License/ Certification No Oct 8, 1988

Size: px
Start display at page:

Download "License/ Certification No Oct 8, 1988"

Transcription

1 James Maningas Manalaysay PERSONAL DATA Age: 40 Date of Birth: Apr 23, 1968 Gender: Male Civil Status: Married Height: 160 cm Weight: 130 kg Nationality: Filipino Religion: Christianity - Catholic EDUCATION Highest Education Second Highest Education Education Level: Prof'l License(Passed Board/Bar/Prof'l Post Graduate Diploma / Master's Degree License Exam) Education Field: Engineering(Mechanical) Business Studies/Administration/Management Course: Mechanical Engineering Master in Business Administration School/University: Technological Institute Of The Philippine Christian University : Manila, Manila Date: Oct Oct 1988 May May 1993 LICENSES/CERTIFICATIONS License/Certification Exam Taken 1. Mechanical Engineer Licensure Examination License/ Certification No. Date Oct 8, 1988 WORK EXPERIENCED I have been working for 18.0 year(s). 1. Piping Engineer Jun 23, PRESENT(0.8 yrs) Malaysia Marine and Heavy Engineering SDN BHD Oil / Gas / Petroleum Pasir Gudang, Johor Barhu, Malaysia Project Management Team(Engineering and Construction) 2. Same as Piping Engineer Job Description Commissioning Piping Inspector Oct 28, Jun 18, 2008(0.6 yrs) Chiyoda Technip Joint Venture Oil / Gas / Petroleum Ras Laffan Industrial City, Doha,QAtar Commissioning/Construction ľ Study and understand the project scoop and specifications as well as the ITP and method of statements with respect to piping inspection. ľ Receive the RFI from the discipline staff and carry out the inspection of the pipes as per ITP, identify any discrepancies and generates the non

2 3. conformance report. ľ Support pre fabrication activities for the pipes in the areas of, drawings, specifications as well as the right use of valves. ľ Carry out the mechanical inspection after the lines has been fully installed and generate the punch list with the A,B and C category items clearly and initiate the hydro testing procedure. ľ Oversee the hydro testing process including the selection of joints as per ITP, identifying the test limits ensuring the usage of proper gauges. ľ Carry out inspection of work in progress including checking if the right procedure is followed for the piping as well as the check for the qualification of the piping personnel and the kind of materials being used for the process. ľ Coordinate with the discipline engineers to ensure corrective action on the above thereby ensuring the closure of the NC raised. ľ Report any major quality issues to the quality manager of the project management team. ľ Coordinate with the project safety, Environment and certification engineer and ensure that all statutory requirements are met. ľ Review of all certification and documentation to ensure validity and compliance with specifications, drawings, manufacturing and inspection test plans. ľ Generate daily weekly and monthly reports on the quality status of all activities with their schedule for completion. ľ Validate all piping fit-ups, square-ness, and level-ness to make appropriate revision as require. ľ Check all materials for fabrication and erection based on issue for construction drawing. ľ Line check based on approved test package and coordinated with other group to ensure that all line are 100% completed. ľ Check piping lay out, cutting marks as per material plant required. ľ Check/ validate for the correctness pipeline specification, valves, fitting and pipe support based on issued for construction drawing. ľ Attend hydro testing/ pneumatic testing to determine compliance to standard or to locate leaks and other defects Piping Engineer May 5, Jul 5, 2007(3.2 yrs) Mohamad Al Mojil, MMG Oil / Gas / Petroleum Dammam, Kingdom Of Saudi Arabia Engineering/Construction ľ Studies design, IFC drawing, plans, schedule and specification of construction project works. ľ Conducts inspection of fabricated spools, fittings and other Mechanical/Instrumentation and equipment before assembly to ensure proper installation procedure. ľ Prepares Weld Mapping and Spooling based on Approved Issued for Construction Isometric Drawing. ľ Prepares Hydro Test Package based on Approved Issued for Construction Isometric, Piping and Instrumentation Drawings. ľ Conducts visual and dimensional checking on fabricated piping spool and components to ensure compliance with isometric drawings. ľ Computes and prepares quantity takeoff, Piping, Civil and Structural based on IFC drawings ľ Participate in the review and checking of costs estimates of various works orders for construction of MEG Petrochemical plant projects. ľ Participate in the review and checking of Piping Test Packages to ensure proper procedure. ľ Review progress of construction works being done for proper authorization of payment. ľ Submits periodic inspection of report for on-going project accomplishment undertaken by contract. ľ Computes and prepares material quantities, makes layout sheet and complies cost data on construction works done by contractor.

