1 Facility Assessment Report Thomas J Higgins Elementary Community Academy This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a 7-point scale: rank 7 means the item is in new or in good condition and no work is required while rank means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank 5 or 6) or full replacement (rank 2, 3 or 4). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report. Campus Summary Building ame ear Constructed umber of Floors Building Area (Sq Ft) Assessed eed Main ,500 $,50,220 Addition ,803 $449,745 SITE $48,530 Campus Total 5,303 $2,08,496 Building: Main Category: Building Exterior Entrance Foundation Lighting Entrance Control - Audio and Video EA 7 Exterior Doors - Exterior Steel Door 7 EA 6 $48 dents, faded paimt Exterior Doors - Exterior Steel Door 8 EA 6 $48 dents, faded paint Exterior Doors - Exterior Steel Door 9 EA 5 $,34 chipped paint, dents Exterior Doors - Exterior Wood Door 0 / Boiler Room 2 EA 5 $2,683 paint peeling, slight water damage Exterior Doors - Exterior Wood Door 2 2 EA 5 $2,683 water damage, graffiti, chipped wood; chained at interior Exterior Doors - Store Front 2 EA 6 $,092 Exterior Stairs - Concrete 2 2 LF 6 $98 Exterior Stairs - Concrete 7 3 LF 6 $245 Exterior Stairs - Concrete 8 3 LF 6 $245 Exterior Stairs - Concrete 9 6 LF 5 $,753 cracking at landing Power Door Operator and Controls EA 7 Foundation - Concrete Entire Building 368 LF 7 Superstructure - Concrete Entire Building 9,365 SF 7 Exterior Lighting - Parapet or Roof Mounted Entire Building / Roof 8 EA 6 $4,292 HIGGIS Page of 30

2 Building: Main Category: Building Exterior Roof System Thomas J Higgins Elementary Community Academy Chimney - Brick Chimney- Concrete/ Mortar Liner 3 / South 8 LF 6 $7,637 efflorescence Chimney - Brick Chimney- Concrete/ Mortar Liner 3 / South 32 LF 7 Coping - Metal 82 LF 7 gravel stop Coping - Metal 2 20 LF 7 gravel stop Coping - Metal 2 94 LF 7 Coping - Metal LF 7 gravel stop Coping - Metal LF 7 gravel stop Coping - Metal 4 45 LF 7 Downspouts - Exterior Downspouts 3 LF 7 Downspouts - Exterior Downspouts 4 64 LF 7 Downspouts - Interior Downspouts 23 LF 7 Downspouts - Interior Downspouts 2 49 LF 7 Downspouts - Interior Downspouts 3 25 LF 7 Downspouts - Interior Downspouts 4 2 LF 7 Parapet - 6" - 30" Height 4 45 LF 7 Parapet - Parapet < 6" Height 2 94 LF 7 Roof Structure - Steel / Metal Deck/ Concrete Topping 756 SF 7 Roof Structure - Steel / Metal Deck/ Concrete Topping 2 6,690 SF 7 Roof Structure - Steel / Metal Deck/ Concrete Topping 3 5,29 SF 7 Roof Structure - Steel / Metal Deck/ Concrete Topping 4 6,733 SF 7 Roof - Modified Bitumen 756 SF 5 $5,903 ponding Roof - Modified Bitumen 2 6,6 SF 7 Roof - Modified Bitumen 2 / South 50 SF 5 $,428 ponding Roof - Modified Bitumen 3 5,066 SF 7 Roof - Modified Bitumen 3 / orth 25 SF 5 $3,570 ponding Roof - Modified Bitumen 4 6,733 SF 7 Walls Canopy - Concrete/ Stucco Entire Building 30 SF 6 $0,258 Cornice - Metal Projecting Entire Building 368 LF 7 metal fascia- new Exterior Walls - Brick Entire Building 8 SF 5 $90 wet masonry from leaking pipe Exterior Walls - Brick Entire Building 7,428 SF 7 4sf slightly deteriorated mortar on west facade Exterior Walls - Brick Entire Building / orth West 0 SF 5 $238 stepcracking Exterior Walls - Stone-Cut Entire Building 88 SF 6 $,264 Exterior Walls - Stone-Cut Entire Building / West Façade 4 SF 5 $70 tar Windows Curtain wall - Glazed Double Pane Entire Building,260 SF 6 $4,26 fixed HIGGIS Page 2 of 30

3 Building: Main Category: Building Exterior Windows Thomas J Higgins Elementary Community Academy Curtain wall - Insulated Panel Entire Building,944 SF 6 $2,795 dented Curtain wall - Louver Entire Building 90 SF 6 $,009 Curtain wall - Windows Entire Building 420 SF 6 $4,709 hopper Guard - Guards perforated Entire Building,950 SF 7 Lintels - Stone Entire Building 8 LF 6 Windows - Decorative Entire Building / West Façade 60 SF 7 glass block Windows - Louver Entire Building / East Façade 9 SF 6 $67 Windows - Sash Aluminum Double-pane Entire Building / East Façade 08 SF 6 $806 Building Exterior Subtotal: $99,347 Building: Main Category: Electrical System Emergency System Main Service Automatic Transfer Switch Mechanical Room / Boiler Room EA 4 $8, control Pitted. Showing signs of arcing. Emergency A/C Power - Corridors and Stairs Entire Building 4,492 SF 6 $,349 Emergency A/C Power - Gym Entire Building / st Floor 3,68 SF 6 $,78 Emergency Battery Packs - Gym Entire Building / st Floor 5 EA 6 $,03 eeds Batteries Exit Signs - Corridors and Stairs Entire Building 6 EA 2 $3,273 Exit signs are more than 20 years of age and they are not provided with battery backup. Exit Signs - Gym Entire Building / st Floor EA 6 $57 Batteries need to be replaced Exit Signs - Gym Entire Building / st Floor EA 7 Security System - CCTV Entire Building 30,754 SF 5 $24,88 System is being upgraded soon. Security System - CCTV Entire Building 30,754 SF 6 $9,235 Security System - Intrusion Detection Entire Building 30,754 SF 6 $7,96 Security System - Intrusion Detection Entire Building 30,754 SF 6 $7,96 Independent Electrical Service for emergency power Electrical Room EA 6 $2,92 Main Electrical Service A 20/208/3PH Mechanical Room / Boiler Room EA 6 $5,078 Switchgear is greater than years of age. PA System Entire Building 30,754 SF 6 $0,5 Multiple PA/clock modules are broken. Power Distribution Lighting and Power Panels - Above 00 A Entire Building EA 4 $6,578 o latch, deformed/degraded Lighting and Power Panels - Above 00 A Entire Building 7 EA 6 $3,479 Lighting and Power Panels - Above 00 A Entire Building 4 EA 7 Main Distribution Panels - Greater than 600 amp Entire Building / Boiler Room EA 6 $730 HIGGIS Page 3 of 30

