Hide & Slide. Equipment Manufacturer

Size: px
Start display at page:

Download "Hide & Slide. Equipment Manufacturer"

Transcription

1 Hide & Slide Equipment Manufacturer 50-79

2 Hide & Slide Equipment Manufacturer 50-79

3 49'-6" [5.0M] PLAYWORLD SYSTEMS, INC. 000 Buffalo Road Lewisburg, PA USA '-0" [0.0M] 6'-" [.88M] TUBE GLIDE 60 SPIRAL ANYWHERE SEATS (Qty. ) 6'-8" [.0M] 7",8M 7",8M NUVO PANEL SHIFTING SANDS INSERT (deck) STOREFRONT (ground) POST MOUNT WHEEL NUVO PANEL W/ COUNTING INSERT (95mm) RISE 90 CLOUD WALK (95MM) RISE VERTICAL 'S' CRAWL TUBE 0,9M 0,9M " (05mm) RISE FUNNEL ADVENTURE TUBE POST MOUNT DRUM 6'-" [.86M] 48",M GLIDE 6'-" [.89M] 6'-" [.9M] NUVO PANEL W/ TACTILE INSERT (deck) BELL PANEL (ground) 6'-" [.89M] AREA: USER CAPACITY: EQUIPMENT SIZE: 7'" x 0'8" x 0'6" 69 SqFt. 7,8 SqM.,M x 6,M x,m USE ZONE: 49'6" x '0" 5,0M x 0,0M FALL HEIGHT: 6 Ft.,8M PERIMETER: 8 Ft. 4,06M AGE GROUP: 59-5 HIDE & CATALOG PRE-DESIGN 6'-" [.87M] 6'-" [.86M] NUVO TRANSFER STATION ADA SCHEDULE Total Elevated Play Activities: Total Ground-Level Play Activities: Elevated Activities Ground-Level Activities 6 Ground-Level Play Types Required 7 4 Provided 4 0 5' 0' ASTM F487-7 CPSC # Meters PROJECT NO: SCALE: 50-79A /6"='-0" *PLAYGROUND SUPERVISION REQUIRED DRAWN BY: M. MERTZ DATE: 0-NOV-7 Paper Size B

4 '-6" [5.0M] PLAYWORLD SYSTEMS, INC. 000 Buffalo Road Lewisburg, PA USA 6'-8" [.0M] 6'-" [.86M] EQUIPMENT SIZE: 7'" x 0'8" x 0'6",M x 6,M x,m '-0" [0.0M] 6'-" [.88M] ",8M 7",8M ,9M 0,9M ",M 7 8 6'-" [.89M] 0 6'-" [.9M] 7 6'-" [.89M] USE ZONE: 49'6" x '0" 5,0M x 0,0M AREA: PERIMETER: 69 SqFt. 8 Ft. 7,8 SqM. 4,06M FALL HEIGHT: 6 Ft.,8M USER CAPACITY: AGE GROUP: 59-5 HIDE & CATALOG PRE-DESIGN 6'-" [.87M] 0 6'-" [.86M] 9 ADA SCHEDULE Total Elevated Play Activities: Total Ground-Level Play Activities: Elevated Activities Ground-Level Activities 6 Ground-Level Play Types Required 7 4 Provided 4 0 5' 0' ASTM F487-7 CPSC # Meters PROJECT NO: SCALE: 50-79A /6"='-0" *PLAYGROUND SUPERVISION REQUIRED DRAWN BY: M. MERTZ DATE: 0-NOV-7 Paper Size B

5 COMPONENT FOOTING (DETAIL ) SPIRAL CENTER POST FOOTING (DETAIL) SUPPORT POST FOOTING (DETAIL or 4) (" INDICATES POST LENGTH) CANTILEVER, "T" POST, AND COMPONENT POST FOOTING (DETAIL ) (ZZCH850 INDICATES PART NUMBER) GROUND ZERO POST FOOTING (DETAIL ) (44" INDICATES POST LENGTH) SCALE: DRAWN BY: DATE:

6 PLAYWORLD SYSTEMS, INC. 000 Buffalo Road Lewisburg, PA USA 60 SPIRAL 4" 47" 8" GLIDE FOOTING LEGEND TUBE 09" 69" 6" 88" 8" ZZUN 09 8" GLIDE 5" 5" 60" 60" " 60" 60" (95MM) RISE VERTICAL 'S' CRAWL TUBE 60" 60" 88" 48" 7" 47" 8" " 47" " " 8" (95mm) RISE 9" 90 CLOUD WALK 44" 4" 4" 4" 88" 48" 9" " 9" 48" " " 4" " 7" 5" " " " (05mm) RISE FUNNEL ADVENTURE TUBE 0" " 5" 0" 4" 64" " " 0" " 5" 8" " 80" " " 4" 06" COMPONENT FOOTING (DETAIL ) SPIRAL CENTER POST FOOTING (DETAIL) " SUPPORT POST FOOTING (DETAIL or 4) (" INDICATES POST LENGTH) ZZCH 850 CANTILEVER, "T" POST, AND COMPONENT POST FOOTING (DETAIL ) (ZZCH850 INDICATES PART NUMBER) 44" GZ HIDE & CATALOG PRE-DESIGN NUVO TRANSFER STATION GROUND ZERO POST FOOTING (DETAIL ) (44" INDICATES POST LENGTH) PROJECT NO: SCALE: 50-79A /4"='-0" *PLAYGROUND SUPERVISION REQUIRED DRAWN BY: M.MERTZ DATE: -AUG-7 Paper Size B

7 Hide Slide Design Number: 50-79A - Bill Of Material Ref. No. Part No. Description Quantity Posts ZZCH008.5in OD x 4in STEEL POST W/RIVETED CAP ZZCH008.5in OD x 6in STEEL POST W/ RIVETED CAP 6 ZZCH008.5in OD x 48in STEEL POST W/ RIVETED CAP 4 ZZCH0048.5in OD x 60in STEEL POST W/ RIVETED CAP 6 5 ZZCH056.50in x 88in STEEL POST w/cap Decks & Kick Plates 6 ZZCH067 TRIANGULAR COATED DECK ASSEMBLY 7 zzch069 FULL HEX COATED DECK ASSEMBLY 8 ZZUN90 COATED DECK TO DECK CONNECTION KIT ADA Items 9 ZZCH0679 NUVO- 6in TRANSFER STATION Slides 0 ZZCH696 GLIDE (7in DECK) ZZCH006 0in ROUND TUBE ENTRANCE/EXIT ZZCH6 GLIDE (48in DECK) ZZCH57 - NUVO 60 SPIRAL 4 ZZUN009 0in ROUND RIGHT TUBE SECTION 5 ZZUN09 ROUND TUBE SUPPORT LEG 4ft 6 ZZUN08 0in ROUND STRAIGHT TUBE SECTION W/ WINDOW Activity Panels 7 ZZCH490 POST MOUNTED STEERING WHEEL 8 ZZCH4578 ANYWHERE SEAT 9 ZZCH4646 STORE FRONT PANEL 0 ZZCH486 NUVO ACTIVITY PANEL ZZUN487 NUVO TACTILE INSERT ZZUN488 NUVO COUNTING INSERT ZZUN4877 NUVO - SHIFTING SANDS PANEL INSERT Crawl Tubes 4 ZZCH568 FUNNEL ADVENTURE TUBE ft RISE 5 ZZCH5668 VERTICAL S CRAWL ADVENTURE TUBE (GROUND TO DECK) Climbers 6 ZZCH6458 DECK TO DECK CLOUD WALK (6in RISE RIGHT) 7 ZZCH7088 CLIMBING SQUARES (48in) Audible Activities 8 ZZCH4409 ACCESSIBLE BELL PANEL 9 ZZCH4649 POST MOUNT DRUM Additional Tool & Maintenance Kits 0 ZZCHGUID CHALLENGER GUIDELINES ZZUN990 SURFACING WARNING LABEL KIT ZZUN990 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL Friday, September 9, 07 Page of Playworld.com

8 Hide Slide Design Number: 50-79A - Compliance and Technical Data Reference Document: ASTM F487 Ref. No. Part No. Qty. Description Unit ASTM Status Total Weight Pre- Post- Consumer Recycled Content COe Footprint (kgs) Users Install Hours Concrete (Yds) Active Play Events ZZCH008.5in OD x 4in STEEL POST W/RIVETED Certified CAP ZZCH in OD x 6in STEEL POST W/ RIVETED Certified CAP ZZCH008.5in OD x 48in STEEL POST W/ RIVETED Certified CAP 4 ZZCH in OD x 60in STEEL POST W/ RIVETED Certified CAP 5 ZZCH056.50in x 88in STEEL POST w/cap Certified ZZCH067 TRIANGULAR COATED DECK ASSEMBLY Certified zzch069 FULL HEX COATED DECK ASSEMBLY Certified ZZUN90 COATED DECK TO DECK CONNECTION KIT Certified ZZCH0679 NUVO- 6in TRANSFER STATION Certified ZZCH696 GLIDE (7in DECK) Certified ZZCH006 0in ROUND TUBE ENTRANCE/EXIT Certified ZZCH6 GLIDE (48in DECK) Certified ZZCH57 - NUVO 60 SPIRAL Certified , ZZUN009 0in ROUND RIGHT TUBE SECTION Certified ZZUN09 ROUND TUBE SUPPORT LEG 4ft Certified ZZUN08 0in ROUND STRAIGHT TUBE SECTION W/ Certified 96.99, WINDOW 7 ZZCH490 POST MOUNTED STEERING WHEEL Certified ZZCH4578 ANYWHERE SEAT Certified ZZCH4646 STORE FRONT PANEL Certified ZZCH486 NUVO ACTIVITY PANEL Certified ZZUN487 NUVO TACTILE INSERT Certified ZZUN488 NUVO COUNTING INSERT Certified ZZUN4877 NUVO - SHIFTING SANDS PANEL INSERT Certified ZZCH568 FUNNEL ADVENTURE TUBE ft RISE Certified Friday, September 9, 07 Page of Playworld.com

