1 Series 500 Greenhouse Kit w/blackout System, Ventilation & Evaporative Cooling BLUE - End Wall Cladding 2017 Growers Supply All Rights Reserved. Reproduction is prohibited without permission. Revision date: GB30PVBLUE 30' Wide Series 500 End Wall Cladding Kit: Front and Back 1

2 Color Coding READ THIS BEFORE YOU BEGIN Purchased greenhouse and all accessories & systems require a specific installation sequence. All components have been separated into different categories based on common grouping and/or the chronology of installation. Each category has been color coded. All parts within any given color category will be labeled accordingly, and each color category will have its own respective instruction manual. The following illustrates a highly recommended order in which all components should be installed. IMPORTANT: There are some procedures that can occur simultaneously, depending on available assistants and equipment, but there are some procedures that MUST be done in chronological order. Before you begin, review below step recommendation and all technical documents to better understand overall building kit design. 1 RED - MAIN FRAME (Rafters, Purlins, Chord Support and Cabling) 2 3 ORANGE - END WALL FRAMING (Columns, Cross Beams and Door Framing) BLUE - END WALL CLADDING (Polycarbonate, Termination and Flashing) 4 GREEN - ROOF CLADDING (Film, Inflation Kits and Termination) PINK - AIR DISTRIBUTION (Fan, Vent Tube and Shutter) YELLOW - EVAPORATIVE COOLING (Framing, Cooling Pads and Plumbing) BROWN - END WALL VENT (Framing, Motor and Drive Shaft) WHITE - VENTILATION (Exhaust Fans, Ceiling Fans and Light Traps) PURPLE - STATIC BLACKOUT (Monofilament, Fixation and Sealing) BLACK - MOVABLE BLACKOUT (Fabric, Leading Edge, Motor and Drive Shaft) GRAY - BLACKOUT SIDE POCKET (Framing and Polycarbonate) Near the beginning of each color-coded instruction guide, you will find information to lead you through the installation and assembly steps. This information identifies at what point during the assembly the respective components are installed or attached to the main building frame. Since we cannot anticipate changes made by the customer/contractor, all instructions assume the use of accessories purchased from us to be used on the building the accessory was designed for. Each instruction guide presents the basic steps to install the color-coded components. When in doubt, consult the services of a qualified contractor experienced with the assembly of similar structures. 2 Revision date:

3 Color Coding BLUE End Wall Cladding Installation Chronology MUST READ: All components that are color coded BLUE represent the end wall cladding of the greenhouse. ***Color coded components that MUST be installed before installing BLUE: RED ORANGE ** ** ** WHITE PURPLE PINK **See following page for chronology specifics If above color coded components have not yet been installed, put this manual down and consult those manuals to install those components before returning to this manual. If above color coded components have been installed, gather all components that have been color coded with a BLUE label or paint splotch, and continue on the next page with the end wall cladding installation. ATTENTION: Recommended installation order is not critically definitive. Depending on personal preference and/or availability of assistants and equipment, there are some procedures that can occur before or simultaneously with this procedure. Color coded components that can be installed before or at the same time as BLUE: PINK GRAY YELLOW WHITE PURPLE Revision date:

4 Color Coding IMPORTANT: There are certain components of other color coded groups that MUST be installed before installing BLUE components, without necessarily having to install the rest of those color coded components. Please read specifics below and verify that pertaining components of those color coded manuals have been installed before installing the end wall cladding. WHITE & PINK The attachment through-bolts of the exhaust fans & air distribution fan will need to be installed before installing the end wall cladding. It is highly recommended to install the air distribution fans of the PINK color coded manuals and the fans & adaptor boxes of the WHITE color coded manuals before installing the end wall cladding, or else the cladding will obstruct the fan installation. See example. SIDE VIEW Cladding Outside Inside Outside FA3182 Fan PURPLE The wire brackets that are used to secure the monofilament wires need to be slipped over the end headers before attaching the end cladding to the end headers. SIDE VIEW Inside End Header Cladding Outside Wire Bracket 4 Revision date:

5 Important Information READ THIS DOCUMENT BEFORE YOU BEGIN TO INSTALL THE END CLADDING. UNPACK AND IDENTIFY PARTS The following steps will ensure that you have all the necessary parts before you begin. 1. Unpack the contents of the shipment and place where you can easily inventory the parts. Refer to the Bill of Materials/Spec Sheets. 2. Verify that all parts listed on the Bill of Materials/Spec Sheets are present. If anything is missing or you have questions, consult the parts guide (below) and all diagrams for clarification, or contact Customer Service. NOTE: At this time, you do not need to open the plastic bags containing smaller parts such as fasteners and clamps. TECHNICAL DOCUMENTS For a quick overview of the end cladding and its components, consult the diagrams at the back of these instructions. CARE AND MAINTENANCE Proper care and maintenance of your end frame is important. Check the following items periodically: Inspect all components regularly and frequently. Check connections and all fasteners to verify that they remain tight and in good repair. Do not climb or stand on the shelter or end frame. Remove debris and objects that may accumulate on the shelter. Use tools that will not damage the cover (if equipped) when removing debris. Remove snow to prevent excess accumulation. Use tools that will not damage the cover (if equipped) when removing snow. Never allow snow to accumulate on the cover or along the sides and end panels after removing the snow from the main cover. Replace all worn or damaged parts promptly. Revision date: Thank you for purchasing a Series 500 greenhouse kit with a black-out system, ventilation & evaporative cooling. When properly assembled and maintained, this product will provide years of reliable service. These instructions include helpful hints and important information needed to safely assemble and properly maintain the structure. Please read these instructions before you begin. If you have any questions during the assembly, contact Customer Service for assistance. SAFETY PRECAUTIONS Wear eye, hand, and head protection. Use a portable GFCI (Ground Fault Circuit Interrupter) when working with power tools and cords. Do not climb on the shelter or framing during or after construction. Do not occupy the shelter during high winds, tornadoes, or hurricanes. Provide adequate ventilation if the structure is enclosed. Do not store hazardous materials in the shelter. Provide proper ingress and egress to prevent entrapment. REQUIRED TOOLS The following identifies the main tools needed to install the end cladding. Additional tools and supports may be needed depending on the structure, location, and application. Tape measure or measuring device Marker to mark locations on tubing. Variable speed drill and impact driver (cordless with extra batteries works best) Metal file and metal-cutting saw Hammers, gloves, and eye protection Adjustable pliers and self-locking pliers Ladders, work platforms, and other machinery for lifting designed to work safely at the height of the building and end frame. ATTENTION: Consult the services of a qualified, professional contractor if you are not familiar with the construction of similar structures & components. 5

