INSTRUMENTS FOR YOUR PLAYGROUND CLIMBING WALL: 6' HEIGHT N.T.S. RI SE DETAIL

Size: px
Start display at page:

Download "INSTRUMENTS FOR YOUR PLAYGROUND CLIMBING WALL: 6' HEIGHT N.T.S. RI SE DETAIL"

Transcription

1 ISTRUMETS FOR YOUR PLAYGROUD CLIMBIG WALL: 6' HEIGHT PRODUCT UMBER PAGE 8.5x11 DRAW CHECKED PHOE UMBER: I-PG OF 8 COPYRIGHT 2016 ATURE'S ISTRUMETS. DO OT SCALE DRAWIGS. OT FOR COMMERCIAL USE OR REPRIT WITHOUT EXPRESSED WRITTE PERMISSIO FROM ATURE'S ISTRUMETS.

2 SIT-DOW COLLAR CLIMBIG WALL CAPPIG BOARD F H CLIMBIG WALL WITH HAD HOLDS G D RAILIG E L4 L5 RAILIG POST WIG WALL B C L3 A L2 L1 864mm [2'-10"] STEEL SUPPORT FRAME LOCATIOS SHOW FOR REFERECE OLY (STEEL IS OT VISIBLE FROM FROT OF WALL) 203mm [8"] CRUSHED GRAVEL - 98% S.P.D.D. 305mm [1'] C D E - SECTIO A-A - COMPACTED GRAULAR BASE BEEATH WALL ISTRUMETS FOR YOUR PLAYGROUD CLIMBIG WALL: 6' HEIGHT PRODUCT UMBER PAGE 8.5x11 DRAW CHECKED PHOE UMBER: I-PG OF 8 COPYRIGHT 2016 ATURE'S ISTRUMETS. DO OT SCALE DRAWIGS. OT FOR COMMERCIAL USE OR REPRIT WITHOUT EXPRESSED WRITTE PERMISSIO FROM ATURE'S ISTRUMETS.

3 I K SIT-DOW COLLAR CLIMBIG WALL CAPPIG BOARD J CLIMBIG WALL WITH HAD HOLDS 750mm [2' "] R5 R4 L M RAILIG RAILIG POST O R3 WIG WALL 1829mm [6'] R2 P R1 490mm [1' "] 1004mm [3' "] PROTECTIVE SAFETY SURFACIG RECOMMEDED DRAIAGE OR BASE COURSE UDISTURBED EARTH - SECTIO B-B - PROTECTIVE SAFETY SURFACIG I FROT OF ASSEMBLED CLIMBIG WALL ISTRUMETS FOR YOUR PLAYGROUD CLIMBIG WALL: 6' HEIGHT PRODUCT UMBER PAGE 8.5x11 DRAW CHECKED PHOE UMBER: I-PG OF 8 COPYRIGHT 2016 ATURE'S ISTRUMETS. DO OT SCALE DRAWIGS. OT FOR COMMERCIAL USE OR REPRIT WITHOUT EXPRESSED WRITTE PERMISSIO FROM ATURE'S ISTRUMETS.

