1 Council on Forest Engineering (COFE) Conference Proceedings: Working Globally Sharing Productivity and Cost of Processing and Top-skidding Long Logs * Bruce McMorland Senior Researcher, Harvesting Operations, Forest Engineering Research Institute of Canada Vancouver, BC bruce-m@vcr.feric.ca Abstract The Forest Engineering Research Institute of Canada (FERIC) measured the productivity of two harvesters and a rubber tired grapple skidder operating in the southeastern Interior of British Columbia. The harvesters produced long logs at the stump and the skidder top-skidded the logs to roadside landings. FERIC assessed this long-log/top-skid harvest technique and compared its costs with those for tree-length/butt-skid systems that are more typically used. Keywords: costs, productivity, harvesters, grapple skidders, top skidding, machine interaction 1. BACKGROUND Tembec Industries Inc. in Cranbrook, BC operates several sawmills in the area as well as a pulp mill at Skookumchuck. Tembec s sawmills require long logs as their primary fibre source, and utilize short logs cut to a maximum 6.25 m (20 6 ) to supplement mill production. Much of Tembec s wood supply is located on lower slopes of the Rocky Mountains, and frequently on slopes with grades from 20 to 60%. Historically, Tembec s contractors have dealt with the narrow valleys and steep slopes by using small landings often oversized road turnouts built as part of the road system. Tembec has employed various systems on these sites including feller-bunchers with steep-slope capability, grapple skidders operating on skid trail networks, and processors stationed at roadside or on the small landings. To try and improve overall production and reduce costs, Tembec has experimented with a variety of equipment configurations. On some sites, cut-to-length harvesters sometimes produced long logs that would then be handled by grapple skidders to roadside, and sometimes the harvester produced short logs that would then be handled by forwarders. In 2002, one trial involved grapple skidders to transport stems from a feller buncher to a dangle-head processor located on bladed skid trails. This system produced both long and short logs, which were then re-skidded downhill to landings for loading by a front-end loader. Tembec tested top-skidding and butt-skidding techniques with several of the equipment configurations. Based on these experiences, Tembec staff drew several conclusions: Feller-processing long lengths was more productive than producing short lengths, since fewer cuts were made. Skidding was more productive than forwarding. Top skidding of long logs was more productive than butt-skidding because the skidder could collect a larger turn volume. * The 29 th Council on Forest Engineering Conference. Coeur d Alene, Idaho, July 30-August 2,. W. Chung and H.S. Han, editors. pp

2 Council on Forest Engineering (COFE) Conference Proceedings: Working Globally Sharing Removing a dedicated processor from the conventional operation improved safety at the landing because only 3 machines (skidder, loader, truck) interacted instead of four. In 2003, Tembec worked in partnership with one of its contractors to commit to a system that used a stump-area harvester to produce both long and short logs. A grapple skidder would then skid the piles of processed logs, by the top, downhill to the landing. Tembec requested that FERIC assess this long-log/top skid system and compare its performance to that of the treelength/butt skid system. 2. OBJECTIVES FERIC agreed on a project with the following objectives: Quantify harvester productivity for feller-processing long logs and compare the results to studies conducted for the INTERFACE 1 model. Assess length-measurement accuracy of the feller-processors. Quantify rubber-tired grapple skidder productivity when skidding bunches of logs by their tops. Assess machine interaction at the landing for long-log and tree-length systems. Assess and contrast productivity and cost for long-log and tree-length systems. 3. STUDY METHODS FERIC conducted detailed-timing studies to assess productivity of the long-log system during the fall of 2003 and January The studies were on the felling-processing and skidding phases, and used the procedures FERIC employs to collect data for the INTERFACE model. During January and February 2004, FERIC also performed shift-level monitoring of the long-log contractor and one of Tembec s conventional tree-length contractors. Harvesting machines were instrumented with Servis recorders and the operators provided daily charts and shift reports. The machines were monitored while each contractor harvested two small blocks. Production, obtained from Tembec s weigh scale records, totalled about 5100 m³ for the long-log system and 6600 m³ for the tree-length system. Working times were obtained from the charts and shift reports, and volumes were obtained by totalling the log loads delivered from each block as recorded in Tembec s weigh scale records. 3.1 Equipment and system descriptions The equipment employed in the study is shown in Table 1.

3 Council on Forest Engineering (COFE) Conference Proceedings: Working Globally Sharing Table 1. Equipment complement for each system Felling/feller-processor equipment Skidders Long-log/top-skid system Caterpillar TK 722 harvester John Deere 2054 harvester each with Waratah HTH 20 head John Deere 648 G III rubber-tired grapple skidder Caterpillar 517 tracked grapple skidder Tree-length/butt-skid system John Deere 753 GL feller-buncher with Gilbert 22 head Case 9020 with Hultdins directional falling head Ranger H67 rubber-tired grapple skidder John Deere JD 650 G tracked line skidder Processor Linkbelt 2800 LX with Denharco 550 DH Loader John Deere 644 G front-end loader None trucks were self loaders 1 INTERFACE is a model developed by FERIC to predict the costs for harvesting various harvest prescriptions using a variety of harvesting equipment. The software contains predefined rates of production as determined by previous and ongoing FERIC studies. The harvesters normally produced four sorts. Products were separated according to whether they were redwood (Douglas fir and western larch) or whitewood (pine and spruce) species, and then further separated into short and long logs. The target length for the short log group was 6.25 m (20 6 ) and shorter lengths in 61 cm (2-foot) multiples were allowed. Long logs were defined as longer than 6.25 m and primarily comprised lengths from 11.4 m to 16.9 m in 61 cm multiples (37 6 and 55 6 in 2-foot multiples.) The four product sorts were stacked in separate piles in the stump area prior to skidding. For the top-skid system, the long-log contractor used two skidders in a two-stage skidding process. First, the tracked Caterpillar 517 operated in the stump area in a pre-skid bunching phase in which the skidder operator first gathered and stacked the harvester log piles into larger bunches (Figure 1). It then forwarded the piles to a position on the primary skid trail. From there, the John Deere 648 top-skidded the large bunches the rest of the way to the landing (Figure 2). Figure 1. Tracked skidder performing Figure 2. Rubber-tired skidder * The 29 th Council on Forest Engineering Conference. Coeur d Alene, Idaho, July 30-August 2,. W. Chung and H.S. Han, editors. pp

4 Council on Forest Engineering (COFE) Conference Proceedings: Working Globally Sharing pre-skid bunching arriving at landing 4. RESULTS AND DISCUSSION 4.1 Harvester productivity FERIC studied the two harvesters for the long-log contractor in the fall and in the winter. Both operators were experienced. Table 2 shows some of the site conditions and results from the productivity studies. The table shows the block-average tree size from the cruise, but FERIC also measured the gross tree volume at the study sites within the blocks so that these studies could be compared with data from other FERIC studies. Figure 3 shows harvester productivity from studies conducted by FERIC in western Canada for the INTERFACE model. The graph shows results for 37 studies of harvesters that produced short logs (<6.25 m in length) compared to five harvesters that produced long logs (McMorland 2003). The graph includes the four studies shown in Table 2. The long-log group comprised the three studies from Table 2 and two earlier studies on Tembec operations (McMorland 2003). Table 2. Harvester productivity Fall 2003 January 2004 Block 052 Block 152 Block 37 JD 2054 Cat 722 JD 2054 Cat 722 Cruise tree size, m³ (block average) No cruise data Silvicultural prescription Reserve Douglas-fir, western larch (100 stems/ha) Reserve Douglas-fir, western larch (30 stems/ha) Reserve aspen & Douglas-fir, western larch (max 30 stems/ha) Average slope at study site, % No. of products Proportion of long logs, % All short logs Average gross stem volume in study, m³ Average stems / cycle (no.) Average logs / stem (no.) Average stems / PMH 2 (no.) Average gross volume / PMH, m³ Products were based on redwood and whitewood species species (Douglas fir and western larch vs. pine and spruce) and then length (short logs vs. long logs). 2 PMH = Productive Machine Hours the amount of time the machine was doing work related to its prime function; excludes delays >10 min. The placement of the trend line for the long-log results suggests that harvester productivity was higher when the machines manufactured long logs. This may be true, but it is also visually apparent that the two sets of data overlap. The five observations for long logs may be too small a sample to represent a different data group.