6 End Panel Installation END PANEL INSTALLATION The steps that follow describe one way to complete the polycarbonate panel installation. The materials and parts needed to install the polycarbonate panels include: Polycarbonate panels (clear and black-out), vent tape (#104774), and foil tape (#DH8002) Expandable foam weather stripping (#111983) Aluminum H-channel (#113236Z127), aluminum end cap channel (#104548) and aluminum U-channel profile (#104213) Tek screws (#FA4484B) and neo-bonded, galvanized washers (#102921B) Read the following information before starting: U-channel (104213) is used to finish the polycarbonate panel edges around door and vent openings. H-channel (113236Z127) is used to join polycarbonate panels at the seams and to splice the black-out polycarbonate panels and the clear polycarbonate panels at the level of the horizontal end wall headers. Expandable foam weather stripping (111983) is used to line the outside facing planes of the end wall headers to light-seal the gaps around obstructions when the black-out polycarbonate panels are installed. Tek Screws and neo-bonded washers are used to secure aluminum channel and panels to end wall framing. Install the polycarbonate panels with the UV-protected side to the outside. Mark this side with a marker if needed after removing the protective film. "NO DRIP" side of the black-out polycarbonate goes to the inside of the greenhouse. ATTENTION: Remove the protective film from the polycarbonate panels. Do not stack panels in direct sunlight. Allowing the film to remain intact and in direct sunlight will make the film difficult if not impossible to remove. Consult the polycarbonate panel layouts in the technical documents towards the end of these instructions for the location and lengths of each panel. The diagrams are located at the back of these instructions. ATTENTION: Position panels as shown on the panel diagrams. Using a panel in the incorrect place can affect the placement of subsequent panels. In addition, the amount of aluminum profile used between panels may not be adequate if additional seams are created. POLYCARBONATE PANELS FOR END WALL VENT Polycarbonate panels for the vent are cut from the larger panels used to cover the end wall. To cut the panels to size, measure each opening of the vent frame and cut a panel to cover the opening. Cut the panel approximately 1/4" smaller than the actual size of the opening to allow for expansion. REMEMBER: Panel slides into the top rail channel and sits tight to the top of the bottom rail when properly cut and installed. Tape the open cells at the bottom of each panel using vent tape. Tape the open cells at the top of each panel using DH8002 foil tape. Mark UV Side Always remove the protective film and mark and install the UV-protected side to the outside of the greenhouse. X During preparation, rest the edges of the panels on cardboard or other material to protect them from dirt and damage. Do not install panels on a windy or stormy day or when such conditions are expected. Apply vent tape to the lower end of all lower panels and foil tape to the upper end of all upper panels to seal the cell openings. Tape Panel 6 Revision date:

7 End Panel Installation INSTALL WEATHER STRIPPING & TERMINATION TUBING Consult the technical documents at the back of these instructions for further detail. Repeat steps for both end walls. 1. Using 1/4"x3-1/4" tapcon screws (FA7165), attach sections of 1"x1-1/2" tubing (113301) directly to the ground along the base of the 30' opening, as shown below. Run a bead of construction sealant between the ground and the tubing. Cut to fit as needed. IMPORTANT: Verify that the outside facing plane of the tubing is FLUSH with the outside facing plane of the endwall columns and base plates. See below. 2. Line the outside faces of the 2"x2" vertical & horizontal headers with expanding weather foam tape. Extend out to the rafter leg to the ground, as shown below. Polycarbonate panels will "sandwich" the weather tape as it expands creating a light deprivation seal along the header profile. View as seen from the outside looking in. A NOTE: Some framing has been removed for clarity. column column Weather Stripping column column B A B Weather Stripping [113301] Revision date:

8 End Panel Installation INSTALL HORIZONTAL H-CHANNEL SPLICING Consult the technical documents at the back of these instructions for further detail. Repeat steps for both end walls. 1. Using #14x1-1/2" Tek screws (FA4484B) & neo-bonded washers (102981B), attach sections of Z127 H-channel to the outside face of the 2"x2" end wall header, rafter-to-rafter, as shown below. Cut to fit as needed. IMPORTANT: Verify that H-Channel is positioned so that the center channel is facing the attachment surface. View as seen from the outside looking in. NOTE: Some framing has been removed for clarity. A column column column column A FA4484B Tek screws Rafter SIDE VIEW 2"x2" Header 2"x2" Header Z127 H-channel (cut to fit) H-channel 8 Revision date:

9 End Panel Installation POLYCARBONATE PANEL INSTALLATION Consult the technical documents at the back of these instructions for additional detail. Repeat steps for both end walls. Panel layout is applicable for BOTH ends. ATTENTION: Remove the protective film from each panel before installation. Mark the panel if needed to ensure the uv-protected side is installed toward the sun. "No Drip" side of the blackout polycarbonate is installed to the inside of the shelter. Install panel cells vertically to allow condensation to drain from the cells. Apply vent tape over the open cells at the bottom of each panel before installation. If installing in an end wall with ground post mounting, embed 6" of panel below finished grade. Install the u-profile to finish fan, door and vent openings. See technical documents at the back of these instructions. 1. Starting in the center of the end wall, and working outward, install both blackout polycarbonate and clear polycarbonate panels as shown. Reference the tables below, details on the following pages, and the technical documents at the end of these instructions. 2. Before securing panels to the wall, verify panels are square on the frame and in the desired position. Attach using FA4484 Tek screws and B neo-bonded washers. Install the Tek screws through the panels & h-channel and into the cross beams & columns every 18". Do not overtighten screws! 3. Using the end rafter as a guide, cut the excess polycarbonate. Tape exposed upper cells using DH8002 foil tape. IMPORTANT: Only ONE 32" panel per end wall will be used for the 'Panel D' locations. See below. 4. Notch polycarbonate around fan, door, and vent openings, if applicable. 5. Measure and cut sections of profile and cap the fan, door, and vent openings, if applicable. ATTENTION: Along the bottom of the end wall vent opening only, cap with profile. 5 PANEL "B" PANEL "A" PANEL "A" 1 PANEL "B" NOTE: Cut excess and use on left side. PANEL "D" PANEL "C" 3 PANEL "C" PANEL "D" PANEL "E" PANEL "E" PANEL "E" PANEL "E" PANEL "E" PANEL "E" PANEL "E" PANEL "E" 4 8 (end vent opening only) END WALL 8MM CLEAR POLYCARBONATE END WALL 8MM BLACK-OUT POLYCARBONATE PANEL: A B C D PANEL: E (ground posts) E (mounting feet) LENGTH: 90" 84" 66" 32" LENGTH: 133" 126-3/8" Revision date:

10 End Panel Installation 1 CLEAR & BLACKOUT 2 NOTE: 3 Cut and splice vertical runs to fit. ATTENTION: Horizontal run of H-Channel that splices clear 8MM polycarbonate panels and blackout polycarbonate panels is uninterrupted. 10 Revision date:

11 End Panel Installation 4 Cut upper panels to proper length. 5 End panel excess can be removed using a power tool with a round cutting bit or a utility knife. Exercise caution! 6 ATTENTION: All photos and diagrams illustrate cutout details that are applicable for fan openings, door opening, and the end vent opening. Adjust accordingly. Revision date:

12 End Panel Installation 7 POLYCARBONATE GLAZING PANEL FOIL TAPE [DH8002] U-PROFILE NOTE: [104213] U-PROFILE IS USED TO FINISH EDGES AT DOORS, FANS, VENTS, OPENINGS ETC. Cap all sides of all fan and door openings with u-profile. Vent openings will only be capped along the top & sides with u-profile and end cap along the bottom. See below. 8MM POLYCARBONATE GLAZING PANEL POLYCARBONATE GLAZING PANEL VENT TAPE [104774] NOTE: POLYCARBONATE GLAZING PANEL FOIL TAPE [DH8002] TO BE APPLIED TO TOP END OF POLYCARBONATE AND VENT TAPE [104774] TO BE APPLIED TO BOTTOM END OF POLYCARBONATE. 8 End Wall Cladding Cut here along stringer End Cap Secure to cross beam with FA4482B Tek screws 1.5"x1.5" Cross Beam (bottom stringer for end wall vent) 1.5"x1.5" Cross Beam (bottom stringer for end wall vent) 1.5"x1.5" Cross Beam (bottom stringer for end wall vent) FRONT FRONT ATTENTION: Photos show end panels fully installed with accessories that may or may not be installed at this time. Adjust accordingly. 12 Revision date:

13 Attach to End Rafters INSTALL Secure to top of both end rafters so that it extends over the top of the end wall panels to create a finished edge using FA4482 Tek screws spaced at 16" on-center. See below for details about position of on end rafter A B IMPORTANT: For the rounded edge of the rafter, prepare the profile by slitting the FLAT edge as shown in the photos below. Photos show a profile different from the provided Application is the same. Adjust accordingly for cover installation. Notch flat edge a. Cut slits into the aluminum profile to allow bending of the profile. The tighter the curve, the closer the slits. NOTE: Purchased greenhouse may differ from photos shown. Photo shows a sample building with an installed ridge vent in the open position. Do not install the here. A b. The distance between the slits is determined by the degree of the bend required to fit the rafter. NOTE: B c. Bend the profile at the slits before installing it. Flat walls on either side of the slit will overlap when profile is bent. Revision date:

14 Attach to End Rafters Additional photos illustrating installation of over-the-top end wall cladding flashing. 14 Revision date:

15 Silicon Sealing The following steps describe areas to seal along the installed panels for both water and light leakage. NOTE: The amount of sealant needed to complete the following steps will vary and depends on how thick the sealant is applied. Call Customer Service at to purchase additional sealant if needed. CLEAR SEALANT FOR WATER LEAKAGE 1. Open the supplied DE4007 clear sealant and apply a thin bead to the outside of all u-channel and end cap that is finished fans, doors and vent openings. 2. Seal the seams between the H-channel intersections. 3. Seal the top edge of the horizontal run of H-channel. 4. Return to any holes in the H-channel or clear polycarbonate and repair these using the sealant. 5. Seal the upper edge of both end walls with a bead of sealant. See the dashed line in the diagram below. Frame shown may differ from actual frame. Dashed lines indicate areas to seal with water leakage prevention silicon (DE4007). OPAQUE SEALANT FOR LIGHT LEAKAGE 1. Open the supplied DE4009 opaque sealant and apply a thin bead along the bottom of the termination tubing, as shown to the right. 2. Return to any holes or gaps where light might leak into and repair these using the sealant. ATTENTION: Once entire blackout system has been installed, and is in the CLOSED position, repeat this step where light is visibly leaking through, if applicable. Revision date:

16 Light Deprivation ADDITIONAL LIGHT DEPRIVATION When greenhouse and blackout system are installed completely, and the blackout system is in the "closed position", there is potential for light leakage based on framework. Inspect the entire greenhouse frame for potential gaps where external light could leak into the greenhouse. Many minor details and touch-ups will need to be taken care of at the customer's discretion. A great deal of carefulness, craftsmanship, and thoroughness is required, and proper installation will eliminate most potential issues black tape is included to seal gaps accordingly. Other customer-supplied light sealing agents can also be used such as opaque foam, non-clear caulking, regular duct tape etc. Below is an example diagram of a trouble-area in the end wall cladding where light may leak into the greenhouse. Clear Polycarbonate (above header) Black-Out Tape Between End Headers and Polycarbonate Cladding Blackout Polycarbonate (below header) 16 Revision date:

17 Additional Notes Space below is reserved for customer notes. Revision date:

18 DEVELOPED BY ENDWALL LOCATION CALL-OUTS A DIVISION OF ENGINEERING SERVICES & PRODUCTS CO TH AVENUE SW DYERSVILLE, IA P: F: ORDER #: CUSTOMER #: [J1] VIEW 4 ENDWALL COLUMN TO RAFTER CONNECTION [J1] VIEW 1 RAFTER TO CROSS BEAM CONNECTION [J1] VIEW 9 2" X 2" SQUARE TUBE SPLICE CONNECTION [J1] VIEW 6 ENDWALL COLUMN TO CROSS BEAM CONNECTION [J1] VIEW 5 ENDWALL COLUMN TO ENDWALL BRACE CONNECTION [J1] VIEW 3 RAFTER TO VERTICAL HEADER CONNECTION [J1] VIEW 2 VERTICAL HEADER TO CROSS BEAM CONNECTION STRUCTURE SKU #: GS STRUCTURE SIZE: [J1] VIEW 8 BASE TUBE CONNECTION (IF APPLICABLE) CUSTOMER INFORMATION: CUSTOMER CONTACT: SHEET TITLE: ENDWALL LOCATION CALL-OUTS STRUCTURE DESCRIPTION: 30' WIDE SERIES 500 BLACKOUT GREENHOUSE CONTACT PHONE: [J1] VIEW 7 ENDWALL BASE PLATE CONNECTION DRAWN BY: CCC DRAWING S CREATION DATE: 6/1/2016 REVISIONS: NO. BY: REVISION DATE: NOT TO SCALE SHEET SIZE: 11X17 SHEET: H1