4 Building: Main Category: Electrical System Electrical System Subtotal: $93,325 Building: Main Category: Safty System Fire Alarm Fire Alarm Panel Entire Building / st Floor EA 6 $6,6 Fire Alarm Strobe Lights Entire Building 9,365 SF 6 $6,923 Fire Alarm_System Entire Building 30,754 SF 6 $4,953 Serves the Main Building and Addition Safty System Subtotal: $28,28 Building: Main Category: Mechanical System Air Handling Systems Air Handling Unit- Package Multi Zone- Indoor- Hot Water Coils - Less than 6000 cfm Boiler Room EA 3 $8,207 Air Handling Unit-Package Single Zone- Indoor- Hot Water Coils Mechanical Room / 2nd Floor EA 3 $84, cfm Air Intake Boiler Room / Roof EA 6 $5,765 Air Intake Mechanical Room / East Façade EA 6 $5,765 Air Intake Mechanical Room / West Façade EA 3 $7,66 Zone Dampers Boiler Room / Entire Building 3 EA 6 $2,499 Zone Dampers Mechanical Room / 2nd Floor 2 EA 5 $3,827 Three Zones - Temps are not maintained in rooms Unit Inoperative Boiler Systems Gas Booster Heating Devices Boiler Auxiliary- Scotch Marine- Hot Water Boiler MBH Boiler Room EA 4 $82,879 Draft fan inoperative Hot Water Pump Boiler Room EA 6 $374 Hot Water Pump Boiler Room EA 5 $4,704 on Condensing- Scotch Marine- Hot Water Boiler MBH Boiler Room EA 6 $998 Gas Booster Boiler Room EA 6 $499 Cabinet Heaters - With Hot Water Coil Entire Building / st Floor EA 5 $,755 Fin Tube - Hot Water Entire Building 6 LF 6 $,520 Fin Tube - Hot Water Entire Building 7 LF 5 $,384 HIGGIS Page 4 of 30

5 Building: Main Category: Mechanical System Heating Devices Unit Heater - Hot Water Entire Building 3 EA 5 $4,595 Mechanical Plumbing Hot Water Pump - Less than 0 Mechanical Room / Boiler Room EA 6 $, Hydronic Supply and Return - Steel Entire Building 0 LF 5 $83,249 Piping is insulated/patched with duct tape Temperature Control Unit Ventilation Ventilation Pneumatic System Entire Building 30,754 SF 3 $60,08 Serves Entire School Thermostats - Pneumatic Entire Building EA 7 Thermostats - Pneumatic Entire Building 5 EA 6 Thermostats - Pneumatic Entire Building 4 EA 4 $2,949 Unit Ventilators- Floor Mounted- Hot Water Heating Coils Only Entire Building / st Floor 4 EA 4 $74,395 Deformed, portion of cover missing Unit Ventilators- Floor Mounted- Hot Water Heating Coils Only Entire Building 2 EA 5 $02,754 Exhaust Fans- Indoor - Less than 500 CFM Roof EA 4 $,278 Exhaust Fans- Roof Mounted - Less than 500 CFM Roof 5 EA 6 $,48 Type I Exhaust Hood- Culinary Arts Roof EA 4 $26,74 ot functional, circuit constantly trips and fan shuts off. Mechanical System Subtotal: $790,660 Building: Main Category: Plumbing System Hot Water Gas Heater BTU/HR Boiler Room EA 6 $30 Piping Domestic Piping-Cold Water from Risers to Fixtures Entire Building 9,365 SF 6 $3,877 Domestic Piping-Cold Water Horizontal Lines Entire Building 9,365 SF 6 $4,708 Domestic Piping-Cold Water Risers Entire Building 9,365 SF 6 $3,600 Domestic Piping-Hot Water from Risers to Fixtures Entire Building 9,365 SF 6 $3,046 Domestic Piping-Hot Water Horizontal Lines Entire Building 9,365 SF 6 $3,600 Domestic Piping-Hot Water Return Lines Entire Building 9,365 SF 6 $2,769 Domestic Piping-Hot Water Return Risers Entire Building 9,365 SF 6 $2,769 Sanitary Piping Entire Building 9,365 SF 6 $7,723 HIGGIS Page 5 of 30

6 Building: Main Category: Plumbing System Piping Storm Piping Entire Building 9,365 SF 6 $6,892 Vent Piping Entire Building 9,365 SF 6 $3,05 Pumps Pumps - Ejector-Duplex Boiler Room EA 4 $5,749 One pump not functional Plumbing System Subtotal: $88,058 Building: Main Category: Classrooms Classroom #00 (Other Instructional Use) Casework st Floor 44 LF 6 $, st Floor 953 SF 6 $2,862 st Floor 48 SF 4 $675 Water damage Doors - Steel Doors incl hw st Floor EA 6 $30 Doors - Wood Doors inclu hw st Floor EA 6 $30 Floor - Tile st Floor,00 SF 6 $2,90 Lighting - Pendent/Surface st Floor 9 EA 6 $,5 Marker Board st Floor 28 LF 6 $600 Storage/ Closet st Floor 24 SF 6 $74 Walls - Concrete Block st Floor 867 SF 6 $2,542 Work Sink st Floor EA 5 $,508 Engineer informed that faucet needs replacement Classroom #0 (Kindergarten) Casework 44 LF 6 $,,025 SF 6 $3,078 Doors - Side-lite 2 SF 6 $20 Doors - Wood Doors inclu hw EA 6 $30 Floor - Tile/Sheet,032 SF 5 $5,077 Floor - Tile/Sheet,025 SF 6 $,290 Lighting - Pendent/Surface 9 EA 7 Storage/ Closet 7 SF 6 $5 Walls - Concrete Block 867 SF 6 $2,542 Work Sink EA 6 $379 Broken, chipped and cracked tiles Classroom # (Kindergarten) Casework 42 LF 6 $,06 HIGGIS Page 6 of 30

7 Building: Main Category: Classrooms Classroom # (Kindergarten) 0 SF 4 $4,696 SF 6 $5,093 Doors - Side-lite 30 SF 6 $502 Doors - Wood Doors inclu hw 2 EA 6 $602 Floor - Tile/Sheet,724 SF 6 $,726 Lighting - Lay-in 20 EA 6 $2,380 Lighting - Pendent/Surface 4 EA 7 Storage/ Closet 8 SF 6 $3 Walls - Concrete Block,750 SF 6 $5,30 Work Sink EA 6 $379 Classroom #04 () Casework 2 LF 6 $ SF 6 $2,562 Chalk Board 20 LF 4 $,836 Doors - Side-lite 5 SF 6 $25 Doors - Wood Doors inclu hw EA 6 $30 Floor - Tile/Sheet 853 SF 6 $854 Lighting - Lay-in 9 EA 7 Lighting - Pendent/Surface 2 EA 7 Storage/ Closet 9 SF 6 $65 Walls - Concrete Block 875 SF 6 $2,565 Work Sink EA 6 $379 Water infiltration damage Partially covered, obsolete material Classroom #05 () Casework 2 LF 6 $ SF 6 $2,862 Chalk Board 9 LF 4 $826 Doors - Side-lite 5 SF 6 $25 Doors - Wood Doors inclu hw EA 6 $30 Floor - Tile 953 SF 6 $2,085 Lighting - Lay-in 2 EA 6 $,428 Lighting - Pendent/Surface EA 7 Storage/ Closet 9 SF 6 $65 Walls - Concrete Block 935 SF 6 $2,74 Work Sink EA 6 $379 Classroom #06 () Casework 2 LF 6 $530 HIGGIS Page 7 of 30

