1 GOREE ARCHITECTS, INC Bellaire Blvd., Suite 105 Bellaire, TX Tel (713) DATE: February 22, 2016 FROM: TO: RE: Goree Architects, Inc. General Contractors of Record Tomball Ford Image Remodel and Additions Addendum No. 001 This Addendum No. 001 forms a part of the Contract Documents and modifies the original Bidding Documents dated February 5, Acknowledge receipt of this Addendum in the space provided on the Bid Proposal Form. This Addendum consists of ( 1 ) one page(s) as enumerated below plus attachments. I. Project Manual Item 1. Item 2. Item 3. Refer to Section and execute the following: Discard the previous Schedule of Values MS-Excel file and replace with the file attached to this addendum labeled R1. Refer to section and execute the following: Discard the previous Bid Proposal Form and replace with the file attached to this addendum dated February 22, Refer to section and execute the following: Discard the previous Invitation to Bid document and replace with the file attached to this addendum dated labeled R1 and dated February 22, END OF ADDENDUM NO. 001 Attachments: As noted in addendum.

2 Tomball Ford IMAGE REMODEL & ADDITIONS INVITATION TO BID 1.1 Project: Tomball Ford Image Remodel & Additions Tomball PKWY. Tomball, TX Owner: Ben Keating Port Lavaca Auto Group 1801 HWY 35 South Port Lavaca, TX Architect: Civil Engineer: Goree Architects, Inc. Gessner Engineering 4710 Bellaire Boulevard 2501 Ashford DR. Suite 105 College Station, TX Phone: Phone: Project Architect: Michael Wanja Project Engineer: Jeremy Peters 1.4 Project Description: Construction of image remodel and additions to existing sales, service, parts, and business building in Tomball (Harris County). Work is exclusive of all Furniture, Fixtures, and Equipment unless otherwise expressly noted. [Power supplies and connections are included the Contractor s Work Scope.] All construction related permits (building, site development, etc.) are included in the Contractors Scope of Work. Impact or related fees will be the responsibility of the Owner. Construction Testing will be provided as an allowance as instructed in the allowances section of the Project Manual and Bid Proposal Form. 1.5 Bid Date and Time Bids are due by 2:00pm CT, Thursday, March 10th, Contractor may send a copy of its bid package via Proposal Form: A Bid Proposal Form is provided and required to be filled out accordingly as part of your submission. February 22, 2016

3 1.7 Bonds: No Bid Bond or Bid Security is required. A Performance and Payment Bond will be required in the amount of 100% of the Contract Sum from the successful bidder. Each bidder will accompany its bid with a signed certificate from a surety company acceptable to the Owner stating that such surety will be provided by the bidder, if awarded the Contract. Also indicate the bidder s total bonding capacity, and how much of this capacity is presently used. The cost for the Bond will be indicated on the attached Bid Proposal Form. 1.8 Documents: Each Bidder will be provided with an electronic set of Contract Documents in PDF format for its use. Any printing will and/or costs will be the responsibility of the Bidder. 1.9 Bid Period: No Bid may be withdrawn for a period of thirty (30) days after the date of the receipt of bids Contract Form: A Standard Form of Agreement Between Owner and Contractor where the basis of payment is Stipulated Sum Project Schedule: 1. A Letter of Intent to Award a construction contract will be issued within (3) weeks of bid receipt. 2. Provide the number of construction days in the allotted spacing on the Bid Proposal Form which will include weather days and punch list 1.12 Other: 1. Contractor shall provide Builders Risk Insurance coverage for the full value of the Work. Contractor will provide a summary level Critical Path Schedule with its bid form indicating major activities/milestones and proposed Certificate of Occupancy date & Final Completion. [Note: All dates will be referenced in calendar days using receipt of Building Permit as a basis for starting.] February 22, 2016

4 BID PROPOSAL PROPOSAL OF (Name of Bidder) BID PROPOSAL for the CONSTRUCTION of: TOMBALL FORD IMAGE UPGRADE & ADDITIONS TOMBALL, TEXAS Dear Sir: C/o GOREE ARCHITECTS, INC. ARCHITECT The undersigned, having examined the Drawings, Specifications and related documents, the site of the proposed Work, being familiar with all of the conditions relating to the construction of the proposed project, including the availability of materials and labor, hereby proposes to furnish all labor, materials, services, equipment and appliances required in connection with or incidental to the construction of, Tomball Ford Image Remodel & Additions, for the following in strict conformance with the Specifications, Drawings, Addenda and Invitation to Bidders prepared by GOREE ARCHITECTS, INC., itemized as follows: BASE BID AMOUNT OF: The following Addenda have been included: Dollars ( ).. PROJECT CONSTRUCTION TIME (Calendar Days). EXTENDED GENERAL CONDITIONS COST PER DAY: Dollars ( ). Liquidated Damages and Early Completion Bonus: The Owner and Contractor agreement shall include a Liquidated Damages and Early Completion Bonus clause of two thousand dollars per day ($2,000.00/day). Owner shall deduct from the contract sum two thousand dollars per day ($2,000.00/day) for each day that the Contractor exceeds the adjusted construction time. Owner will award the Contractor two thousand dollars per day ($2,000.00/day) for each day of early completion from the adjusted construction time. Approved Change Order(s) will change adjusted time only.

5 BID PROPOSAL Page 2 Tomball Ford - Image Remodel & Additions Tomball, Texas Base Bid includes the following: 1. Allowances: A. Allowance(s) Included in Base Bid: 1 Testing Laboratory Services $ 15, Owner Contingency $ 50, Total of cash allowances to be included in Base Bid: $ 65, Construction Time: a. Project Construction Time: Shall include the following: Rain Days per Month a. January 3 g. July 4 b. February 4 h. August 4 c. March 4 i. September 4 d. April 2 j. October 3 e. May 5 k. November 5 f. June 6 l. December 4 b. Project construction time may be extended for additional Rain days by Change Order only. c. Project construction time shall commence five (5) working days after receipt of written notice to proceed or receipt of the building permit, whichever is later. d. Project construction time shall include 30 calendar days for the contractor to complete or correct all punch list items incorporated in the Certificate of Substantial Completion. 3. Retainage: Upon entering into contact with owner, 10% of monthly Contractor s Application for Payment will be held in retainage until the completion of the Project.

6 BID PROPOSAL Page 3 Tomball Ford - Image Remodel & Additions Tomball, Texas PROPOSED SUBCONTRACTORS: (THIS MUST BE FILLED IN AND SUBMITTED WITH BID.) The following are principal subcontractors: Structural Steel: (Material Supplier) (Erector Contractor s Name) (Erector Contractor s Address) Mechanical Work: Electrical Work: Plumbing Work: Concrete Work:

7 BID PROPOSAL Page 4 Tomball Ford - Image Remodel & Additions Tomball, Texas RESPECTFULLY SUBMITTED BIDDERS (Corporations only) Fill in the following BIDDERS (Other than Corporations) Fill in the following (Legal name of Corporation) (State of incorporation) (Name of officer printed) (Signature of officer) (Title of officer) (Date) (Legal name of bidding firm) (Name of officer printed) (Signature of officer) (Title of officer) (Date) WITNESS Fill in the following (Name of witness printed) (Signature of witness) (Address of witness) (Date)