1 Date Adopted: 7 March 2013 Reviewed: 7 March 2013 Due for Review: 7 March 2015 Business Unit: HSE Current Policy Date: 7 March 2013 ANGLE GRINDER USE PROCEDURE 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES TasPorts has a duty of care to ensure that workers and other persons are not exposed to health and safety risks arising from the business, this duty includes ensuring, so far as is reasonably practicable the provision and maintenance of safe plant, and the safe use, handling,storage and transport of plant. This procedure shall define the application and use of electric & air supplied angle grinders by all. This procedure covers the use of all portable angle grinders up to and including 7 (180mm). This document applies to all TasPorts employees, contractors/ subcontractors, visitors and other workers on Tasports controlled sites. This procedure cannot and does not replace any statutory requirements or obligations of employees and management. Indeed, it should be viewed as supporting our statutory obligations regarding Occupational Health and Safety. 3.1 Tasports PPE Procedure and Standard 3.2 Tasports New, Disposed or Changed Asset Assessment and Notification Procedure and Checklist. 3.3 Tasports Permit to Work System - Hot Work Permit 3.4 Relevant Australian Standards AS 2210: Safety footwear. AS 3765: Clothing for protection against hazardous chemicals. AS 2161: Industrial safety gloves and mittens (excluding electrical and medical gloves). AS 1336: Recommended practices for occupational eye protection. AS 1337: Eye protectors for industrial applications. AS 1319: Safety signs for the occupational environment. Angle Grinder Use Procedure Page 1 of 5
2 AS 2899: Public information symbol signs. 4.0 DEFINITIONS Angle Grinder - An electrically or pneumatically powered grinding device designed and intended to be held and manipulated by the operator. It includes all variants including straight and acute types. It includes machines being used for the purposes of grinding or cutting. Dead Man switch - A switch that requires the operator to hold in the switch in order to apply continuing energy to the grinder. It is designed such that in the event of an incident or loss of control, the switch is released to de-energise the machine. Soft start - An electronic feature of the grinder designed to reduce the starting inertial effect of the grinder to reduce the likely hood of loss of control. Electronic brake - A feature of the grinder designed to stop the grinder motor quickly when the power switch is released. Safety Clutch - A feature of the grinder intended to mechanically disconnect the motor from the gearbox assembly in the event of a stall or kick back. 5.0 PROCEDURE 5.1 General All tasks involving the use of any grinder must be subject to a pre task risk assessment. A job start card is set as a minimum Wherever practicable, safer tools shall be used in preference to hand held angle grinders (particularly for cutting operations) Where use of an angle grinder cannot practicably be avoided, the size of angle grinder selected for the task shall be assessed through Job Safety Analysis and minimised Abrasive wheels used for cutting/grinding operations shall not exceed 180 mm (7 ) Angle grinders above 125mm (5 ) shall not be used for any work above chest height. 5.2 Grinder specifications Angle Grinder Use Procedure Page 2 of 5
3 Angle grinders designed and manufactured in compliance with all applicable Australian Standards shall be used. 5.3 PPE All grinders above 115 mm (4 ½ ) must have non lockable press to operate switches, fitted with an interlock requiring the trigger to be released before re-starting after any loss of power New and hired grinders shall be selected with a torque limiting device and/or a brake depending on the application (in the absence of models with both features torque limiting devices are more important for cutting. If the tool is predominantly used for grinding, selection of a unit with a brake may result in greater risk reduction) In addition to the above features, preference shall be given to grinders with a soft (or progressive) start up Only abrasive wheels certified to AS Abrasive wheels Design, construction, and safeguarding shall be used Guards must always be fitted and firmly secured to prevent movement whenever the tool is in use Abrasive wheels must not be used on