8 Building: Main Category: Classrooms Classroom #06 () 853 SF 6 $2,562 Chalk Board 2 LF 4 $,928 Doors - Side-lite 5 SF 6 $25 Doors - Wood Doors inclu hw EA 6 $30 Floor - Tile/Sheet 853 SF 6 $854 Lighting - Lay-in 0 EA 6 $,90 Lighting - Pendent/Surface EA 7 Storage/ Closet 9 SF 6 $65 Walls - Concrete Block 875 SF 6 $2,565 Classroom # (Science Classroom) Casework 42 LF 5 $8,78,706 SF 5 $0,49 Chalk Board 9 LF 4 $826 Doors - Transom Window 30 SF 6 $508 Doors - Wood Doors inclu hw 2 EA 6 $602 Floor - Tile/Sheet 20 SF 5 $5 Floor - Tile/Sheet,704 SF 6 $,706 Lighting - Lay-in 20 EA 7 Lighting - Pendent/Surface 2 EA 6 $248 Storage/ Closet 8 SF 6 $3 Walls - Concrete Block,750 SF 6 $5,30 Work Sink EA 6 $379 Classroom #204 () Casework 2nd Floor 2 LF 6 $530 2nd Floor 82 SF 6 $2,465 2nd Floor 32 SF 4 $450 Water infiltration damage amd broken acoustic tiles Chalk Board 2nd Floor 2 LF 4 $,928 Obsolete material Doors - Side-lite 2nd Floor 5 SF 6 $25 Doors - Wood Doors inclu hw 2nd Floor EA 6 $30 Floor - Tile/Sheet 2nd Floor 853 SF 6 $854 Lighting - Lay-in 2nd Floor 0 EA 7 Lighting - Pendent/Surface 2nd Floor EA 7 Storage/ Closet 2nd Floor 9 SF 6 $65 Walls - Concrete Block 2nd Floor 875 SF 6 $2,565 Work Sink 2nd Floor EA 6 $379 HIGGIS Page 8 of 30

9 Building: Main Category: Classrooms Classroom #205 () Casework 2 LF 6 $ SF 4 $ SF 5 $5,550 Chalk Board 2 LF 4 $,02 Doors - Wood Doors inclu hw EA 6 $30 Floor - Tile/Sheet 953 SF 6 $954 Lighting - Lay-in 0 EA 6 $,90 Storage/ Closet 9 SF 6 $65 Walls - Concrete Block 935 SF 6 $2,74 Classroom #206 () Casework 2 LF 6 $ SF 5 $ SF 6 $2,32 Chalk Board 9 LF 4 $826 Doors - Wood Doors inclu hw EA 6 $30 Floor - Lay-in 853 SF 6 Lighting - Lay-in 0 EA 7 Lighting - Pendent/Surface EA 6 $24 Marker Board 6 LF 6 $29 Storage/ Closet 9 SF 6 $65 Walls - Concrete Block 853 SF 6 $2,50 Classroom #207 (Computer Lab) Casework 5 LF 6 $26 32 SF 5 $ SF 6 $2,465 Chalk Board 3 LF 4 $275 Doors - Side-lite 5 SF 6 $25 Doors - Wood Doors inclu hw EA 6 $30 Floor - Tile/Sheet 853 SF 6 $854 Lighting - Lay-in 0 EA 7 Lighting - Pendent/Surface EA 6 $24 Storage/ Closet 9 SF 6 $65 Walls - Concrete Block 875 SF 6 $2,565 Water infiltration damage Broken tiles and water damage Obsolete material Water damage Classrooms Subtotal: $4, HIGGIS Page 9 of 30

10 Building: Main Category: Rooms (Other Than Classrooms) Administrative Suites/Offices 08 - Counselor Office 430 SF 6 $,29 Doors - Side-lite 08 - Counselor Office 5 SF 6 $25 Doors - Wood Doors inclu hw 08 - Counselor Office EA 6 $30 Thomas J Higgins Elementary Community Academy Floor - Tile 08 - Counselor Office 430 SF 4 $3,696 Cracked and broken tiles Lighting - Lay-in 08 - Counselor Office 7 EA 6 $833 Storage/ Closet 08 - Counselor Office 3 SF 6 $94 Walls - Concrete Block 08 - Counselor Office 560 SF 6 $,642 08A Main Office 468 SF 6 $,5 08A Main Office 8 SF 4 $2 Broken ceiling tile Doors - Wood Doors inclu hw 08A Main Office EA 6 $30 Floor - Tile/Sheet 08A Main Office 476 SF 6 $476 Lighting - Lay-in 08A Main Office 7 EA 6 $833 Storage/ Closet 08A Main Office 4 SF 6 $,022 Vault/Storage Walls - Concrete Block 08A Main Office 725 SF 6 $2,25 AC Unit 08B - Principals Office EA 7 08B - Principals Office 95 SF 7 Doors - Wood Doors inclu hw 08B - Principals Office 2 EA 6 $602 Floor - Tile/Sheet 08B - Principals Office 95 SF 6 $95 Lighting - Lay-in 08B - Principals Office 4 EA 7 Storage/ Closet 08B - Principals Office 5 SF 6 $36 Walls - Concrete Block 08B - Principals Office 49 SF 6 $,228 Custodial Office 8 SF 4 $9 Broken tiles Custodial Office 66 SF 6 $98 Doors - Wood Doors inclu hw Custodial Office 2 EA 6 $602 Floor - Tile/Sheet Custodial Office 74 SF 6 $74 Lighting - Pendent/Surface Custodial Office 2 EA 6 $248 Walls - Concrete Block Custodial Office 22 SF 6 $62 Engineer's Office 9 SF 6 $273 Doors - Wood Doors inclu hw Engineer's Office EA 6 $30 Floor - Tile Engineer's Office 9 SF 6 $99 Lighting - Pendent/Surface Engineer's Office 2 EA 6 $248 Walls - Concrete Block Engineer's Office 262 SF 6 $768 South Faculty Room 264 SF 6 $793 Doors - Steel Doors incl hw South Faculty Room EA 6 $30 Floor - Tile South Faculty Room 264 SF 6 $578 Lighting - Lay-in South Faculty Room 4 EA 6 $476 Walls - Concrete Block South Faculty Room 50 SF 6 $,469 HIGGIS Page 0 of 30

11 Building: Main Category: Rooms (Other Than Classrooms) Gymnasia Thomas J Higgins Elementary Community Academy Ceiling - Splined st Floor 3,68 SF 4 $33,07 Engineer reports acoustic tiles detaching from the ceiling Doors - Steel Doors incl hw st Floor 2 EA 6 $602 Doors - Wood Doors inclu hw st Floor 2 EA 6 $602 Floor - Wood st Floor 3,68 SF 6 $22,334 Lighting - Metal Halide/ High Pressure Sodium st Floor 2 EA 7 Scoreboards st Floor EA 6 $2,244 Stage st Floor 76 SF 6 $,07 Stage Lighting System st Floor EA 6 $2,369 Stage-Stairs - Wood st Floor LF 6 $470 Storage/ Closet st Floor 72 SF 5 $,6 Floor needs to be replaced Walls - Concrete Block st Floor 4,93 SF 5 $43,05 Cracks and water damage in south wall Mechanical/ Service Rooms Restroom Boiler Room st Floor 768 SF 6 $5,502 Janitor's Closet st Floor 27 SF 5 orth Corridor Janitor's Closet st Floor 20 SF 5 South Corridor Mechanical/ Service Rooms st Floor 30 SF 6 $25 Electrical room Storage Room st Floor 0 SF 6 $788 Janitor's Closet 2nd Floor 24 SF 6 $72 Mechanical/ Service Rooms 2nd Floor 263 SF 6 East Corridor Mechanical/ Service Rooms 2nd Floor 30 SF 6 $25 Electrical Equipment Room Accessories 00A 8 SF 6 $66 00A 8 SF 6 $54 Doors - Wood Doors inclu hw 00A EA 6 $30 Floor - Tile Ceramic/ Porcelain 00A 8 SF 6 $38 Lighting - Pendent/Surface 00A EA 6 $24 Walls - Concrete Block 00A 49 SF 6 $437 Water Closet 00A EA 6 $336 Accessories 0A 8 SF 6 $66 Toilet paper holder 0A 8 SF 6 $54 Doors - Wood Doors inclu hw 0A EA 6 $30 Floor - Tile Ceramic/ Porcelain 0A 8 SF 6 $38 Lighting - Pendent/Surface 0A EA 6 $24 Walls - Concrete Block 0A 49 SF 6 $437 Water Closet 0A EA 6 $336 Accessories 08C 65 SF 6 $600 HIGGIS Page of 30