5 m 3 / PMH Council on Forest Engineering (COFE) Conference Proceedings: Working Globally Sharing Harvester Productivity Treelength - 11 Long logs - 5 Short logs y = x R 2 = y = 66.98x R 2 = y = x R 2 = m 3 / stem Figure 3. Harvester productivity for tree- length logs, long logs and short logs. Figure 3 includes the results for 11 additional harvesters that produced tree-length logs (stems that were topped at maximum length after being measured). Harvesters in those studies operated similarly to stump-area delimbers, except that they made an accurate length measurement prior to topping. The trendline and data grouping for the tree-length results are markedly higher than the long-log and short-log results. The following conclusions can be drawn from Figure 3. Harvesters that manufactured tree-length logs had higher hourly productivity than harvesters that produced shorter lengths. Harvesters that manufactured long logs (lengths between 12.2 and 18.3 m, or 40- and 60 feet) had slightly higher productivity than harvesters that produced logs less than or equal to 6.25 m long. In the tree-size range between 0.25 and 0.40 m³/stem, hourly productivity can be similar for all three product groups. 4.2 Harvester length measurement accuracy Table 3 summarizes the length assessment. Almost 80% of the logs were manufactured within the length tolerances allowed by Tembec. About 8% of logs were over length by an average of 3 cm, and 13% were under length by an average of nearly 10 cm. The under-length category was strongly influenced by one log that was 61 cm under the minimum and which accounted for almost half of the category length value. If this log was excluded from the assessment, the average under-length measure for the other 13 logs would have been 5.9 cm.

6 Council on Forest Engineering (COFE) Conference Proceedings: Working Globally Sharing Table 3. Length measurement assessment Short logs (<6.26m) no. measured % average length under/over, cm Within tolerance Under length Over length Long logs (>6.25) no. measured % average length under/over, cm All logs no. measured % average length under/over, cm Grapple skidder productivity Examples of large turn volumes are shown in Figures 4 and 5. Turn volumes were consistently between 9.5 and 12.0 m 3 per turn, and averaged 11.4 m 3. The number of pieces per turn ranged from 10 to 53, and averaged 30. The large turn volumes resulted in very high hourly volume production for the rubbertired skidder. Figure 6 shows data from three top-skidding studies and 54 butt-skidding studies conducted by FERIC. A few of the studies were on adverse skids, but most of the machines skidded down favourable slopes. Each data point is the average hourly productivity of one study. The top-skid data point at the 200-m class is from a Tembec contractor studied earlier as part of the INTERFACE program. This contractor also performed top skidding with a 115-kW class machine, but only conducted additional bunching on some of the turns. Figure 4. End view of tops of a large top-skidded turn Figure 5. Large-volume grapple skidder turn The two data points at the 400-m distance class are the top-skidding studies from the John Deere 648 (115-kW size class) described in this report. 2 These two studies show hourly volume production of approximately 70 m 3 per Productive Machine Hour (PMH). These results are higher than the productivities found in other skidder studies at this distance, likely because bunches were made larger by additional bunching The butt-skidding studies were conducted on rubber-tired machines in the 115 kw, 125 kw and 135 kw engine-size classes. Roughly, these groups correspond to 160, 170 and 180 hp

7 m 3 / PMH Council on Forest Engineering (COFE) Conference Proceedings: Working Globally Sharing engine-size classes. About half of the studies were with 115 kw machines, one-third were with 125 kw machines and the remainder were with the 135 kw class Rubber-tired grapple skidders Butt skidding - 54 studies Long-log, top skid- 3 studies y = x R 2 = Distance, m Figure 6. Skidder productivity. 2 Other common models in the in the 115-kW size-class include the Timberjack 460D, Ranger 667, and Cat 525B. Top skidding is often considered inappropriate because of unacceptable levels of wood breakage. FERIC did not observe any breakage as a result of top skidding during these studies. Figures 2, 4 and 5 show that tops of top-skidded bunched logs are packed together and tightly grasped. The logs tend to support each other, resulting in turns that are less susceptible to bending than turns that are top-skidded by the comparatively flimsy stem leader. 4.4 Machine interaction at roadside for long-log and tree-length systems Table 4 shows the results of the machine interaction studies. The table lists the percentage of time that different numbers of machines were active on the landing. FERIC studied a tree-length contractor in this assessment (System B in Table 4) in order to include a conventional contractor with a front-end loader. Observations were recorded at 5-minute intervals for one shift at each operation, starting around 7:00 am and finishing between 3:30 and 4:00 pm.

8 Council on Forest Engineering (COFE) Conference Proceedings: Working Globally Sharing Table 4. Percentage of time machine interaction occurred Equipment type Long-log / top skid 2 skidders 1 front-end loader System A 2 skidders 1 processor Tree-length / butt skid System B 2 skidders ½ time front-end loader ½ time processor Landing empty, % harvest machine, % harvest machines, % harvest machines, % Trucks present on landing, % The long-log / top skid system resulted in less harvest machine interaction at the landing. Only one harvest machine was active at the landing for 74% of the time, compared to 57% and 65% of the time for the tree-length systems. Although reducing the amount of interaction does not guarantee that there will be fewer safety incidents, certainly the risk of an incident is reduced. 4.5 Productivity and cost for long-log and tree-length systems Productivity FERIC collected shift-level data at the long-log and tree-length contractors operations as each harvested two small blocks. Table 5 presents the block descriptions. Table 5. Block descriptions for winter blocks Harvest system Prescription Gross volume (m3/ha) Long-log / top-skid Block 152 Block 037 Tree-length / butt skid Block 12 Block 13 Reserve D-fir/larch (30 stems/ha) Reserve aspen, D-fir (max 30 stems/ha) Reserve larch >25 cm (10 stems/ha) Reserve non-lodgepole pine >18 cm Gross merchantable tree size, m Species Distribution Lodgepole Western Douglas- Spruce pine % larch % fir % % The long-log blocks had a greater volume/ha and larger average stem size than the treelength areas. The topography was generally similar in that the harvest blocks were on 20-30% slopes, but the treelength block had some trails with 55-m segments of 15% adverse grades. Occasional short pitches of adverse skidding in the long-log blocks ranged from 8% to 27% and accounted for about 5% of skid distance. Average skid distance was approximately 170 m at the tree-length operation and 380 m in the long-log blocks. Costs The two harvesters used by the contractor in the long-log block did not have identical scheduling or productivity. The on-board computers could not be used to apportion production between the machines because one of the computers was not operating correctly.