machines capable of speeds above the maximum speed rating of the wheel. e.g. Fitting of a larger guard to an angle grinder to allow a larger wheel to be fitted or transfer of a worn wheel to a smaller angle grinder will typically exceed the speed rating of the wheel and is not permitted. People using angle grinders shall wear hearing protection and be protected by: (a) combination of a high impact face shield (certified to AS1337, Eye protectors for industrial applications ) with goggles or equivalent close fitting eye protection; or (b) high impact rated full face respiratory protection (i.e. mask or combination face shield/hood). Note: Unless specifically certified to AS1337, Eye protectors for industrial applications, welding shields do not typically provide the required impact protection. Angle Grinder Use Procedure Page 3 of 5
4 5.4 Inspection The condition of the wheel and the position of the guard and hand supports shall be checked prior to each use The mechanical condition of angle grinders, their guards, wheel flanges and the wheel fitted shall be checked at least every 6 months (in addition to pre-start and electrical safety checks). 5.5 Procurement The purchase and approval of angle grinders for the site will be via the relevant Tasports Supervisor/Manager All new equipment may only be purchased through the New, Disposed or Changed Asset Assessment and Notification Procedure and Checklist. This is to ensure that this equipment meets the Australian Standards, is in line with TasPorts standards in relation the size permitted to be used, it is fit for its intended purpose and is recorded in the portable appliance database in Tasports asset management system 6.0 DOCUMENTATION 6.1 Permit to work. Refer to TasPorts Hot Work Procedure. The TasPorts procedure applies to everyone performing work for TasPorts on TasPorts sites. A hot work permit is required whenever work is to be done that generates heat or sparks (welding, cutting, grinding, etc.) outside of defined safe areas (eg. welding bays) or when the integrity of the fire system is put at risk. 7.0 AUTHORISATION & RESPONSIBILITY Management Angle Grinder Use Procedure Page 4 of 5
5 Management has a responsibility to protect its employees, contractors/ subcontractors, visitors and other workers on Tasports controlled sites from the risks associated with using portable grinder equipment. TasPorts Management shall provide grinding equipment to individual employees for work purposes on an 'as needs' basis. Management are also responsible for ensuring that portable grinders are Australian Standard approved and suitable for the area of use required and for the effective implementation of the procedure consistently mill-wide. TasPorts Management will consult with employees, their representatives and where necessary it s OHS Professionals in order to meet its organisational responsibilities. Employees, Contractors/Sub Contractors, Visitors and other workers on Tasports controlled sites. Your primary responsibility is to ensure you are complying with this procedure, along with other relevant procedures whilst working on the Tasports controlled sites. You are also to liaise with Management/OHS Unit if you believe that you are not being provided with the adequate PPE. The company provides equipment to assist in work activities. Your responsibility is to ensure that the equipment is appropriate for the task, to operate in a safe manner and to maintain this equipment to ensure your own health and safety. You are also to liaise with Management/OHS Unit if you believe that you are not being provided with the appropriate equipment or training. Angle Grinder Use Procedure Page 5 of 5
NEVER REMOVE THE SAFETY GUARDS
Page 1 of 5 Name Recommended Use Designed for cutting stumps up to 200 mm above ground and 120 mm below ground. Maximum Stump diameter 300 mm. NOT suitable for stumps surrounded by rocks, stones, concrete
More informationImplementing an Effective Personal Protective Equipment (PPE) Programme
Implementing an Effective Personal Protective Equipment (PPE) Programme Introduction Personal protective equipment is preventive equipment which is used by the worker to protect his safety in many organisations
More informationPersonal Protective Equipment (PPE) Safety Program
