2. Question: Could not find a detail for Type A3 Expansion Joints? Answer: A Type A3 Expansion Joint detail has been added to sheet C4.7.

Size: px
Start display at page:

Download "2. Question: Could not find a detail for Type A3 Expansion Joints? Answer: A Type A3 Expansion Joint detail has been added to sheet C4.7."

Transcription

1 February 3, 207 Office of the Director of Purchasing: Shelly Albert Purchasing Officer ADDENDUM NO. 3 RECONSTRUCTION OF SEVEN PARKING LOTS AT THE SCHOOL OF DENTAL MEDICINE LOCATED ON THE ALTON CAMPUS OF SOUTHERN ILLINOIS UNIVERSITY EDWARDSVILLE KNOWN AS QUOTATION NO This Addendum forms a part of the bidding and contract documents and modifies the original 00% Bid Documents. Please notify the appropriate subcontractors and/or suppliers of this Addendum and acknowledge receipt of this Addendum in the Bidder s Proposal. Failure to acknowledge receipt of this Addendum may subject Bidder to disqualification. This Addendum supersedes all conflicting portions of the drawings and specifications. Contractors shall include all omissions, additions and adjustments of all trades as may be necessary because of each change, substitution or omission. Such omission, addition or adjustment shall conform to recognized and accepted architecture and engineering practice. Clarifications:. Question: On S.0 and S., no TOF elevation is provided for the retaining wall in detail 2 on Sheet.. Answer: The bottom of the footing should be the minimum 2.5 below grade for frost depth. Therefore, for wall elevation 2 on Sheet S., the top of footing elevation is 58.5 based on the low side of wall being at Question: Could not find a detail for Type A3 Expansion Joints? Answer: A Type A3 Expansion Joint detail has been added to sheet C Question: Please clarify per the comments at the prebid meeting that this will be nonreinforced pavement? Answer: Non-reinforced pavement joint details replace the details previously shown on sheet C4.7. Page of 4

2 4. Question: Will electronic/cad files be provided to the survey company for horizontal layout? Answer: Yes, to aid with layout, AutoCAD 205 files will be provided to the contractor upon receipt of an indemnity waiver. 5. Question: For an electrical contractor, it may be difficult to do the 30% workforce with in their contract with all the excavation/backfill required. Could this be eliminated for this project? Answer: No 6. Question: Will the electrical contractor be required to haul off their spoils or leave on site? Answer: The electrical contractor shall haul off their spoils as required. 7. Question: Drawing DE.0 Note 4. Is it possible to get contact of the contractor who installed the roof on these (2) buildings? Answer: Yes this can be provided. 8. Question: Drawing DE3.0 Note, What is the depth of removal for the light fixture base? Answer: The pole base shall be removed to a minimum of 5 below final parking lot grade. 9. Question: Is Saturday considered Premium time? Answer: Premium time is in accordance with union contracts. 0. Question: Are there hours Monday thru Friday considered premium time? Answer: Premium time is in accordance with union contracts.. Question: Drawing E.0 keyed note 6, Please provide the Ameren service voltage and if it is single phase or three phase. And verify a separate grounding conductor is not required to the Ameren meter. Answer: Service voltage is 240V Single phase. A separate grounding conductor and ground rod is required at the Ameren meter. Further instruction will be given in the plans section of this addendum. 2. Question: Is boring for some of the underground electrical conduit acceptable? Answer: Yes given it is coordinated with existing underground utilities. Page 2 of 4