9 Council on Forest Engineering (COFE) Conference Proceedings: Working Globally Sharing For costing purposes, the harvesters results have been combined to derive a weighted average hourly cost. Table 6 shows the production and working hours for both harvesters, their hourly costs, and the weighted combined cost. Table 6. Weighted hourly cost for harvesters in long-log blocks a Harvester 1 Caterpillar TK 722 Harvester 2 John Deere 2054 Combined Weighted Average, $ / SMH Number of shifts Productive machine hours (PMH) Delay, h Scheduled machine hours (SMH) Machine cost, $ / SMH Cost, $ 20,259 14,337 34, a Note that long-log is a descriptor used to differentiate from tree-length operations. The long-log harvesting system produces a small percentage of short logs. Table 7 shows the cost comparison between the two systems. The weighted hourly volume for the harvesters was 26.4 m 3 /SMH, meaning that each harvester produced roughly at that rate. The long-log/top-skid combination was estimated to be $2.92/m 3 less expensive to employ than the more conventional tree-length/butt skid system. Most of the savings for the long-log system occurred because the harvester had a onestep-to-product cost of $6.82/m 3 compared to the two-step-to-product cost of $10.53/m 3 for the buncher/processor system. Some of the savings is a result of productivity differences between the two systems due to differences in average stem size (larger at the long-log operation). However, the skidding phase cost for the long-log system was also lower even though two skidding machines were utilized and skid distances were considerably longer. The lower skidding cost was the result of the large top-skidded turn volumes. As noted, the long-log/top skid operation had a larger average stem size compared to the butt-skid operation. A smaller stem size probably would not alter direct skidding productivity at this operation turn volumes would be unlikely to change because turns are composed of logs, not stems but the pre-skid cost may increase to reflect more accumulation time necessary for large turn volumes. The front-end loader was not instrumented with a recording device so net productive time was not measured. The loader was required on site earlier each day than the other harvesting machines in order to load early trucks, and it stayed until the end of the working day with the other machines to organize the landing and log decks for the next morning. This resulted in more scheduled time/day for the loader than for the other machines. Table 7. Productivity and cost comparison Long-log/top-skid b Harvesters Pre-skid Skidder Shifts (no) Productive Machine Hours (PMH) Delays (h) Scheduled Machine Hours (SMH) Utilization (%) Machine Cost a ($/SMH) Volume (m3/sm H) Cost ($/m3 )

10 Council on Forest Engineering (COFE) Conference Proceedings: Working Globally Sharing Front-end loader Total Tree-length/butt-skid c Buncher Skidder Processor Miscellaneous d Total a These costs are based on FERIC s standard costing methodology for determining machine and operating costs. These costs do not include supervision, profit, or overhead and are not the actual costs incurred by the contractor or company. b Total volume produced was 5074 m3 c Total volume produced was 6640 m3 d Occasional tracked cable skidder and feller-director 5. CONCLUSIONS / IMPLEMENTATION Harvesters that manufactured tree-length logs had higher hourly productivity than harvesters that produced shorter lengths. Harvesters that manufactured long logs between 12.2 and 18.3 m (40 and 60 feet) had slightly higher productivity than harvesters that produced logs less than or equal to 6.25 m long. In the tree-size range between 0.25 and 0.40 m³/stem, hourly productivity can be similar for all three product groups. Most of the logs were manufactured within the length tolerances allowed by Tembec. Skidder turn volumes when top-skidded were consistently between 9.5 and 12.0 m 3 per turn because bunches were made larger by additional gathering and bunching at the stump area. This resulted in a very high hourly volume production of approximately 70 m 3 /PMH at an average skid distance of about 400 m. These results were higher than those found in other skidder studies, regardless of machine size. FERIC did not observe any breakage as a result of top skidding during these studies. The long-log / top skid system is potentially safer because it resulted in less harvest machine interaction at the landing. As well, the long-log/top-skid combination was estimated to be $2.92 less expensive per m 3 to employ than the more conventional tree-length/butt skid system. Most of the savings for the long-log system occurred because the harvester had a onestep-to-product cost of $6.82/m 3 compared to the two-step-to-product cost of $10.53/m 3 for the buncher/processor system. Skidding cost for the long-log system was also lower, even though two skidding machines were utilized and the skid distances were considerably longer. The lower cost was the result of the large top-skidded turn volumes. Although outside the scope of this study, there are additional benefits from using a longlog/top skid system: reduced regeneration costs / higher survival rates (increased moisture retention and less grass at the stump area) savings in landing construction reduction or elimination of slash disposal safety hazard avoidance / reduced cost of accidents

11 Council on Forest Engineering (COFE) Conference Proceedings: Working Globally Sharing 6. ACKNOWLEDGEMENTS The author thanks the staff at Tembec Industries Inc., Norm Roberts Logging and Crabbe Logging for their help in setting up and conducting this study. In addition, thanks to FERIC staff Joanne Lennerton and Pat Forrester for help with field work and analysis, and Marv Clark, Tony Sauder, Yvonne Chu and Shelley Kerr for valuable input to the report. 7. LITERATURE CITED McMorland, B INTERFACE productivity data from western Canada: harvesters II. FERIC, Vancouver, BC. Progress Report No pp.

Snip & Skid: Partial Cut Logging to Control Mountain Pine Beetle Infestations in British Columbia

Snip & Skid: Partial Cut Logging to Control Mountain Pine Beetle Infestations in British Columbia Snip & Skid: Partial Cut Logging to Control Mountain Pine Beetle Infestations in British Columbia Han-Sup Han Department of Forest Products, University of Idaho, Moscow, ID, USA 83844 1132, Phone: (208)

More information

Observations of Three Shortwood System Machines in a Hardwood Stand using a Single Selection Cutting Approach with Temporary Trails

Observations of Three Shortwood System Machines in a Hardwood Stand using a Single Selection Cutting Approach with Temporary Trails 580, boul. Saint-Jean Pointe-Claire, QC H9R 3J9 www.feric.ca Observations of Three Shortwood System Machines in a Hardwood Stand using a Single Selection Cutting Approach with Temporary Trails Vincent

More information

Productivity and utilisation of an in-field chipping harvest system in an unmanaged blue gum coppice stand in Western Australia

Productivity and utilisation of an in-field chipping harvest system in an unmanaged blue gum coppice stand in Western Australia Productivity and utilisation of an in-field chipping harvest system in an unmanaged blue gum coppice stand in Western Australia Mark Brown 1, 2, Rick Mitchell 1,2 and John Wiedemann 1 1 CRC for Forestry

More information

What is Thinning? The most challenging logging chance faced by a harvesting system. The objectives of thinning are to: Thinning vs.