Personal Protective Equipment (PPE) Safety Program ENVIRONMENTAL HEALTH & SAFETY pg. 1 Table of Contents A. Introduction And Purpose... 4 B. Background... 4 C. Policy... 4 D. Personal Protective Equipment
More informationOH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable)
OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable) 4.1 General Requirements 4.2 OHS policy Has the organisation an established and maintained
More informationPOLICY ON PERSONAL PROTECTIVE EQUIPMENT
Effective date: August 27, 2016 Supersedes/Amends: November 29, 2005 Originating office: Vice-President, Services Policy Number: VPS-41 SCOPE This policy applies to all Members of the University Community
More informationSEMEMI SQA Unit Code H2AT 04 Carrying out scheduled maintenance tasks on electrical equipment
Carrying out scheduled maintenance tasks on electrical equipment Overview This unit identifies the competences you need to carry out scheduled maintenance tasks on electrical equipment, in accordance with
More informationCOSVR664 - SQA Unit Code H4HB 04 Diagnose faults in plant or machinery systems or components
Diagnose faults in plant or machinery systems or components Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components, consumables
More informationFloor stand grinder. The inspection was carried out in accordance with the checklist for Tooling Machines, dated
CHECKLIST for Tooling Machines Floor stand grinder Issue Date: 2009-03-30, Rev. 1 I. Nature of the inspection First inspection Follow-up inspection Job No. II. Details of the machine: In-house system designation
More informationSafety Program. For Packaging, Manufacturing, Distribution
Safety Program For Packaging, Manufacturing, Distribution SAFETY PROGRAM Clarification This document is provided only as a guide to assist employers and employees in developing a Safety Program designed
More informationSnelling Injury and Illness Prevention Program. (Reviewed : June 2016)
Snelling Injury and Illness Prevention Program (Reviewed : June 2016) POLICY: It is the policy of Snelling Staffing, LLC to provide its employees with a reasonably safe place to work. To this end, at the
More informationSEMEMI SQA Unit Code H2AN 04 Carrying out scheduled maintenance activities on mechanical equipment
Carrying out scheduled maintenance activities on mechanical Overview This unit identifies the competences you need to carry out scheduled maintenance activities on mechanical, in accordance with approved
More informationHSE MANAGEMENT PLAN. Parami Energy HSE Management Plan Page 1 of 16
HSE MANAGEMENT PLAN Parami Energy HSE Management Plan Page 1 of 16 Table of Contents 1. Purpose 2. Scope 3. Definition of Terms 4. HSE Policy Statement 5. Commitments and Motivation 6. HSE Rules 7. HSE
More informationProcedure: Safety Management System Procedure - My Safety
Procedure: Safety Management System Procedure - My Safety 1. Purpose Ensure a framework for managing OHS risks is implemented integrating the organisation's planning, management, reporting processes, communication,
More informationBowmer. & Kirkland. Kirkland. & Accommodation. Health & Safety Policy.
Bowmer Kirkland & Kirkland & Accommodation Health & Safety Policy December 2013 www.bandk.co.uk Index Policy Statement Page 3 Interaction of Health and Safety Responsibilities Page 5 Organisation Page
More informationOPTUS SUPPLIER WORK HEALTH & SAFETY POLICY
OPTUS SUPPLIER WORK HEALTH & SAFETY POLICY 1. Introduction 1.1 SCOPE & PURPOSE This policy (which includes this document and the work health and safety standards, policies, procedures and safety control
More informationLock Out Tag Out (LOTO) Safety Procedure
Pars Oil & Gas Company Lock Out Tag Out (LOTO) Safety Procedure HEALTH, SAFETY AND ENVIRONMENT PROCEDURE Lock Out Tag Out (LOTO) Safety Procedure DOCUMENT ID - PR-82-POGC-002 REVISION 0.0 Pars Oil & Gas
More informationPolicy Work Health and Safety (WHS) RCPA Introduction WHS legislation
Policy Subject: Work Health and Safety (WHS) Approval Date: July 2011, December 2014 Review Date: July 2018 Review By: Board of Directors Number: 1/2011 The Royal College of Pathologists of Australasia
More informationHFM Asset Management Contractor Induction Queens Riverside Apartments
HFM Asset Management Contractor Induction Queens Riverside Apartments Contents Purpose About HFM Asset Management HFM Asset Management s Responsibilities Contractors Responsibilities Commencing Work Working
More informationEMF Safety.