9 Hide Slide Design Number: 50-79A - Compliance and Technical Data Reference Document: ASTM F487 Ref. No. Part No. Qty. Description Unit ASTM Status Total Weight Pre- Post- Consumer Recycled Content COe Footprint (kgs) Users Install Hours Concrete (Yds) Active Play Events 5 ZZCH5668 VERTICAL S CRAWL ADVENTURE TUBE Certified.4, (GROUND TO DECK) 6 ZZCH6458 DECK TO DECK CLOUD WALK (6in RISE Certified RIGHT) 7 ZZCH7088 CLIMBING SQUARES (48in) N/A 54.0, ZZCH4409 ACCESSIBLE BELL PANEL Certified ZZCH4649 POST MOUNT DRUM Certified ZZCHGUID CHALLENGER GUIDELINES N/A ZZUN990 SURFACING WARNING LABEL KIT Certified ZZUN990 PIPE SYSTEMS MAINTENANCE KIT W/ N/A 90 AEROSOL Totals:, , , Kg 9 Kg 76 Kg 5 Metric Tons.6 m Friday, September 9, 07 Page of Playworld.com

10 Hide Slide Design Number: 50-79A - Compliance and Technical Data Reference Document: ASTM F487 Ref. No. Part No. Qty. Description Unit ASTM Status Total Weight Pre- Post- Consumer Recycled Content COe Footprint (kgs) Users Install Hours Concrete (Yds) Active Play Events ASTM F487 The lay-out for this custom playscape, design number 50-79A, has been configured to meet the requirements of the ASTM F487 standard. In addition, each of the above components listed as "Certified" have been tested and are IPEMA certified. Components listed as "Not Applicable" do not fall within the scope of the ASTM F487 standard and have not been tested. IPEMA certification can be verified on the IPEMA website, In the interest of playground safety, IPEMA provides a Third Party Certification Service which validates compliance. 00 ADA Standards for Design The lay-out was also designed to meet the 00 Standards published 5-Sep-00, by the Department of Justice when installed over a properly maintained surfacing material that is in compliance with ASTM F95 "Accessibility of Surface Systems Under and Around Playground Equipment" as well as ASTM F9, "Impact Attenuation of Surfacing Materials Within the Use Zone of Playground Equipment", appropriate for the fall height of the structure. Installation Times Installation times are based on one experienced installer. A crew of three experienced individuals can perform the installation within the given time, each member working / of the given hours. [Eg. Installation Time = 0 hours. For a crew of three, each member will work 0 hours on the installation for a total of 0 hours on the project.] Carbon Footprint The COe (carbon footprint given in Kilograms and Metric Tons) listed above is a measure of the environmental impact this play structure represents from harvesting raw materials to the time it leaves our shipping dock. Playworld Systems nurtures a total corporate culture that is focused on eliminating carbon producing processes and products, reducing our use of precious raw materials, reusing materials whenever possible and recycling materials at every opportunity. Playworld Systems elected to adopt the Publicly Available Specification; PAS 050 as published by the British Standards Institute and sponsored by Defra and the Carbon Trust. The PAS 050 has gained international acceptance as a specification that measures the greenhouse gas emissions in services and goods throughout their entire life cycle. Pre-Consumer Recycle Content A measurement, in pounds, that qualifies the amount of material that was captured as waste and diverted from landfill during an initial manufacturing process and is being redirected to a separate manufacturing process to become a different product. E.g. 00% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as rods, flat bars and H-channels. Post-Consumer Recycle Content A measurement, in pounds, that qualifies the amount of material that was once another product that has completed its lifecycle and has been diverted from a landfill as a solid waste through recycling and is now being used in a Playworld Systems' product. E.g. **0% to 40% of the steel in our steel tubing and sheet steel have been diverted from landfills. Automobiles are scrapped and recyclable steel is purchased by the steel mill that produces our raw product. ** The amount of Post-Consumer recycled steel fluctuates daily based on the availability of the recycled steel. Friday, September 9, 07 Page of Playworld.com