4 WALL ASSEMBLY 1. FIRST, POSITIO THE CLIMBIG WALL O THE PREPARED GRAULAR BASE COURSE. 2. MATCH AD SECURE THE STEEL FRAMES TO THE STEEL O THE BACK OF THE CLIMBIG WALL USIG THE SUPPLIED LAG BOLTS. THE STEEL WILL HOLD THE WALL AT THE APPROPRIATE AGLE (15 ) DURIG ASSEMBLY. 2.a. FASTE SUPPLIED STEEL SPACERS BETWEE THE STEEL SUPPORTS O THE GROUD AD THE AGLED STEEL. 3. SET THE WIG-WALLS TO THE LEFT AD RIGHT SIDES OF THE CLIMBIG WALL. 4. MATCH AD SECURE THE STEEL FRAMES TO THE STEEL THAT IS PRE-ISTALLED TO THE BACK OF THE WIG WALLS. THE STEEL WILL HOLD THE WALL AT THE APPROPRIATE AGLE (15 ) DURIG ASSEMBLY. 5. ALIG THE BACK OF THE WIG-WALLS TO THE BACK EDGE OF THE STEEL OF THE CLIMBIG WALL. ESURE THEY ARE ALIGED ALL THE WAY UP AD FIT SUGLY TOGETHER. 6. THE CEDAR FACADE O THE CLIMBIG WALL PORTIO SHOULD SIT APPROXIMATELY EVE WITH THE FROT FACE OF THE WIG-WALLS. 7. WITH ALL 3 WALLS I PLACE AD SUPPORTED BY STEEL FRAMIG, SECURE THE CLIMBIG WALL TO THE WIG-WALLS BY FASTEIG S.D.W.S. FASTEERS THROUGH THE PREDRILLED HOLES OF THE ISTALLATIO FRAME ITO THE WIG-WALLS. WIG-WALL 'E' STEEL (TO SIT AT A AGLE) HAS HOLES AT EQUAL DISTACE FROM THE EDS F F CLIMBIG WALL STEEL PRE-ISTALLED O THE BACK OF THE WALLS FASTEER 'E' STEEL (AGLED) STEEL SPACER 'D' STEEL (HORIZ.) FASTEER VIEW A VIEW B - SECTIO C-C - - SECTIO E-E - - SECTIO F-F - STEEL ASSEMBLY STEEL SUPPORT PRE-ISTALLED O THE BACK OF THE WALLS mm [6" - 8"] CARRIAGE BOLT WITH UT & WASHER STEEL SUPPORT PRE-ISTALLED O THE BACK OF THE WALLS 'E' STEEL SUPPORT (AGLED) 203mm [8"] LEGTH CARRIAGE BOLT WITH UT & WASHER STEEL SPACER 'D' STEEL SUPPORT (HORIZOTAL) 'E' STEEL SUPPORT (AGLED) - VIEW A - - VIEW B - COMPACTED GRAULAR BASE COURSE ISTRUMETS FOR YOUR PLAYGROUD CLIMBIG WALL: 6' HEIGHT PRODUCT UMBER PAGE 8.5x11 DRAW CHECKED PHOE UMBER: I-PG OF 8 COPYRIGHT 2016 ATURE'S ISTRUMETS. DO OT SCALE DRAWIGS. OT FOR COMMERCIAL USE OR REPRIT WITHOUT EXPRESSED WRITTE PERMISSIO FROM ATURE'S ISTRUMETS.