What is Thinning? The most challenging logging chance faced by a harvesting system. The objectives of thinning are to: Thinning vs. What is Thinning? The most challenging logging chance faced by a harvesting system. The objectives of thinning are to: Remove small, poorly formed, diseased, or otherwise undesirable trees Improve the

More information

2008 Council on Forest Engineering (COFE) Conference Proceedings: Addressing Forest Engineering Challenges for the Future Charleston, June 22-25, 2008

2008 Council on Forest Engineering (COFE) Conference Proceedings: Addressing Forest Engineering Challenges for the Future Charleston, June 22-25, 2008 Production for a Biomass Harvesting System in Pine Brandon O Neal and Tom Gallagher Graduate Research Assistant and Assistant Professor School of Forestry and Wildlife Sciences, Auburn University, Auburn,

More information

Harvesting Systems and Equipment in British Columbia

Harvesting Systems and Equipment in British Columbia Harvesting Systems and Equipment in British Columbia Ministry of Forests Forest Practices Branch Harvesting Systems and Equipment in British Columbia REFERENCE Operating Techniques Page 127 134 The handbook

More information

Comparing Productivity and Costs of Two Beetle-killed Stand Harvesting Methods in Northern Colorado

Comparing Productivity and Costs of Two Beetle-killed Stand Harvesting Methods in Northern Colorado Comparing Productivity and Costs of Two Beetle-killed Stand Harvesting Methods in Northern Colorado Hee Han1, Woodam Chung2, Nathaniel Anderson 3 Abstract There has been increasing interest in utilizing

More information

PRODUCTIVITY OF A TREE LENGTH HARVESTING SYSTEM THINNING PONDEROSA PINE IN NORTHERN ARIZONA

PRODUCTIVITY OF A TREE LENGTH HARVESTING SYSTEM THINNING PONDEROSA PINE IN NORTHERN ARIZONA PRODUCTIVITY OF A TREE LENGTH HARVESTING SYSTEM THINNING PONDEROSA PINE IN NORTHERN ARIZONA Jason D. Thompson USDA Forest Service Auburn, AL jasonthompson@fs.fed.us ABSTRACT - In the fall of 2 a productivity

More information

Harvesting Western Juniper (Juniperus occidentalis) in Eastern Oregon - A Case Study

Harvesting Western Juniper (Juniperus occidentalis) in Eastern Oregon - A Case Study Harvesting Western Juniper (Juniperus occidentalis) in Eastern Oregon - A Case Study J.F. McNeel, University of British Columbia and L. Swan, U.S. Forest Service This paper summarizes the results of a

More information

HARVESTING TECHNICAL NOTE

HARVESTING TECHNICAL NOTE Summary Steep Slope Harvesting in Coastal British Columbia Steep slope harvesting operations in the coastal region of British Columbia, Canada (BC) were observed in November 2012 by Keith Raymond, FFR

More information

Forest Harvesting in Virginia

Forest Harvesting in Virginia Forest Harvesting in Virginia Characteristics of Virginia s Logging Operations ANR-5 Forest Harvesting in Virginia Characteristics of Virginia s Logging Operations Scott M. Barrett Joshua L. Chandler M.

More information

Elemental Time Studies

Elemental Time Studies Elemental Time Studies Elemental time studies record times for machine activities: from continuous observation of the machine for a longer period of time Machine time is divided into elements. Each element:

More information

Biomass Utilization & Gaps in Inventory for Business Development

Biomass Utilization & Gaps in Inventory for Business Development THE SPIRIT OF INNOVATION Biomass Utilization & Gaps in Inventory for Business Development Jason Linkewich Tembec overview Outline History of Tembec bio-refinery Why we are interested in additional biomass?

More information

A User s Guide for Western Biomass: Software to Calculate Cost. and Production of Biomass Harvesting, Processing, and.

A User s Guide for Western Biomass: Software to Calculate Cost. and Production of Biomass Harvesting, Processing, and. Western Biomass Documentation - 1 - A User s Guide for Western Biomass: Software to Calculate Cost and Production of Biomass Harvesting, Processing, and Transportation Fei Pan, PhD, Research Associate

More information

THINNING OF RADIATA PINE BY CRAWLER TRACTOR ON STEEP SLOPES IN NORTH-EASTERN VICTORIA: A PRELIMINARY STUDY

THINNING OF RADIATA PINE BY CRAWLER TRACTOR ON STEEP SLOPES IN NORTH-EASTERN VICTORIA: A PRELIMINARY STUDY 213 THINNING OF RADIATA PINE BY CRAWLER TRACTOR ON STEEP SLOPES IN NORTH-EASTERN VICTORIA: A PRELIMINARY STUDY C. J. LEITCH Forests Commission Victoria, Box 164, Myrtleford 3737, Australia and G. B. MOORE

More information

Results of biomass harvesting in Missouri

Results of biomass harvesting in Missouri Results of biomass harvesting in Missouri A project was initiated in 2007 in an effort to develop a small scale harvesting system that will economically and efficiently deliver a biomass product to an

More information

Shortwood Systems. NSCC-Natural Resources Forestry

Shortwood Systems. NSCC-Natural Resources Forestry NSCC-Natural Resources Forestry Shortwood harvesting systems produce products at the stump Wood is piled (bunched) in the woods on cutting trails Products include pulpwood, studwood, sawlogs, fence posts

More information

Forest Bioenergy and Biofuels Integration: Sustainability, Energy Balance and Emissions from Forest Restoration in the Southern Rocky Mountains

Forest Bioenergy and Biofuels Integration: Sustainability, Energy Balance and Emissions from Forest Restoration in the Southern Rocky Mountains Forest Bioenergy and Biofuels Integration: Sustainability, Energy Balance and Emissions from Forest Restoration in the Southern Rocky Mountains Beth Dodson (UM), John Goodburn (UM), Lucas Townsend (UM),

More information

IMPROVED SKIDDING FOR SMALL-SCALE BIOMASS HARVESTING SYSTEMS

IMPROVED SKIDDING FOR SMALL-SCALE BIOMASS HARVESTING SYSTEMS IMPROVED SKIDDING FOR SMALL-SCALE BIOMASS HARVESTING SYSTEMS Taylor Burdg a and Tom Gallagher b a Graduate Research Assistant Email:burdgto@auburn.edu b Associate Professor Auburn University s School of

More information

Results of biomass harvesting in Alabama

Results of biomass harvesting in Alabama Results of biomass harvesting in Alabama A project was initiated in 2007 in an effort to develop a small scale harvesting system that will economically and efficiently deliver a biomass product to an alternative

More information

Productivity Estimates for Chippers and Grinders on Operational Southern Timber Harvests

Productivity Estimates for Chippers and Grinders on Operational Southern Timber Harvests Productivity Estimates for Chippers and Grinders on Operational Southern Timber Harvests Addison Aman, Graduate Research Assistant Shawn Baker, Research Professional Dale Greene, Professor Center for Forest

More information

Thinning, Fuel Manipulation and Prescribed Fire in Dry Forest Types

Thinning, Fuel Manipulation and Prescribed Fire in Dry Forest Types Thinning, Fuel Manipulation and Prescribed Fire in Dry Forest Types Bob Rich Forest Management Supervisor, Missoula Unit. Montana Department of Natural Resources and Conservation: Missoula, Montana ABSTRACT

More information

Harvesting Systems and Equipment in British Columbia

Harvesting Systems and Equipment in British Columbia Harvesting Systems and Equipment in British Columbia Ministry of Forests Forest Practices Branch Harvesting Systems and Equipment Part One EQUIPMENT SELECTION Chart 1 to 13 The handbook does not attempt

More information

ROADSIDE RESIDUAL HANDLING GUIDELINE VERSION 3.0. Prepared by FPInnovations and Forest Tenures Branch

ROADSIDE RESIDUAL HANDLING GUIDELINE VERSION 3.0. Prepared by FPInnovations and Forest Tenures Branch ROADSIDE RESIDUAL HANDLING GUIDELINE VERSION 3.0 Prepared by FPInnovations and Forest Tenures Branch May 9, 2018 1 Disclaimer This document contains material to inform forest tenure holders on best practices

More information

A HIGHLY MECHANISED HARVESTING SYSTEM IN NEW ZEALAND

A HIGHLY MECHANISED HARVESTING SYSTEM IN NEW ZEALAND 199 A HIGHLY MECHANISED HARVESTING SYSTEM IN NEW ZEALAND C. J. TERLESK and K. WALKER Forest Research Institute, New Zealand Forest Service, Private Bag, Rotorua, New Zealand (Received for publication 1