12 Building: Main Category: Rooms (Other Than Classrooms) Restroom 08C 50 SF 6 $50 Ceiling - Plaster/Drywall 08C 5 SF 7 Doors - Wood Doors inclu hw 08C EA 6 $30 Floor - Tile Ceramic/ Porcelain 08C 5 SF 6 $32 Thomas J Higgins Elementary Community Academy Floor - Tile/Sheet 08C 50 SF 5 $225 Cracks and broken tiles Lavatory 08C EA 6 $320 Lighting - Pendent/Surface 08C EA 6 $24 Lighting - Wall Mounted 08C 2 EA 6 $248 Walls - Concrete Block 08C 237 SF 6 $695 Water Closet 08C EA 6 $336 Accessories 08D-Principal's Office 2 SF 6 $94 Mirror, soap dispenser and toilet paper dispenser Ceiling - Plaster/Drywall 08D-Principal's Office 2 SF 6 $73 Doors - Wood Doors inclu hw 08D-Principal's Office EA 6 $30 Floor - Tile/Sheet 08D-Principal's Office 2 SF 6 $2 Lavatory 08D-Principal's Office EA 6 $320 Lighting - Pendent/Surface 08D-Principal's Office EA 6 $24 Lighting - Wall Mounted 08D-Principal's Office EA 6 $24 Walls - Concrete Block 08D-Principal's Office 26 SF 7 Water Closet 08D-Principal's Office EA 6 $336 Ceiling - Plaster/Drywall st Floor Boys 66 SF 6 $574 Doors - Wood Doors inclu hw st Floor Boys EA 6 $30 Floor Drain st Floor Boys EA 6 $,059 Floor - Tile Ceramic/ Porcelain st Floor Boys 45 SF 6 $307 Floor - Tile/Sheet st Floor Boys 2 SF 6 $2 Lavatory st Floor Boys 2 EA 6 $639 Lighting - Pendent/Surface st Floor Boys 3 EA 6 $372 Partitions st Floor Boys 3 EA 6 $89 Urinals st Floor Boys 2 EA 6 $672 Walls - Concrete Block st Floor Boys 96 SF 6 $575 Walls - Tile Ceramic/ Porcelain st Floor Boys 96 SF 6 $443 Water Closet st Floor Boys 3 EA 6 $,008 Accessories st Floor Girls 46 SF 6 $,347 Ceiling - Plaster/Drywall st Floor Girls 46 SF 6 $505 Doors - Wood Doors inclu hw st Floor Girls EA 6 $30 Floor Drain st Floor Girls EA 6 $,059 Floor - Tile Ceramic/ Porcelain st Floor Girls 28 SF 6 $27 Floor - Tile/Sheet st Floor Girls 8 SF 5 $8 HIGGIS Page 2 of 30

13 Building: Main Category: Rooms (Other Than Classrooms) Restroom Lavatory st Floor Girls 2 EA 6 $639 Lighting - Pendent/Surface st Floor Girls 3 EA 7 Partitions st Floor Girls 5 EA 6 $,485 Walls - Concrete Block st Floor Girls 207 SF 7 Walls - Tile Ceramic/ Porcelain st Floor Girls 207 SF 6 $468 Water Closet st Floor Girls 5 EA 6 $,680 Thomas J Higgins Elementary Community Academy Accessories st Floor Mens South 72 SF 7 Mirror, paper towel dispenser, toilet paper holder and soap dispenser. Ceiling - Plaster/Drywall st Floor Mens South 72 SF 7 Doors - Wood Doors inclu hw st Floor Mens South EA 6 $30 Floor - Tile Ceramic/ Porcelain st Floor Mens South 6 SF 6 $29 Floor - Tile/Sheet st Floor Mens South SF 6 $ Lavatory st Floor Mens South EA 6 $320 Lighting - Lay-in st Floor Mens South EA 4 $336 Lens missing Lighting - Pendent/Surface st Floor Mens South EA 6 $24 Urinals st Floor Mens South EA 6 $336 Walls - Concrete Block st Floor Mens South 24 SF 6 $364 Walls - Tile Ceramic/ Porcelain st Floor Mens South 24 SF 6 $280 Water Closet st Floor Mens South EA 6 $336 Accessories st Floor Single-User South 44 SF 6 $6 Ceiling - Plaster/Drywall st Floor Single-User South 44 SF 6 $52 Doors - Wood Doors inclu hw st Floor Single-User South EA 6 $30 Floor - Tile Ceramic/ Porcelain st Floor Single-User South 44 SF 6 $93 Lavatory st Floor Single-User South EA 6 $320 Lighting - Pendent/Surface st Floor Single-User South 2 EA 6 $248 Showers st Floor Single-User South EA 5 $,72 Walls - Concrete Block st Floor Single-User South 9 SF 6 $560 Water Closet st Floor Single-User South EA 6 $336 Accessories st Floor Womens South 5 SF 6 $,393 st Floor Womens South 80 SF 6 $2 st Floor Womens South 0 SF 5 $69 Water stain Ceiling - Plaster/Drywall st Floor Womens South 6 SF 6 $2 Doors - Wood Doors inclu hw st Floor Womens South EA 6 $30 Floor - Tile st Floor Womens South 6 SF 6 $33 Floor - Tile/Sheet st Floor Womens South 90 SF 6 $90 Lavatory st Floor Womens South 2 EA 6 $639 Lighting - Pendent/Surface st Floor Womens South 3 EA 6 $372 Partitions st Floor Womens South 2 EA 6 $594 HIGGIS Page 3 of 30

14 Building: Main Category: Rooms (Other Than Classrooms) Restroom Walls - Concrete Block st Floor Womens South 263 SF 7 Walls - Tile Ceramic/ Porcelain st Floor Womens South 88 SF 6 $99 Water Closet st Floor Womens South 2 EA 6 $672 Thomas J Higgins Elementary Community Academy Accessories 2nd Floor Boys 66 SF 6 $,53 Mirror, soap dispenser and toilet paper holder Ceiling - Plaster/Drywall 2nd Floor Boys 66 SF 6 $574 Doors - Wood Doors inclu hw 2nd Floor Boys EA 6 $30 Floor Drain 2nd Floor Boys EA 6 $,059 Floor - Tile Ceramic/ Porcelain 2nd Floor Boys 45 SF 6 $307 Floor - Tile/Sheet 2nd Floor Boys 5 SF 6 $5 Floor - Tile/Sheet 2nd Floor Boys 6 SF 4 $69 Broken tiles Lavatory 2nd Floor Boys 2 EA 6 $639 Lighting - Lay-in 2nd Floor Boys 2 EA 6 $238 Lighting - Pendent/Surface 2nd Floor Boys EA 7 Partitions 2nd Floor Boys 3 EA 6 $89 Urinals 2nd Floor Boys EA 4 $7,669 In process the process of being replaced Urinals 2nd Floor Boys EA 6 $336 Walls - Concrete Block 2nd Floor Boys 96 SF 6 $575 Walls - Tile Ceramic/ Porcelain 2nd Floor Boys 96 SF 6 $443 Water Closet 2nd Floor Boys 3 EA 6 $,008 Ceiling - Plaster/Drywall 2nd Floor Girls 46 SF 6 $505 Doors - Wood Doors inclu hw 2nd Floor Girls EA 6 $30 Floor Drain 2nd Floor Girls EA 6 $,059 Floor - Tile Ceramic/ Porcelain 2nd Floor Girls 28 SF 6 $27 Floor - Tile/Sheet 2nd Floor Girls 8 SF 6 $8 Lavatory 2nd Floor Girls EA 6 $320 Lavatory 2nd Floor Girls EA 4 $7,342 Missing sink Lighting - Pendent/Surface 2nd Floor Girls 3 EA 7 Partitions 2nd Floor Girls 5 EA 6 $,485 Walls - Concrete Block 2nd Floor Girls 83 SF 6 $536 Walls - Tile Ceramic/ Porcelain 2nd Floor Girls 83 SF 6 $43 Water Closet 2nd Floor Girls 5 EA 6 $,680 Rooms (Other Than Classrooms) Subtotal: $22,89 Building: Main Category: Building Interior HIGGIS Page 4 of 30