5 LOG BORDER 1. LOG BORDERS ARE PRE-ASSEMBLED I SETS. 2. ISTALL A LOG BORDER SET AT EACH ED OF THE WIG WALLS TO RETAI THE HILL BEHID, TYP. 3. DIG A 810mm [32"] WIDE TRECH TO 1014mm [40"] BELOW THE FIISHED GRADE OF THE PROTECTIVE SAFETY SURFACIG. 4. GRAULAR BASE COURSE TO BE 100mm [4"] MI. DEPTH OF CRUSHED GRAVEL (OR 3 4" CLEAR GRAVEL) COMPACTED TO 98% S.P.P.D. 5. PLACE THE LOG SET ITO THE TRECH. ABUT THE ED LOG AGAIST THE ED OF THE WIG WALL. 6. ESURE EACH SET IS AGLED AT 15 TO MATCH THE BATTER OF THE WIG WALLS. 7. ATTACH THE ED LOG TO THE ADJACET WIG WALL. 7.a. USE SUPPLIED FASTEERS O A AGLE TO ESURE SECURE ATTACHMET. 7.b. ALL FASTEERS MUST BE ISTALLED BELOW FIISHED GRADE. 8. BRACE LOG SETS I POSITIO AD BACKFILL TRECH WITH HIGH PERFORMACE BEDDIG (H.P.B.). 9. RESTORE ADJACET SURFACIG TO PRE-COSTRUCTIO CODITIO ULESS OTHERWISE SPECIFIED. RAILIG RAILIG POST WIG WALL FIISHED GRADE OF HILL (BEHID WALL) FIISHED GRADE OF PROTECTIVE SAFETY SURFACIG 432mm [17"] (I FROT OF WALL) 305mm mm [ "] [12"] 152mm [6"] LOG BORDER SET 100mm [4"] 914mm [36"] HIGH PERFORMACE BEDDIG (H.P.B.) COMPACTED GRAULAR BASE COURSE 100mm [4"] 1220mm [48"] UDISTURBED SOIL 505mm [20"] 811mm [32"] - ED OF WIG WALLS: FROT SECTIO - - ED OF WIG WALLS: SIDE SECTIO - ISTRUMETS FOR YOUR PLAYGROUD CLIMBIG WALL: 6' HEIGHT PRODUCT UMBER PAGE 8.5x11 DRAW CHECKED PHOE UMBER: I-PG OF 8 COPYRIGHT 2016 ATURE'S ISTRUMETS. DO OT SCALE DRAWIGS. OT FOR COMMERCIAL USE OR REPRIT WITHOUT EXPRESSED WRITTE PERMISSIO FROM ATURE'S ISTRUMETS.

6 COLLAR AD COLLAR POSTS 1. ISTALL THE COLLAR AD COLLAR POSTS BEFORE ISTALLIG THE RAILIGS. 2. PLACE SUPPLIED COLLAR POSTS I OTCHES I THE OAK WIG WALLS WITH THE SIT-DOW COLLAR DIRECTED TOWARD THE FROT OF THE CLIMBIG WALL. 3. FASTE COLLAR POSTS: 3.a. 3.b. WITH 305mm [12"] S.D.W.S. FASTEERS THROUGH PRE-DRILLED HOLES I THE STEEL FRAME, THROUGH THE COLLAR POSTS AD ITO THE WIG-WALLS. WITH 152mm [6"] S.D.W.S. FASTEERS FROM THE BACK OF THE POSTS ITO THE WIG-WALLS. RAILIG POST S.D.W.S. FASTEERS WEDGE TO MAKE POST VERTICAL GEOGRID RAILIG POSTS 2. BECAUSE THIS PRODUCT IS MADE FROM ATURAL MATERIALS, EACH POST IS UIQUE TO ITS LOCATIO. RAILIG POSTS AD THEIR ISTALLED LOCATIOS ARE MARKED L1 TO L5 AD R1 TO R5 (REFER TO SECTIO-ELEVATIO #-# AD SECTIO-ELEVATIO #-#). MATCH THEM APPROPRIATELY AD SECURE WITH SDWS SCREWS. 3. THE RAILS ARE SHIPPED WITH PICKETS ATTACHED. EACH UPPER RAIL ED IS LETTERED A TO P. THE RAILS HAVE OTCHES I THE POSTS. MATCH THE LETTERS AD SECURE IT I PLACE. WIG WALL - SECTIO: RAILIG POST ATTACHMET mm [3' "] 683mm [2' "] RAILIG POST COLLAR POST TOP LOGS OF WIG WALLS ARE PRE-OTCHED TO RECEIVE POSTS 12" S.D.W.S. FASTEERS I PRE-DRILLED HOLES STEEL FRAME SECURIG CLIMBIG WALL TO WIG WALLS GEOGRID 76mm [3"] 230mm [ "] 174mm [6 7 8 "] 216mm [8 1 2 "] GEOGRID 687mm [2' "] S.D.W.S. FASTEEERS I PRE-DRILLED HOLES - BACK VIEW OF WALL - ISTRUMETS FOR YOUR PLAYGROUD CLIMBIG WALL: 6' HEIGHT PRODUCT UMBER PAGE 8.5x11 DRAW CHECKED PHOE UMBER: I-PG OF 8 COPYRIGHT 2016 ATURE'S ISTRUMETS. DO OT SCALE DRAWIGS. OT FOR COMMERCIAL USE OR REPRIT WITHOUT EXPRESSED WRITTE PERMISSIO FROM ATURE'S ISTRUMETS.