More information

Innovative Harvesting Approaches for Tolerant Hardwood Forests

Innovative Harvesting Approaches for Tolerant Hardwood Forests Innovative Harvesting Approaches for Tolerant Hardwood Forests Philippe Meek Location: Webinar Date: May 23rd, 2013 Key Learnings from the Hardwood Initiative 2 Key Learnings from the Hardwood Initiative

More information

Focus on Forest Engineering 2011

Focus on Forest Engineering 2011 Focus on Forest Engineering 2011 The application of Full-tree and Treelength Systems on Difficult Terrain: Increasing our knowledge base to better select and operate FT and TL equipment Gary Olsen International

More information

PROSPECTUS CAPPELL C LOGGING UNIT YUROK INDIAN LANDS

PROSPECTUS CAPPELL C LOGGING UNIT YUROK INDIAN LANDS PROSPECTUS CAPPELL C LOGGING UNIT YUROK INDIAN LANDS I. INTRODUCTION The purpose of this Prospectus is to furnish sufficient information in addition to that contained in the published advertisement to

More information

Operational trial of the selection cut using the 123 method

Operational trial of the selection cut using the 123 method 580, boul. Saint-Jean Pointe-Claire, QC H9R 3J9 www.feric.ca Operational trial of the selection cut using the 123 method In collaboration with NewPage Port Hawkesbury by Dave Lepage Philippe Meek June

More information

Timber Harvesting Options for Woodland Owners

Timber Harvesting Options for Woodland Owners LOGGING EC 1582 August 2006 $2.50 Timber Harvesting Options for Woodland Owners R. Parker and S. Bowers Contents Choosing the best harvest system... 2 Table 1. General performance of various timber yarding

More information

Quota Certificate or Deciduous Timber Allocation Number. Timber Permit Number covers operating period to

Quota Certificate or Deciduous Timber Allocation Number. Timber Permit Number covers operating period to TM 118(Rev.11/17) Forestry Division ANNUAL OPERATING PLAN SUBMISSION INTRODUCTION This plan for Timber Licence Number issued under Quota Certificate or Deciduous Timber Allocation Number or Timber Permit

More information

Full-tree harvesting system aids forest management

Full-tree harvesting system aids forest management Utah State University DigitalCommons@USU Aspen Bibliography Aspen Research 1969 Full-tree harvesting system aids forest management Z.A. Zasada J.C. Tappeiner Follow this and additional works at: https://digitalcommons.usu.edu/aspen_bib

More information

Factors that Affect Fuel Consumption in Logging Systems

Factors that Affect Fuel Consumption in Logging Systems Factors that Affect Fuel Consumption in Logging Systems J O N A T H A N K E N N E Y T O M G A L L A G H E R M A T H E W S M I D T T I M M C D O N A L D D A N A M I T C H E L L National Average Fuel Prices

More information

LOGGING METHODS for WISCONSIN WOODLANDS. A landowner s guide to timber harvesting in Wisconsin s forests

LOGGING METHODS for WISCONSIN WOODLANDS. A landowner s guide to timber harvesting in Wisconsin s forests LOGGING METHODS for WISCONSIN WOODLANDS A landowner s guide to timber harvesting in Wisconsin s forests 1 Equipment descriptions & Illustrations Timber harvesting is an integral part of sound forest management.

More information

Factors that Affect Fuel Consumption and Harvesting Cost. Jonathan Tye Kenney

Factors that Affect Fuel Consumption and Harvesting Cost. Jonathan Tye Kenney Factors that Affect Fuel Consumption and Harvesting Cost By Jonathan Tye Kenney A thesis submitted to the Graduate Faculty of Auburn University in partial fulfillment of the requirements for the Degree

More information

Harvesting Systems and Equipment in British Columbia

Harvesting Systems and Equipment in British Columbia Harvesting Systems and Equipment in British Columbia Ministry of Forests Forest Practices Branch Harvesting Systems and Equipment in British Columbia A.J. MacDonald Forest Engineering Research Institute

More information

Timber Sale Appraisal Likely Storey Sale FG W

Timber Sale Appraisal Likely Storey Sale FG W Timber Sale Appraisal Likely Storey Sale FG-341-2019-W00543-02 District: Forest Grove Date: August 28, 2018 Cost Summary Conifer Hardwood Total Gross Timber Sale Value $1,546,409.96 $0.00 $1,546,409.96

More information

Timber Measurements Society Coeur d Alene Idaho April, 2018

Timber Measurements Society Coeur d Alene Idaho April, 2018 Timber Measurements Society Coeur d Alene Idaho April, 2018 Logging Utilization in Arizona and New Mexico 2012-2017 Eric Simmons Research Associate, Forest Industry Research Program, Bureau of Business

More information

Innovation in Maine s Logging Industry

Innovation in Maine s Logging Industry Innovation in Maine s Logging Industry Forest Resources Association Fall Board Meeting Bangor, Maine October 2, 2014 Jeffrey G. Benjamin, Associate Professor of Forest Operations School of Forest Resources,

More information

ExtensionNotes. Careful Logging Practices: The Ontario Woodlot. Selecting the Right Harvesting Equipment ONTARIO WOODLOT ASSOCIATION

ExtensionNotes. Careful Logging Practices: The Ontario Woodlot. Selecting the Right Harvesting Equipment ONTARIO WOODLOT ASSOCIATION ONTARIO WOODLOT ASSOCIATION ExtensionNotes Careful Logging Practices: Selecting the Right Harvesting Equipment The Ontario Woodlot Association published A Landowner s Guide to Careful Logging in 2009.

More information

Mathew Smidt, Ph.D, Associate Professor and Extension Specialist, Forest Operations Phone: ,

Mathew Smidt, Ph.D, Associate Professor and Extension Specialist, Forest Operations Phone: , 2009 Council on Forest Engineering (COFE) Conference Proceedings: Environmentally Sound Forest Operations. Lake Tahoe, June 15-18, 2009 Stump to mill logging cost program (STOMP) Authors Mathew Smidt,

More information

Timber Sale Appraisal Bad Ham Sale KL

Timber Sale Appraisal Bad Ham Sale KL Timber Sale Appraisal Bad Ham Sale KL-341-2017-054- District: Klamath/Lake Date: October 06, 2016 Cost Summary Conifer Hardwood Total Gross Timber Sale Value $351,028.84 $0.00 $351,028.84 Project Work:

More information

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK C.1 SCOPE OF CONTRACT Description of Work: The intent of this contract is to secure whole tree harvesting with subsequent processing of dead and

More information

Harvesting Systems and Equipment in British Columbia

Harvesting Systems and Equipment in British Columbia Harvesting Systems and Equipment in British Columbia Ministry of Forests Forest Practices Branch Harvesting Systems and Equipment in British Columbia PART 2: REFERENCE PRIMARY TRANSPORT EQUIPMENT Part

More information

STEEP SLOPE LOGGING RESEARCH AT OSU Eye movement tracking to grapple yarding, collaboration for a safer work environment.