EMF Safety www.linkmicrotek.com EMF Directive 2013/35/EU & UK CEMFAW Regulations 2016 All employers have a duty to assess risks arising from work undertaken and to put in place protective or preventive
More informationTurbocharger / TPL-C Original assembly instructions English
Assembly Instructions Turbocharger / TPL-C Original assembly instructions English This document is valid for the TPL-C series: TPL79-C Purpose The assembly instructions explain how the ABB turbocharger
More informationMachinery GUIDELINES FOR GUARDING PRINCIPLES AND GENERAL SAFETY FOR
GUIDELINES FOR GUARDING PRINCIPLES AND GENERAL SAFETY FOR Machinery TO MEET THE REQUIREMENTS OF THE HEALTH AND SAFETY IN EMPLOYMENT ACT 1992 AND REGULATIONS 1995 OCCUPATIONAL SAFETY & HEALTH SERVICE LABOUR
More informationA 30/36 V BF. coarse medium fi n e soft medium hard. A aluminium oxide M R U BA resin bond
Cutting and Grinding Discs echnical Information Durability Resin bonded grinding and cutting wheels for free-hand application must be used within three years of manufacture. Please see metal ring for the
More informationInstallation Manual. Orion. TL-3 Steel Barrier. VHD (v2)
Installation Manual Orion TL-3 Steel Barrier VHD (v2) 300914 Table of Contents Orion Introduction.......... 3 Limitations & Warnings. 4 Before Installation..... 3 System Design & Design Considerations
More informationNZ Health & Safety at Work
NZ Health & Safety at Work A partnership publication Get ready & be ready for April 4th 2016. The revised Health and Safety at Work Act comes into effect on 4 April 2016. It s quite a change for a lot
More informationChapter 18 Welding Table of Contents
Chapter 18 Welding Table of Contents 18.1 Foreword 18.2 Introduction 18.3 Applicability of Standard 18.4 Other Policies that Might Apply 18.5 Approved Areas for Welding and Cutting 18.6 Other Areas 18.7
More informationElectrical Safety Management Plan (ESMP)
Electrical Safety Management Plan (ESMP) CONTENTS 1 INTRODUCTION 4 1.1 Purpose 4 1.2 Background 4 2 OBJECTIVES OF THE ESMP 2.1 Electrical Safety Policy 2.2 Electrical Safety Goals 2.3 Objectives 5 5 5
More informationor from the OSHA website, adisp.show_document?p_table=fed ERAL_REGISTER&p_id=20094.
3 Regulations Update OH&ESD page 1 of 7 #29 Published: January, 2008 OSHA Regulation: 29 CFR 1910.132 (h) On November 15, 2007, the Occupational Safety and Health Administration (OSHA) issued a final rule
More informationMetal or Woodworking Shop Policy
Metal or Woodworking Shop Policy Responsible Office: Risk Management and Safety Issued: January, 2013 Revised: 1. INTRODUCTION Risk Management and Safety, recognizing that hazards may exist in shop areas,
More informationCOSVR184 - SQA Unit Code FW15 04 Install wall cladding systems
Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 preparing and installing proprietary wall cladding
More informationCOSVR477 SQA Unit Code HM2F 04 Machinery and equipment maintenance
Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 preparing and maintaining machinery and equipment
More informationXYX Company. Safety Program. XYZ Company 100 Main Street Somewhere, NH Implementation Date: August 12, 1901 Revision Date: September 31, 1955
XYX Company Safety Program XYZ Company 100 Main Street Somewhere, NH 03000 Implementation Date: August 12, 1901 Revision Date: September 31, 1955 1 Table of Contents 1. Introduction... 3 2. Objectives...
More informationContractor Management and Purchasing
company workers at risk. Contractors play a significant role in safety and health management at facilities whether there are contract miners or contractors performing project work. They often face very
More informationversion 1 / 96 R Green Stars Hotel Environmental Management System
Environmental Management Manual for Hotels in Hong Kong version 1 / 96 R Green Stars Hotel Environmental Management System 2002 Acknowledgements: This document is a revised version of the manual published
More informationPROGRAM OVERVIEW JOB HAZARD ANALYSIS (JHA) SAFETY PROGRAM REGULATORY STANDARD: 29 CFR
PROGRAM OVERVIEW JOB HAZARD ANALYSIS (JHA) SAFETY PROGRAM REGULATORY STANDARD: 29 CFR 1910.132-138. INTRODUCTION: Injuries in the workplace often occur because employees are not adequately trained in the
More informationInstalling door ironmongery in the workplace
Unit Update H/503/2636: INSTALLING DOOR IRONMONGERY IN THE WORKPLACE U s e f r o m 2 0 1 2 J a n u a r y This version of this unit replaces all previously published versions with effect from January 2012.
