1 Infrastructure Development and Environment
2
3 Few Stories Lift irrigation from Chambal River No Development Zone around Numaligarh Refinery NH - 31 C passing through Jaldapara, Mahananda and Buxa Nh-72 cutting across elephant corridor NH-7 passing through the border of buffer areas of Pench National Park
4 Infrastructure Interested in a Definition?????? Please see: Generally categorised into Transport, Energy, Water sanitation, Communication, Social and Commercial Infrastructure further divided into various sub-sectors Secretariat for PPP and infrastructure in Planning Commission focuses on - Highways, Railways, Ports, Airports, Telecom, Power, and Urban Infrastructure
5
6 Environmental governance An ideal framework should be anticipative, technically oriented, cognizant of legal issues, geopolitically relevant and forward looking, capable of maximising national interests and progressive enough to make a social impact. Most importantly, management of the environment should include progressively adapting/changing actions that rely on sound scientific, technological, human-cognitive and collaborative principles.
7 The Institutional setup Development of infrastructure responsibility of concerned Ministry / Department Issuing Environmental Clearance responsibility of MoEF MoEF dependent on State Forest Departments, PCBs, CZMAs Interface of MoEF with other Ministries, like - MoRD Concurrent Monitoring of clearance process by PMO through CCI and PMG
8 Functions of CCI Identify key projects. involving investment of > 1000 Cr.. or any other critical project. Prescribe time limits for issue of requisite approvals and clearances. Monitor the progress of identified projects time prescribed / taken to obtain each approval / clearance and delays Review procedures followed by Ministries / departments to grant / refuse approvals and clearances
9 Relevant Regulations Environment protection Act-1986 The Forest Conservation Act-1980 The Wildlife (protection) Act-1972 The air (prevention and control of pollution) Act-1981 The water (prevention and control of pollution) Act Environmental Impact Assessment Notification, 2006 The CRZ notification 2002
10 Relevant Regulations The Panchayats (Extension to the Scheduled Areas) Act, 1996 The Scheduled Tribes and Other Traditional Forest Dwellers (Recognition of Forest Rights) Act, 2006 The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013
11 Clearance process in Highways Sub-sector
12 Environment Clearance Category A (Appraisal by MoEF) New National Highways Existing NH > 100 Km, widening > 40m, Bypass / realignment > 60m wide Category B (Appraisal by SEIAAA) New State Highways SHs above 1000 m msl SHs in eco-sensitive areas
13 Environment Clearance EIA notification 2006 Clearance process decentralised and made concurrent with design process Application in Form-1 to be submitted with pre-feasibility and TOR of the proposal Category A (Appraisal by MoEF) Category B (Appraisal by SEIAA) Category B to be considere A if located within 10Km of wildlife areas, critically polluted areas, notified sensitive areas, inter-state boundaries, international boundaries. Expert Appraisal Committee (EACs) under Environment (Protection) Act, 1986 Central Government (MOEF, New Delhi) State Environment Impact Assessment Authority (SEIAA)
14 Features of EIA Notification 2006 Broadly 4-stages Stage (I) Screening (All B Category projects). The project requiring an EIA report shall be termed as B1 category and the remaining are B2 category. [All highway projects requiring clearance are under B1 or A] Stage (II) Scoping New highway projects - the Expert Committee shall advise the applicant how to prepare EIA based on Form-1, TOR and Prefeasibility report submitted by the applicant. Highway widening projects EIA to be prepared based on model TOR
15 Features of EIA Notification 2006 Stage (III) Public Consultation All Category A and B1 projects. Conducted by State Pollution Control Board (SPCB) or the Union Territory Pollution Control Committee (UTPCC) Stage (IV) Appraisal Detailed scrutiny by the EAC (MOEF) or State level Expert Appraisal Committee (SEIAA). The recommendation of EAC or SEIAA submitted to competent authority for final decision based on Form-1, EIA, EMP, other documents and minutes of public consultation.
