1 Earth Mechanics, Inc. Geotechnical & Earthquake Engineering TECHNICAL MEMORANDUM DATE: June 3, 2009 EMI PROJECT NO: TO: COPY: FROM: SUBJECT: John Chun, P.E. / Port of Long Beach (POLB) Jorge Castillo / POLB Cheng Lai, S.E. / POLB Raj Varatharaj / Earth Mechanics, Inc. (EMI) Ranjan Gunaranjan / EMI Arul Arulmoli / EMI Geotechnical Data Memorandum for Metropolitan Stevedoring Sewer Line Repair Project, Pier G, Port of Long Beach, California Earth Mechanics, Inc. (EMI) has been requested by the Port of Long Beach (POLB) to provide geotechnical information for Metropolitan Stevedoring Sewer Line Repair Project at Pier G in Port of Long Beach (Figure 1). This memorandum is prepared to provide the details of geotechnical investigation performed for the Sewer Line Repair Project. Project Description The project area is located about 600 ft northeast of Berth G211A in POLB (Figure 1). An existing 18-inch sewer line, approximately 20 ft below the existing grade, needs to be repaired in the vicinity of the existing tower (Figure 2). The existing grade is at about El. +18 ft MLLW. The site-specific field investigation was performed to identify the subsurface soil conditions. Field Investigation A site-specific field investigation was performed under the supervision of EMI for the Sewer Line Repair Project on May 26, This field investigation consisted of one exploratory soil boring (09-B1) and one Cone Penetration Test (CPT) sounding (09-C1). The purpose of the borings was to log subsurface conditions and collect soil samples in the vicinity of the subject sewer line bypass. The locations of the boring and the CPT sounding are shown in Figure 2. The approximate coordinates and elevations of the exploratory locations are estimated based on the drawing provided by POLB. The Northing, Easting, surface elevation, groundwater elevation, and depth of the boring and CPT sounding are summarized in Table 1. The logs of boring and CPT sounding are included at the end of this memorandum Newhope Street, Suite E, Fountain Valley, California Tel: (714) Fax: (714)
2 Pier G Metropolitan Stevedoring Sewer Line Repair Project Port of Long Beach June 3, 2009 Page 2 TABLE 1 SUMMARY OF BORING / CPT SOUNDING INFORMATION Boring / CPT Sounding No Date Performed Approx. Northing (ft) Approx. Easting (ft) Approx. Grade Elevation (MLLW, ft) Approx. Groundwater Elevation (MLLW, ft) Depth of Boring / CPT Sounding (ft) 09-B ,732,239 6,499, C ,732,235 6,499, Not Measured 83.2 Note: (1) Coordinate System: CA State Plane, Zone 5, NAD 83 and NGVD 2006 (MLLW). (2) The coordinates and elevations are approximate and estimated from the design drawing provided by POLB. Soil Boring The soil boring (09-B1) was drilled by SoCal Drilling Inc. on May 26, 2009 under a subcontract with EMI. An EMI representative observed the drilling operations, logged the borehole, and collected soil samples for laboratory testing. The boring was extended down to a depth of 61.5 ft. The borehole was backfilled with soil cutting-cement mixture and the surface conditions were restored. The soil boring was excavated using a truck-mounted drill rig equipped with 5 inches diameter mud rotary wash bit. Subsurface soils and conditions were logged and samples of soils were collected for laboratory testing. Soil samples were collected at approximately 5.0 ft intervals or when change in soil type occurred, using SPT sampler and modified California drive sampler. The SPT sampler has an outside diameter of 2 inches and inside diameter of 1.4 inches without any lining inside. The modified California drive sampler has an outside diameter of 3.25 inches and is lined inside with 2.5 inches diameter brass rings to obtain relatively undisturbed soil samples. Both samplers were driven to a total depth of 18 inches using a 140 pounds automatic hammer with a drop height of 30 inches. The blowcounts for the last one foot of penetration were recorded on the boring logs. Soil samples were visually classified and logged in the field. The log of soil boring is included in Attachment 1. CPT Sounding The CPT sounding (09-C1) was performed by Middle Earth Geo Testing, Inc. on May 26, 2009 under subcontract with EMI. The CPT sounding was performed using an electronic cone penetrometer in general accordance with the current ASTM Standards (ASTM D5778 and ASTM D3441). The CPT equipment consisted of a cone penetrometer assembly mounted at the end of a series of hollow sounding rods. The cone penetrometer assembly consisted of a conical tip with a 60 apex angle and a projected cross sectional area of 1.55 in² (10 cm²) and a cylindrical friction sleeve with a surface area of in² (150 cm²). The interior of the cone Earth Mechanics, Inc. Geotechnical & Earthquake Engineering