More informationTable of Contents. A Operate and monitor Micro Hydel Power Plant (MHP) plant 04
Page 2 Table of Contents Competency Standards A Operate and monitor Micro Hydel Power Plant (MHP) plant 04 B Carry out corrective maintenance procedures on electrical components in a MHP plant 05 C Carry
More informationRail Safety Management Procedure General Engineering and Operational Systems - Asset Management of Rolling Stock
1/16 Management of Rolling Stock Revision Date Comments 1 January 2011 Procedure developed to support SMS and legislative requirements. 2 February 2012 Reviewed with RISSB Standards and change of titles
More informationCOSVR186 - SQA Unit Code FW1A 04 Remove existing wall cladding systems
Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 removing existing proprietary wall cladding systems
More informationMNG 331: ROCK MECHANICS SPRING Experiment 2: Cutting and Grinding
MNG 331: ROCK MECHANICS SPRING 2016 Experiment 2: Cutting and Grinding 01/29/2016 John and Willie Leone Family Department of Energy and Mineral Engineering College of Earth and Mineral Sciences, Pennsylvania
More informationRECOMMENDED SAFETY TRAINING REQUIREMENTS page 1 of 4
RECOMMENDED SAFETY TRAINING REQUIREMENTS page 1 of 4 OHSA s. 9 (12) - 2 JHSC Members (1 Management, 1 Worker) - Upon selection of the 2 to 3 days - Certified Workers are to be trained, at the employers
More informationAdelaide Airport Limited
Induction Pack for Contractors Site Rules and Conditions for Contractors Revision: 7 November 2015 Site Rules and Conditions-Adelaide:Legal 42723757_1 1. GENERAL 1 2. BUILDING CONSENT AND APPROVAL 1 3.
More information5/9/2012. My Background On-boarding a New Employee Where do you start What do you need to consider How to make the process go smoothly
Training a New Hire Where do I Start? Discussion Points My Background On-boarding a New Employee Where do you start What do you need to consider How to make the process go smoothly 1 On-boarding a New
More informationLockout/Tagout. Company Policy
Company Policy Lockout/Tagout is dedicated to the protection of its employees from occupational injuries and illnesses. is responsible for providing a safe working environment and the employees have and
More informationAn Industry Code of Conduct Maritime Autonomous Systems (Surface) MAS(S)
BEING A RESPONSIBLE INDUSTRY An Industry Code of Conduct Maritime Autonomous Systems (Surface) MAS(S) The ISSUE 1 Maritime 01/03/2016 Autonomous Systems Surface, MAS(S) Industry Code of Conduct Foreword
More informationUniversity of Birmingham
University of Birmingham Health and Safety Policy Manager responsible for review: Facilities Manager Date of last review and update: April 2015 Approved by: H&S committee 2015 Next scheduled review date:
More informationWritten Safety and Health Program
Written Safety and Health Program For XYZ Company Required for all Hawaii Businesses with 25 or More Employees Incorporates Provisions of Hawaii Administrative Rules Title 12, Subtitle 8, Part 2, Chapter
More informationIntroduction. Module Objective
Introduction Managing Safety and Health Time: About two hours, Objectives: 1: Explain the importance of an effective health & safety program 2: Explain worker rights to a safe & healthful workplace 3:
More informationSafety Statement Including Risk Assessment
Safety Statement Including Risk Assessment Health and Safety Authority 6th March 2012 Health & Safety Policy I / We of am / are committed to working in accordance with the provisions of the Safety, Health
More informationCHAS Assessment Standards
CHAS Assessment Standards Section 1 - All Prosecutions or Enforcement Notices The Supplier has provided details of any enforcement notices or prosecutions served on them in the last three years by the
More informationUsing petrol-driven chainsaws
AFAG301 Using petrol-driven chainsaws Introduction This leaflet covers the safe working practices to be followed when using a petroldriven chainsaw. For guidance on specific operations involving chainsaws,
More information2.6 Students Visitors, Contractors and Others Health and Safety Team Facilities Team IT/ MIS
1 Index Section 1 - General... 5 General Statement... 6 1.1 Health and Safety Management System... 9 1.3 Overview... 10 1.4 Implementation and Operation - Resources, Roles, Responsibility, Accountability
More informationSECTION 1 - INTRODUCTION 2 PURPOSE 2 SCOPE 2 DEFINITIONS 2 LEGISLATIVE CONTEXT 4 RESPONSIBILITIES 4
OH&S Procedure Name: Manual Handling Procedure Approved by: Director Human Resources Last reviewed: December 2013 SECTION 1 - INTRODUCTION 2 PURPOSE 2 SCOPE 2 DEFINITIONS 2 LEGISLATIVE CONTEXT 4 RESPONSIBILITIES
More informationPersonal Protective Equipment (PPE)
Personal Protective Equipment (PPE) Owner Name Title Signature Date 03 March 2017 Suleman Ali Director of Safety Strategy & Support Services Authoriser Name Title Signature Peter Vujanic Date 26 June 2017
More informationHealth, Safety and Environmental Manager
Health, Safety and Environmental Manager External Vacancy Post Ref 5881. 37 hours, Permanent. 30,603.00-32,463.42 per annum Sunderland College is seeking to appoint an experienced Health, Safety & Environmental
More informationFW66 FORESTRY WINCH FW66. Owner s Manual 19/02/2016