15 Building: Main Category: Building Interior Corridor st Floor East Corridor 693 SF 7 Doors - Side-lite st Floor East Corridor EA 6 $669 Doors - Steel Doors incl hw st Floor East Corridor 4 EA 6 $,204 Floor - Tile/Sheet st Floor East Corridor 693 SF 6 $377 Lighting - Pendent/Surface st Floor East Corridor 8 EA 6 $99 Walls - Concrete Block st Floor East Corridor 630 SF 6 $,847 Thomas J Higgins Elementary Community Academy st Floor orth Corridor 8 SF 4 $25 Water damage st Floor orth Corridor,08 SF 6 $3,327 Doors - Steel Doors incl hw st Floor orth Corridor 3 EA 6 $903 Drinking Fountains - Single Fountain st Floor orth Corridor 2 EA 6 $55 Floor - Tile/Sheet st Floor orth Corridor,076 SF 6 $585 Floor - Tile/Sheet st Floor orth Corridor SF 4 $593 Broken tiles Lighting - Pendent/Surface st Floor orth Corridor 3 EA 7 Walls - Concrete Block st Floor orth Corridor,959 SF 6 $5,743 st Floor South Corridor 66 SF 4 $,030 Water damage and broken apart tiles st Floor South Corridor 665 SF 6 $,997 Doors - Steel Doors incl hw st Floor South Corridor EA 6 $30 Floor - Tile/Sheet st Floor South Corridor 73 SF 4 $7,066 Cracks, and broken tiles Lighting - Pendent/Surface st Floor South Corridor 0 EA 7 Walls - Concrete Block st Floor South Corridor 973 SF 6 $2,852 2nd Floor East Corridor 606 SF 6 $,820 Floor - Tile/Sheet 2nd Floor East Corridor 606 SF 7 Lighting - Pendent/Surface 2nd Floor East Corridor 6 EA 7 Walls - Concrete Block 2nd Floor East Corridor 833 SF 6 $2,442 2nd Floor orth Corridor 500 SF 6 $,773 2nd Floor orth Corridor 66 SF 5 $4,06 Water damage and broken tiles. Drinking Fountains - Single Fountain 2nd Floor orth Corridor 2 EA 6 $55 Floor - Tile/Sheet 2nd Floor orth Corridor,6 SF 6 $606 Lighting - Pendent/Surface 2nd Floor orth Corridor 3 EA 6 $,6 Walls - Concrete Block 2nd Floor orth Corridor,778 SF 6 $5,22 Stairs orth East 47 SF 4 $,606 Water damage, deteriorated and missing tiles Floor - Tile/Sheet orth East 32 SF 5 $593 Floor - Tile/Sheet orth East 0 SF 4 $48 Broken tiles Handrails orth East 48 LF 6 $46 Lighting - Pendent/Surface orth East 2 EA 6 $248 Stairs - Tile orth East 72 LF 6 $668 HIGGIS Page 5 of 30

16 Building: Main Category: Building Interior Stairs Walls - Concrete Block orth East 742 SF 6 $2,75 South East 39 SF 6 $47 Floor - Tile/Sheet South East 6 SF 5 $52 Thomas J Higgins Elementary Community Academy Floor - Tile/Sheet South East 2 SF 4 $78 Broken tiles Handrails South East 44 LF 6 $38 Lighting - Pendent/Surface South East 2 EA 7 Stairs - Tile South East 72 LF 6 $668 Walls - Concrete Block South East 772 SF 7 Building Interior Subtotal: $56,256 Total Building Cost $,50,220 Category: Building Exterior Entrance Foundation Entrance Control - Audio and Video 4 / Parking Lot EA 7 Exterior Doors - Exterior FRP Door 3A EA 7 Exterior Doors - Exterior FRP Door 4 3 EA 7 Exterior Doors - Exterior Steel Door 3 2 EA 6 $96 dents, faded paint Exterior Doors - Exterior Steel Door 5 EA 6 $48 minor corrosion, faded paint Exterior Doors - Exterior Steel Door 6 2 EA 6 $96 some corrosion at small dents Exterior Stairs - Concrete 3 2 LF 6 $98 Exterior Stairs - Concrete 3A 3 LF 6 $245 Exterior Stairs - Concrete 4 9 LF 7 Exterior Stairs - Concrete 5 4 LF 6 $327 Exterior Stairs - Concrete 6 6 LF 6 $49 chipped corner Power Door Operator and Controls 4 EA 7 Ramps - Concrete 4 0 LF 7 Stair Handrail - Steel_Stair Handrail 4 9 LF 7 Foundation - Concrete Entire Building 605 LF 7 Superstructure - Concrete Entire Building,389 SF 7 HIGGIS Page 6 of 30

17 Category: Building Exterior Lighting Exterior Lighting - Parapet or Roof Mounted Entire Building / Roof 7 EA 6 $3,756 Roof System Coping - Metal 290 LF 7 Coping - Metal 00 LF 7 gravel stop Coping - Metal 2 65 LF 7 Coping - Metal 3 82 LF 7 gravel stop Downspouts - Exterior Downspouts / South West 23 LF 7 Downspouts - Interior Downspouts 49 LF 7 Parapet - Parapet < 6" Height 290 LF 7 Parapet - Parapet < 6" Height 2 65 LF 7 Roof Structure - Steel / Metal Deck/ Concrete Topping 9,483 SF 7 Roof Structure - Steel / Metal Deck/ Concrete Topping SF 7 Roof Structure - Steel / Metal Deck/ Concrete Topping SF 7 Roof - Modified Bitumen 9,483 SF 7 Roof - Modified Bitumen SF 7 Roof - Modified Bitumen SF 5 $5,903 ponding Walls Canopy - Concrete/ Stucco Entire Building 200 SF 6 $6,68 Cornice - Metal Projecting Entire Building 4 LF 7 fascia Exterior Walls - Brick Entire Building 6 SF 5 $43 step cracking Exterior Walls - Brick Entire Building 4,0 SF 7 Windows Curtain wall - Glazed Double Pane Entire Building,4 SF 6 $6,44 fixed Curtain wall - Insulated Panel Entire Building 8 SF 6 $202 stainless steel replacement panels Curtain wall - Insulated Panel Entire Building,224 SF 6 $3,723 small dents in panels throughout Curtain wall - Louver Entire Building 90 SF 6 $,009 Curtain wall - Windows Entire Building 480 SF 6 $5,38 hopper Guard - Guards perforated Entire Building,824 SF 6 $23,292 Windows - Louver Entire Building 4 SF 6 $30 Building Exterior Subtotal: $90,647 Category: Electrical System HIGGIS Page 7 of 30

