Titan Tower. Equipment Manufacturer WIN-1651

Size: px
Start display at page:

Download "Titan Tower. Equipment Manufacturer WIN-1651"

Transcription

1 Equipment Manufacturer WIN-65

2 Equipment Manufacturer WIN-65 Marine Terra Moss

3 EQUIPMENT SIZE: 3,38m x 4,52m x 3,8m USE ZONE: 7,09M x 8,3M AREA: PERIMETER: 47,57 SqM. 25,3M FALL HEIGHT:,22M USER CAPACITY: AGE GROUP: Total Elevated Play Activities: Total Ground-Level Play Activities: Elevated Activities Ground-Level Activities Ground-Level Play Types Required Provided 0 5' 0' ASTM F487- CPSC #325 PROJECT NO: SCALE: DRAWN BY: DATE:

4 EQUIPMENT SIZE: 3,38m x 4,52m x 3,8m USE ZONE: 7,09M x 8,3M AREA: PERIMETER: 47,57 SqM. 25,3M FALL HEIGHT:,22M USER CAPACITY: AGE GROUP: Total Elevated Play Activities: Total Ground-Level Play Activities: Elevated Activities Ground-Level Activities Ground-Level Play Types Required Provided 0 5' 0' ASTM F487- CPSC #325 PROJECT NO: SCALE: DRAWN BY: DATE:

5 COMPONENT FOOTING (DETAIL 3) SPIRAL SLIDE CENTER POST FOOTING (DETAIL) SUPPORT POST FOOTING (DETAIL or 4) (2" INDICATES POST LENGTH) CANTILEVER, "T" POST, AND COMPONENT POST FOOTING (DETAIL 2) (ZZCH850 INDICATES PART NUMBER) GROUND ZERO POST FOOTING (DETAIL 2) (44" INDICATES POST LENGTH) SCALE: DRAWN BY: DATE:

6 COMPONENT FOOTING (DETAIL 3) 56" 56" 36" 36" SPIRAL SLIDE CENTER POST FOOTING (DETAIL) 56" 56" 36" SUPPORT POST FOOTING (DETAIL or 4) (2" INDICATES POST LENGTH) CANTILEVER, "T" POST, AND COMPONENT POST FOOTING (DETAIL 2) (ZZCH850 INDICATES PART NUMBER) GROUND ZERO POST FOOTING (DETAIL 2) (44" INDICATES POST LENGTH) PROJECT NO: SCALE: DRAWN BY: DATE:

7 Design Number: WIN-65 - Bill Of Material Ref. No. Part No. Description Quantity Posts ZZCH in OD x 36in STEEL POST W/ RIVETED CAP 3 2 ZZCH in OD x 56in SWAGED STEEL POST 4 Decks & Kick Plates 3 ZZCH066 SQUARE COATED DECK ASSEMBLY 4 ZZCH067 TRIANGULAR COATED DECK ASSEMBLY ADA Items 5 ZZCH2006 TRANSFER STATION (36in DECK) 6 ZZUN209 APPROACH STEP FOR TRANSFER STATION Slides 7 ZZCH2666 STAINLESS STEEL LIGHTNING SLIDE (36in DECK) 8 ZZCH2667 STAINLESS STEEL LIGHTNING SLIDE (48in DECK) Activity Panels 9 ZZCH4290 POST MOUNTED STEERING WHEEL Climbers 0 ZZCH80 BEANSTALK CLIMBER (48in DECK) ZZCH8289 RIBBON CLIMBER (36in DECK) Roofs & Arches 2 ZZCH9626 SQUARE PEAK ROOF Stairs and Ladders 3 ZZCH968 2in ACCESS STEPPED PLATFORM (DECK TO DECK) Additional Tool & Maintenance Kits 4 ZZCHGUID CHALLENGER GUIDELINES 5 ZZUN990 SURFACING WARNING LABEL KIT 6 ZZUN9930 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL Tuesday, December 08, 205 Page of Playworld.com