STEEP SLOPE LOGGING RESEARCH AT OSU Eye movement tracking to grapple yarding, collaboration for a safer work environment. STEEP SLOPE LOGGING RESEARCH AT OSU Eye movement tracking to grapple yarding, collaboration for a safer work environment. Presenter: Preston Green 1 1 Oregon State University College of Forestry Research

More information

In-woods Chipping. Popular in the early 1970 s Big demand for pulp fiber and wood for industrial fuel. WDSC 422 Chipping and Wetland Systems 1

In-woods Chipping. Popular in the early 1970 s Big demand for pulp fiber and wood for industrial fuel. WDSC 422 Chipping and Wetland Systems 1 In-woods Chipping Popular in the early 1970 s Big demand for pulp fiber and wood for industrial fuel WDSC 422 Chipping and Wetland Systems 1 In-woods Chipping Chippers: Produce whole-tree chips Grind/chip

More information

DESIGNING AND TESTING A SMALL-SCALE BIOMASS HARVESTING SYSTEM IN THE EASTERN UNITED STATES

DESIGNING AND TESTING A SMALL-SCALE BIOMASS HARVESTING SYSTEM IN THE EASTERN UNITED STATES Austro2007/FORMEC 07: Meeting the Needs of Tomorrows Forests New Developments in Forest Engineering, October 7 11, 2007, Vienna and Heiligenkreuz Austria DESIGNING AND TESTING A SMALL-SCALE BIOMASS HARVESTING

More information

Logging Utilization in New Mexico

Logging Utilization in New Mexico Sacramento Mountain Wood Industry Summit March 2016 Logging Utilization in New Mexico Eric Simmons Steve Hayes State Level Logging Utilization Objectives The goal is to update logging residue data for

More information

Harvesting Systems and Equipment in British Columbia

Harvesting Systems and Equipment in British Columbia Harvesting Systems and Equipment in British Columbia Ministry of Forests Forest Practices Branch Harvesting Systems and Equipment in British Columbia REFERENCE EXTERNAL REQUIREMENTS Page 169 183 The handbook

More information

Loading Productivity of Untrimmed and Trimmed Pulpwood

Loading Productivity of Untrimmed and Trimmed Pulpwood Loading Productivity of Untrimmed and Trimmed Pulpwood Jason Thompson 1, John Klepac 1, and Dana Mitchell 2 1 Engineer, Forest Operations Research Unit, Southern Research Station, USDA Forest Service 2

More information

Successfully managing change

Successfully managing change Click here to download a PDF of this article Successfully managing change Nova Scotia logging contractor Dana Day has successfully responded to the continuing changes in the forest industry, with support

More information

a.research 3.ssoc.iate 2nd "'''~,"u'a Forest F~esearc.h endo:rset:n.ent nor not of con1nj_e:tcic:u names failure to n1ention 2 r1ct1ne

a.research 3.ssoc.iate 2nd '''~,u'a Forest F~esearc.h endo:rset:n.ent nor not of con1nj_e:tcic:u names failure to n1ention 2 r1ct1ne a.research 3.ssoc.iate 2nd "'''~,"u'a Forest F~esearc.h of con1nj_e:tcic:u names failure to n1ention 2 r1ct1ne not critic.isxr.l endo:rset:n.ent nor EFFECT OF MECHANIZED TREE HARVESTING ON JACK PINE REGENERATION

More information

Operational trial of the Selection cut using the 123 method at Northern Pulp Nova Scotia Corporation

Operational trial of the Selection cut using the 123 method at Northern Pulp Nova Scotia Corporation 570, boul. Saint-Jean Pointe-Claire, QC H9R 3J9 www.feric.ca Operational trial of the Selection cut using the 123 method at Northern Pulp Nova Scotia Corporation By Philippe Meek, Jean A. Plamondon and

More information

Harvesting Systems and Equipment in British Columbia

Harvesting Systems and Equipment in British Columbia Harvesting Systems and Equipment in British Columbia Ministry of Forests Forest Practices Branch Harvesting Systems and Equipment in British Columbia REFERENCE SITE AND STAND CHARACTERISTICS Page 151 168

More information

In-woods Treatment of Forest Residues for Productions of Quality Feedstocks. Anil Raj Kizha. and Han-Sup Han

In-woods Treatment of Forest Residues for Productions of Quality Feedstocks. Anil Raj Kizha. and Han-Sup Han FOREST PRODUCTS SOCIETY. 70 th International Convention. Portland, OR. July 27-29, 2016. In-woods Treatment of Forest Residues for Productions of Quality Feedstocks Anil Raj Kizha. and Han-Sup Han Assistant

More information

Comparing the Flatwise Modulus of Elasticity (E flat ) of Green Lodgepole Pine Lumber & Grey-Stage Dry MPB Lumber

Comparing the Flatwise Modulus of Elasticity (E flat ) of Green Lodgepole Pine Lumber & Grey-Stage Dry MPB Lumber Comparing the Flatwise Modulus of Elasticity (E flat ) of Green Lodgepole Pine Lumber & Grey-Stage Dry MPB Lumber Prepared for Forestry Innovation Investment Ltd. by Dan Alexander Project No. MPB 2007-002

More information

Comparison of Two Cut-to-Length Harvesting Systems Operating in Eastern Hardwoods

Comparison of Two Cut-to-Length Harvesting Systems Operating in Eastern Hardwoods Journal of Forest Engineering 53 Comparison of Two Cut-to-Length Harvesting Systems Operating in Eastern Hardwoods ABSTRACT Chris B. LeDoux USDA Forest Service Morgantown, WV Neil K. Huyler USDA Forest

More information

MECHANISED VERSUS MANUAL LOG-MAKING IN TWO CHILEAN PINUS RADIATA STANDS

MECHANISED VERSUS MANUAL LOG-MAKING IN TWO CHILEAN PINUS RADIATA STANDS Carey & Murphy Log-making in two Chilean Pinus radiata stands 25 MECHANISED VERSUS MANUAL LOG-MAKING IN TWO CHILEAN PINUS RADIATA STANDS PATRICIO CAREY B. Forest Management Department, Universidad Austral

More information

PEND OREILLE COUNTY COMMUNITY DEVELOPMENT DEPARTMENT 2016 TIMBER SALE. REQUEST for LOGGING & HAULING SERVICES

PEND OREILLE COUNTY COMMUNITY DEVELOPMENT DEPARTMENT 2016 TIMBER SALE. REQUEST for LOGGING & HAULING SERVICES 1 PEND OREILLE COUNTY COMMUNITY DEVELOPMENT DEPARTMENT 2016 TIMBER SALE REQUEST for LOGGING & HAULING SERVICES BID DEADLINE: 2 p.m. on Friday, April 1 st, 2016 SUBMIT BIDS TO: Pend Oreille County Attn:

More information

Productivity and Cost of Processing and Sorting Forest Residues

Productivity and Cost of Processing and Sorting Forest Residues Productivity and Cost of Processing and Sorting Forest Residues Anil Raj Kizha 1 and Han-sup Han 2 1 Post-Doctoral Researcher, Department of Forestry and Wildland Resources, Humboldt State University 2

More information

Assessing moisture content of piled woody debris: implications for burning

Assessing moisture content of piled woody debris: implications for burning Assessing moisture content of piled woody debris: implications for burning Greg Baxter Researcher, Wildland Fire Operations Group, FPInnovations Feric Keywords Harvest debris, woody debris, fuel moisture,

More information

Timber Sale Appraisal Sunday Passage Sale FG

Timber Sale Appraisal Sunday Passage Sale FG Timber Sale Appraisal Sunday Passage Sale FG-341-2018-024- District: Forest Grove Date: August 23, 2017 Cost Summary Conifer Hardwood Total Gross Timber Sale Value $3,295,699.11 $68,708.64 $3,364,407.75

More information

FINAL TIMBER REMOVAL and MANAGEMENT PLAN BLUE LAKE HYDROELECTRIC PROJECT (FERC NO. 2230) EXPANSION. Prepared By: Dean Orbison

FINAL TIMBER REMOVAL and MANAGEMENT PLAN BLUE LAKE HYDROELECTRIC PROJECT (FERC NO. 2230) EXPANSION. Prepared By: Dean Orbison FINAL TIMBER REMOVAL and MANAGEMENT PLAN BLUE LAKE HYDROELECTRIC PROJECT (FERC NO. 2230) EXPANSION Prepared By: Dean Orbison For the City and Borough of Sitka Electric Department December, 2010 INTRODUCTION

More information

TABLE OF CONTENTS 7.1 OPERATIONAL PLANNING Wood Requirements... 1

TABLE OF CONTENTS 7.1 OPERATIONAL PLANNING Wood Requirements... 1 TABLE OF CONTENTS 7.1 OPERATIONAL PLANNING... 1 7.1.1 Wood Requirements... 1 7.1.2 Allocation of Harvest... 1 Harvesting Volumes... 1 Operating Areas... 2 7.1.3 Woodflow... 2 7.1.4 Pre-Work Meeting...