3 Pier G Metropolitan Stevedoring Sewer Line Repair Project Port of Long Beach June 3, 2009 Page 3 penetrometer is instrumented with strain gauges that allow simultaneous measurements of cone tip and friction sleeve resistance during penetration. The cone penetrometer assembly is continuously pushed into the soil by a set of hydraulic rams at a standard rate of 0.79 inch per second (20 mm per second) while the cone tip resistance and sleeve friction resistance are recorded every inches (50 mm) and stored in digital form. A specially designed all wheel drive 25-ton truck provides the required reaction weight for pushing the cone assembly and is also used to transport and house the test equipment. The computer generated graphical logs include cone resistance, friction resistance, and friction ratio. Soil behavior type interpretations are based on guidelines by Robertson and Campanella (1989). The log of CPT sounding is provided in Attachment 2. Laboratory Testing Laboratory tests were performed by EMI to determine relevant physical characteristics and engineering properties of soils that exist at the subject site. Selected soil samples were tested to determine soil classification and physical and engineering properties. The laboratory soil tests were conducted in general accordance with American Society for Testing and Materials (ASTM) standards. The following laboratory tests were performed: Visual Soil Classification (ASTM D-2488) In-Situ Moisture and Density (ASTM D-2937 and D-2216) Atterberg Limits (ATM D-4318) No. 200 Wash (ASTM D-1140) Direct Shear (ASTM D-3080) The types and distribution of laboratory tests performed are shown on the boring log. The in-situ dry densities and moisture contents are shown on the boring logs and the remaining test results are presented in Attachment 3. Subsurface Conditions Subsurface soil conditions at the site were evaluated using information gathered from the boring and CPT sounding. Within the depths explored (between approximate El ft MLLW and El ft MLLW), the subsurface profile generally consists of loose to medium dense silty sand with varying amount of gravel and fines content. A layer of medium stiff silt material with low to medium plasticity and varying thickness was encountered between approximate El ft MLLW and El ft MLLW. The groundwater was encountered at approximate El ft MLLW at the time of drilling. Due to the proximity to ocean, the groundwater table at the site is directly related to tidal fluctuations. It should be noted that the above soil description is general and is intended to describe the subsurface in very broad terms. The soil descriptions above should not be construed to mean that the subsurface profile is uniform and that soil is homogeneous within the project area. For details on the stratigraphy at the exploration locations, refer to the log of boring and CPT sounding at the end of the memorandum. Earth Mechanics, Inc. Geotechnical & Earthquake Engineering
4 Pier G Metropolitan Stevedoring Sewer Line Repair Project Port of Long Beach June 3, 2009 Page 4 Closure We appreciate the opportunity to work with you on this project. If you have any questions, please do not hesitate to call us. (Ranjan) G.J. Gunaranjan, RCE (Raj) S. Varatharaj, GE 2787 Senior Staff Engineer Senior Project Engineer (Arul) K. Arulmoli, GE 2090 Project Manager Reference American Society for Testing and Materials (ASTM), 2007, Annual Book of Standards, Soil and Rock, Vol Robertson, P. K. and Campanella, R. G., 1989, Guidelines for Geotechnical Design Using CPT and CPTU, Civil Engineering Department, University of British Columbia, Vancouver, Canada, November. Attachments Attachment 1 Log of Boring Attachment 2 Log of CPT Sounding Attachment 3 Laboratory Test Results for Boring Samples Earth Mechanics, Inc. Geotechnical & Earthquake Engineering
5
6
7
8
9
10
11
12
13 Earth Mechanics Project POLB Sewer Bypass Project Operator DK/ML Filename SDF(833).cpt Job Number Cone Number DSG0906 GPS Hole Number CPT-9C1 Date and Time 5/26/2009 7:48:15 AM Maximum Depth ft Water Table Depth ft Net Area Ratio.8 DEPTH (ft) 0 CPT DATA TIP FRICTION Fs/Qt SPT N 0 TSF TSF 10 0 % SOIL BEHAVIOR TYPE 0 12 REMARKS 10 Hand Auger 20 Ground Water sensitive fine grained 4 - silty clay to clay 7 - silty sand to sandy silt 10 - gravelly sand to sand 2 - organic material 5 - clayey silt to silty clay 8 - sand to silty sand 11 - very stiff fine grained (*) 3 - clay 6 - sandy silt to clayey silt 9 - sand 12 - sand to clayey sand (*) Cone Size 10cm squared *Soil Behavior behavior Referance type and SPT based on data from UBC-1983
14
15
16
17
18
19
20
21
22
23
24
April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1
PUBLIC WORKS DEPARTMENT David A. Jones, P.E., Director April 7, 2017 Webster Street Sub-Surface Stormwater Storage System Bid No. 2017-022 Bid Date: 4/13/17 ADDENDUM NO 1 Please make the following changes
More informationGEOTECHNICAL INVESTIGATION I-15 SIGN BRIDGES LAS VEGAS EA JANUARY
GEOTECHNICAL INVESTIGATION I-15 SIGN BRIDGES LAS VEGAS EA 73171 JANUARY 06 MATERIALS DIVISION STATE OF NEVADA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION GEOTECHNICAL SECTION GEOTECHNICAL REPORT I-15
More informationPreliminary Geotechnical Exploration Armstrong Tract Rivers Avenue and Hanahan Road North Charleston, South Carolina S&ME Project No.
