1 2013 Small & Emerging Contractor Webinar Series Estimating and Bidding

2 What is an Estimate? The first step to obtaining work. Includes costs for the following Material Labor Equipment

3 Types of Estimate OOM SWAG - Conceptual Square Foot Estimating Assemblies Estimating Unit Price Estimating

4 The Estimating PROCESS 1.Scope the Work is Key!! 2. Quantity Take Off 3. Pricing 4. Check the Results

5 How to Scope Construction Site visit Ask questions!! As-Builts (if they exist) Plans/Specs Think like a contractor Build it before you build it

6 How to Scope Construction Subcontractor input Vendor input Get maintenance input Get end-user input Organize it Outline the scope by work breakdown

7 Whine List of Issues in Repair/Remodel Projects Ongoing operations Time Match existing The customer Small quantities Environmental Issues Weather

8 Whine List of Issues in Repair/Remodel Projects Noise Dust Control Safety Tie into existing Access/egress Code issues, fire, seismic, ADA Unknowns

9 Three Categories of SCOPE AE Scope: As defined by Architect and Engineer via plans and specifications. Context Scope: As defined by the context or environment in which the project will be built. Execution Scope: As defined by the processes necessary to construct the project in the context.

10 Identify Costs To apply the proper markup it is critical to first correctly identify your costs.

11 Pricing The Directs and Indirects Direct Costs (bare costs) Material Labor (plus labor burden; futa, suta, fica, wci) Equipment Subcontractor Site Overhead (5% - 15% of project total) Home Office Overhead (5% - 10% of project) Profit (5% - 15%; a function of risk, market) Sales Taxes Bond Estimate Contingency (for budget estimating 2% - 20%)

12 What is Markup Markup is a percent of cost needed to cover general and administrative costs and indirect costs. The percentage of markup varies from business to business.

13 Accounting for Waste Waste is unavoidable. Controlling waste is critical Each facet of work has a standard for acceptable levels of waste. Whatever your tolerance for waste, you must account for the cost because it affects your profitability

14 Seasonal Affects Seasonal conditions will directly affect costs and profitability. Forgetting to calculate winter protection can have a negative impact on your project. Lack of skilled labor in the work force may require an adjustment in productivity rates for new craftspeople who are unfamiliar with your operations.

15 Project Timeframe The duration of project and start & finish dates have impacts related to: Permits and Financing Weather considerations Labor and material considerations

16 What is an (RFI) A formal Request for Information regarding a clarification on bid scope. Check the specifications for specific forms and timelines for submittal. Often an RFI is a substitution request from a subcontractor or supplier to provide another or-equal product.

17 Estimating Software There are many software programs for estimating. They vary from very simple to fully integrated systems that tie into your scheduling, ordering and invoicing software. Do not get an overly complex system unless you are willing to take the time to learn it.

18 Checking Bid Estimates Assign an estimator to prepare the estimate Then ensure that there is someone else to review and double check it. This helps catch omissions or mistakes

19 Principles of an Estimate A good estimate must be: Logical Defensible Easy to follow Obvious what is included And what is not included

20 Prepare to Bid You must have specific information before you can prepare a bid. This information includes: Project description Specifications & drawings Schedules and material lists Bonding requirements Submittal requirements Applicable Government regulations

21 Bidding Check List

22 Bid Proposal Components Scope of work Inclusions and exclusions Quoted price (lump sum, GMP, T & M) Timeframe to start and finish project Name of the documents used in preparation of the quote If the bid is Complete per Plans & Specifications it should be noted. Addenda

23 Addenda Addenda are documents issued to add specific details not included in the original bid documents or to indicate changes. The addendum should be referenced in the bid proposal.

24 Inclusions and Exclusions Keep your exclusions as brief as possible Inclusions should be pertinent to the project The less detail on the drawings, the MORE detail should be included in your proposal

25 Types of Bids There are three common proposal types: Lump Sum All the risk and all the reward is with the Bidder Lump sum = Fixed Price Time and Materials All the risk and all the reward are with the Owner T&M = Hourly rates plus material receipts, plus overhead and markup Check the Bid Documents for limits on OH&P

26 Types of Bids Guaranteed Maximum Price (GMP) Risk and reward are shared between the Bidder and the Customer Essentially a T&M job with a ceiling on the price Typically include a shared savings clause Example: 60/40 split on savings between Customer and Bidder

27 Subcontractors and Suppliers Building a reliable network of subcontractors and suppliers will enhance your ability to succeed as a contractor. Certain basic steps will help to select these partners. Ask for and check references Speak with industry peers who have dealt with them Ask your colleagues for recommendations Chart their response time, quality, safety, ethics and honesty

28 Selecting Subs and Suppliers After you have evaluated prospective subcontractors and suppliers Ask for bids on projects: A Bid Invitation Form is a useful tool for alerting them of upcoming projects. Compare bid sheets and select the best fit.

29 Sample Bid Invitation From GC to Subcontractor / Supplier

30 Sample of a Bad Sub Proposal

31 Sample of a Better Sub Proposal

32 Qualifying Bids Use the following steps to qualify bids submitted. Use a checklist to ensure that all necessary components are contained in each bid. Eliminate incomplete or late bids from the process Compare bid scope of work to verify bids are equivalent. Ask for clarification of any unclear information File unsuccessful bids for reference.

33 Avoid Select Projects Carefully Complicated contract terms Unreasonableness concerning price and change order process Broad or vague contracts Owner safety requirements Dual signatures on checks Contracts with liquidated damages Substantially increased liability insurance

34 Potential problems Financial loss Damaged Reputation Legal Liabilities

35 Job Acceptance Criteria Does the Job Meet your company s operational abilities Meet your company s design abilities Meet your company s financial abilities

36 Collect and Analyze Data Just as you collect and analyze data on financial operations, you should do the same for estimating and bidding operations. Your goal is to increase accuracy of bids and takeoffs, increase profitability, and streamline your estimating and bidding process.

37 Types of Data Collect the following types of data to analyze your estimating & bidding operations. Budget to actual cost comparisons Historical data from past estimates & bids on similar projects. Productivity rates.

38 Pricing Sources BNI RS Means The Guide The Gordian Group CTC Trade Service Marshall Swift Engineering News Record

39 Pricing Sources Design Construction Data Own Cost Records Suppliers, supplier catalogs Vendors Subcontractors quotes Commodity pricing- tied to Unit Costs

40 Notes From the Field Most business is relationship based. We all do business with individuals. All things being equal, most people will do business with their friends. All things not being equal, most people will still do business with their friends. Do not bid the competition! Bid the job.

41 Final Thought Every construction project is a prototype. This is why it is an estimate not a calculate.

42 Contact Information Melody Derrick Express Construction Co., Inc. (206) Pat Oda Neeley Construction & Cabinet Co. (253) Rory Woolsey The Gordian Group James Walsh Finishing Systems