SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project : Siddapur Natural Sand Mining in Patta land

Size: px
Start display at page:

Download "SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project : Siddapur Natural Sand Mining in Patta land"

Transcription

1 SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS Name of the Project : Siddapur Natural Sand Mining in Patta land Sl. No DOCUMENTS / X 1 Form -1 2 Pre-Feasibility Report [PFR] 3 Environmental management plan [EMP] 4 Approved Mining/ Quarry Plan 5 Topo sheet Duly marking the project site with 5 Kms Radius 6 Original Village Maps duly marking project site. Adjacent village maps of the project site is located at vicinity of the village boundary 7 Latest Google Map Duly marking the project site 8 Latest Site Photographs 9 Land Documents a. Notification OR Letter of Intent from Department of Mines and Geology b. District Task Force committee Proceedings c District Survey Report proposed as per Notification No. S.O.141 dated 15th January 2016 d. Compliance of the earlier E.C in case of Renewal, Expansion, Modification e. Lease Deed in case of Renewal, Expansion, Modification NA f. Renewal Notification OR Deemed Extension Letter etc., NA g. RTC h. NOC from Forest Department - Compulsory 1st Stage Clearance in NA case of Forest Land i. NOC from Revenue Department in case of Government, Patta Land j. NOC from Forest Department in case of Government, Patta Land k. Regarding Applicability of ESA/ESZ NA l. Joint inspection report in case of Government Gomal Land NA m. Copy of Conversion order in case of Patta/ Private Land It s a patta land sand. Land conversion obtained It s a patta land sand. n. Copy of order of conversion of the land for non-agricultural -mineral/ quarrying purpose in case of private/patta land o. Allotment letter/gazette Notification in case River sand quarrying It s a patta land sand p. Other Specify X 10 Disputes if any and copy of documents/ orders there off X 11 Cluster Certificate From Dept of Mines and Geology details regarding Quarries within 500mts from the applied Quarry area.

2 SEIAA KARNATAKA BRIEF NOTE FOR MINING/ QUARRYING PROJECTS Sl. No PARTICULARS INFORMATION Sri. G. Srinivasulu 1 Name & Address of the Project Renukanagar, Proponent 14th Cross, Thaluru Road, Bellary District. 2 Name & Location of the Project Siddapur Natural Sand Quarry in patta land over an extent of Acres (5.20 Ha) adjacent to Sy. No. 425/3 of Siddapura Village, Molakalmuru Taluk, Chitradurga District. 3 Co-ordinates of the Project Site Latitude: N to N Longitude:E to E Type of Mineral 5 6 New / Expansion / Modification / Renewal Type of Land [ Forest, Government Revenue, Gomal, Private/Patta, Other] Natural Sand Quarry in Patta land Expansion in Earlier EC from 56,373.4 TPA to 1,17,500 TPA Patta Land 7 Whether the project site fall No within ESZ/ESA 8 Area in Ha 5.20 Ha 9 Actual Depth of sand in the 9.0m lease area 10 Depth of Sand proposed to be 6.32m removed 11 Annual Production Proposed 1,02,012 Tons/annum (Metric Tons/ CUM) / Annum 12 Quantity of Topsoil/Over It is a natural Sand Quarry burden in cubic meter 13 Mineral Waste Handled No Waste (Metric Tons/ CUM)/ Annum 14 Project Cost (Rs. In Crores) 1.62 crores 15 Environmental Sensitivity a. Nearest Forest Santegudda Reserved Forest 3.20 kms(nw)

3 16 b. Nearest Human Habitation Siddapura Village 0.50 Kms(S) c. Educational Institutes, Hospital The nearest post and telegraph office, hospital, schools, police station is situated in Molakalmuru. d. Water Bodies Chinna Hagari River 100 mts (S) Karnataka Andhra Pradesh State Border e. Other Specify 3.00 kms (SE) Applicability of General NA Condition of the EIA Notification, Details of Land Use in Ha a. Area for Mining/ Quarrying b. Waste Dumping Area 0-10 c. Top Soil Storage Area -- d. Mineral Storage Area -- e. Infrastructure Area -- f. Road Area -- g. Buffer Zone for Storage of 1-02 Top soil h. Unexplored area -- i. Others Specify (Screening) Method of Mining/ Quarrying Semi Mechanized Method 19 Water Requirement a. Source of water b. Total Requirement of Water in KLD 20 Storm water management plan Drinking water : Borewell from the village Dust Suppression: Borewell from the village Dust 3.5 KLD Suppression Domestic 1.5 KLD Other 3.0 KLD Total 8.0 KLD Drains will be constructed along the boundary of activity area Check dams will be constructed to contain the surface run-off of the silt and sediments from the lease area during heavy rainy season Remarks:-