19 DEVELOPED BY RAFTER (1x) 3/8" X 3-1/2" HEX BOLT [FAG365B] (1x) 3/8" LOCK WASHER [FAMA38B] (1x) 3/8" HEX NUT [FALB04B] (1x) 3/8" X 1" HEX BOLT [FAG355B] (1x) 3/8" LOCK WASHER [FAMA38B] RAFTER (1x) 3/8" X 3" HEX BOLT [FAG363B] (1x) 3/8" LOCK WASHER [FAMA38B] RAFTER VERTICAL HEADER 90 BRACKET [115182] A DIVISION OF ENGINEERING SERVICES & PRODUCTS CO TH AVENUE SW DYERSVILLE, IA P: F: ORDER #: CUSTOMER #: (1x) 3/8" X 1" HEX BOLT [FAG355B] (1x) 3/8" LOCK WASHER [FAMA38B] U-BRACKET [115181] CROSS BEAM (3x) #14 X 1" TEK SCREW [FA4482B] CROSS BEAM VERTICAL HEADER [J1] VIEW 1 RAFTER TO CROSS BEAM CONNECTION RAFTER [J1] VIEW 2 VERTICAL HEADER TO CROSS BEAM CONNECTION NOTE: INSTALL ENDWALL BRACE FLUSH WITH OUTSIDE FACE OF ENDWALL COLUMNS. [J1] VIEW 3 RAFTER TO VERTICAL HEADER CONNECTION ENDWALL COLUMN ENDWALL COLUMN CROSS BEAM CROSS BEAM ADJUSTABLE ANGLE BRACKET [QH1330] ENDWALL COLUMN -(4X) #14 x 1" TEK SCREWS [FA4482B] [J1] VIEW 4 ENDWALL COLUMN TO RAFTER CONNECTION -(4X) #14 x 1" TEK SCREWS [FA4482B] ENDWALL BRACE ADJUSTABLE ANGLE BRACKET [QH1330] [J1] VIEW 5 ENDWALL COLUMN TO ENDWALL BRACE CONNECTION NOTE: INSTALL ALUMINUM TUBE FLUSH WITH ENDWALL COLUMNS. -(4X) #14 x 1" TEK SCREWS [FA4482B] 2" x 4" ANGLE BRACKET [111818] [J1] VIEW 6 ENDWALL COLUMN TO CROSS BEAM CONNECTION STRUCTURE SKU #: GS STRUCTURE SIZE: CONTACT PHONE: STRUCTURE DESCRIPTION: 30' WIDE SERIES 500 BLACKOUT GREENHOUSE COLUMN BASE PLATE - (1X) 1/4" X 3 1/4" TAPCON SCREW [FA7165] (SPACE AT APPROX. 12" O.C.) COLUMN BASE PLATE 2.0" X 2.0" SQUARE TUBE - (4X) #14 X 1" TEK SCREW [FA4482B] CUSTOMER INFORMATION: CUSTOMER CONTACT: SHEET TITLE: ENDWALL CONNECTION S -(1X) 1/2" X 3 1/2" HEX BOLT (A325) [GS0046] -(2X) 1/2" WASHER (STRUCTURAL) [106953] -(1X) 1/2" HEX NUT (STRUCTURAL) [106977] 1" X 1 1/2" ALUMINUM TUBE [113301] - (1X) 1 3/4" SQUARE INSERT [104075] 2.0" X 2.0" SQUARE TUBE DRAWN BY: CCC NO. 1 2 DRAWING S CREATION DATE: 6/1/20163/16/2017 REVISIONS: BY: REVISION DATE: 3 4 [J1] VIEW 7 ENDWALL BASE PLATE CONNECTION (IF APPLICABLE) [J1] VIEW 8 BASE TUBE CONNECTION (IF APPLICABLE) [J1] VIEW 9 2" X 2" SQUARE TUBE SPLICE CONNECTION NOT TO SCALE SHEET SIZE: 11X17 SHEET: J1

20 NOTES: SEE DOOR KIT INSTRUCTIONS FOR ADDITIONAL INSTALLATION INFORMATION (IF APPLICABLE) THE [L2] VIEW 1 ENDWALL DRAWING SHOWS LOCATIONS AND THE TWO DIFFERENT SIZED SLANT FANS OFFERED. DEPENDING ON THE BLACKOUT SYSTEM KIT ORDERED YOUR BUILDING MAY HAVE (2X) 3', (1X) 3' & (1X) 4', OR (2X) 4' SLANT FANS. FRAMING MAY REQUIRE FIELD DRILLING AND CUTTING. ENDWALL COLUMNS: (2" SQ TUBE, 14 GAUGE) C1 C2 C3 C4 BASE PLATES S20P1775 S20P1975 S20P2025 S20P1625 ENDWALL BRACE: GROUND POST S20P2015 S20P2215 S20P2265 S20P1765 2'-6" 4'-7 3/4" H1 A1 VH A2 C4 A C2 H3 Y H4 A6 A6 A6* A6 C2 H3 B C4 TYP. BLACKOUT S500 ENDWALL LAYOUT FOR GB0530xxPVEV ONLY. COMES WITH PASSIVE VENTILATION AND EVAPORATIVE COOLING. H1 A1 VH A2 FRAME-OUT SCHEDULE CALL-OUT DESCRIPTION ROUGH OPENING A B 3'-0" SLANT WALL FAN 4'-0" SLANT WALL FAN 41" W X 41.75" H 53.5" W X 54.25" H 10'-6 7/16" (CROSSBEAM C L TO GRADE) AIR DISTRIBUTION FAN FAN SIZE ENDWALL BRACING HEIGHT FAN ROUGH OPENING Y 2' 2'-1 1/2" 24" X 24" 3' 3'-6 1/2" X 3'-7 1/4" 41" W X 41.75" H A DIVISION OF ENGINEERING SERVICES & PRODUCTS CO TH AVENUE SW DYERSVILLE, IA P: F: ORDER #: CUSTOMER #: DEVELOPED BY A1 S15P0355 (1.5" SQ TUBE, 16 GAUGE) A2 A3 A4 A6 S15P039GA16 (1.5" SQ TUBE, 16 GAUGE) S15P0545 (1.5" SQ TUBE, 16 GAUGE) S15P063 (1.5" SQ TUBE, 16 GAUGE) S15P069 (1.5" SQ TUBE, 16 GAUGE) S15P117 (1.5" SQ TUBE, 16 GAUGE) ENDWALL CROSSBEAM: H1 H2 H3 H4 S20P02943G14SGC (2" X 2" SQ TUBE, 14 GAUGE) S20P05343G14SGC (2" X 2" SQ TUBE, 14 GAUGE) S20P070 (2" X 2" SQ TUBE, 14 GAUGE) S20P118 (2" X 2" SQ TUBE, 14 GAUGE) BRACKETS: B3 QH1330 (1X PER LOCATION) QH1330 (2X PER LOCATION) (BOTTOM HEADER BRACKET) BLACKOUT VERTICAL HEADER: VH S20P100G14SGB (2" SQ TUBE, 14 GAUGE) 4'-0" 3'-6" 1'-8" B3 BP 4'-0" H2 A3 BP BASE PLATE TERMINATION GROUND LEVEL 6'-0" 10'-0" 6'-0" 4'-0" [L2] VIEW 1 FRONT ENDWALL PROFILE C1 GROUND POST TERMINATION Y C3 C3 C1 H3 H3 H3 H2 A3 BP BP B3 VENT SIZE ENDWALL BRACING HEIGHT 2'-0" EMBEDMENT (FOR GROUND POST APPLICATIONS) VENT OPENING VENT ROUGH OPENING EVAP WALL ROUGH OPENING X 3' 3'-1 1/2" 3'-1" 2'-11" 4' 4'-1 1/2" 4'-1" 3'-11" 5' 5'-1 1/2" 5'-1" 4'-11" AIR DISTRIBUTION BOX FAN SIZE ENDWALL BRACING HEIGHT SHUTTER ROUGH OPENING Y 2' 2'-3 7/8" 2'-1/2" 3' 3'-1 1/2" 2'-6 1/2" STRUCTURE SKU #: GS STRUCTURE SIZE: CONTACT PHONE: STRUCTURE DESCRIPTION: 30' WIDE SERIES 500 BLACKOUT GREENHOUSE ENDWALL BASE PLATE : BP (1X PER LOCATION) NOTE: AIR DISTRIBUTION FAN TO BE IN LINE WITH TOP OF AIR DISTRIBUTION BOX. NOTE: ALL DIMENSIONS TO C L UNLESS OTHERWISE NOTED. NOTE: EVAP WALLS TO BE OFFSET FROM CENTER FOR PIPING AND CENTERD BETWEEN VENT. *NOTE: ADJUST HEIGHT OF ENDWALL BRACE AND USE AS DOOR HEADER AND USE ADDITIONAL (2X) S15P117 (CUT TO FIT DOOR SIZE) FOR DOOR COLUMNS WITH (2X) QH1330 BRACKET (IF APPLICABLE). LINE STYLES BRACKETS: ENDWALL COLUMNS: GRADE: ENDWALL BRACING: 1/4" x 1" BARSTOCK: X 4'-0" B3 VH A4 BP BASE PLATE TERMINATION BP 25'-0" INSIDE TO INSIDE GROUND LEVEL 6'-0" 6'-0" 6'-0" 6'-0" 6'-0" [L2] VIEW 2 BACK ENDWALL PROFILE GROUND POST TERMINATION BP A4 BP VH B3 10'-6 7/16" (CROSSBEAM C L TO GRADE) 2'-0" EMBEDMENT (FOR GROUND POST APPLICATIONS) CUSTOMER INFORMATION: DRAWN BY: CCC NO CUSTOMER CONTACT: SHEET TITLE: BUILDING PROFILE II DRAWING S NOT TO SCALE CREATION DATE: 6/1/2016 REVISIONS: BY: REVISION DATE: SHEET: L2 SHEET SIZE: 11X17

