engineer. m Ditto but for basecourse first class thick 20cm m Supply and install granular second class layer of base coarse of 40 cm thick after compaction (2 layers 20cm thick each) for roads; (Material details in accordance to section 3.01 of the attached special specifications). This shall include preparing sub-grade, mixing, spreading and laying cement 10kg / m2 above natural m ground during compaction, compacting 100% and finishing. Including all test required. All according to specifications, drawings and direction of the site engineer 1.5 Ditto but for basecourse first class thick 20cm m Supply and install soil for embankment between different levels to prevent erosion. The price should حصى include laying a layer of natural ground from site or if needed, a second layer of 40cm selected approved واد fill with compaction each 20cm and a third layer of 30cm agricultural soil as a finish layer. m Total of Bill. 1 Earth Works-1 Page 1

3 Bill. 2 Steel Works Description Unit QTY Price / Unit Total USD 2 Steel Works A. The submittal of shop drawings for the satisfaction of the Engineer prior to fabricating the units. B. The fabrication and installation of full scale model for part of metal works for inspection and approval of the Engineer before commencement of work. 2.1 Supply and install steel ready made fence angles180cm high fixed 30cm in plain concrete foundation size (40X40X40 cm ) every 3m length along the boundary wall of the site, price shall include the cost of excavation, and disposal of the deprease, subgrade layer of 80X80X40 cm fine aggregate (19mm one size) under the foundation, the plain concrete foundation and welding 3 steel bars Ø 10 35cm length in different direction embedded in the concrete foundation. All as shown on drawings and instructed by the site engineer Supply and install ready made 2.2mm thick galvanized diagonal streched steel mesh 150cm high for the site boundary fence, the price should include supplying and installing of 3mm thick galvanized steel wires to be stretched on the steel angles each 20 cm high and two stretched diagonally between each and every support. All as shown on drawings and instructed by the site engineer m Total of Bill.2 Steel Page 1

4 Bill. 3 Soil test Description Unit QTY Price / Unit Total USD 3 soil test 1. Bore Holes Before the Start of work and in the phase of preparing the shop drawings, the contractor shall carry out and on his own expense 10 bore holes 20m depth according to the following terms: 1.1. Locations of boreholes to be determined in cooperation with the consultant to avoid duplication with previous performed test Drilling of boreholes: Boreholes shall be drilled in a way that the surface and subsurface characteristics can be assessed. Properties of the subsurface soil or rocks can be determined through the drilling of boreholes Sampling from Boreholes: Samples shall be taken at different depths all over the drilling depth. Disturbed and undisturbed samples shall be taken. For further investigation, the following undisturbed samples could be obtained depending on encountered soil or rock The core samples will be taken from the rock layers, using double tube core barrel (3 inches), these samples will be taken according to (ASTM D ) Diamond core drilling for site investigation Standard Penetration Test (SPT) will be performed to obtain split spoon samples, in order to assess the consistency and relative density of the soil. This test will be carried out at interval of 1.5 to 2.0 m, or when a different layer in encountered during the drilling. This test will be performed according to (ASTM D ), Standard Test Method Penetration Test and Split- Barrel Sampling of Soils Shelby tube samples will be taken from the cohesive soil, if encountered. This method of sampling will be carried out according to (ASTM D 1587), Standard Practice for Thin-walled Tube Geotechnical Sampling of Soils. A. soil drill for bedrock, soil and gravel deposits at 20 m depthincluding standard penetration test at every 1.5 m intervals in each borehole Meter Depth (MD) 200 Total of Bill. 3 BoreHoles Page 1