18 Category: Electrical System Emergency System Main Service Emergency A/C Power - Corridors and Stairs Entire Building 3,93 SF 6 $,75 Emergency A/C Power - Lunchrooms Entire Building 2,508 SF 6 $932 Thomas J Higgins Elementary Community Academy Exit Signs - Corridors and Stairs Entire Building 4 EA 2 $2,82 Exit signs are more than 20 years old and they are not provided with battery backup. Exit Signs - Lunchroom Entire Building 5 EA 2 $2,727 Exit signs are more than 20 years old and they are not provided with battery backup. Main Electrical Service A 20/208/3PH Electrical Room EA 6 $8,232 Main Electrical Service A 20/208/3PH Electrical Room EA 6 $8,232 Power Distribution Lighting and Power Panels - 00 A Entire Building 2 EA 6 $598 Broken latch Lighting and Power Panels - Above 00 A Entire Building 4 EA 6 $,988 Main Distribution Panels amp Entire Building / 2nd Floor EA 7 Main Distribution Panels - Greater than 600 amp Entire Building / st Floor EA 7 Electrical System Subtotal: $26,066 Category: Safty System Fire Alarm Fire Alarm Strobe Lights Entire Building,389 SF 6 $4,072 Served by main Safty System Subtotal: $4,072 Category: Mechanical System Air Conditioning Condensing Unit- Roof Mounted - Less than 5 tons Roof EA 6 $3,334 Air Handling Systems Heating Devices Roof Top Unit-Single Zone-Roof Mounted- Electric Coil tons Roof EA 7 o heating Cabinet Heaters - With Electric Coil Entire Building 5 EA 5 $7,929 Wall Heater - Electric Entire Building 2 EA 5 $,073 HIGGIS Page 8 of 30

19 Category: Mechanical System Heating Devices Wall Heater - Electric Entire Building 2 EA 6 $278 Unit Ventilation Unit Ventilators- Floor Mounted- Electric Heating & DX Cooling Coil W/ Self Contained Compressor Entire Building 2 EA 6 $4,973 Ventilation Exhaust Fans- Roof Mounted CFM Roof 2 EA 6 $,85 Exhaust Fans- Roof Mounted - Less than 500 CFM Roof 2 EA 6 $592 Mechanical System Subtotal: $29,364 Category: Plumbing System Hot Water Electric Heater - Less than 20 KW Mechanical Room / 2nd Floor EA 6 $682 Piping Domestic Piping-Cold Water from Risers to Fixtures Entire Building,389 SF 6 $2,280 Domestic Piping-Cold Water Horizontal Lines Entire Building,389 SF 6 $2,769 Domestic Piping-Cold Water Risers Entire Building,389 SF 6 $2,7 Domestic Piping-Hot Water from Risers to Fixtures Entire Building,389 SF 6 $,79 Domestic Piping-Hot Water Horizontal Lines Entire Building,389 SF 6 $2,7 Domestic Piping-Hot Water Return Lines Entire Building,389 SF 6 $,629 Domestic Piping-Hot Water Return Risers Entire Building,389 SF 6 $,629 Sanitary Piping Entire Building,389 SF 6 $0,423 Storm Piping Entire Building,389 SF 6 $9,935 Vent Piping Entire Building,389 SF 6 $7,655 Plumbing System Subtotal: $43,027 Category: Classrooms Classroom #0 () Casework 23 LF 6 $58 24 SF 4 $337 water damage HIGGIS Page 9 of 30

20 Category: Classrooms Classroom #0 () 839 SF 6 $2,520 Doors - Steel Doors incl hw EA 6 $30 Floor - Tile 862 SF 6 $,886 Lighting - Lay-in EA 7 Marker Board 6 LF 6 $343 Walls - Concrete Block 36 SF 6 $06 Walls - Plaster/Drywall 896 SF 6 $2,473 Classroom # () Casework 23 LF 6 $ SF 6 $2, SF 4 $422 Doors - Steel Doors incl hw EA 6 $30 Floor - Tile 862 SF 6 $,886 Lighting - Lay-in EA 7 Marker Board 6 LF 6 $343 Walls - Concrete Block 26 SF 6 $765 Walls - Plaster/Drywall 67 SF 6 $,852 Classroom #2 () Casework 23 LF 6 $ SF 6 $2, SF 4 $450 Doors - Steel Doors incl hw EA 6 $30 Floor - Tile 862 SF 6 $,886 Lighting - Lay-in EA 6 $,309 Marker Board 6 LF 6 $343 Walls - Concrete Block 36 SF 6 $06 Walls - Plaster/Drywall 882 SF 6 $2,434 Classroom #3 (Office) Casework 23 LF 6 $ SF 6 $2, SF 5 $255 Doors - Steel Doors incl hw EA 6 $30 Floor - Tile/Sheet 862 SF 6 $863 Lighting - Lay-in EA 7 Walls - Concrete Block 36 SF 6 $06 Walls - Plaster/Drywall 67 SF 6 $,852 Water damage and broken tiles. Water damage and broken tiles. Water infiltration damage HIGGIS Page 20 of 30

21 Category: Classrooms Classroom #3 (Office) Walls - Plaster/Drywall Classroom #209 (Computer Lab) 225 SF 6 $737 Casework 60 LF 6 $, SF 5 $, SF 6 $,502 Doors - Steel Doors incl hw EA 6 $30 Floor - Carpet 708 SF 5 $3,635 Lighting - Lay-in EA 6 $,309 Walls - Plaster/Drywall 937 SF 6 $2,586 Classroom #20 () Casework 4 LF 6 $ SF 6 $2,559 0 SF 5 $80 Doors - Steel Doors incl hw EA 6 $30 Floor - Tile 862 SF 6 $,886 Lighting - Lay-in EA 6 $,309 Marker Board 6 LF 6 $343 Walls - Concrete Block 36 SF 6 $06 Walls - Plaster/Drywall 96 SF 6 $2,528 Classroom #2 (Music Room) Casework 8 LF 6 $ SF 6 $2, SF 5 $223 Doors - Steel Doors incl hw EA 6 $30 Floor - Tile 862 SF 6 $,886 Lighting - Lay-in EA 6 $,309 Storage/ Closet 68 SF 6 $493 Walls - Concrete Block 26 SF 6 $765 Walls - Plaster/Drywall 67 SF 6 $,852 Classroom #22 () Casework 6 LF 6 $4 846 SF 6 $2,54 6 SF 4 $225 Chalk Board 6 LF 4 $,469 Doors - Steel Doors incl hw EA 6 $30 Folding partition Water infiltration damage Water infiltration damage Water stains Door hardware needs replacement. Water damage HIGGIS Page 2 of 30

