1 BID ITEMS FOR THE CONSTRUCTION OF MESQUITE REGIONAL LANDFILL RAIL SPUR AND INTERMODAL YARD-STAGE I Item 1 - For the Construction of Mesquite Regiorial Landfill Rail Spur and Interrnodal Yard-Stage I, complete as shown and specified in the Contract Documents, but EXCLUDING the work described under Bid Items 2 through 13 below, the lump sum price of: = $ Item 2 - Furnish labor, equipment, and materials to provide approximately 9,500 tons ofportland cement for the' production ofonly soil cement and roller-compacted concrete including delivery and other appurtenances, complete as shown and specified in the Contract Documents, the $ ----=:-:--_...,--- per ton x 9,500 = $ _ Item 3 - Furnish labor, equipment, and materials to provide appro:ximately 15,300 tons ofrip-rap including delivery and placement, fabric, excavation, slurry fill, and other appurtenances, complete as shown and specified in the Contract Documents: Approximately 3,000 tons of" 1/4 ton" rip-rap, the Approximately 12,000 tons of"25 Ib" rip-rap, the $ per ton x 12,000 = $ _ Approximately 300 tons of"75 Ib" lip-rap, the $ per ton x 300 = $ _ Total for Item 3 =$, Item 4 - Furnish labor, equipment, and materials for the installation ofapproximately 6,000 linear feet of12-, 18-, 24-, 30-, and 36-inch dual-wall corrugated HOPE pipe including trenching, excavation, backfill, compaction, and all necessary fittings and appurtenances, complete as shown and specified in the Contract Documents: Approximately 1,400 linear feet of 12-inch dual wall corrugated HOPE pipe, the $ per I.f. x 1,400 = $, _ X-1626 Bid Item Page I of 5 ADDENDUM NO. I

2 Approximately 2,300 linear feet of 18-inch dual wall corrugated HDPE pipe, the $ per l.f. x 2,300 = $ _ Approximately 1,500 linear feet of 24-inch dual wall corrugated HDPE pipe, the $ per l.f. x 1,500 = $ _ (d) Approximately 600 linear feet of30-inch dual wall corrugated HDPE pipe, the unit price of: $ per l.f. x 600 = $ _ (e) Approximately 200 linear feet of36-inch dual wall corrugated HDPE pipe, the unit price of: $ per l.f. x 200 = $. _ Total for Item 4 Item 5 - Furnish labor, equipment, and materials for the installation ofapproximately 6,600 linear feet of6-, 8-, 12-, and 14-inch SDR 9 HDPE pipe including connection, trenching, excavation, backfill, compaction, testing and disinfection, fire hydrant stub-outs, utility markers, and all necessary valves, fittings and appurtenances, complete as shown and specified in the Contract Documents: Approximately 300 linear feet of 6-inch SDR 9 HDPE pipe, the $ per l.f. x 300 = $ _ Approximately 100 linear feet of 8-inch SDR 9 HDPE pipe, the $ per l.f. x 100 = $ _ Approximately 3,000 linear feet of 12-inch SDR 9 HDPE pipe, the $ per l.f. x 3,000 = $ _ (d) Approximately 3,200 linear feet of 14-inch SDR 9 HDPE pipe, the $ per l.f. x 3,200 = $ _ Total for Item 5 X-1626 Bid Item Page 2 of 5 ADDENDUM NO.1

3 Item 6 - Furnish labor, equipment, and materials for the installation ofapproximately 2,250 linear feet of4-, 6-, and 8-inch SDR 17 HOPEpipeincluding trenching, excavation, backfill, compaction, utilitymarkers, and all necessary valves, fittings and appurtenances, complete as shown and specified in the Contract Documents: Approximately 400 linear feet of 4-inch SDR 17 HOPE pipe, the $ per 1.f. x 400 = $ _ Approximately 650 linear feet of 6-inch SDR 17 HOPE pipe, the $ per I.f. x 650 = $ _ Approximately 1,200 linear feet of 8-inch SDR 17 HOPE pipe, the $. per 1.f. x 1,200 = $ _ Total for Item 6 Item 7 - Furnish labor, equipment, and materials to construct approximately 1,100 linear feet of cast-indrilled-hole (CIDH) piling for Bridge 4.35, including drilling, reinforcement, concrete, curing, testing, and inspection, complete as shown and specified in the Contract Documents: Approximately 350 linear feet of 36-inch CIDH piling, the $ per 1.f. x 350 = $ _ Approximately 750 linear feet of 42-inch CIDH piling, the Total for Item 7 = $ FOR ITEMS 8 THROUGH 13 ONLY: The District reserves the right to use all or none or any portion of the bid item without renegotiation ofthe bid price. Item 8 - Furnish labor, equipment, and materials to produce, transport, place, compact and cure approximately 1,000 cubic yards of soil cement in addition to what is shown and specified in the Contract Documents, but EXCLUDING the Portland cement covered in Bid Item No.2, the $ per c.y. x 1,000 = $ _ X-1626 Bid Item Page 3 of 5 ADDENDUM NO. I

4 Item 9 - Furnish labor, equipment, and materials to produce, transport, place, compact and cure approximately 1,000 cubic yards ofroller-compacted concrete in addition to what is shown and specified in the Contract Documents, but EXCLUDING the Portland cement covered in Bid Item No.2, the $ --,- per c.y. x 1,000 = $ _ Item 10 - Furnish labor, equipment, and materials to produce, transport, place and compact approximately 500 tons of Caltrans Class II aggregate base, in addition to what is shown and specified in the Contract Documents, the $ per ton x 500 = $ _ Item 11 - Furnish labor, equipment, and materials to construct approximately 2,500 linear feet of various fencing in addition to what is shown and specified in the Contract Documents: For constructing approximately 500 linear feet of6-foot chain link fence, including all necessary posts, stakes, fabric, fasteners, concrete footings, tension wires, trenching, backfill, compaction and appurtenances, the $ per J.f. x 500 = $ _ For the installation, maintenance, and removal ofapproximately 1,000 linear feet of Caltrans silt fencing, the For the installation, maintenance, and removal ofapproximately 1,000 linear feet of temporary rope fencing, the Total for Item 11 =$ Item 12 - Furnish labor, equipment, and materials for approximately 24 months of one(l) Galileo 102m Satellite Communication System (I.54m/512K bandwidth w/sla included), complete as shown and specified in the Contract Documents, the $ per mo. x 24 =$ X-1626 Bid Item Page 4 of 5 ADDENDUM NO.1

5 Item 13 - Furnish labor, equipment, and materials to conduct inspection and repair, if applicable, of approximately 8.5 miles of existing tortoise fence, complete as shown and specified in the Contract Documents: For inspection of approximately 8.5 miles of existing fence, six(6) times, as specified in Section 2H, Part ofthe Special Provisions, complete as shown and specified in the Contract Documents, the $. each x 6 =$ For repair of approximately 4,000 linear feet of existing fence, as specified in Section 2H, Part ofthe Special Provisions, complete as shown and specified in the Contract Documents, the $ per 1.f. x 4,000 = $ _ Total for Item 13 =$ ,-.,.., TOTAL OF BID ITEMS 1 THROUGH 13 FOR THE CONSTRUCTION OF MESQUITE REGIONAL LANDFILL RAIL SPUR AND INTERMODAL YARD-STAGE I = $ _ (Figures, Total) BID ITEMS AND TOTAL SHALL INCLUDE ALL APPLICABLE TAXES X-1626 Bid Item Page 5 of 5 ADDENDUM NO. I