More information

Factors that Affect Fuel Consumption in Logging Systems

Factors that Affect Fuel Consumption in Logging Systems Factors that Affect Fuel Consumption in Logging Systems Jonathan Kenney 1, Thomas Gallagher 2, Mathew Smidt 3, Dana Mitchell 4, Timothy McDonald 5 Abstract: Fuel consumption is an important aspect of the

More information

Standing Stem Harvesting

Standing Stem Harvesting Standing Stem Harvesting Don Cleaver Weyerhaeuser Canada Ltd., North Island Woodlands Div., P.O Box 6000, Campbell River, BC, V9W 5E1, (250)287-5000 ABSTRACT - Standing stem harvesting is a method of individual

More information

Timber Sale Appraisal Rock Fish Sale cost summary. Conifer Hardwood Total. Gross Timber Sale Value $0.00 $117, $117,005.

Timber Sale Appraisal Rock Fish Sale cost summary. Conifer Hardwood Total. Gross Timber Sale Value $0.00 $117, $117,005. Timber Sale Appraisal Rock Fish Sale 341-13-71 District: West Oregon Date: November 14, 2012 cost summary Conifer Hardwood Total Gross Timber Sale Value $0.00 $117,005.52 $117,005.52 Project Work: $(18,056.00)

More information

FILE COPY. How To Reduce Injuries. Stand Management Activities. to Residual Trees During EDITOR'S. Paul E. Aho, Gary Fiddler, Gregory M.

FILE COPY. How To Reduce Injuries. Stand Management Activities. to Residual Trees During EDITOR'S. Paul E. Aho, Gary Fiddler, Gregory M. United States Department of Agricu It ure Forest Service Pacific Northwest Forest and Range Experiment Stat ion General Technical Report, PNW-156 June 1983 EDITOR'S FILE COPY How To Reduce Injuries to

More information

Timber Sale Appraisal More Cow Bell Sale FG W

Timber Sale Appraisal More Cow Bell Sale FG W Timber Sale Appraisal Sale FG-341-2019-W00542-01 District: Forest Grove Date: January 24, 2019 Cost Summary Conifer Hardwood Total Gross Timber Sale Value $2,048,273.85 $10,164.42 $2,058,438.27 Project

More information

FPInnovations Canada s Forest Sector Innovation Hub

FPInnovations Canada s Forest Sector Innovation Hub Canada s Forest Sector Innovation Hub FPInnovations Canada s Forest Sector Innovation Hub Forest Operations Research Highlights September 13, 2012 Janet Mitchell, Assoc. Research Leader, Silvicultural

More information

Integration of high-quality harvester data and new log scaling technology for efficient control of wood flow in German wood supply chains

Integration of high-quality harvester data and new log scaling technology for efficient control of wood flow in German wood supply chains Integration of high-quality harvester data and new log scaling technology for efficient control of wood flow in German wood supply chains Dirk Jaeger 1, Martin Opferkuch 1, Siegmar Schönherr 1, Thilo Wagner²

More information

Conifex Timber Inc SFI Surveillance Audit

Conifex Timber Inc SFI Surveillance Audit Conifex Timber Inc. 2018 SFI Surveillance Audit From July 30-August 3, 2018 an audit team from KPMG Performance Registrar Inc. (KPMG PRI) carried out a surveillance audit of Conifex Timber Inc. s (Conifex

More information

Timber Sale Appraisal Knob Point Combination. Sale AT Cost Summary. Conifer Hardwood Total. District: Astoria Date: April 20, 2015

Timber Sale Appraisal Knob Point Combination. Sale AT Cost Summary. Conifer Hardwood Total. District: Astoria Date: April 20, 2015 Timber Sale Appraisal Knob Point Combination Sale AT-341-2015-54- District: Astoria Date: April 20, 2015 Cost Summary Conifer Hardwood Total Gross Timber Sale Value $1,321,653.69 $34,121.84 $1,355,775.53

More information

FPSuite TM and EFI: A winning solution

FPSuite TM and EFI: A winning solution www.fpinnovations.ca FPSuite TM and EFI: A winning solution + FPInnovations Wood Fibre Forum November 2010 Jean Favreau, Mihai Pavel FPInnovations, Value Maximization Introduction Improving forest inventory

More information

Timber Measurements Society Portland, 2017 Logging Utilization in Oregon and Washington Eric Simmons

Timber Measurements Society Portland, 2017 Logging Utilization in Oregon and Washington Eric Simmons Timber Measurements Society Portland, 2017 Logging Utilization in Oregon and Washington 2011 2015 Eric Simmons State Level Logging Utilization Objectives The goal was to update logging residue data for

More information

GREAT LAKES REGIONAL MICHIGAN MASTER LOGGER FIELD AUDIT FORM. Field Verifier s I.D. #: Acres: Sale #:

GREAT LAKES REGIONAL MICHIGAN MASTER LOGGER FIELD AUDIT FORM. Field Verifier s I.D. #: Acres: Sale #: Applicant s I.D. #: Date Audited: Field Verifier s I.D. #: Acres: Sale #: 1 The purpose of this form is to document an applicant s compliance in specific areas of responsibility and with performance standards

More information

Lesson 11: Harvesting Timber Products

Lesson 11: Harvesting Timber Products Lesson 11: Harvesting Timber Products TEACHER: SCHOOL: GRADE LEVEL: 9-12 TASKS/COMPETENCIES ANR8040.102 Demonstrate ability to fell trees according to cutting patterns, using chain saw. ANR8040.103 Demonstrate

More information

MODELING GROUND-BASED TIMBER HARVESTING SYSTEMS USING COMPUTER SIMULATION

MODELING GROUND-BASED TIMBER HARVESTING SYSTEMS USING COMPUTER SIMULATION MODELING GROUND-BASED TIMBER HARVESTING SYSTEMS USING COMPUTER SIMULATION Jingxin Wang Assistant Professor, Division of Forestry, West Virginia University, Morgantown, WV 20 USA Chris B. LeDoux Project

More information

Chapter 7 Transportation Operations

Chapter 7 Transportation Operations Chapter 7 Transportation Operations This chapter discusses transporting logs from stump to landing to sawmill. Log transportation involves skidding and loading. There are many method involved. Whatever

More information

Timber Sale Appraisal East Dean Sale CS

Timber Sale Appraisal East Dean Sale CS Timber Sale Appraisal Sale CS-341-2017-68- District: Coos Date: December 13, 2016 Cost Summary Conifer Hardwood Total Gross Timber Sale Value $395,372.12 $4,466.90 $399,839.02 Project Work: $0.00 Advertised