8 Design Number: WIN-65 - Compliance and Technical Data Reference Document: ASTM F487 Ref. No. Part No. Qty. Description Unit ASTM Status Total Weight (lbs) Pre- Post- Consumer Recycled Content (lbs) CO2e Footprint (kgs) Users Install Hours Concrete (Yds3) Active Play Events ZZCH in OD x 36in STEEL POST W/ RIVETED Certified CAP 2 ZZCH in OD x 56in SWAGED STEEL POST Certified ZZCH066 SQUARE COATED DECK ASSEMBLY Certified ZZCH067 TRIANGULAR COATED DECK ASSEMBLY Certified ZZCH2006 TRANSFER STATION (36in DECK) Certified ZZUN209 APPROACH STEP FOR TRANSFER STATION Certified ZZCH2666 STAINLESS STEEL LIGHTNING SLIDE (36in Certified.24 2, DECK) 8 ZZCH2667 STAINLESS STEEL LIGHTNING SLIDE (48in Certified , DECK) 9 ZZCH4290 POST MOUNTED STEERING WHEEL Certified ZZCH80 BEANSTALK CLIMBER (48in DECK) Certified ZZCH8289 RIBBON CLIMBER (36in DECK) Certified ZZCH9626 SQUARE PEAK ROOF N/A ZZCH968 2in ACCESS STEPPED PLATFORM (DECK TO Certified DECK) 4 ZZCHGUID CHALLENGER GUIDELINES N/A ZZUN990 SURFACING WARNING LABEL KIT Certified ZZUN9930 PIPE SYSTEMS MAINTENANCE KIT W/ N/A AEROSOL Totals:, , Kg 02 Kg 20 Kg 8 Metric Tons 0.92 m3 Tuesday, December 08, 205 Page of 2 Playworld.com

9 Design Number: WIN-65 - Compliance and Technical Data Reference Document: ASTM F487 Ref. No. Part No. Qty. Description Unit ASTM Status Total Weight (lbs) Pre- Post- Consumer Recycled Content (lbs) CO2e Footprint (kgs) Users Install Hours Concrete (Yds3) Active Play Events ASTM F487 The lay-out for this custom playscape, design number WIN-65, has been configured to meet the requirements of the ASTM F487 standard. In addition, each of the above components listed as "Certified" have been tested and are IPEMA certified. Components listed as "Not Applicable" do not fall within the scope of the ASTM F487 standard and have not been tested. IPEMA certification can be verified on the IPEMA website, In the interest of playground safety, IPEMA provides a Third Party Certification Service which validates compliance. 200 ADA Standards for Design The lay-out was also designed to meet the 200 Standards published 5-Sep-200, by the Department of Justice when installed over a properly maintained surfacing material that is in compliance with ASTM F95 "Accessibility of Surface Systems Under and Around Playground Equipment" as well as ASTM F292, "Impact Attenuation of Surfacing Materials Within the Use Zone of Playground Equipment", appropriate for the fall height of the structure. Installation Times Installation times are based on one experienced installer. A crew of three experienced individuals can perform the installation within the given time, each member working /3 of the given hours. [Eg. Installation Time = 30 hours. For a crew of three, each member will work 0 hours on the installation for a total of 30 hours on the project.] Carbon Footprint The CO2e (carbon footprint given in Kilograms and Metric Tons) listed above is a measure of the environmental impact this play structure represents from harvesting raw materials to the time it leaves our shipping dock. Playworld Systems nurtures a total corporate culture that is focused on eliminating carbon producing processes and products, reducing our use of precious raw materials, reusing materials whenever possible and recycling materials at every opportunity. Playworld Systems elected to adopt the Publicly Available Specification; PAS 2050 as published by the British Standards Institute and sponsored by Defra and the Carbon Trust. The PAS 2050 has gained international acceptance as a specification that measures the greenhouse gas emissions in services and goods throughout their entire life cycle. Pre-Consumer Recycle Content A measurement, in pounds, that qualifies the amount of material that was captured as waste and diverted from landfill during an initial manufacturing process and is being redirected to a separate manufacturing process to become a different product. E.g. 00% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as rods, flat bars and H-channels. Post-Consumer Recycle Content A measurement, in pounds, that qualifies the amount of material that was once another product that has completed its lifecycle and has been diverted from a landfill as a solid waste through recycling and is now being used in a Playworld Systems' product. E.g. **20% to 40% of the steel in our steel tubing and sheet steel have been diverted from landfills. Automobiles are scrapped and recyclable steel is purchased by the steel mill that produces our raw product. ** The amount of Post-Consumer recycled steel fluctuates daily based on the availability of the recycled steel. Tuesday, December 08, 205 Page 2 of 2 Playworld.com