21 NOTE: BLACKOUT 8MM POLYCARBONATE PANELING IS TO BE EITHER TRIMMED OR EMBEDDED SO IT DOES NOT CLEAR PAST THE CROSSBEAM. 8MM TWIN-WALL POLYCARBONATE PANELING WILL BE THE SAME FOR BOTH ENDWALLS. IF APPLICABLE, 8MM TWIN-WALL POLYCARBONATE PANELING TO BE FIELD CUT FOR DOORS, FANS, VENTS, ETC... A DIVISION OF ENGINEERING SERVICES & PRODUCTS CO TH AVENUE SW DYERSVILLE, IA P: F: ORDER #: CUSTOMER #: DEVELOPED BY PANELS TO BE FIELD CUT TO FIT ENDWALL PROFILE. ENDWALL 8MM CLEARPANELING PANEL: A B C D LENGTH: 90" 84" 66" 32" ENDWALL 8MM BLACKOUT PANELING - BASE PLATES PANEL: E LENGTH: 126 3/8" PANEL "C" PANEL "B" PANEL "A" PANEL "A" PANEL "B" PANELS TO BE FIELD CUT TO FIT ENDWALL PROFILE PANEL "C" NOTE: GROUND POST PANELING WILL HAVE 6" EMBEDMENT BELOW GRADE. ENDWALL 8MM BLACKOUT PANELING - GROUND POST PANEL: E LENGTH: 133" CLEAR POLYCARBONATE PANELING PANEL "D" PANEL "D" NOTE: ENDWALL SHOWN WITH VENT FOR POSITIONS IF APPLICABLE. ACTUAL ENDWALL MAY DIFFER. NOTE: ENDWALL VENT TO BE IN-LINE WITH EVAP WALL. NOTE: ENDWALL VENT PANELING TO BE CUT FROM ENDWALL PANELS. BLACKOUT POLYCARBONATE PANELING PANEL "E" PANEL "E" PANEL "E" PANEL "E" PANEL "E" PANEL "E" PANEL "E" PANEL "E" STRUCTURE SKU #: GS STRUCTURE SIZE: CONTACT PHONE: STRUCTURE DESCRIPTION: 30' WIDE SERIES 500 BLACKOUT GREENHOUSE 6" EMBEDMENT (FOR GROUND POST APPLICATIONS) PANELS TO BE FIELD CUT TO FIT ENDWALL VENT. 3/4" TYP. SPACING USE END CAP [104548] FOR BOTTOM SIDE OF ENDWALL VENT PANELS 3'-11 1/4" TYP. BASE PLATE PANELING TERMINATION GROUND POST PANELING TERMINATION GRADE CUSTOMER INFORMATION: DRAWN BY: CCC CUSTOMER CONTACT: DRAWING S SHEET TITLE: GLAZING PANEL S CREATION DATE: 6/1/2016 REVISIONS: NO. BY: REVISION DATE: [M1] VIEW 1 TYP. ENDWALL GLAZING NOT TO SCALE SHEET: M1 SHEET SIZE: 11X17