7 GEO-GRID REIFORCEMET: 1. GEO-GRID REIFORCEMET WILL BE ISTALLED TO IMPROVE THE STRUCTURAL ITEGRITY OF THE SOILS BY REIFORCIG AD COFIIG FILL MATERIALS AD DISTRIBUTIG LOAD. 2. GEOGRID IS PRE-ATTACHED TO THE BACK OF THE WALL (SHIPPED ROLLED UP AD SECURED WITH ZIP-TIES). 3. DRAIAGE SAC TO BE 3 4" CLEAR GRAVEL WRAPPED I O-WOVE GEOTEXTILE FABRIC. 4. PLACE FILL AD DRAIAGE SAC UP TO THE LOWEST GEO-GRID AD COMPACT THE FILL TO 98% S.P.D.D. 5. CLIP THE ZIP-TIES O THE LOWEST GE0-GRID ROLL. PULL OUT THE FULL LEGTH (1828mm [6']) OF GEO-GRID OVER THE PREPARED DRAIAGE SAC AD COMPACTED FILL. 6. PLACE THE EXT DRAIAGE SAC AD LAYER OF FILL O THE GEO-GRID UP TO THE EXT GEO-GRID ROLL AD COMPACT TO 98 % S.P.D.D. 7. COTIUE I THIS MAER UTIL ALL OF THE GEO-GRID HAS BEE EXTEDED AD THE HILL HAS BEE BACKFILLED UP TO 165mm [6 1 2"] FROM THE TOP OF WALL. 8. GRADE THE HILL BEHID THE WALLS TO FOLLOW THE SLOPE OF THE TOP OF THE WIG-WALLS. BACKFILLIG AD DRAIAGE 9. BE SURE TO ISTALL ALL FASTEERS BEFORE BACKFILLIG. 10. ISTALL 100mm [4"] WEEPIG TILE O THE COMPACTED GRAVEL BEHID WALL. 11. WEEPIG TILE TO DRAI TO DAYLIGHT OR COECT TO STORM WATER MAAGEMET PLA FOLLOWIG LOCAL STADARDS. 12. WEEPIG TILE TO HAVE A 2% SLOPE. 13. SEPARATE DRAIAGE SACS MUST BE ISTALLED DIRECTLY BEHID THE WALLS BETWEE THE GEO-GRID LAYERS. 14. BACKFILL WITH EGIEERED FILL THAT CA ACHIEVE 98% S.P.D.D. COMPACTIO. SIT-DOW COLLAR ASSEMBLY: REFER TO "BACK VEIW OF WALL" REFER TO LAYOUT PLA FOR ADJACET MATERIALS BOTTOM OF DRAIAGE SAC AD DRAIAGE LAYER BEEATH SAFETY SURFACE TO BE I-LIE WITH EACH OTHER PROTECTIVE SAFETY SURFACE RECOMMEDED DRAIAGE OR BASE COURSE FOR SAFETY SURFACE 1829mm [6'] PRE-ISTALLED TIMBER BATTIG FULLY EXTEDED GEO-GRID 1800mm [71"] DRAIAGE SAC 1272mm [4' "] 967mm [3' "] 305mm [1'] 305mm [1'] 4" Ø WEEPIG TILE COMPACTED GRAULAR BASE COURSE 203mm [8"] 2758mm [9' "] UDISTURBED EARTH / TERRA FIRMA - SECTIO D-D - GEO-GRID, SAFETY SURFACE, DRAIAGE, AD COMPACTED GRAULAR BASE ISTRUMETS FOR YOUR PLAYGROUD CLIMBIG WALL: 6' HEIGHT PRODUCT UMBER PAGE 8.5x11 DRAW CHECKED PHOE UMBER: I-PG OF 8 COPYRIGHT 2016 ATURE'S ISTRUMETS. DO OT SCALE DRAWIGS. OT FOR COMMERCIAL USE OR REPRIT WITHOUT EXPRESSED WRITTE PERMISSIO FROM ATURE'S ISTRUMETS.

