- Views:
Transcription
1 Zinc Rich Paint in a Pigeon Rich Environment
2 Achieving Bridge Rehab without Going to Rehab
3 Louisville Bridge Rehabilitation
4 Lea Joyner Bridge Rehabilitation US 80 / Ouachita River Monroe/West Monroe Ouachita Parish District 05
5 Bridge Type: Year Built: Total Length: Roadway: ADT: Movable / Bascule ft (4) - 10 ft lanes & sidewalks 40,000 (1) 160-ft Bascule Span (two 80-ft leaves) (9) 40-ft Concrete Deck Girder Approach Spans (6) 100-ft Deck Truss Spans (2) 20-ft Steel Girder Spans (over counterweights)
6 South Elevation
7 West Bascule Leaf
8 South Elevation
9 Approach Spans
10 Lea Joyner Bridge Rehabilitation Phase 1 Phase 2 S.P S.P
11 Designer: Contractor: Huval & Associates, Inc. Modjeski & Masters, Inc. LA DOTD Bridge Design Section Kiewit Louisiana Co. Designer: Phase 1 Phase 2 Contractor: LA DOTD Bridge Design Section PCL Civil Constructors, Inc.
12 Scope of Work: Phase 1 Phase 2 Structural Electrical Mechanical Architectural
13 Structural Electrical Mechanical Architectural Phase 1 Phase 2 40% 60% 60% 40% Cost $ 9.8 M $ 3.0 M $ 0.9 M $ 0.9 M Temp. Signs, Barricades, DMS units Site Lab Mobilization Cleaning, Clearing & Grubbing $ 14.6 M $ 17.3 M
14 Structural Concrete Cracked Caps and Girder Ends End Wall Repairs & Added Girder Supports Major Spalls / Caps & Deck Undersides Jammed Fascia Joints Timber Fender System (Partial Replacement) Deck & Sidewalk Joint Seals Added Seismic Lateral Restraints Steel Members (Replace, Strengthen, or Repair) Steel Connections, Splices, Stiffeners Deficient Rivets High Strength Bolts Clean & Paint Structural Steel New Steel Grid Floor / Conc. Lane Lines Deck Epoxy Overlay Added Steel Curb Rail / New Conc. Curb
15 Failed End Wall
16 Cracked Bent Cap
17 Repaired Bent Cap
18 Repaired Bent Cap
19 Cracked Girder Bearing
20 Jammed Fascia Joint
21 Cliff Swallow Nests
22 Steel Overhang Gusset
23 Deck Truss Stringers
24 Deck Truss Stringers
25 Deck Truss Stringers
26 Deck Truss Stringers
27 Deck Truss Bottom Chords
28 Floor Beam Bottom Chords
29 Floor Beam Bottom Chords
30 Floor Beam Bottom Chords
31 Floor Beam Bottom Chords
32 Rivet Replacement w/ Bolts
33 Machinery Truss
34 Machinery Truss
35 Machinery Truss Trunnion Truss Machinery Support Beams
36 Machinery Support Beam
37 Machinery Truss
38 Machinery Truss
39 Machinery Truss
40 Dead Load Load Transfer
41 Dead Load Stress Transfer
42 Dead Load Load Transfer
43 Stairs
44 Spalled Curb
45 Removed Curb
46 Removed Curb
47 Removable Sidewalk Panel
48 Added Curb Rail
49 Old Grid Floor
50 New Grid Floor
51 New Grid Floor
52 New Grid Floor
53 Bicycle Detour
54 1950: Steel Risers + Steel Grid Floor 1936: Timber Risers + Timber Planks + Asphalt Stringers Rotation Point Main Support Trunnion CWT Balancing Act
55 2012: New Steel Grid Floor, Added Conc. + Curb Rail Stringers Rotation Point Main Support Trunnion CWT Balancing Act
56 Electrical (New) Electrical System (230 V 480 V) Control System and Switchboard Drive Motors and Brakes Conduit and Wiring House Lighting Traffic Signals and Gates Navigational Lighting Generator Submarine Cables Walkway Lighting
57 Old Generator
58 New Generator
59 New Disconnect Boxes
60 New Breaker Box
61 New Breaker
62 New Transfer Switch
63 Old Walkway Lighting
64 Old Walkway Lighting
65 New Walkway Lighting
66 New Walkway Lighting
67 New Walkway Lighting
68 New Walkway Lighting
69 Mechanical New Gears New Machinery Houses Live Load Shoes / Clean & Adjust Center Span Locks / Clean & Adjust Clean & Paint Machinery and Machinery Houses Temporary Operating System Bascule Span Balancing
70 Center Span Locks
71 Center Span Locks
72 Center Span Locks
73 Center Span Locks
74 Center Span Locks
75 New Gears
76 New Gears
77 New Gears
78 Gear Removal System
79 Temp. Operating System
80 Temp. Operating System
81 Architectural (4) Houses / Refurbished New Doors and Windows Roof and Gutter Repair New Stairway Hatches New Louvers and Exhaust Piping Removed Sinks, Toilets, Piping, Valves Class 2A Concrete Special Finish Added Lea Joyner Plaques
82 House (Before)
83 House (After)
84 House (After)
85 House & Lighting (Before)
86 House, Curb Rail & Lights
87 Steel and Concrete Color
88 Steel and Concrete Color
89 Steel and Concrete Color
90 Approaches (Before)
91 Approaches (After)