16 Other environment related clearances CRZ clearance in coastal areas CRZ notification if the project area fall under CRZ-I, II,III and IV Consent to Establish (CFE) under the Air Act and Water Act Consent to Operate (CFO) under the Air Act and Water Act Clearance from the Inland Waterways Authority in case of navigational channels NOC from Central Ground Water Board for drawing ground water in notified blocks NOC from ASI with respect to protected monuments
17 Forest Clearance Required if forest area is to be diverted for the project (including notified roadside plantations) Application submitted to the State Govt. State Govt. recommends the case to the MoEF Upto 5 ha clearance issued by RO of MoEF 5-40 ha, processed by RO, approved by MOEF Delhi > 40 ha processed and approved by MOEF Delhi Road projects considered in entirety
18 Forest Clearance Documents required while submitting application: Short narrative of the project Map showing required forest land, boundary of adjoining forests (1:50,000) Cost of project Justification for locating the project in forest area Cost benefit analysis (not applicable upto 20 ha in plains and 5 ha in hills) Employment likely to be generated Purpose-wise breakup of total land required Details of displacement of people Requirement of Environmental Clearance Undertaking to bear the costs of Compensatory Afforestation DGPS map of the area under diversion and of the areas identified for CA
19 Forest clearance Two stage process FIRST STAGE CLEARANCE In-principle approval Conditions specified Deposit Net Present Value of Forest (4.38 to lakhs/ha) Deposit Money for Compensatory Afforestation Plant at least double the no. of trees felled Submit Plan for afforestation Provide land for land (not in centrally sponsored projects????? ) Submit certificate of compliance under FRA No activity allowed until final clearance accorded State can stipulate additional conditions SECOND STAGE CLEARANCE After fulfillment of stipulated conditions
20 Forest Clearance Documents required for final clearance (responsibility of the State Government): Proof of depositing amount for Compensatory Afforestation Proof of depositing amount for Net Present Value Proof of depositing amount for meeting other conditions - roadside plantations, compensation for damage / dismantling of assests, etc. Strip chart for roadside plantations Undertakings for compliance on other generic and specific conditions Certificate from the District Collector(s) on settlement of all rights under the Forest Rights Act, 2006
21 Wildlife Clearance No case to be referred unless unavoidable Prior permission of Supreme Court required Case referred to the State Board of Wildlife (SBWL) and the National Board of Wildlife (NBWL) even for survey in wildlife area In Eco-sensitive area, process same as WL clearance. However, permission from Hon ble SC not required In case of migratory corridors elsewhere, comments of Chief wildlife Warden of the State required After receiving SC approval, proposal processed by the State Govt. for forest clearance
22 Role of Forest Officers
23 Forest officers in States / UTs Study the regulations Know your responsibilities in the clearance / monitoring processes Know the timelines and stick to them Examine the cases with a positive mindset. Differentiate between: En-mass Vs linear projects Site specific Vs non-site specific projects Write clear recommendations Be sure that your recommendations have scientific basis and are implementable
24 Forest officers in Development organisations Study the regulations Know the requirements of the Sector Identify conflict points, and try removing conflicts of development objectives with conservation needs Educate and advise the organisation on environmental responsibilities Follow the decision protocol: Avoid minimise - mitigate Ensure that statutory requirements are met before commencement of activities
25 Forest officers in MoEF Facilitate Update Acts / Rules / notifications immediately after an amendment Practice transparency Follow timelines Give clear and feasible recommendations Nobody forces us to clear a project, but we are duty bound to dispose the case on merits within stipulated time
26
27
28
29
State. 2. Location: Madhya Pradesh. Total period for which the forest land is proposed to be diverted (in year). 3. Detail of user agency
F. No. 8-39/2018-FC Sub: Proposal for diversion of 55.3 ha. of forest land for construction of Parna Minor Irrigation Project, in favour of Water Resources Department, Damoh District Madhya Pradesh State.-regarding.
More informationOutline of the presentation
Socio-economic considerations in environmental decision-making in India Asha Rajvanshi ar@wii.gov.in Head, EIA Cell Wildlife Institute of India, Dehradun Outline of the presentation Historical perspective
More informationApplication Forms FORM A. Form for seeking prior approval under section 2 of the proposals. by the State Governments and other authorities PART-I
Application Forms As per Rule 6 of the Forest (Conservation) Rules, 2003, every user agency, who wants to use any forest land for non-forest purposes shall make his proposal in the appropriate Form appended
More information2. Details indicated in the proposal submitted by the Government of Himachal Pradesh vide letter dated are as below:- FACT SHEET
Sub: F..8-70/2018-FC Diversion of 40.5084 ha. of forest land in favour of ADM- cum- Dy. DIR ADMN c/o ADM Office Bilaspur for the construction of proposed AIIMS at Kothipura, within the jurisdiction of
More informationPROPOSED TERMS OF REFERENCE
PROPOSED TERMS OF REFERENCE 1 PROPOSED TOR FOR EIA STUDY Kottmeta Limestone Mine, ML Area 801.171 ha, is located in Village Katamater, Tehsil/District Malkangiri, Odisha. Dalmia Cement (Bharat) Limited,
More information2) A copy of the document in support of the fact that the Proponent is the rightful lessee of the mine should be given.
PROPOSED TERMS OF REFERENCES (A) Suggested by the Applicant 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED
More informationCHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA.
CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. A. CONSENT TO ESTABLISH UNDER THE PROVISIONS OF WATER (PREVENTION & CONTROL OF
More informationIMPLEMENTATION PROTOCOL FOR DETERMINATION AND NOTIFICATION OF CRITICAL WILDLIFE HABITATS IN NATIONAL PARKS AND WILDLIFE SANCTUARIES
IMPLEMENTATION PROTOCOL FOR DETERMINATION AND NOTIFICATION OF CRITICAL WILDLIFE HABITATS IN NATIONAL PARKS AND WILDLIFE SANCTUARIES PREAMBLE: The purpose of this Implementation Protocol is to detail the
More informationGOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE. LOK SABHA STARRED QUESTION No. 334 TO BE ANSWERED ON
GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE LOK SABHA STARRED QUESTION No. 334 TO BE ANSWERED ON 09.08.2016 Ecological Impact of Mining *334. SHRI JANARDAN SINGH SIGRIWAL state:
More informationCHECKLIST FOR ENVIRONMENTAL PUBLIC HEARINGS and PUBLIC CONSULTATION UNDER EIA NOTIFICATION,
CHECKLIST FOR ENVIRONMENTAL PUBLIC HEARINGS and PUBLIC CONSULTATION UNDER EIA NOTIFICATION, 2006 1 The EIA notification, 2006 specifies four stages for the environment clearance of development and industrial
More informationSTANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE
STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE Terms of Reference (TOR) for preparation of Environmental Impact Assessment (EIA) and Environmental
More information1 POLICY STATEMENT ON ENVIRONMENTAL CLEARANCE
1 POLICY STATEMENT ON ENVIRONMENTAL CLEARANCE The Indian experience with Environmental Impact Assessment is just over 20 years old. Till 1994, Environmental Clearance from the central government was an
More informationINLAND WATERWAYS AUTHORITY OF INDIA (Ministry of Shipping, Government of India) Head Office : A-13, Sector 1, Noida
Project Management Unit (World Bank Assisted Development Project for NW-1) INLAND WATERWAYS AUTHORITY OF INDIA (Ministry of Shipping, Government of India) Head Office : A-13, Sector 1, Noida - 201301 Phone
More informationEnvironment Impact Assessment (EIA) Notification 2006
Environment Impact Assessment (EIA) Notification 2006 Information Sources: 1.) Environment Impact Notification 2006; Gazette of India, 14th September, 2006 2.) Green Tapism; Environment Support Group;
More informationMinistry of Environment, Forests & Climate Change Northern Regional Office Dehradun
Dr. Mahesh K. Verma Arki Limestone Project 1 Name and address of the project In-charge along with their telephone, fax, mobile and email address ARKI, Distt. Solan 173208 (H.P.) Mob. 0945 942 9428 Tel:0177-2674052
More informationMinistry of Environment, Forests & Climate Change Northern Regional Office Dehradun Dr. Mahesh K. Verma Sr. Manager (Geol) & OIC
Dr. Mahesh K. Verma 1 Arki Limestone Project Name and address of the project In-charge along with their telephone, ARKI, Distt. Solan 173208 (H.P.) fax, mobile and email address Mob. 0945 942 9428 Tel/Fax:0177-2674051
More informationTerms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P
Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P SITUATED AT KAKKUR VILLAGE KOZHIKODE TALUK KOZHIKODE DISTRICT KERALA STATE EXTENT: 2.0437 Ha STANDARD TERMS OF REFERENCE (TOR)
More informationForest (Conservation) Amendment Rules, 2004
Forest (Conservation) Amendment Rules, 2004 (Published in Gazette of India: Extraordinary on 3 rd February, 2004 and Corrigendum on 9 th February, 2004) G.S.R.94 (E)- In exercise of the powers conferred
More informationPRESENTATION ON DEVELOPMENT OF NEW POWER PROJECTS APPROACH & WAY FORWARD
PRESENTATION ON DEVELOPMENT OF NEW POWER PROJECTS APPROACH & WAY FORWARD Presentation By N.K.Srivastava General Manager (Engg. Services & R&M) 20.04.2012 PROJECT DEVELOPMENT AT NTPC PROJECT IS DEVELOPED
More informationFrom : April 2015 To : October 2015 Status of conditions stipulated in Environmental and CRZ clearance. Adani Vizag Coal Terminal Private Limited
Page 1 of 27 Half yearly Compliance report for Environment and CRZ Clearance for development of East quay -1 (EQ-l) by replacing the existing EQ-l berth and part of EQ-2 berth. Sr. No. Conditions Compliance
More information4. Particular of Forests i. Name of Forest Division North (General) Balaehat Forest Division.
File No. 8-27/2015-FC Sub.: Proposal for diversion of 122.60 hectares of forest land for Under Ground Mining of Copper Ore Minerals (Hindustan Copper Limited Malanjkhand Copper Project) in favour of M/s.
More informationSTANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE
Terms of Reference (TOR) for preparation of Environmental Impact Assessment (EIA) and Environmental Management Plan (EMP) for "Mining of Minerals" as per the EIA Notification, 2006 has been devised to
More information(Pg. 59/c). (Pg. 61/c).