5 4 Bill. 4 Storm Water Channel Description Unit QTY Price / Unit Total USD The Contractor shall when pricing the rates of this bill, take into consideration including and allow for the cost or expenses of all requirements stipulated in the preambles, drawings, and technical specifications. The words engineer below means owner's engineer. The rate include the following: The price should include hiring a survey engineer to be present on site during the project time Cut in any kind of soil, concrete, asphalt or stone walls to reduce level below site leveling for storm water channel and to reach the desired level according to drawings and site instructions.the price should include the removal of excavated materials from the site to an approved dump location and adjustment store. Supply and lay aggregate (16mm one size) first class depth 50 cm below water channel. The price should include preparing the natural ground and compacting it before laying the aggregate. All according to specifications, drawings and direction of the site engineer m m Supply & install blinding Concrete B200 of 28 days cube crushing strength 200kg/cm2. Price shall include cleaning, 4.3 vibration, shuttering and making good of ground surface before casting the concrete. Price shall include all nails, forms and equipments needed. 4.4 REINFORCED IN-SITU / READY MIXED CONCRETE B300/ 300 Kg / CM2] Supply & install concrete B300 of 28 days cube crushing strength 300kg/cm2. Price shall include the following: 1. Cleaning and making good of surfaces before casting of concrete 2. Steel reinforcement workmanship as per drawings. 3. Form-work of any type or shape. 4. Any materials such as nails, wires, 6mm steel for shuttering or any other material or workmanship needed for a best completion of the works. 5. Installation of water stop 20 cm high, 1cm thick. For expansion joints each 12m length. 6. All steel reinforcement of any diameter and shape of high yield stress steel. Concrete water channel of any shape, depth and size (every 12m length) including water channel foundations, walls and grill of 65cm wide,thus length can vary to ensure the full coverage of the designed area. Please refer to drawing addendum # 1 for details. m3 195 m3 700 Total of Bill. 4 Storm water channel Page 1

6 5 Bill. 5 Provisional items Description Unit QTY Price / Unit Total USD The Contractor shall when pricing the rates of this bill, take into consideration including and allow for the cost or expenses of all requirements stipulated in the preambles, drawings, and technical specifications. The words engineer below means owner's engineer. The rate include the following: The price should include hiring a survey engineer to be present on site during the project time The Contractor shall, when pricing the rates of this bill, take into consideration including and allow for the costs or expenses of all requirements stipulated in the preambles, drawings. Rehabilitation of the existing building on site to be used as offices for the PIEFZA, supervision engineers and all visitors during the entire period of the project. The contractor should estimate the cost of rehabilitation of the building including door, windows, painting, electricity, sanitary, tiles, aluminuim and steel works, insulation, airconditioning... to be functioned as any normal office building The following notes should be considered when pricing for the conduit pipes around the PV site: 1- The price shall include all required digging or excavation backfilling,coring and cement covering as specified. 2- The price shall include all connections to exsisting drainage pipes and manholes if needed.includded cutting in tile & asphalt,retiling,repair the asphalts 3- The contractor must consider keeping the system running where needed during the whole construction period. Supply and install UPVC 10" pipes Royal SN.8 Taken to the rain water around the road of the pv site including digging for pipes,gutting,opening in street,supply with all necessary fittings such as elbow,tee,y,.etc,for sewage disposal and vent pipe, the price allso include for digging,supports,hanggers,and laying at least 8cm concreate arround the pipes,approve manufacture for pipes and fittings: ( red blassim) Supply and install steel ready made fence angles 240cm high fixed 30cm in plain concrete foundation size (40X40X40 cm ) every 3m length along the boundary wall of the PV site, price shall include the cost of excavation, and disposal of the deprease, subgrade layer of 80X80X40 cm fine aggregate (19mm one size) under the foundation, the plain concrete foundation and welding 3 steel bars Ø 10 35cm length in different direction embedded in the concrete foundation. All as shown on drawings and instructed by the site engineer Job 1 L.m Supply and install ready made 2.2mm thick galvanized diagonal streched steel mesh 200cm high for the PV site boundary, the price should include supplying and installing of 3mm thick galvanized steel wires to be stretched on the steel angles each 20 cm high and two stretched diagonally between each and every support. All as shown on drawings and instructed by the site engineer m Total of Bill. 5 Provisional items Page 1

7 Jericho Agro Industrail Park Bill. 1 Excavation & Earth Works 2 Steel Works 3 Soil Test 4 Storm Water Channel 5 Provisional item Total Price Summary Description Total $ Total - Excluding Value Added Tax (VAT) The Sum of (in words ): Contractor: Address: Signature: Date: Tel: Mob: Fax: Summary- Civil Page 1

8