22 Category: Classrooms Classroom #22 () Floor - Tile 862 SF 6 $,886 Lighting - Lay-in EA 7 Marker Board 6 LF 7 Walls - Concrete Block 225 SF 6 $660 Walls - Plaster/Drywall 69 SF 6 $,907 Classroom #23 () Casework 6 LF 6 $4 838 SF 6 $2,57 24 SF 5 $92 Doors - Steel Doors incl hw EA 6 $30 Floor - Tile 862 SF 6 $,886 Lighting - Lay-in EA 7 Marker Board 6 LF 7 Walls - Concrete Block 36 SF 6 $06 Walls - Plaster/Drywall 96 SF 6 $2,528 Classroom #Unmarked () Casework 6 LF 6 $4 806 SF 6 $2, SF 5 $447 Chalk Board 32 LF 6 $74 Doors - Steel Doors incl hw EA 6 $30 Floor - Tile 846 SF 6 $,85 Floor - Tile 6 SF 5 $92 Lighting - Lay-in EA 6 $,309 Marker Board 6 LF 6 $343 Walls - Concrete Block 08 SF 6 $37 Walls - Plaster/Drywall 844 SF 6 $2,329 Classroom #Unmarked (Weight) 8 SF 5 $ SF 6 $2,565 Doors - Steel Doors incl hw EA 6 $30 Floor - Weight/ Fitness Room Floor Matting 862 SF 6 $4,52 Lighting - Lay-in EA 6 $,309 Walls - Concrete Block 224 SF 6 $657 Walls - Plaster/Drywall 447 SF 6 $,234 Walls - Plaster/Drywall 225 SF 6 $737 water stains Water stains Broken and chipped tiles Water stains Folding partition HIGGIS Page 22 of 30

23 Category: Classrooms Classroom #Unmarked (Weight) Classrooms Subtotal: $05,48 Category: Rooms (Other Than Classrooms) Administrative Suites/Offices Kitchen Office 53 SF 6 $59 Doors - Steel Doors incl hw Kitchen Office EA 6 $30 Floor - Terrazzo Kitchen Office 53 SF 6 $6 Lighting - Pendent/Surface Kitchen Office EA 6 $24 Walls - Plaster/Drywall Kitchen Office 24 SF 6 $665 Teachers' Lounge 206 SF 6 $69 Teachers' Lounge 48 SF 5 $333 Water infiltration damage Doors - Steel Doors incl hw Teachers' Lounge EA 6 $30 Floor - Tile Teachers' Lounge 254 SF 6 $556 Lighting - Lay-in Teachers' Lounge 2 EA 7 Walls - Plaster/Drywall Teachers' Lounge 438 SF 6 $,209 Kitchen SF 5 $ SF 6 $2,23 Doors - Steel Doors incl hw 3 EA 6 $903 Doors - Wood Doors inclu hw EA 6 $30 Floor - Terrazzo 783 SF 6 $,73 Lighting - Lay-in 2 EA 6 $,428 Lighting - Pendent/Surface 3 EA 6 $372 Storage/ Closet 85 SF 6 $66 Walls - Concrete Block 467 SF 6 $,369 Walls - Plaster/Drywall 467 SF 6 $,289 Water damage Library Casework 2nd Floor 72 LF 6 $,88 2nd Floor,76 SF 6 $5,53 2nd Floor 48 SF 5 $383 Water infiltration damage Doors - Steel Doors incl hw 2nd Floor 2 EA 6 $602 Floor - Carpet 2nd Floor,764 SF 6 $3,759 Lighting - Lay-in 2nd Floor 7 EA 7 HIGGIS Page 23 of 30

24 Category: Rooms (Other Than Classrooms) Library Walls - Concrete Block 2nd Floor 675 SF 6 $,979 Walls - Plaster/Drywall 2nd Floor 675 SF 6 $,863 Lunch & Multipurpose Room MDF_IDF st Floor 2,69 SF 6 $6,54 st Floor 48 SF 5 $383 Water infiltration damage Doors - Steel Doors incl hw st Floor 5 EA 6 $,505 Floor - Tile/Sheet st Floor 2,7 SF 6 $2,9 Floor - Tile/Sheet st Floor 00 SF 4 $,48 Cracks and broken tiles Lighting - Lay-in st Floor 2 EA 6 $2,498 Walls - Concrete Block st Floor 720 SF 6 $2, Walls - Plaster/Drywall st Floor 60 SF 6 $524 Folding partition Walls - Plaster/Drywall st Floor 720 SF 6 $,987 Doors - Steel Doors incl hw 2nd Floor EA 6 $30 Finishes 2nd Floor 83 SF 5 $,3 Ventilation and Cooling 2nd Floor EA 6 $,855 Mechanical/ Service Rooms Restroom Mechanical/ Service Rooms st Floor 56 SF 5 $903 Janitor's Closet 2nd Floor 37 SF 6 $265 Storage Room 2nd Floor 84 SF 6 West corridor Accessories st Floor Boys 3 SF 6 $,208 st Floor Boys 3 SF 4 $,332 Water damage Doors - Steel Doors incl hw st Floor Boys EA 6 $30 Floor Drain st Floor Boys EA 6 $,059 Floor - Tile Ceramic/ Porcelain st Floor Boys 3 SF 5 $2,092 Lavatory st Floor Boys 2 EA 6 $639 Lighting - Lay-in st Floor Boys 2 EA 6 $238 Partitions st Floor Boys 2 EA 6 $594 Urinals st Floor Boys 3 EA 6 $,008 Walls - Tile Ceramic/ Porcelain st Floor Boys 345 SF 6 $779 Water Closet st Floor Boys 2 EA 6 $672 Accessories st Floor Girls 82 SF 6 $,679 Soap dispenser, mirror and toilet paper holders. st Floor Girls 34 SF 6 $2 st Floor Girls 48 SF 4 $544 Water damage HIGGIS Page 24 of 30

25 Category: Rooms (Other Than Classrooms) Restroom Doors - Steel Doors incl hw st Floor Girls 2 EA 6 $602 Floor Drain st Floor Girls EA 6 $,059 Floor - Tile Ceramic/ Porcelain st Floor Girls 82 SF 6 $385 Lavatory st Floor Girls 2 EA 6 $639 Lighting - Lay-in st Floor Girls 3 EA 6 $357 Partitions st Floor Girls 4 EA 6 $,88 Walls - Concrete Block st Floor Girls 308 SF 6 $903 Walls - Tile Ceramic/ Porcelain st Floor Girls 03 SF 6 $233 Water Closet st Floor Girls 4 EA 6 $,344 Accessories 2nd Floor Boys 3 SF 6 $,208 2nd Floor Boys 75 SF 6 $225 Thomas J Higgins Elementary Community Academy 2nd Floor Boys 56 SF 5 $388 Water damage Doors - Steel Doors incl hw 2nd Floor Boys EA 6 $30 Floor Drain 2nd Floor Boys EA 5 $2,094 Missing cover Floor - Tile Ceramic/ Porcelain 2nd Floor Boys 3 SF 6 $277 Lavatory 2nd Floor Boys 2 EA 6 $639 Lighting - Lay-in 2nd Floor Boys 2 EA 6 $238 Lighting - Pendent/Surface 2nd Floor Boys 2 EA 7 Partitions 2nd Floor Boys 2 EA 6 $594 Urinals 2nd Floor Boys 3 EA 6 $,008 Walls - Tile Ceramic/ Porcelain 2nd Floor Boys 324 SF 6 $732 Water Closet 2nd Floor Boys 2 EA 6 $672 Accessories 2nd Floor Girls 82 SF 6 $,679 Mirror, soap dispenser, and toilet paper holders. 2nd Floor Girls 26 SF 6 $378 2nd Floor Girls 56 SF 4 $634 Water damage Doors - Steel Doors incl hw 2nd Floor Girls 2 EA 6 $602 Floor Drain 2nd Floor Girls EA 6 $,059 Floor - Tile Ceramic/ Porcelain 2nd Floor Girls 82 SF 6 $385 Lavatory 2nd Floor Girls 2 EA 6 $639 Lighting - Lay-in 2nd Floor Girls 3 EA 6 $357 Partitions 2nd Floor Girls 4 EA 6 $,88 Walls - Concrete Block 2nd Floor Girls 308 SF 6 $903 Walls - Tile Ceramic/ Porcelain 2nd Floor Girls 03 SF 6 $233 Water Closet 2nd Floor Girls 4 EA 6 $,344 Accessories Kitchen Locker Room 82 SF 6 $756 Soap dispenser, mirror and toilet paper holder. Kitchen Locker Room 82 SF 6 $246 Doors - Steel Doors incl hw Kitchen Locker Room 2 EA 6 $602 HIGGIS Page 25 of 30