8 PLATFORM 1. THE DECK PLATFORM IS TO SIT O TOP OF THE DRAIAGE SAC ALREADY ISTALLED BEHID THE WALL. 2. ISTALL 150mm [6"] OF CRUSHED COMPACTED GRAVEL EXTEDIG FROM THE WALL DRAIAGE SAC TO 150mm [6"] BEYOD THE ED OF THE PLATFORM. 3. PLATFORM IS TO SIT 13mm [ 1 2"] LOWER THA THE CLIMBIG WALL CAP (THIS CREATES A HAD HOLD TO PULL UP OTO THE PLATFORM) 4. REMOVE THE TWO DECK BOARDS THAT ARE TACKED DOW. 13mm 5. ISTALL 4 SUPPLIED S.D.W.S. FASTEERS THROUGH THE PRE-DRILLED HOLES I THE JOISTS ITO THE CLIMBIG WALL. 6. RE-FASTE REMAIIG 2 DECK BOARDS WITH SUPPLIED DECK SCREWS. 7. ADJACET SURFACE EXT TO THE PLATFORM MUST BE FIRM AD FLUSH WITH THE ELEVATIO OF THE PLATFORM. CLIMBIG WALL CAP REMOVE 2 DECKBOARDS TO ALLOW ACCESS TO SECURE PLATFORM TO CLIMBIG WALL. REPLACE DECKBOARDS. [ 1 2 "] FASTE JOIST TO CLIMBIG WALL ASSEMBLED PLATFORM 152mm [6"] COMPACTED BASE COURSE TO SUPPORT PLATFORM DRAIAGE SAC TO COME UP TO BOTTOM OF PLATFORM COMPACTED BACKFILL STEEL SUPPORT FRAME - SECTIO E-E - ISTRUMETS FOR YOUR PLAYGROUD CLIMBIG WALL: 6' HEIGHT PRODUCT UMBER PAGE 8.5x11 DRAW CHECKED PHOE UMBER: I-PG OF 8 COPYRIGHT 2016 ATURE'S ISTRUMETS. DO OT SCALE DRAWIGS. OT FOR COMMERCIAL USE OR REPRIT WITHOUT EXPRESSED WRITTE PERMISSIO FROM ATURE'S ISTRUMETS.

9 EXAMPLE COTOURS SHOWIG MIIMUM SIZE OF HILL BEHID CLIMBIG WALL 9145 [30'] EXCAVATIO REQUIRED FOR BASE COURSE, STEEL SUPPORTS AD GEOGRID 1.60 m 1.80 m PROTECTIVE SAFETY ZOE 1800 [71"] 9145 [30'] FIISHED WIDTH OF WALL AD PROTECTIVE SAFETY ZOE EXAMPLE GRADIG [46'-11"] 1.40 m 1.20 m 1.00 m 0.80 m 0.60 m 0.40 m 0.20 m 2871 [9'-5"] EXCAVATIO REQUIRED FOR BASE COURSE, STEEL SUPPORTS, AD GEOGRID EXAMPLE GRADIG [33'-2"] ISTRUMETS FOR YOUR PLAYGROUD CLIMBIG WALL: 6' HEIGHT - LAYOUT PRODUCT UMBER PAGE 8.5x11 DRAW CHECKED PHOE UMBER: I-PG OF 1 COPYRIGHT 2016 ATURE'S ISTRUMETS. DO OT SCALE DRAWIGS. OT FOR COMMERCIAL USE OR REPRIT WITHOUT EXPRESSED WRITTE PERMISSIO FROM ATURE'S ISTRUMETS.