FW66 FORESTRY WINCH FW66 19/02/2016 Owner s Manual TABLE OF CONTENTS INTRODUCTION ---------------------------------------------------------------------------------- 2 INTENDED USE -----------------------------------------------------------------------------------
More informationPERSONAL PROTECTIVE EQUIPMENT SAFETY PROGRAM
PERSONAL PROTECTIVE EQUIPMENT SAFETY PROGRAM INCLUDED IN THIS SAFETY PROGRAM 1.0 Purpose 2.0 Responsibilities 3.0 Hazard Assessment for PPE 4.0 Selection of PPE 5.0 Training 6.0 Cleaning and Maintenance
More informationPerformance Standards for Self-insurers
A.1.3.1 adequacy check Applicant: name Date: date Person responsible for content: name Evaluator: name Performance Standards for Self-insurers This adequacy check relates specifically to the and/or Injury
More informationUSMC_FY-15 OSHA CITATIONS Total. Page 1
Installation Open Conf. Inspection Date Inspection Type Violation Type Standard Cited Description MARCORPS OSH Reference Abatement Date Max Private Sector Penalty Marine Corps Community Services (Mccs)
More informationMATERIAL SAFETY DATA SHEET FOR COATED ABRASIVES -Formatted by FEPA as per EC Directive 91/155/EG and ISO Standard
page 1 of 5 MATERIAL SAFETY DATA SHEET FOR COATED ABRASIVES -Formatted by FEPA as per EC Directive 91/155/EG and ISO Standard 11014-1 1. Identification of Product and Company: 1.1 Product Name: MAGNUM
More informationAustralian Motor Body Repairers Association. AMBRA National Shop Grading Program
Australian Motor Body Repairers Association AMBRA National Shop Grading Program AMBRA National Shop Grading Program 1 Foreword In order to become an accredited member of the Body Repair Division of your
More informationSAMPLE. MEM05052A Apply safe welding practices. MEM05 Metal and Engineering Training Package. Learner guide Version 1
MEM05 Metal and Engineering Training Package MEM05052A Apply safe welding practices Learner guide Version 1 Training and Education Support Industry Skills Unit Meadowbank Product Code: 5749 Acknowledgments
More informationSee revision section. Resources, Roles, Responsibility, Accountability, and Authority. Section in OHSAS 18001:2007
1. PURPOSE The purpose of this document is to identify occupational health and safety roles and responsibilities at each function and level within the City of Dallas in accordance with the requirements
More informationDrag Chain Conveyor Installation and Operation Manual
Drag Chain Conveyor Installation and Operation Manual Material Handling Equipment Sales, Incorporated 310 S. Section Line Rd Delaware, OH 43015 Phone: (989) 430-4005 Fax: (740) 363-9004 WARRANTY MATERIAL
More informationOHS - Making Contracts Work. Contractor Safety Checklists
OHS - Making Contracts Work Contractor Safety Checklists OHS - Making Contracts Work Contractor Safety Checklists Authors: Greg Dodd and Kathy Haseloff Safety Valve Consulting Publisher: Mining and Quarrying
More informationOperate a dozer (wheeled and tracked)
Operate a dozer (wheeled and tracked) Code OHSCER209A Workplace Health and Safety Queensland is moving to a new learning and assessment system for certificates to work in prescribed occupations. Learning
More informationGiven a functional welder, instruction and demonstration of use, each employee will be able to:
I. Competencies Given a functional welder, instruction and demonstration of use, each employee will be able to: A. Identify the major parts of the arc welder. B. Pass a written test of safety and operating
More informationMachine Guarding and Maintenance
1. Identification of Workplace Hazard Machine Guarding and Maintenance The exposed moving parts of machinery can cause serious injuries to an employee who is inadvertently caught by the machine. Hazardous
More informationCOSVR290 - SQA Unit Code H36A 04 Erect timber roof structures
Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 constructing roofs in situ and erecting pre-assembled
More informationOperations Department, Research Support Division
POSITION DESCRIPTION Position Details Position Title Department and Division Reports To WHS & Compliance Manager Operations Department, Research Support Division Chief Operating Officer The Institute The
More informationSample Written Program. for. Control of Hazardous Energy (Lockout/Tagout) OSHCON
Sample Written Program for Control of Hazardous Energy (Lockout/Tagout) provided as a public service by OSHCON Occupational Safety and Health Consultation Program Publication No. HS02-011B(3-03) Revised
More informationSafe Work Method Statement
Safe Work Method Statement Disclaimer: Use of Master Builders Generic Safe Work Method Statements The Master Builders Association of Victoria expressly disclaim all and any liability to any person in respect
More informationASBESTOS AWARENESS. Supplement to Standard Training Module
ASBESTOS AWARENESS Supplement to Standard Training Module TRAINING REQUIREMENTS OVERVIEW This standard Vivid training module provides a general overview of the asbestos standard for general industry. The
More informationSERIOUS OSHA VIOLATIONS USMC THRU 4th QUARTER FY-15. Page 1
Installation Open Conf. Inspection Date Inspection Type Violation Type Standard Cited Description MARCORPS OSH Reference Abatement Date Max Private Sector Penalty Marine Corps Community Services (Mccs)
More informationDuty holders under the OHS Act and OHS Regulations should use the Code together with this legislation.
