1 ADVANCE CONCRETE & PRE-CAST HOLDING PTY LTD A.C.N Victoria street Riverstone N.S.W. P.O Box130 Riverstone n.s.w Phone fax Introduction To supply Grease Traps of 1000 and 1500 Litres to plumbers for restaurant, shops and other related premises. Compared to Waterboard design internals are the same, but outside is the only changes in shape, instead off a T frame, we changed to a H frame base for more stable for transport and installation for above and below ground installation. Rubber ring joints for vent pipe to suit 100mm PVC for ground movement Installation Above ground To install these type of Grease Arrestors (Trap) refer to drawing on 9 for a concrete slab for the pit to sit on. Or equivalent to supporting weight of this type in approx 2500 Kgs (note: not weighed or calculated.( to be advised)), and water content.1500 Kg for 1500 Litre Grease trap, or 1000 Kg for 1000 Litre, to ensure the pit level and supported from falling over. All pipes will have to be braced to ensure the pipe don t sage. NOTE: crash barriers or Ballard s must be fitted to prevent the pit being hit. Below ground After digging hole, level and compact ground, place embedment refer to AS section to hold the determined weight. Connect pipe to the outer collar by glue or as per PVC type to inlet and outlet pipes to ensure there is fall to the inlet side of the Pit and fall away from the outlet side of the Pit. Vent pipe, just lubricate plastic PVC pipe with a waterbased lubricant, push plastic pipe into the rubber seal, the vent side must be ventilated will 100mm induct air vent or micaflap vent for air circulation. On top of the inlet and outlet pipe a inspection pipe must be connected to ground level with an air tight inspection type apparatus eg: inspection box. 1

2 When back filling ensure the utility operator does not move the Pit as it is back filled and compacted evenly. Minimum of 300 mm or greater around the pit. Back fill material to be a clean granular type e.g. road base or 14 mm gravel not clay or plastic material to be used. Before lid or riser are fitted. Heights are to be checked for step height if needed. Lifting holes have to be grouted and sealed. Grease trap to be filled immediately after installation to ensure pit don t float Risers Lids Note Before placing Risers on top of Pits you must place a sealing joint between the Pit and Riser to prevent water leaking into the Pit. After placing Riser on top of Pit any exposed concrete must be Sealed with a Tar base paint. Before placing Lids on top of Pit you must place a sealing joint between the Lid and the Pit/Riser to prevent water leaking in to the Pit. After placing Lid on top of Pit/Riser you must open Cast Iron Cover to check for any exposed concrete, if so it must be sealed with a tar based paint. Any Council or Waterboard inspections to be carried out during installation have to be done according to local requirements or Waterboard requirements. The identification plate must be able to be seen during these inspections. Or refer to the guidelines for the on site pretreatment of trade waste water discharge. 2

3 Applicability For all food related drainage waste e.g.: takeaway shops or other related food preparation. If in pump situation 1000 litre.3 litre per second pump shall be used 1500 litre.5 litre per second pump shall be used The lifting weight and manufacture of the cast iron cover used in the top of 1000/1500-litre grease trap lid. Are as follow. 600 x 450 h/d cast iron havestock 40-kg solid top 600 x 450 h/d cast iron romwood 48 kg in fill 600 x 450 l/d cast iron romwood 28 kg in fill 600 x 450 l/d cast iron Durham 28 kg in fill 450 x 450 h/d cast iron havestock 27-kg solid top 450 x 450 h/d cast iron advance c 40 kg in fill 450 x 450 l/d cast iron advance c 23 kg in fill 450 x 450 l/d cast iron romwood 24 kg in fill 600 x 600 l/d cast iron romwood 35 kg in fill Note: Lifting weights are ½ the actual weights due, to lifter are fitted on one side. The way it is to be lifted is. Lift one side and slide cover away, to access the pit. Material ALL concrete used shall be 32 mpa and supplied by accredited cement company e.g. HYMIX ALL steel mesh or metal fibers used shall be supplied by an accredited company e.g. BHP ALL plastic PVC pipe used shall be accredited e.g. VINIDEX All rubber used will be Water board approved All tar base paint will be Water board approved ALL metal covers used will be to accordance with AS3996 are tested to design weights e.g. 210kN see attached for tested weight 3

4 Quality control It will be up to foreman to inspect all operation of production to ensure the highest standards are maintained and recorded. All material used will be accredited before use and filed for future reference and warranties. Compliance Plate Compliance plates are fitted for identification for plumbers and inspectors. Also for warranties and traceability, on each plate shall have * Date of Manufacture * Rate of flow if pumps are used * Size * Model Reference to attached document on s 5 and 6 Maintenance To be determined by Water board as per requirement and by site use. After pit being emptied and cleaned pit is to be filled by clean water. Warranties There will be a 5-year warranty on these Grease Traps on workmanship in manufacture of these products NOT on installation, during cleaning, neglect or other related devices or products Australian standards References AS/NZS: Discharge of commercial and industrial liquid Water to sewer. AS Metal Access Cover, Road Grates & Frames AS National Plumbing & Drainage code. 4

5 MP52 Manual of authorisation procedures for Plumbing & drainage products. Appendix Compliance plate 1500 litre drawing 5 Compliance plate 1000 litre drawing 6 Grease trap 1000 litre drawing 7 Grease trap 1500 litre drawing 8 Concrete slab above ground to Suit 1000/1500-litre pit 9 Advance. Cast iron cover test result 10 copy only 5

6 6

7 Note all drawing not to scale on disk. Scale drawing attached. 7

8 Version 1 copyright to Advance Concrete & Precast Pty Ltd 13/4/99 8

9 Version 1 copyright to Advance Concrete & Precast Pty Ltd 13/4/99 9

10 Version 1 copyright to Advance Concrete & Precast Pty Ltd 13/4/99 10

11 Version 1 copyright to Advance Concrete & Precast Pty Ltd 13/4/99 11