Sub.: File No. 8-36/ 2017-FC Proposal for diversion of 119.25 ha. of forest land in favour of Water Resources Department for Construction of Karam Medium Irrigation Project in Dhar District in the State
More informationMINISTRY OF ENVIRONMENT, FOREST & CLIMATE CHANGE NEW INITIATIVES AND EFFORTS
MINISTRY OF ENVIRONMENT, FOREST & CLIMATE CHANGE NEW INITIATIVES AND EFFORTS 2014-2016 The Universe Comprises of Five Elements To Maintain Balance and to Protect the Five Elements Forest cover increased
More informationEIA Study and Report Preparation 20 June, Dr. Suneel Pandey Senior Fellow
EIA Study and Report Preparation 20 June, 2013 Dr. Suneel Pandey Senior Fellow EIA as an Environmental Management Tool Environmental Impact Assessment (EIA) - Introduction An assessment of the impact of
More informationPolicy Resolution for Promotion of. Petroleum, Chemicals and Petrochemical Investment Regions (PCPIRs)
Policy Resolution for Promotion of Petroleum, Chemicals and Petrochemical Investment Regions (PCPIRs) POLICY OBJECTIVES 1. The Petroleum, Chemicals and Petrochemical industry in India is well established
More informationProposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous
Proposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous chemicals may include, but not limited to the following
More informationSTATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India
STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India O/O PUNJAB POLLUTION CONTROL BOARD, VATAVARAN BHAWAN, NABHA ROAD, PATIALA 147 001 Telefax:- 0175-2215802
More informationAGENDA ITEM NO Particulars of Forests: (iv) Name of Forest Division and Forest area involved. Jhunjhunu Forest Division 95.
AGENDA ITEM NO. 3 Sub: Renewal of diversion of 95.81 ha of forest land in favour of Hindustan Copper Limited, Jhunjhunu for mining of Copper under Copper Chandmari Project in Jhunjhunu Forest Division
More informationNIMZ Guidelines :- From : CA Ratan Moondra. Presentation on National Investment & Manufacturing Zone
NIMZ Guidelines :- From : CA Ratan Moondra Presentation on National Investment & Manufacturing Zone GUIDELINES FOR ESTABLISHMENT OF NATIONAL INVESTMENT & MANUFACTURING ZONES (NIMZS) o Background o Application
More informationPREFEASIBILITY REPORT
(B) PREFEASIBILITY REPORT OF EXISTING SAND MINING PROJECT OF RAJESHBHAI BHAGUBHAI PATEL AT VILLAGE:- Panchlai, TALUKA:- Pardi, DIST.:-Valdad. 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY
More information2. Details indicated in the proposal submitted by the Government of Himachal Pradesh vide letter dated are as below:- FACT SHEET
F.. 8-70/2018-FC Sub: Diversion of 40.5084 ha. of forest land in favour of ADM- cum- Dy. DIR ADMN C/o ADM Office Bilaspur for the construction of proposed AIIMS at Kothipura, within the jurisdiction of
More informationDate : Ref. No.: Haryana/ NOC/Forest. To, The District Forest Office. Mewat (Haryana)
Date : 16.05.2016 Ref. No.: / NOC/Forest To, The District Forest Office Mewat () Subject: NOC for use of forest land for installation of proposed Essar Oil Limited s Retail Outlet/ Petrol Pump in Diversion
More informationSubject: Environmental and CRZ clearance for expansion of Karaikal Port (Phase-II) at Puducherry by MIs. Karaikal Port Pvt. Ltd. - Reg.
No. 10-42/2009-IA.III Government of India Ministry of Environment & Forests (IA Division) Paryavaran Bhawan, CGO Complex, Lodhi Road, New Delhi - 110003. I i I I I Dated: 22 nd September, 2009. To MIs.
More informationMINING REGULATIONS IN FOREST AND ECO-FRAGILE AREAS A PRESENTATION BY RAJEEVA, IFS, ADDITIONAL PRINCIPAL CHIEF CONSERVATOR OF FORESTS.
MINING REGULATIONS IN FOREST AND ECO-FRAGILE AREAS A PRESENTATION BY RAJEEVA, IFS, ADDITIONAL PRINCIPAL CHIEF CONSERVATOR OF FORESTS. MINERAL RESOURCES IN INDIA The mineral resources in India consist of
More information4. Environmental Legislation. Mr. S. P. Deshmukh, Watumull Institute
4. Environmental Legislation Things to be learned Overview of legislation Ministry of Environment & Forest (MoEF), Organizational structure of MoEF. Functions & powers of Central Control Pollution Board.
More informationFACT SHEET. The State Government has now submitted a proposal for renewal of diversion of forest land. The facts of the case are as below:
Sub : Renewal of existing mining lease over an area of measuring 122.18 ha of forest land in favour of M/s Ambuja Cement Ltd., Darlaghat Tehsil Arki, Distt. Solan, within the jurisdiction of Kunihar Forest
More information(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF
(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF Makwana Dineshbhai Khimjibhai AT VILLAGE:- Tithava, TALUKA:- Wankaner, DIST.:- Morbi 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXCUTIVE SUMMARY
More informationAGENDA ITEM NO. F. No. 8-20/2015-FC
AGENDA ITEM NO. F. 8-20/2015-FC Sub: Proposal for according permission for use of 2.0001 ha of forest land within total forest land of 400 ha (out of total prospecting lease area of 816 ha) in Meenakshi
More informationNo.13-20/2015-CAMPA Dated the 29 th January 2015.