3 4. ľ Coordinates with field officers in the preparation of IFC construction drawings to serve as basis for among others, estimating similar construction projects. Piping Operations And Maintenance Engineer Jun 20, - Mar 1, 2003(7.7 yrs) Opertins And Maintenance ľ Managing repair of all pipe works at Malaya Gas turbine and thermal power plants. ľ Accountable for maintenance with the area of responsibility. ľ Supervise the fabrication and erection of piping in Malaya gas turbine power station. ľ Coordinates with contractors and vendors and maintain cost effective and high quality works. ľ Remain updated on technical development within the area of responsibility. ľ Calculates, Prepares reports/ documentations on Energy and Maintenance billing of Kelphico Thermal Power Plant ľ Prepare commissioning plans, scheduling the work and managing activities. ľ Perform work in line with the project procedures specifications performance standards and legislation requirements. ľ Define and update the Turnover and test system packages. ľ Monitor Mechanical Completion activities and to review completed Mechanical Completion Packages ľ Implement and test commissionable systems according to Commissioning Acceptance Test requirements. ľ Timely complete commissioning and Turn over to the Start-up and Operations Groups. ľ Coordinating the execution of turn over activities, ensuring the necessary assistance to the Construction Director for any work to be carried out. ľ Coordinating with Operating personnel for systems, punch outs, and turnovers. ľ Reports discrepancies/anomalies on fuel and related activities including conditions of storage tanks, pumping facilities and pipeline systems. ľ Oversees fuel pipeline transfers/withdrawals of FFIC Pipeline and Manila i.e.,sucat Rockwell 10" line by preparing fuel receiving reports based on Manila Thermal Plant lank and out-turn report based on source tank of Sucat Thermal Plant. ľ Prepares reports /documentations on Fuel diesel Transfer for processing of payments and to determine loss/gain of Fuel/Diesel: i.e., compares fuel delivery receipts against actual fuel received based on tank figure Reports conditions of and recommends measures for improvement and Determines forecast requirements of NPC Plants in coordination with system operation group and submits reports to Fuel Distribution and Operations Division ľ Evaluates / Assesses fuel inventory level of all NPC Plants; i.e. measures /reports day to day fuel delivery, transfers, and/or withdrawals from NPC receiving facilities to different NPC Plants. ľ Updates/ Determines forecast requirements of NPC Plants: e.g. Urgency, Economics and Flexibility of Inventory levels. ľ Asserts the accuracy /correctness and completeness of documentation records of all fuel transactions in accordance with fuel management procedure. ľ Determines actual fuel inventory of NPC Plants in the region and prepares reports for fuel accounting purposes.

4 5. 6. Piping Supervisor Jun 28, Jun 20, (4 yrs) Malaya Construction ľ Supervision of all piping works at Sulfur Recovery Unit Construction site based on piping general arrangement drawing and other relevant drawing. ľ Supervision and monitoring of daily works activities of subcontractor personnel piping group ľ Conduct toolbox meeting before starting of works discussing the hazard and precaution to be taken to mitigate and minimizes the hazard this include emergency response plan and other safety responsibility. ľ Interprets construction drawing drawings and validate all materials for correct specification for proper execution of piping procedure. ľ Supervise piping activities to ensure that works is installed in accordance with IFC ISO drawings, specifications, and applicable codes. ľ Monitor all pipes spool status from fabrication shop to lay down yard up to construction site prior for erection. ľ Assist contractor in planning and scheduling work to obtain maximum efficiency of the project. ľ Coordinates with subcontractor supervisor to resolve construction problem and to prevent project delay. ľ Coordinates with sub-contractor field supervisors regarding on all priorities materials needed for erection and installation. ľ Verify and correct installation of piping works at site such as pipe support, hanger, valves and other piping components. ľ Perform site visit to verify construction progress and assist/ resolve technical issues. ľ Directly involve in punch list clearing of all areas and coordinates with QC on test package cleared for hydro testing. ľ Prepare weekly works schedule and daily progress report. ľ Coordinates with client and consultant and attend for work down inspection for the acceptance of the completed piping installation. Junior Engineer Aug 16, Jan 28, 1991(1.5 yrs) Muntinlupa City, Construction ľ Conducts quality assurance inspection of newly delivered supplies to NPC for use in rehabilitation works thru comparison against packing lists. ľ Conducts inspection of valves and other equipment before assembly to ensure proper procedure. ľ Participate in the review and checking of costs estimates of various works orders for construction/ installation of power projects. ľ Assists in cost and monitoring of project/s by computing the number of days of project completion ľ Conduct pipe line checking and prepare weekly report on piping.

5 ľ Prepare Piping Material Take Off reports ľ Undertakes special assignments in field construction/installation works. ľ Assists principal engineers in field inspection of turbine generator, boiler, and auxiliary s rehabilitation works thru research of technical data regarding the auxiliaries. SKILLS Skill Yrs of Experience Remarks 1. Piping Engineer Piping Inspector Piping Supervisor 15 ľ Highly motivated and goal oriented engineer, having appropriate planning skill, personal qualities and high level of job knowledge with 15 years of unyielding experience in Power Plants, Oil and Gas Refinery construction. ľ Enough knowledge in performing project requirements in piping codes, various piping standards and components. ľ Full awareness in drawing specifications and engineering procedures of the project. ľ Highly skilled in Isometric Weld Mapping and Spooling including materials take-off preparation. ľ Wellversed in Microsoft Office and AutoCAD 2D and 3D. ľ Basic knowledge in operation of Smart Plant Review and NAVISWORKS software ľ Able to perform in reviewing and approval of sub-contractors technical query and method of statements. ľ Has knowledge and understanding of P&ID and ISO drawings. ľ Thorough knowledge in Test Package preparation and post punch, as well as hydro-testing and pneumatic testing work. ľ Knowledge in supervision of Spool Fabrication at Fabrication Shop. ľ Highly flexible with respect to long and variable hours of work. ľ Very much interested and willing to learn new skills, improve existing abilities in construction & latest engineering technology TRAININGS/SEMINARS Date Topic/Course Title Jul 17, Aug 28, 2007 AutoCAD 2D and 3D Version IMFORMATICS Computer Institute of Singapore Apr 6, Apr 24, 1998 Welding Technology Technical Education and Skill Development Authority Manila Oct 22, Oct 25, 1997 Technical Writing Angat Hydroelectric Power Plant Aug 16, - Aug 21, Jul 4, - Jul 13, Apr 21, - Apr 22, Mar 13, - Mar 16, Jul 25, Jul 29, 1994 Aug 16, Aug 21, 1993 Disaster Control Brigade Training Course Basic Supervisory Course Mechanical Engineer For ISO 9000 Occupationa Health and Safety Center Power Plant Personnel Training on Safety Microsoft Office Metro Manila Regional Center, Fire Fighting and First Aid Course