1 SECTION (00041) SPECIAL INSPECTIONS PART 1 GUIDELINES As defined by the IBC 2003, Section 1704, Special Inspections of materials, installation, fabrication, erection of components and connections requiring special expertise to ensure compliance with the construction documents are required. Special inspections may include: structural steel framing, welding, concrete, masonry wall panels & veneers, or sprayed on fire-resistant materials. Special Inspections for the following may also be required for Seismic Resistance in compliance with IBC 2003, Section and Special Inspections for seismic resistance. 1. The seismic-force-resisting systems in structures assigned to Seismic Design Category C, D, E or F, as determined in section Designated seismic systems in structures assigned to Seismic Design Category D,E or F. 3. Architectural, mechanical and electrical components in structures assigned to Seismic Design Category C, D, E or F that are required in Sections and Structural steel 1. Continuous special inspections for structural welding in accordance with AISC 341. At the beginning of each project, the architect/engineer should review the project scope to determine if and what construction activities require special inspections and bring to the WUSM project managers attention. The architect should review all questionable areas with the building official/ Authority Having Jurisdiction. The owner or the registered design professional in responsible charge acting as the owner s agent shall employ one or more special inspectors to provide inspections during construction on the types of work listed under Section Exception: Special Inspections are not required on projects with work of a minor nature or as warranted by conditions in the jurisdiction as approved by the building official. PART 2 CONTRACT DOCUMENT GUIDELINES The registered design professional in responsible charge shall prepare a statement of special inspections to be submitted by the permit applicant. The statement shall include a complete list of materials and work requiring special inspections, the special inspections to be performed and a list of the individuals, approved agencies or firms intended to be retained for conducting such inspections (See attached Tables). PART 3 EXECUTION The owner or registered design professional shall seek competitive bids (minimum of 3 bids required) from the WUSM approved testing agencies master list for the professional services. The special inspector(s) shall be qualified who shall demonstrate competence, to satisfy the building official, for inspection of the particular type of construction or operation requiring special inspection. Acceptable Special Inspection Agencies: Geotechnology, Inc SSE Reitz PSI Shannon & Wilson END OF SECTION SPECIAL INSPECTIONS

2 Table Required Verification and Inspection of Steel Construction Steel Construction: The special inspections for steel elements of buildings and structures shall be as required by Section and Table Where required, special inspection of steel shall also comply with Section Verification and Inspection Continuous Periodic Referenced Standard IBC Referen ce 1. Material verification of high-strength bolts, nuts and washers. conform to ASTM standards specified in the approved construction documents. X b. Manufacturer s certificate of compliance required. 2. Material verification of high-strength bolts, nuts and washers. a. Bearing-type connections. X b. Slip-critical connections X X 3. Material verification of structural steel: conform to ASTM standards specified in the approved construction documents. b. Manufacturers certified mill test reports 4. Material verification of weld filler materials: conform to AWS specification in the approved construction documents. b. Manufacturer s certificate of compliance required. 5. Inspection of welding structural steel: a. Complete and partial penetration groove welds. Applicable ASTM material specifications; AISC 335, Section A3.4; AISC LRFD, Section A3.3 X AISC LRFD Section M ASTM A 6 or ASTM A 568 AISC, ASD, Section A3.6; AISC LRFD, Section A x b. Multi-pass fillet welds. x AWS D c. Single-pass fillet welds > 5/16 x d. Single-pass fillet welds > 5/16 x e. Floor and deck welds X AWS D Inspection of steel frame joint details for compliance with approved construction documents: X a. Details such as bracing and stiffening. b. Member locations. c. Application of joint details at each connection SPECIAL INSPECTIONS

3 Table Required Verification and Inspection of Concrete Construction Section Concrete Construction: The special inspections and verifications for concrete construction shall be as required by this section and Table Verification and Inspection Continuous Periodic Referenced Standard IBC Reference 1. Inspection of reinforcing steel. ACI 318: , X , , Item 5B 3. Inspect bolts to be installed in concrete prior to and during placement of concrete where allowable loads have been increased. 4. Verifying use of required design mix. X X 5. At the time fresh concrete is sampled to fabricate specimens for strength tests, perform slump and air content tests, and X determine the temperature of the concrete. 6. Inspection of concrete and shotcrete placement for proper application techniques. X 7. Inspection for maintenance of specified curing temperature and techniques. X ACI 318: Ch. 4, ASTM C 172, ASTM C 31, ACI , , , , , ACI 318:5.9, , , , , ACI 318: , , Erection of precast concrete members X ACI 318: Ch Verification of in-situ concrete strength, prior to stressing of tendons in posttensioned concrete and prior to removal of shores and forms from beams and structural slabs. X ACI 318: SPECIAL INSPECTIONS

4 Table Level 1 Special Inspection Masonry Construction: Masonry construction shall be inspected and evaluated in accordance with the requirements of this section. Inspection Task Continu ous during task listed Frequency of Inspection Periodically during task listed IBC Section Reference for Criteria ACI 530/ ASCE5/ TMS 402 ACI 530.1/ ASCE 6/TMS 602 As masonry construction begins, the following shall be verified to ensure compliance: Proportions of site-prepared mortar. X Art. 2.6A Construction of mortar joints. X Art. 3.3B Location of reinforcement and Art. 3.4, X connectors. 3.6A Prestressing technique X Art. 3.6 B Grade and size of prestressing Art. 2.4 B, X tendons and anchorages. 2.4H The Inspection program shall verify: Size and location of structural elements. X Art. 3.3G Type, size and location of anchors, including other details of anchorage of masonry to structural members, frames or other construction. Specified size, grade and type of reinforcement. Welding of reinforcing bars. Protection of masonry during cold weather (temperature below 40ºF) or hot weather (temperature above 90ºF). Application and measurement of X Sec (e), 2.1.4, X Sec Art. 2.4, 3.4 X X Sec , Sec , (b) SPECIAL INSPECTIONS Art. 1.8C, 1.8D X Art. 3.6 B prestressing force. Prior to grouting, the following shall be verified to ensure compliance. Grout space is clean. X Art. 3.2 D Placement of reinforcement and connectors and prestressing tendons and anchorages. Proportions of site-prepared grout and prestressing grout for bonded tendons. X Sec Art. 3.4 X Art. 2.6 B Construction of mortar joints. X Art. 3.3 B Grout placement shall be verified to ensure compliance with code and X Art. 3.5

5 construction document provisions Table Level 1 Special Inspection continued Grouting of prestressed bonded tendons Preparation of any required grout specimens, mortar specimens and/or prism shall be observed. Compliance with required inspection provisions of the construction documents and the approved submittals shall be verified. X Art. 3.6 C X Sec, , Art. 1.4 X Art. 1.5 SPECIAL INSPECTIONS