Ad-hoc Compensatory Afforestation Fund Management and Planning Authority Constituted by the Hon ble Supreme Court of India, by Order dated 5 th May 2006 in IA No.1337 with IA Nos.827, 1122, 1216, 1473
More informationMinistry of Environment & Forests NOTIFICATION. New Delhi, the 6 th January, 2000.
1 of 9 10/1/2012 2:50 PM Ministry of Environment & Forests NOTIFICATION New Delhi, the 6 th January, 2000. S.O. 24(E).- Whereas a notification of the Government of India in the Ministry of Environment
More informationHISTORY The Additional Director General of Forests (WL), vide letter dated 6th February 2002, had requested all the Chief Wildlife Wardensfor listing
GUIDELINES FOR DECLARATION OF ECO-SENSITIVE ZONES AROUND NATIONAL PARKS AND WILDLIFE SANCTUARIES HISTORY The Additional Director General of Forests (WL), vide letter dated 6th February 2002, had requested
More informationBEFORE THE NATIONAL GREEN TRIBUNAL (WESTERN ZONE) BENCH, PUNE
BEFORE THE NATIONAL GREEN TRIBUNAL (WESTERN ZONE) BENCH, PUNE EXECUTION APPLICATION No.16/2016 In APPLICATION No. 135(THC)/2013 (Disposed of on 13.01.2014) CORAM: Hon ble Shri Justice U.D. Salvi (Judicial
More informationShriram Vinyl & Chemical Industries, : Kota Compliance Report of Environmental Clearance dated 12 th July 2017 and amended on 23 rd November 2017
Shriram Vinyl & Chemical Industries, : Kota Compliance Report of Environmental Clearance dated 12 th July 2017 and amended on 23 rd November 2017 PART A : SPECIFIC CONDITIONS 1. CONSTRUCTION PHASE S. 1
More informationPRE-FEASIBILITY REPORT FOR ORDINARY SAND
PRE-FEASIBILITY REPORT FOR ORDINARY SAND Proponent NISANT TRADERS At- Opp. Survey No.- 3 Panam River Area-2.50.00 Hectare Village-Ramji-ni-Nal, Taluka- Shahera Dist.- Panchmahal Mob.- +91924040782 CONTENTS
More informationFACT SHEET. 1. Name of the Proposal Diversion of ha. of Forest Land for construction of Kadan Medium Irrigation
Sub: F. 8-11/2018-FC Proposal for diversion of 248.76 ha. of Forest Land for construction of Kadan Medium Irrigation Project in favour of Water Resources Department, Sagar District Madhya Pradesh State.
More informationDEDICATED FREIGHT CORRIDOR CORPORATION OF INDIA LIMITED ENVIRONMENTAL ASSESSMENT (EA) & ENVIRONMENTAL MANAGEMENT FRAMEWORK
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized DEDICATED FREIGHT CORRIDOR CORPORATION OF INDIA LIMITED ENVIRONMENTAL ASSESSMENT (EA)
More informationSTONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha)
Pre Feasibility Report On STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Submitted to MINISTRY OF ENVIRONMENT & FOREST STATE LEVEL ENVIRONMENTAL
More informationENVIRONMENTAL IMPACT ASSESSMENT AND YOU
ENVIRONMENTAL IMPACT ASSESSMENT AND YOU PARTICIPATING IN PUBLIC CONSULTATIONS FOR: COAL FUELED THERMAL POWER PLANTS C A G Citizen consumer and civic Action Group 1. What are Thermal Power Plants? Electricity
More information97MW TASHIDING HYDRO ELECTRIC PROJECT
97MW TASHIDING HYDRO ELECTRIC PROJECT DATA SHEET For period ending November 2017 Details Sl.No. Particulars 1. Project Type Run- of- River Scheme 2. Name of the Project 97MW Tashiding Hydro Electric Project
More informationCIRCULAR. Sub: Instructions for maintenance of transparency and streamlining of procedure for disposal of EC cases in IA Division - Regarding.
