1 PROPOSAL PROPOSAL OF, a corporation a partnership consisting of and an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instruction and Invitations to Bidders, the undersigned proposes to furnish all labor and materials as specified and perform the work required for the construction of new water mains and appurtenances for the San Antonio Water System (SAWS) in accordance with the Plans and Specifications for Hidden Springs Water Project.. The work will be performed for the following prices to wit: Hot Mix Asphaltic Pavement, SY 1,800 Type B (12" Comp Depth); Hot Mix Asphaltic Pavement, SY 12,984 Type D (2" Comp Depth); Salvaging, Hauling, and Stockpiling SY 12,984 Reclaimable Asphaltic Pavement (2" Comp Depth); Concrete Curb; LF 38 BP-1

2 505.1 Concrete Riprap (9 Thick); SY Topsoil (4 ); CY Bermuda Sodding; SY Barricades, Signs and Traffic Handling; LS Temporary Sediment Control Fence; LF 1, Curb Inlet Gravel Filters; LF Trench Excavation Safety Protection; LF 4,299 BP-2

3 818 6 PVC Waterline LF 221 (Restrained as Required); PVC Waterline LF 1,205 (Restrained as Required); PVC Waterline LF 2,843 (Restrained as Required); 824 Relay ¾ Short Service EA Relay ¾ Long Service EA Relay Dual 1 Short Service EA Relay 2 Service EA 1 BP-3

4 828 6 Gate Valves; EA Gate Valves; EA Gate Valves; EA Fire Hydrants; EA Pipe Fittings, All Sizes and Types; TON " Water Tie-Ins; EA " Water Tie-Ins; EA 1 BP-4

5 841 Hydrostatic Testing; EA " Blowoff, Temporary; EA " Air Release Assemblies; EA Jacking, Boring and Tunneling 24 ; LF Carrier Pipe for Jacking, LF 40 Boring and Tunneling; Casing or Liner 24 ; LF Pressure Relief Valve Assembly EA 8 BP-5

6 Hidden Springs Main Line EA 2 Pressure Reducing Valve Assembly LINE ITEM A SUB-TOTAL BASE BID $ 100. Mobilization LS 1 Percent of the Line Item A Subtotal Base Bid Written In Words Percent $ XXXX $ (Maximum of 10% of the Line Item A Sub-total Base Bid amount); 101. Preparing Right of Way LS 1 Percent of the Line Item A Subtotal Base Bid Written In Words Percent $ XXXX $ (Maximum of 5% of the Line Item A Sub-total Base Bid amount); MOBILIZATION AND PREPARING ROW SUB-TOTAL $ Mobilization lump sum bid shall be limited to a maximum 10% of the Line Item A Sub-total Base Bid amount. Preparing Right-of-Way lump sum bid shall be limited to a maximum of 5% of the Line Item A Sub-total Base Bid amount. The Line Item A Sub-total base bid is defined as all bid items EXCLUDING Item 100, Mobilization and Item 101, Preparing Right-of-Way. In the event of a discrepancy between the written percentage and dollar amount shown for Mobilization and Preparation of ROW bid items the written percentage will govern. If the percentage written exceeds the allowable maximum stated for mobilization and or preparation of ROW, SAWS reserves the right to cap the amount at the percentages shown and adjust the extensions of the bid items accordingly. BP-6

7 TOTAL BID AMOUNT (Line Item A, Mobilization, & Preparing Right of Way) $ CENTS The contractor herein acknowledges receipt of the following: Addendum Nos. DOLLARS AND BIDDER'S SIGNATURE & TITLE FIRM'S NAME (TYPE OR PRINT) FIRM'S ADDRESS FIRM'S PHONE NO./FAX NO. FIRM'S ADDRESS OWNER RESERVES THE RIGHT TO ACCEPT THE OVERALL MOST RESPONSIBLE BID. The bidder offers to construct the Project in accordance with the Contract Documents for the contract price, and to complete the Project within 240 calendar days from notice to proceed date. The Bidder understands and accepts the provisions of the contract Documents relating to liquidated damages of the Project if not completed on time. Complete the additional requirements of the Proposal, which are included on the following page. BP-7