More information

Appendix 6. Western felling and timber-carrying machinery

Appendix 6. Western felling and timber-carrying machinery Appendix 6. Western felling and timber-carrying machinery. Page 1 Appendix 6. Western felling and timber-carrying machinery Chainsaw Husqvarna -257 The saw is well known in Russia and is widely used in

More information

HARVESTING BIOMASS TO IMPROVE LOW-VALUE BEECH DOMINATED HARDWOOD STANDS IN MAINE

HARVESTING BIOMASS TO IMPROVE LOW-VALUE BEECH DOMINATED HARDWOOD STANDS IN MAINE HARVESTING BIOMASS TO IMPROVE LOW-VALUE BEECH DOMINATED HARDWOOD STANDS IN MAINE Coup, Charles E. 1, Jeffrey G. Benjamin, and Robert G. Wagner 1 University of Maine, School of Forest Resources, Orono,

More information

LIST OF TABLES AND FIGURES

LIST OF TABLES AND FIGURES TABLE OF CONTENTS 8.0 FIBRE CONTROL... 1 8.1 Fibre Sources... 1 8.2 Fibre Measurement... 1 8.2.1 Wood Measurement Procedures... 1 Roundwood... 1 Wood Chips... 1 Sawlogs... 2 8.2.2 Procedure Monitoring...

More information

Tigercat Log Skidder Manuals

Tigercat Log Skidder Manuals Tigercat Log Skidder Manuals If you are searched for a book Tigercat log skidder manuals in pdf form, then you have come on to the right website. We presented utter edition of this book in PDF, txt, DjVu,

More information

use only equipment which is in good order and has been tested for the purpose.

use only equipment which is in good order and has been tested for the purpose. 5. Harvesting operations - 35-5.2.1 Operational equipment Principles use only equipment which is in good order and has been tested for the purpose. Operational equipment Felling and Logging Machines: Implements

More information

Harvesting Small Trees for Bio-Energy. John Klepac, Bob Rummer, and Jason Thompson 1

Harvesting Small Trees for Bio-Energy. John Klepac, Bob Rummer, and Jason Thompson 1 Harvesting Small Trees for Bio-Energy John Klepac, Bob Rummer, and Jason Thompson 1 ABSTRACT: A conventional whole-tree logging operation consisting of 4-wheeled and 3-wheeled saw-head feller-bunchers,

More information

Timber Sale Appraisal Clatstastic Sale FG

Timber Sale Appraisal Clatstastic Sale FG Timber Sale Appraisal Clatstastic Sale FG-341-2018-15- District: Forest Grove Date: February 20, 2018 Cost Summary Conifer Hardwood Total Gross Timber Sale Value $3,443,295.15 $56,673.24 $3,499,968.39

More information

What you should know about a written plan

What you should know about a written plan APPENDIX What you should know about a written plan It s a document, submitted by a landowner or operator to the Oregon Department of Forestry. It s more than the Notification of Operations it describes

More information

Appalachian Wood Energy Innovations Conference Asheville, NC August 2016

Appalachian Wood Energy Innovations Conference Asheville, NC August 2016 Appalachian Wood Energy Innovations Conference Asheville, NC August 2016 Outline USDA Forest Service, R&D Southern Research Station, Research Unit Introduction & Study Area Methodology Results Conclusions

More information

Changing gears in B.C. coastal logging

Changing gears in B.C. coastal logging Changing gears in B.C. coastal logging B.C. coastal logger Bob Lee has had to change gears with his logging operations in recent years, and this involved some big time changes, with a move to second growth

More information

INNOVATIVE METHODS FOR STEEP TERRAIN HARVESTING

INNOVATIVE METHODS FOR STEEP TERRAIN HARVESTING FORMEC 2010 Forest Engineering: Meeting the Needs of the Society and the Environment July 11 14, 2010, Padova Italy INNOVATIVE METHODS FOR STEEP TERRAIN HARVESTING Dzhamal Amishev, Tony Evanson Scion (New

More information

EFFICIENCY OF BIOMASS HARVESTING IN POOR QUALITY STANDS OF EUCALYPTUS IN WESTERN AUSTRALIA

EFFICIENCY OF BIOMASS HARVESTING IN POOR QUALITY STANDS OF EUCALYPTUS IN WESTERN AUSTRALIA EFFICIENCY OF BIOMASS HARVESTING IN POOR QUALITY STANDS OF EUCALYPTUS IN WESTERN AUSTRALIA Mohammad Reza Ghaffariyan a, Mark Brown b and John Wiedemann c a Corresponding author, Research fellow, CRC Forestry,

More information

Log Transportation. Teacher Notes No prior knowledge of log transportation is needed to successfully deliver this lesson plan.

Log Transportation. Teacher Notes No prior knowledge of log transportation is needed to successfully deliver this lesson plan. Log Transportation Grade Level Grade 11&12 Main Idea Before the introduction of the steam engine, log transportation was in the hands of men and animals. Various techniques were used to lug logs to a loading

More information

Click here to download a PDF of this article. By Paul MacDonald

Click here to download a PDF of this article. By Paul MacDonald Click here to download a PDF of this article There are still good opportunities in logging, and it will still be the core of their business, explains Grant Munson (inset photo, left). But we re trying

More information

PRIMARY TRANSPORT EQUIPMENT

PRIMARY TRANSPORT EQUIPMENT PRIMARY TRANSPORT EQUIPMENT Harvesting timber consists of several phases: falling the trees, manufacturing them into logs, and transporting the logs from the stump to a landing or roadside and then to

More information

Timber Sale Appraisal Boxcar Willie Sale FG

Timber Sale Appraisal Boxcar Willie Sale FG Timber Sale Appraisal Boxcar Willie Sale FG-341-2018-28- District: Forest Grove Date: July 11, 2017 Cost Summary Conifer Hardwood Total Gross Timber Sale Value $1,654,942.01 $50,453.52 $1,705,395.53 Project

More information

Kamloops Timber Supply Area

Kamloops Timber Supply Area Southern Interior Beetle Action Coalition Forest Sector Trend Analysis Fact Sheet A project submitted by: Contacts: In conjunction with: Forest Ecosystem Solutions Ltd. #227 998 Harbourside Dr. North Vancouver

More information

Timber Sale Appraisal Steep Puppy Sale KL

Timber Sale Appraisal Steep Puppy Sale KL Timber Sale Appraisal Steep Puppy Sale KL-341-2018-33- District: Klamath/Lake Date: August 24, 2017 Cost Summary Conifer Hardwood Total Gross Timber Sale Value $821,529.46 $0.00 $821,529.46 Project Work:

More information

Forest Investment Account Forest Science Program 2007/08 Contract Report

Forest Investment Account Forest Science Program 2007/08 Contract Report Forest Investment Account Forest Science Program 2007/08 Contract Report Project Title: Harvesting beetle-killed lodgepole pine while protecting advanced regeneration and non-pine species Project Number:

More information

Timber Sale Appraisal Shepherds Pie Sale cost summary. Conifer Hardwood Total. Gross Timber Sale Value $2,013, $13,263.

Timber Sale Appraisal Shepherds Pie Sale cost summary. Conifer Hardwood Total. Gross Timber Sale Value $2,013, $13,263. Timber Sale Appraisal Shepherds Pie Sale 341-14-23 District: N Cascade Date: January 14, 2014 cost summary Conifer Hardwood Total Gross Timber Sale Value $2,013,923.22 $13,263.00 $2,027,186.22 Project

More information