No. J-11013/41/2006-IA.II(I) Government of India Ministry of Environment & Forests Paryavaran Bhavan, C.G.O. Complex, Lodi Road, New Delhi-110003. Telefax: 24362434 Dated the 4 th November, 2008 CIRCULAR
More informationMONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I
MONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I DATA SHEET 01 Project type : Cement Date: 24.11.2015 02
More informationPROPOSED TERMS OF REFERENCE (TOR) FOR
PROPOSED TERMS OF REFERENCE (TOR) FOR ENVIRONMENTAL IMPACT ASSESSMENT (EIA) AND ENVIRONMENTAL MANAGEMENT PLAN (EMP) FOR PROPOSED NEW NATIONAL HIGHWAY -NH-754K GREENFIELD ALIGNMENT SANCHORE-SANTALPUR SECTION
More informationENVIRONMENTAL IMPACT ASSESSMENT AND YOU
ENVIRONMENTAL IMPACT ASSESSMENT AND YOU PETROCHEMICAL PLANTS C A G Citizen consumer and civic Action Group 1. What are the pollution problems associated with petrochemical plants? Petrochemical plants
More information4. The Chairman, National Highways Authority of India, G-5 ft 6, Sector-10, Dwarka, New Delhi
.>. No. NH-1501712112018 - PftM Dated: February 26,2018 To 1. The Chief Secretaries of all the State Governments/ UTs 2. The Principal Secretaries/ Secretaries of all States/ UTs Public Works Department
More information2. Details indicated in the proposal submitted by the Government of Telangana are as below:- FACT SHEET
Sub: F. 8277/1985FC (Vol.) Proposal for diversion of 2.85 hectares of forest in the Ramavaram RF of Kothagudem division for installation of Submersible Pumps & Sand Stowing Plant at Padmavathi Khani 5
More informationPublic Consultation: Environmental Impact Assessment (EIA) Indian Perspective
Public Consultation: Environmental Impact Assessment (EIA) Indian Perspective G.V.Reddy*, M.Srinivasa Reddy and J.Jyothirmai TEAM LABS AND CONSULTANTS B- 115-117 & 509, Aditya Enclave, Ameerpet, Hyderabad,
More informationFOREST (CONSERVATION) ACT,1980 ;NEED TO STRIKE BALANCE BETWEEN CONSERVATION AND DEVELOPMENT
FOREST (CONSERVATION) ACT,1980 ;NEED TO STRIKE BALANCE BETWEEN CONSERVATION AND DEVELOPMENT SRI SANJAY KUMAR SINHA PARTICIPANT, MCT, BIHAR Abstract There has been a continuous demand for forest land for
More informationForest (Conservation) Rules, 1981
Forest (Conservation) Rules, 1981 (as amended up to May 1992) G.S.R. 719... in exercise of the powers conferred by sub-section (i) of section 4 of the Forest (Conservation) Act, 1980 (69 of 1980), the
More informationEnvironmental Clearance(EC) Process In India - Some Case Studies (June 20 th, 2013)
Mid-Career Training (MCT) Programme for Indian Forest Service Officers (Phase IV) (IGNFA, Dehradun) Environmental Clearance(EC) Process In India - Some Case Studies (June 20 th, 2013) Presented by 30-Oct-13
More information8. Compensatory Afforestation CA has been proposed over 650 ha area with total
Diversion of 324.840 ha of forest land for Kusmunda and Laxman open cast mining of Coal in Korba District of Chhattisgarh in favour of South Eastern Coal Fields Limited (SECL). This relates to diversion
More informationHANDBOOK OF Forest (Conservation) Act, 1980 (With Amendments made in 1988) 3 area and regenerate the forest cover through compensatory afforestation process. Till INDEX A Part Subject Forest (Conservation)
More informationSix Monthly Compliance Report (July 2014 to December 2014) and. Status of Environmental Management Plan. for Budhil (70MW) HEP
Six Monthly Compliance Report (July 2014 to December 2014) and Status of Environmental Management Plan for Budhil (70MW) HEP by M/s. Greenko Budhil Hydro Power Private Limited Six Monthly Compliance Report
More informationStatus of biodiversity and impact assessment in India. Dr. Asha Rajvanshi Environmental Impact Assessment Cell Wildlife Institute of India Dehradun
Status of biodiversity and impact assessment in India Dr. Asha Rajvanshi Environmental Impact Assessment Cell Wildlife Institute of India Dehradun Salient features of India s biodiversity 2.4% of the world
More informationDate : Ref. No.: Haryana/ NOC/Forest. To, The District Forest Office. Gurgaon (Haryana)
Date : 25.10.2015 Ref. No.: Haryana/ NOC/Forest To, The District Forest Office Gurgaon (Haryana) Subject: NOC for use of forest land for installation of proposed Essar Oil Limited s Retail Outlet/ Petrol
More informationThe Singareni Collieries Company Limited (A Government Company) Kothagudem Area.
The Singareni Collieries Company Limited (A Government Company) Kothagudem Area. Application for prior approval for diversion of 776.20 Ha. Forest land for JVR OC-II Mine in Lankapalli R.F., Sattupalli
More informationSanjay Upadhyay Advocate Supreme Court of India Enviro Legal Defence Firm April 2012
Sanjay Upadhyay Advocate Supreme Court of India Enviro Legal Defence Firm April 2012 1 Current Legal and Policy Environment- The need for a new RE law in India Electricity Act Provisions- under Ministry
More informationChemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu
Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu Compliance Report for Environmental Clearance No.11.63/2005.1A.III dated 19.12.2005 Specific Conditions
More informationName of the Project:- J&K Mineral Development Corporation Limited.