1 Preface This Compliance Code (Code) provides practical guidance for those who have duties or obligations in relation to plant under the Occupational Health and Safety Act 2004 (OHS Act) and Occupational
More informationLevel 2 NVQ Diploma in Construction Operations and Civil Engineering Services Highways Maintenance (Construction)
Civil Engineering Services Highways Maintenance (Construction) Qualification Specification ProQual 2017 Contents Page Introduction 3 Qualification profile 3 Qualification structure 4 Centre requirements
More informationTrotz sorgfältiger inhaltlicher Prüfung übernehmen wir keine Haftung für die Richtigkeit und Aktualität für Unterlagen von Dritten.
Trotz sorgfältiger inhaltlicher Prüfung übernehmen wir keine Haftung für die Richtigkeit und Aktualität für Unterlagen von Dritten. IFS HPC Issue 2 Joachim Mehnert Technical Director DQS CFS GmbH 23. February
More informationMETHOD STATEMENT SCREEDING OF FLOOR
17-18 Gaerwen Industrial Estate Gaerwen Isle of Anglesey LL60-6HR Tel: 01248-422555 Fax: 01248-422556 Mobile: 07891-557581 Project/Contract Preparation of sub floors & screeding principal Contractor Apollo
More informationDATA PROTECTION POLICY
DATA PROTECTION POLICY 1. Introduction This policy sets out how The Robert Gordon University shall comply with the requirements of the Data Protection Act 1998 and was created with reference to the JISC
More informationRISQS Audit Protocol: Industry Minimum Requirements, Sentinel, Railway Interface Planning and Plant Operations Scheme modules.
Services for professional procurement. Be better informed, make better decisions. RISQS Audit Protocol: Industry Minimum Requirements, Sentinel, Railway Interface Planning and Plant Operations Scheme modules.
More informationHealth and Safety Manual
Health and Safety Manual CS-OHS-M-01 Version 2 Effective date: 30 November 2012 Next review date: 01 November 2014 Health and Safety Manual CS-OHS-M-01 FOREWORD The foundation of CS Energy s success as
More informationJOB DESCRIPTION FACILITIES MANAGER
JOB DESCRIPTION FACILITIES MANAGER Job Title: Facilities Manager Band: Band 7 Directorate: Estates & Facilities Reports To: Head of Estates & Facilities Accountable To: Director of Estates & Facilities
More informationEurobitume UK. Site Inspection for Delivery of Bitumen
Eurobitume UK Site Inspection for Delivery of Bitumen June 2015 To be used in conjunction with the UK edition of the Eurobitume Guide to Safe Delivery of Bitumen Introduction and Scope This site inspection
More informationCompany s Name: GHI Warehouse Date of Risk Assessment:
Company s Name: GHI Warehouse Date of Risk Assessment: 10-01-06 What are the hazards? Falls from height Who might be harmed and how? Staff could suffer severe or even fatal injuries if they fell whilst
More informationOverview COSVR681. Install external blinds, screens or solar shading systems
Overview This standard is about interpreting information, adopting safe, healthy and environmentally responsible work practices, selecting and using materials, components, tools and equipment, and installing
More informationCOSVR649 - SQA Unit Code H0WP 04 Produce stencils designs using pre-cut stencil plates
Produce stencils designs using pre-cut stencil plates Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting and preparing materials and associated
More informationWelding and Cutting Safety
Welding and Cutting Safety Welding and Cutting Objectives Describe welding safety requirements for: Eye protection Protective clothing Fire Prevention Requirements Ventilation Safety Requirements Electrical
More informationA2B. Construction (Design and Management) Regulations 2015 PRE CONSTRUCTION INFORMATION PACK (V ) PROJECT:
A2B. Construction (Design and Management) Regulations 2015 PRE CONSTRUCTION INFORMATION PACK (V.2 10.5.17) PROJECT: Oakdale Primary School, Peterborough Extension, Refurbishments and Associated Works.