22 [M2] VIEW 4 POLYETHYLENE FILM CONNECTION [M2] VIEW 6 BLACKOUT POLYCARBONATE TO CLEAR POLYCARBONATE CONNECTION [M2] VIEW 3 POLYCARBONATE TO TOP CHORD CONNECTION NOTE: INSTALL VENT TAPE AT BOTTOM OF POLYCARBONATE. H CHANNEL [113236] 8MM POLYCARBONATE GLAZING PANEL NOTE: INSTALL [104546] GABLE END WITH RELIEF CUTS TO FOLLOW PROFILE. -(1X) #14 X 1" TEK SCREW [FA4482B] (SPACE AT APPROX. 18" O.C.) GABLE END [104546] A DIVISION OF ENGINEERING SERVICES & PRODUCTS CO TH AVENUE SW DYERSVILLE, IA P: F: ORDER #: CUSTOMER #: DEVELOPED BY [M2] VIEW 2 H-CHANNEL TO POLYCARBONATE CONNECTION - (1X) #14 X 1 1/2" TEK SCREW [FA4484B] - (1X) #14 X 1 1/2" TEK SCREW [FA4484B] - (1X) NEO-BONDED GALV. WASHER [102921B] (SPACE AT APPROX. 18" O.C.) ENDWALL BRACE 8MM POLYCARBONATE GLAZING PANEL - (1X) #14 X 1 1/2" TEK SCREW [FA4484B] - (1X) NEO-BONDED GALV. WASHER [102921B] (SPACE AT APPROX. 18" O.C.) RAFTER [M2] VIEW 5 POLYCARBONATE TO BASE CONNECTION S WITH LOCATION CALL-OUTS NOT SHOWN ON THIS SHEET: [M2] VIEW 7 - GLAZING PANEL TAPE (IF APPLICABLE) POLYETHYLENE FILM POLYLOCK SPRING [102198] INSIDE OF GREENHOUSE GABLE END [104546] [M2] VIEW 4 POLYETHYLENE FILM CONNECTION [M2] VIEW 1 TYP. ENDWALL CLADDING S OUTSIDE OF GREENHOUSE 8MM POLYCARBONATE GLAZING PANEL 1" X 1 1/2" ALUMINUM TUBE [113301] 8MM POLYCARBONATE GLAZING PANEL BASE PLATE - (1X) #14 X 1 1/2" TEK SCREW [FA4484B] - (1X) NEO-BONDED GALV. WASHER [102921B] (SPACE AT APPROX. 18" O.C.) [M2] VIEW 5 POLYCARBONATE TO BASE CONNECTION COLUMN [M2] VIEW 2 H-CHANNEL TO POLYCARBONATE CONNECTION NOTE: TRIM 8MM BLACKOUT POLYCARBONATE TO FIT SNUGLY INTO H-CHANNEL (113236) AT THE CROSS BEAM AND BEGIN 8MM CLEAR POLYCARBONATE DIRECTLY ABOVE. - (1X) #14 X 1 1/2" TEK SCREW [FA4484B] (SPACE AT APPROX. 18" O.C.) 8MM CLEAR POLYCARBONATE GLAZING PANEL CROSS BEAM H CHANNEL [113236] 8MM BLACKOUT POLYCARBONATE GLAZING PANEL [M2] VIEW 6 BLACKOUT POLYCARBONATE TO CLEAR POLYCARBONATE CONNECTION RAFTER [M2] VIEW 3 POLYCARBONATE TO TOP CHORD CONNECTION 8MM POLYCARBONATE GLAZING PANEL POLYCARBONATE GLAZING PANEL VENT TAPE [104774] POLYCARBONATE GLAZING PANEL FOIL TAPE [DH8002] U-PROFILE NOTE: [104213] U-PROFILE IS USED TO FINISH EDGES AT DOORS, FANS, VENTS, OPENINGS ETC. NOTE: POLYCARBONATE GLAZING PANEL FOIL TAPE [DH8002] TO BE APPLIED TO TOP END OF POLYCARBONATE AND VENT TAPE [104774] TO BE APPLIED TO BOTTOM END OF POLYCARBONATE. [M2] VIEW 7 GLAZING PANEL TAPE (IF APPLICABLE) DRAWN BY: CCC NO STRUCTURE SKU #: GS CUSTOMER INFORMATION: DRAWING S NOT TO SCALE CREATION DATE: 6/1/2016 REVISIONS: BY: REVISION DATE: SHEET: STRUCTURE SIZE: CONTACT PHONE: CUSTOMER CONTACT: M2 STRUCTURE DESCRIPTION: 30' WIDE SERIES 500 BLACKOUT GREENHOUSE SHEET TITLE: GLAZING CONNECTION S SHEET SIZE: 11X17