Name of the Project:- J&K Mineral Development Corporation Limited. Sub:- Six Monthly report of the status of the compliance of the stipulated environment condition of Environment clearance granted vide
More informationEnvironmental Assessment and Review Framework. IND: Visakhapatnam-Chennai Industrial Corridor Development Program
Environmental Assessment and Review Framework March 2016 IND: Visakhapatnam-Chennai Industrial Corridor Development Program Prepared by the Department of Industries, Government of Andhra Pradesh for the
More informationBRIHANMUMBAI MAHANAGARPALIKA
BRIHANMUMBAI MAHANAGARPALIKA PROJECTS SANCTIONED UNDER JNNURM A] IV Mumbai - Middle Vaitarna Water Supply Project :- Municipal Corporation of Greater Mumbai (MCGM) has undertaken the Middle Vaitarana Water
More informationSTATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY PUNJAB Ministry of Environment and Forests, Government of India
STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY PUNJAB Ministry of Environment and Forests, Government of India O/O Punjab Pollution Control Board, Vatavaran Bhawan, Nabha Road, Patiala 147 001 Telefax:-
More informationSTATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY PUNJAB Ministry of Environment and Forests, Government of India
STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY PUNJAB Ministry of Environment and Forests, Government of India O/O Punjab Pollution Control Board, Vatavaran Bhawan, Nabha Road, Patiala 147 001 Telefax:-
More informationFOREST CONSERVATION ACT 1980: NEED TO STRIKE BALANCE BETWEEN CONSERVATION AND DEVELOPMENT L.P. Singh, IFS (1996) Bihar
FOREST CONSERVATION ACT 1980: NEED TO STRIKE BALANCE BETWEEN CONSERVATION AND DEVELOPMENT L.P. Singh, IFS (1996) Bihar Abstract: Forest is a wonderful natural & renewable resource which is not only essential
More informationScope, Structure and Processes of National Environment Assessment and Monitoring Authority (NEAMA)
EXECUTIVE SUMMARY of the Report Scope, Structure and Processes of National Environment Assessment and Monitoring Authority (NEAMA) For Ministry of Environment & Forests, GoI by Prof. Kanika T. Bhal & Prof.
More informationEnvironmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated
Environmental Clearance; Letter No J-11011 / 152 / 2006-IA-II (I) Dt. 21.05.2007 and corrigendum dated 18.09.2007 For Revamping of Ammonia and Urea Plant at Gadepan, Kota; Rajasthan by M/S Chambal Fertilisers
More informationAnnex 2A. Equivalence Matrix: Environmental Assessment
Annex 2A Equivalence Matrix: Objectives and Operational Policy Objective To help ensure the environmental and social soundness and sustainability of investment projects. To support integration of environmental
More informationEnvironmental Assessment and Review Framework. India: Madhya Pradesh Urban Services Improvement Project
Environmental Assessment and Review Framework Project Number: 42486 November 2016 India: Madhya Pradesh Urban Services Improvement Project Prepared by Government of Madhya Pradesh for the Asian Development
More informationEnvironmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated
Environmental Clearance; Letter No J-11011 / 152 / 2006-IA-II (I) Dt. 21.05.2007 and corrigendum dated 18.09.2007 For Revamping of Ammonia and Urea Plant at Gadepan, Kota; Rajasthan by M/S Chambal Fertilisers
More informationNMDC Arki Limestone Project: EC Data Sheet for Oct 2015 to Mar 2016
1 Name and address of the project In charge along with their telephone, fax, mobile and email address 2 Current status of mining operations. Not yet started. 3 Location of the project 4 5 Current status
More informationSTATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY PUNJAB Ministry of Environment and Forests, Government of India
STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY PUNJAB Ministry of Environment and Forests, Government of India O/O Punjab Pollution Control Board, Vatavaran Bhawan, Nabha Road, Patiala 147 001 Telefax:-
More informationEXISTING PROJECT FOR ORDINARY SAND MINING
(C) PROJECT REPORT OF EXISTING PROJECT FOR ORDINARY SAND MINING OF JASHUBEN CHHAGANBHAI OAD AT VILLAGE:-TIMBA, TALUKA:- KAMREJ, DIST.:- SURAT 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY
More informationDRAFT TERMS OF REFERENCE FOR EIA STUDY
Four laning of Balaghat - Gondia Section of NH 54 from km 0.000 to km 48.070 (Package-1A & Package-1B) under Bharatmala Pariyojana in the State of Madhya Pradesh and Maharashtra DRAFT TERMS OF REFERENCE
More informationNo. 138 /PS-MS/MPPCB/SEAC/TOR (75)/2011 Bhopal, dt. 03 /06/2011. Env. Consultant: Créative Enviro Service, Bhopal. (SN-29)
1 By: Speed-Post State Level Expert Appraisal Committee (Formed as per S.O. no. 1533 dated 14 th Sept 2006 of Government of India, Ministry of Environment & Forests) PARYAWARAN PARISAR, E-5, ARERA COLONY,
More informationNo. IWAI/FV/NW-1/18/3/2018 PROJECT MANAGEMENT UNIT INLAND WATERWAYS AUTHORITY OF INDIA
No. IWAI/FV/NW-1/18/3/2018 PROJECT MANAGEMENT UNIT (Development of Freight Village & Logistics Hub) INLAND WATERWAYS AUTHORITY OF INDIA (Ministry of Shipping, Government of India) Head Office: A-13, Sector-1,
More informationThe meeting started with the brief background of the proposed agenda items by the Member Secretary and it was followed by discussion on these items.