More informationCOSVR69 - SQA Unit Code DY3K 04 Lay sand and cement screeds
Overview This standard is about 1 interpreting information 2 adopting safe and healthy working practices 3 selecting materials, components and equipment 4 preparing materials and laying sand and cement
More informationPowered Industrial Truck/Forklift Operations Standards and Procedures. Disaster Cycle Services Standards & Procedures DCS SP DMWT
Powered Industrial Truck/Forklift Operations Standards and Procedures Disaster Cycle Services Standards & Procedures DCS SP DMWT April 2015 Change Log Date Page(s) Section Change Author: Deploy Materials,
More informationGroup Security Policy
Our commitment to good business Focusing on health, safety and security 6 Version 1 July 2014 Our Business Principles 1 Demonstrating integrity in corporate conduct 2 Ensuring openness and transparency
More informationKENNECOTT UTAH COPPER
14.5.1 INTRODUCTION 14.51.1 This standard specifies the safety controls associated with freight / cargo loading operations at KUC properties and presents working references supporting KUC standards and
More informationFAST SPOTTER WT-FS-5.0
. FAST SPOTTER WT-FS-5.0 Installation, Operating and Maintenance Manual WELDING TECHNOLOGIES www.weldingnet.com 1365 Horseshoe Dr., Blue Bell, PA 19422 Phone: 610-278-9325 Fax: 610-278-9325 Toll Free Number:
More informationScaffold Public Documents - SPD16
Scaffold Public Documents - SPD16 Innovative strategies, methods and tools for occupational risks management of manufactured nanomaterials (MNMs) in the construction industry GUIDE FOR THE IMPLEMENTATION
More informationThis standard deals with the following:
facilitate Overview This standard addresses the competence required to transfer materials into and between stages of production. This involves: 1. Moving raw materials, intermediate and finished products
More informationHealth, Safety and Environment (HSE) Policy
Health, Safety and Environment (HSE) Policy Policy Code: HR-015 Version: 6.0 Effective Date: 3 April 17 Purpose: As the principal health, safety and environment policy, this policy seeks to set the approach
More informationJust What OSHA Ordered A quick look at Tuscaloosa s overall crane program.
All About Cranes: Just What OSHA Ordered A quick look at Tuscaloosa s overall crane program. Why Policies, Procedures, Protocols? Core Beliefs We believe that all our activities can be undertaken safely
More informationNetwork Rail Project No: Issue: 002 Date 11/07/2017 Work Package Plan Arena Tunnel LSM773 Prepared by: Start Date: 15/07/17 Finish Date: 23/07/17
Work Package Plan Arena Tunnel LSM773 Prepared by: Jimmy Galbraith (Print Name)..... (Signature) Works Manager (Job Title) Approved by the Contractor s Engineering Manager (CEM):...... (Print Name).....
More informationEnsure your own actions reduce risks to health and safety
Ensure your own actions reduce risks to health and safety UNIT SM 1 Area of competence This unit is designed to demonstrate competence in following the health and safety duties required in the workplace
More informationLevel 2 NVQ Diploma in Construction Operations and Civil Engineering Services Construction Operations (Construction)
Civil Engineering Services Construction Operations (Construction) Qualification Specification ProQual 2017 Contents Page Introduction 3 Qualification profile 4 Qualification structure 5 Centre requirements
More informationTitle: Dining Hall/Restaurant Operations
Environmental Standard Operating Procedure Originating Office: Revision: Prepared By: Approved By: MCAS Miramar Environmental Original Environmental Management Department William Moog Management Department
More information