3 3. Question: E3.0 keyed note 5. Please verify Ameren will install the pad and pad mounted switch complete and the EC only installs one empty conduit to the pad location, and verify Ameren will rework the existing underground that is on the wood pole without any EC involvement. Answer: This is correct. Ameren will install the pad and pad mounted switch complete, and also rework the existing underground. The contractor shall locate the end of the conduit they are responsible for as close to the existing wooden pole as possible. Specifications: Plans:. Replace Sheet C4.7 with the attached. The revised sheet adds Type A3 Expansion Joints and provides non-reinforced pavement joint details. 2. Replace Sheet DE3.0 with the attached revised plan sheet noted Addendum #3. The revised sheet modifies fiber and copper voice conductor runs based on field walk thru Thursday Revise Keyed note 7 Sheet E.0 to read PROVIDE NEW 400A AMEREN APPROVED METER AND ENCLOSURE ON WALL OF BUILDING. PROVIDE () #3 GROUNDING CONDUCTOR FROM METER TO NEW ¾ X 0 COPPER CLAD STEEL GROUND ROD. EXOTHERMICALLY WELD CONDUCTOR TO GROUND ROD. PROVIDE (3) 500MCM, () #3 GND IN 4 CONDUIT BETWEEN METER AND ENCLOSED CIRCUIT BREAKER MOUNTED NEXT TO METER. PROVIDE NEW 400A 2P NEMA 3R SERVICE ENTRANCE RATED ENCLOSED CIRCUIT BREAKER. ENCLOSURE SHALL BE LOCKABLE TO PREVENT UNAUTHORIZED ACCESS. COORDINATE LOCATION TO ALLOW METER AND ENCLOSED BREAKER TO BE MOUNTED BETWEEN CORNER OF BUILDING AND WINDOW. PROVIDE CONDUCTORS INTO BUILDING PER KEYED NOTE #8. PROVIDE (3) #3/0, () #6 GND IN 2 CONDUIT TAPPED OFF LOAD SIDE OF 400A ENCLOSED CIRCUIT BREAKER TO BUILDING 27. SEE KEYED NOTE #9 FOR ADDITIONAL INFORMATION. Page 3 of 4

4 4. Replace Sheet E3.0 with the attached revised plan sheet noted Addendum #3. The revised sheet modifies fiber and copper voice conductor runs based on field walk thru Thursday , as well as additional information for routing through buildings. Also revises feed to new grounds shed, and addresses existing communications pull box at the south of building 263. Addendum #3 consists of: 4 pages of text 3 drawings: DE3.0, C4.7, E RETURN ONE SIGNED COPY TOGETHER WITH YOUR PROPOSAL Addendum No. 3 is hereby acknowledged. Name of Bidder: By: Title: Address: Telephone: Date: Page 4 of 4

5 G F E FINISH JOINT WITH A SELF-LEVELING SEALANT USING MAMECO INTERNATIONAL - VULKEM 45, PECORA CHEMICAL CORP - UREXPAN NR20, SIKA CHEMICAL CORP. - SILKAFLEX 2SL, CONTECH INC., SONNEBORN BUILDING PRODUCTS DIV. - SONALASTIC SL C4.7 t t/2 SCALE: t/3 PAVEMENT JOINT DETAIL NO SCALE SAWED GROOVE 8" MIN. NO. 6 X 30 TIE BARS AT 30" CTS. SAWED LONGITUDINAL JOINT FINISH JOINT WITH A SELF-LEVELING SEALANT USING MAMECO INTERNATIONAL - VULKEM 45, PECORA CHEMICAL CORP - UREXPAN NR20, SIKA CHEMICAL CORP. - SILKAFLEX 2SL, CONTECH INC., SONNEBORN BUILDING PRODUCTS DIV. - SONALASTIC SL t FINISH JOINT WITH A SELF-LEVELING SEALANT USING MAMECO INTERNATIONAL - VULKEM 45, PECORA CHEMICAL CORP - UREXPAN NR20, SIKA CHEMICAL CORP. - SILKAFLEX 2SL, CONTECH INC., SONNEBORN BUILDING PRODUCTS DIV. - SONALASTIC SL 2 C4.7 8" RADIUS t SCALE: 5'-0" 8" MIN. PAVEMENT JOINT DETAIL NO SCALE " PREFORMED EXPANSION JOINT FILLER TYPE A.3 EXPANSION JOINT t/3 SAWED GROOVE 8" MIN. CONTRACTION JOINT 0' ' ' ' ' ' REVISIONS: DATE: REMARKS: NO.: 02/08/7 ADDENDUM 3 - REVISED PAVEMENT JOINTS ILLINOIS DESIGN FIRM LICENSE NO.: D C B A GRAPHIC SCALE FIGURES: /8" /2" /2" /6" /4" 5 0 3/4" 2 ALTON SDM PARKING LOT RECONSTRUCTION PROJECT NO.: DATE: 02/0/7 SHEET NO.: PAVEMENT JOINT DETAILS BID DOCUMENTS