MINUTES OF THE 2 ND MEETING OF THE STANDING COMMITTEE OF STATE BOARD FOR WILDLIFE HELD UNDER THE CHAIRMANSHIP OF HON BLE FOREST MINISTER ON 02.06.2010 IN HIS OFFICE CHAMBERS, SRINAGAR The 2 nd meeting
More informationWHAT IS SUSTAINABLE DEVELOPMENT FRAMEWORK?
WHAT IS SUSTAINABLE DEVELOPMENT FRAMEWORK? A Concept developed as a guiding principle for Indian mining industry at national level by the Ministry of Mines, Government of India, encompassing the critical
More informationEnvironmental Regulations: Policy, Issues and Options
Environmental Regulations: Policy, Issues and Options Paritosh Tyagi NC2E, University of Pune Pune, 21-22 February 2014 Ancient Prayer May the breeze blow sweet and pleasant May the rivers flow sweet and
More informationWhat is the scope of PARIVESH Ans. The PARIVESH is a single window system for appraisal and granting Environmental Clearances and Forest Clearances
1 FAQs for PARIVESH website What does PARIVESH stand for? Ans. PARIVESH stands for Pro Active and Responsive facilitation by Interactive, Virtuous and Environmental Singlewindow Hub. What is the scope
More informationANNEX XIX REFERRED TO IN ARTICLE 3.21 INTERNATIONAL ROAD TRANSPORT AND LOGISTICS SERVICES
ANNEX XIX REFERRED TO IN ARTICLE 3.21 INTERNATIONAL ROAD TRANSPORT AND LOGISTICS SERVICES ANNEX XIX REFERRED TO IN ARTICLE 3.21 INTERNATIONAL ROAD TRANSPORT AND LOGISTICS SERVICES SECTION I GENERAL PROVISIONS
More informationANNEX XIX REFERRED TO IN ARTICLE 3.21 INTERNATIONAL ROAD TRANSPORT AND LOGISTICS SERVICES
ANNEX XIX REFERRED TO IN ARTICLE 3.21 INTERNATIONAL ROAD TRANSPORT AND LOGISTICS SERVICES ANNEX XIX REFERRED TO IN ARTICLE 3.21 INTERNATIONAL ROAD TRANSPORT AND LOGISTICS SERVICES SECTION I GENERAL PROVISIONS
More informationTHE JAMMU AND KASHMIR FOREST (CONSERVATION&AFFORESTATION) RULES, 2000
THE JAMMU AND KASHMIR FOREST (CONSERVATION&AFFORESTATION) RULES, 2000 SRO 203, dated 13th June, 2000. In exercise of the powers conferred by section 6 of the Jammu and Kashmir Forest (Conservation) Act,
More informationDESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT
DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT Subject: Compliance report of Environmental Clearance for CDR & Revamp Reference: J-11011/272/2007-IA,
More informationState Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests
State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests Madhya Pradesh Pollution Control Board E 5. Arera Colony Bhopal 4620 16 visit us
More informationEXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E
EXECUTIVE SUMMARY 1.0 INTRODUCTION Sri Mahesh Prasad Mishra proposes to mine Sand Quarry from an approved Mining Lease over an area of 14.85 Ac or 6.01 hectares (Non-Forest Land) which is located in at
More informationProposed Draft Terms of Reference for Preparation of EIA & EMP for Louis Pharmaceuticals Pvt Ltd STANDARD TERMS OF REFERENCE
Proposed Draft Terms of Reference for Preparation of EIA & EMP for Louis Pharmaceuticals Pvt Ltd 1. Executive Summary 2. Introduction STANDARD TERMS OF REFERENCE I. Details of the EIA Consultant including
More informationF. No. 8-26/2013-FC (Pt.II)
F.. 8-26/2013-FC (Pt.II) Renewal of diversion of 208 ha of forest land in favour of ACC Lakheri Cement Works for limestone mining (Lakheri-Chamovali Mining lease) in Bundi Forest Division, District Bundi
More informationSTATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA
STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA O/O PUNJAB POLLUTION CONTROL BOARD, VATAVARAN BHAWAN, NABHA ROAD, PATIALA 147 001 Telefax:- 0175-2215802
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT 1. Introduction 1. Identification of project and project proponent The Pahanbarri Sand Quarry area is located in the Tawa River at Village- Pahanbarri, Tehsil- Itarsi & District-
More informationBEFORE THE NATIONAL GREEN TRIBUNAL (WESTERN ZONE) BENCH, PUNE
BEFORE THE NATIONAL GREEN TRIBUNAL (WESTERN ZONE) BENCH, PUNE EXECUTION APPLICATION No.19/2016 In APPLICATION No.135(THC)/2013 (Disposed of on 13.01.2014) CORAM: Hon bleshri Justice U.D. Salvi (Judicial
More information