26 Category: Rooms (Other Than Classrooms) Restroom Floor - Terrazzo Kitchen Locker Room 82 SF 6 $79 Lavatory Kitchen Locker Room EA 6 $320 Lighting - Pendent/Surface Kitchen Locker Room 2 EA 6 $248 Student Lockers - One Tier Kitchen Locker Room 3 EA 6 $279 Walls - Concrete Block Kitchen Locker Room 52 SF 6 $446 Walls - Vinyl Coated Gypsum Panel Kitchen Locker Room 52 SF 6 $420 Water Closet Kitchen Locker Room EA 6 $336 Rooms (Other Than Classrooms) Subtotal: $96,45 Category: Building Interior Corridor st Floor orth Corridor,464 SF 6 $4,396 st Floor orth Corridor 8 SF 5 $7 Doors - Steel Doors incl hw st Floor orth Corridor 3 EA 6 $903 Doors - Wood Doors include hw st Floor orth Corridor 3 EA 6 $903 Floor - Tile/Sheet st Floor orth Corridor,476 SF 6 $802 Lighting - Lay-in st Floor orth Corridor EA 7 Walls - Plaster/Drywall st Floor orth Corridor,97 SF 6 $8,737 st Floor West Corridor 638 SF 6 $,96 st Floor West Corridor SF 5 $357 Water damage Floor - Tile/Sheet st Floor West Corridor 678 SF 6 $368 Lighting - Lay-in st Floor West Corridor 6 EA 6 $74 Walls - Masonry st Floor West Corridor 626 SF 6 $,969 Walls - Plaster/Drywall st Floor West Corridor 689 SF 6 $3,054 Vinyl wall base needs to be replaced 2nd Floor orth Corridor 80 SF 5 $74 Water infiltration damage 2nd Floor orth Corridor,205 SF 6 $3,69 Drinking Fountains - Single Fountain 2nd Floor orth Corridor EA 6 $276 Floor - Tile/Sheet 2nd Floor orth Corridor,205 SF 6 $655 Lighting - Lay-in 2nd Floor orth Corridor 9 EA 7 Walls - Masonry 2nd Floor orth Corridor 90 SF 6 $283 Walls - Plaster/Drywall 2nd Floor orth Corridor,97 SF 6 $8,737 2nd Floor West Corridor 558 SF 6 $,676 Floor - Tile/Sheet 2nd Floor West Corridor 558 SF 6 $303 Lighting - Lay-in 2nd Floor West Corridor 5 EA 6 $595 HIGGIS Page 26 of 30

27 Category: Building Interior Corridor Walls - Masonry 2nd Floor West Corridor 626 SF 6 $,969 Walls - Plaster/Drywall 2nd Floor West Corridor 657 SF 6 $2,92 Stairs orth West 48 SF 6 $444 orth West 6 SF 5 $43 Water damage Floor - Terrazzo orth West 73 SF 6 $63 Floor - Tile/Sheet orth West 28 SF 6 $5 Handrails orth West 44 LF 6 $38 Lighting - Lay-in orth West EA 7 Stairs - Terrazzo orth West 72 LF 6 $668 Walls - Concrete Block orth West 597 SF 6 $,750 Walls - Plaster/Drywall orth West 220 SF 6 $607 South West 94 SF 6 $583 Floor - Terrazzo South West SF 6 $336 Floor - Tile/Sheet South West 00 SF 6 $54 Handrails South West 44 LF 6 $38 Lighting - Lay-in South West 2 EA 7 Stairs - Tile South West 72 LF 6 $668 Walls - Concrete Block South West 87 SF 6 $2,395 Building Interior Subtotal: $54,97 Total Building Cost $449,745 SITE Category: Site Civil/Drainage Civil/ Drainage - Catch Basin Entire Site 4 EA 6 $4,375 Civil/ Drainage - Site Manhole Entire Site 4 EA 6 $5,97 Fencing Fencing - Chain Link Entire Site 8 LF 5 $488 door 4 Fencing - Chain Link Entire Site 04 LF 4 $9,548 west of playlot- vandalized Fencing - Chain Link Entire Site / Site West 273 LF 7 Fencing - ew Standard Ornamental Entire Site / Site - East 35 LF 6 $0,050 HIGGIS Page 27 of 30

28 SITE Category: Site Fencing Landscape Parking Lot Playground Sidewalks Signage Thomas J Higgins Elementary Community Academy Fencing - ew Standard Ornamental Entire Site / Site - East 0 LF 5 $,424 warped Landscape - Grass Entire Site 0,044 SF 6 $8,330 Landscape - Hardscape- Concrete Entire Site 4,0 SF 6 $2,27 Landscape - Hardscape- Concrete Entire Site / Site orth 75 SF 5 $957 heaving at manholes Landscape - Hardscape- Concrete Entire Site / Site West 25 SF 5 $39 spalling Parkway trees Entire Site / Site - East 6 EA 7 Parkway trees Entire Site / South East EA 4 $2,624 stump Planting Beds/ Area Entire Site / Site - East 720 SF 6 $,84 Play Area - Synthetic Turf Play Field Entire Site / orth West,600 SF 6 $6,978 north of parking Retaining Wall - Masonry Entire Site 468 SF 6 $6,833 outside kindergarten- come damaged coping throughout Surface - Asphalt West 6,084 SF 5 $3,755 potholes, ponding, cracks Surface - Asphalt West 6,084 SF 7 new Trash Enclosure - Chain Links West 608 SF 6 $0,668 Equipment - School Age 5-2 West EA 7 new Surface - Poured Surface West,599 SF 6 $,707 Sidewalks - Perimeter Sidewalks Entire Site 6,33 SF 6 $2,9, E site Sidewalks - Perimeter Sidewalks Entire Site / Site - East 200 SF 5 $,90 cracking, bucking Flag Pole - Flag Pole East EA 7 Marquee - Free Standing Back Lighted East EA 6 Monument - Building Mounted Cut Letter Sign East EA 6 Site Subtotal: $48,530 Total Site Cost $48,530 Campus Total ² ³ $2,08,496 HIGGIS Page 28 of 30

29 ¹ It is very rare for assessors to find a feature in this condition. If assessors do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked in this report; by the time the report is compiled, they have been resolved. ² As stated above, Total Assessed Campus eed does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Total Assessed Campus eed includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Definitions Quantity means, for each item, the total number (or amount) of that item that exists and was evaluated. Unit means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). Cost means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Total Campus eed listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Total also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. HIGGIS Page 29 of 30

30 Classroom Summary Current Usage Intended Usage Room Location Room umber Floor Plan Room umber Area (SF) Voice Outlets Data Outlets Elect. Outlets Glazed Window Area Operable Window Area oise Level Window Stop Power Strip Smart- Board Main Computer Lab Kindergarten Kindergarten Other Instructional Use Science Classroom Computer Lab Kindergarten Kindergarten Kindergarten Science st Floor 2nd Floor ,032,724, , Addition Computer Lab Music Room Office Weight Unmarked Unmarked HIGGIS Page 30 of 30