23 DEVELOPED BY AIR DISTRIBUTION BOX ENDWALL FRAMING AIR DISTRIBUTION BOX ENDWALL FRAMING AIR DISTRIBUTION BOX A DIVISION OF ENGINEERING SERVICES & PRODUCTS CO TH AVENUE SW DYERSVILLE, IA P: F: ORDER #: CUSTOMER #: AIR TUBE AIR TUBE MOUNT CLAMP (4X) 5/16" X 3" ELEVATOR BOLT [FA3182] (4X) 5/16" WASHER [FAME07B] (4X) 5/16" LOCKWASHER [FAMA37B] (4X) 5/16" HEX NUT [FALB02B] [N1] VIEW 2 AIR DISTRIBUTION BOX TO ENDWALL 3/16" THIMBLE (AS1083) NOTE: OTHER SIDE OF CABLE AND PURLIN NOT SHOWN FOR CLARITY. 3/16" CABLE CLAMPS (AS1003) CABLE BRACKET [108503] CABLE ASSEMBLY TURNBUCKLE [104189] AIR TUBE [N1] VIEW 1 AIR DISTRIBUTION BOX OVERVIEW CABLE ASSEMBLY TURNBUCKLE [104189] ENDWALL FRAMING SHACKLE [AS2162] CABLE ASSEMBLY AIR DISTRIBUTION BOX AIR DISTRIBUTION BOX ENDWALL ENDWALL FRAMING 3/16" CABLE (AR1050) 3/16" CABLE CLAMPS (AS1003) 3/16" THIMBLE (AS1083) [N1] VIEW 3 CABLE ASSEMBLY SHACKLE [AS2162] BRACKET [108503] (1X) 5/16" X 3" ELEVATOR BOLT [FA3182] (1X) 5/16" WASHER [FAME07B] (1X) 5/16" LOCKWASHER [FAMA37B] (1X) 5/16" HEX NUT [FALB02B] SHACKLE [AS2162] CABLE ASSEMBLY [N1] VIEW 4 AIR DISTRIBUTION BOX CABLE TO RAFTER *NOTE: SNAP HOOK TO BE PLACED APPROXIMATELY EVERY 5 FEET. RAFTER (1X) 3/8" X 3-1/2" HEX BOLT [FAG365B] (1X) 3/8" WASHER [FAME08B] (1X) 3/8" HEX NUT [FALB04B] CABLE ASSEMBLY SNAP HOOK [AS3150]* STRUCTURE SKU #: GS CUSTOMER INFORMATION: STRUCTURE SIZE: CONTACT PHONE: CUSTOMER CONTACT: STRUCTURE DESCRIPTION: 30' WIDE SERIES 500 BLACKOUT GREENHOUSE SHEET TITLE: AIR DISTRIBUTION CONNECTION S TURNBUCKLE [104189] 1.5" SQUARE TUBE DRAWN BY: CCC DRAWING S CREATION DATE: 6/1/2016 REVISIONS: NO. BY: REVISION DATE: [N1] VIEW 5 AIR DISTRIBUTION BOX CABLE AIR DISTRIBUTION BOX CABLE ASSEMBLY NO AIR DISTRIBUTION BOX ENDWALL [N1] VIEW 6 AIR TUBE CABLING TO ENDWALLS AIR TUBE [N1] VIEW 7 AIR TUBE TO CABLE ATTACHMENT NOT TO SCALE SHEET: N1 SHEET SIZE: 11X17

24 DEVELOPED BY AIR DISTRIBUTION BOX A DIVISION OF ENGINEERING SERVICES & PRODUCTS CO TH AVENUE SW DYERSVILLE, IA P: F: ORDER #: POLYCARBONATE PANEL CUSTOMER #: SILICONE TO BE PLACED BETWEEN SHUTTER AND POLYCARBONATE. AIR DISTRIBUTION BOX U-PROFILE NOTE: [104213] U-PROFILE IS USED TO FINISH EDGES AT DOORS, FANS, VENTS, OPENINGS ETC. H CHANNEL [113236] [N2] VIEW 1 AIR DISTRIBUTION BOX CLADDING OVERVIEW POLYCARBONATE PANEL U-PROFILE NOTE: [104213] U-PROFILE IS USED TO FINISH EDGES AT DOORS, FANS, VENTS, OPENINGS ETC. STRUCTURE SKU #: GS STRUCTURE SIZE: STRUCTURE DESCRIPTION: 30' WIDE SERIES 500 BLACKOUT GREENHOUSE - (1X) #14 X 1 1/2" TEK SCREW [FA4484B] (SPACE AT APPROX. 12" O.C.) POLYCARBONATE PANEL AIR DISTRIBUTION BOX ENDWALL FRAMING CUSTOMER INFORMATION: CONTACT PHONE: CUSTOMER CONTACT: SHEET TITLE: AIR DISTRIBUTION CLADDING S DRAWING S DRAWN BY: CCC CREATION DATE: 6/1/2016 H CHANNEL [113236] [N2] VIEW 2 AIR DISTRIBUTION BOX CLADDING U-PROFILE NOTE: [104213] U-PROFILE IS USED TO FINISH EDGES AT DOORS, FANS, VENTS, OPENINGS ETC. [N2] VIEW 3 AIR DISTRIBUTION BOX CLADDING TOP NO REVISIONS: BY: REVISION DATE: NOT TO SCALE SHEET: N2 SHEET SIZE: 11X17