Preliminary Geotechnical Exploration Rivers Avenue and Hanahan Road S&ME Project No. 4213-16-016 Prepared for: Charleston Water System 103 Saint Phillip Street Charleston, South Carolina 29403 Prepared
More informationAugust 15, 2006 (Revised) July 3, 2006 Project No A
August 15, 2006 (Revised) July 3, 2006 Project No. 01-05-0854-101A Mr. David Reed, P.E. Protean Design Group 100 East Pine Street, Suite 306 Orlando, Florida 32801 Preliminary Soil Survey Report Polk Parkway
More informationSubsurface Investigations PDCA Professor s Driven Pile Institute. Loren R. Anderson Utah State University June 25, 2015
Subsurface Investigations PDCA Professor s Driven Pile Institute Loren R. Anderson Utah State University June 25, 2015 Ralph B. Peck (1962) Subsurface engineering is an art; soil mechanics is an engineering
More informationGeotechnical Engineering Report
Geotechnical Engineering Report Pavement Subgrade Survey State Highway 125 over Hudson Creek Ottawa County, Oklahoma September 23, 21 Terracon Project No. 415121 Prepared for: Guy Engineering Services,
More informationCPT Guide 5 th Edition. Cone Penetration Test (CPT) Quality control (QC) Gregg Drilling & Testing, Inc. Dr. Peter K. Robertson Webinar #
Gregg Drilling & Testing, Inc. Site Investigation Experts Cone Penetration Test (CPT) Quality control (QC) Dr. Peter K. Robertson Webinar #10 2013 CPT Guide 5 th Edition Download FREE copy from: Robertson
More informationSubsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois
AGI Project No. -11 Subsurface Investigation Report For the Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois Prepared for Mr. Steve Panko Key Development Partners, LLC North State Street,
More informationSubsurface Environmental Investigation
Subsurface Environmental Investigation Lake Development East Lake and 21 st Avenue South February 23, 201 Terracon Project No. MP14738A Prepared for: Minneapolis Public Schools Prepared by: Terracon Consultants,
More informationGeotechnical Engineering Report
Geotechnical Engineering Report Turner Turnpike Widening Milepost 210 to 218 Drainage Structure Pipe Jacking Creek County, Oklahoma July 1, 2016 Terracon Project No. 04165017 Prepared for: Benham Tulsa,
More informationTypical Subsurface Profile. November 28, 2016
November 28, 2016 RSCCD Facility Planning, District Construction and Support Services 2323 N. Broadway, Suite 112, Santa Ana, CA 92706 Attn: Re: Ms. Allison Coburn Facilities Project Manager P: (714) 480-7530
More informationApplied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois
AGI Project No. 13-276 Subsurface Investigation Report For the Proposed New Retail Center 9601 South Pulaski Road Evergreen Park, Illinois Prepared for Mr. Feras Sweis FHS Design + Build LLC 2010 West
More informationSITE INVESTIGATION. Foundation Engineering
SITE INVESTIGATION Assist. Prof. Berrak TEYMUR Foundation Engineering Analysis Design Construction As a foundation engineer, you need to consider geotechnical/structural issues (involves geology, subsurface
More informationSubsurface Investigation Report
AGI Project No. 17-154 Subsurface Investigation Report For the Proposed New One-Story Building Addition 7030 West 111 th Street Worth, Illinois Prepared for T63 Development LLC 11052 Mayflow er Lane Orland
More informationConsultant Specifications for Subsurface Investigation & Geotechnical Analysis and Design Recommendations
Consultant Specifications for Subsurface Investigation & Geotechnical Analysis and Design Recommendations Mn/DOT Geotechnical Section - Office of Materials & Road Research http://www.mrr.dot.state.mn.us/geotechnical/foundations/tcontract.asp
More informationGeotechnical Engineering Report
Geotechnical Engineering Report Shaw AFB East Gate Entrance Control Facility Amendment Sumter, South Carolina September 13, 2010 Terracon Project No. 73105020A Prepared for: TranSystems North Charleston,
More informationSUBSURFACE INVESTIGATION, LABORATORY TESTING PROGRAM, AND PAVEMENT RECOMMENDATIONS
February 7, 2017 EDR Architects, PLLC PO Box 271613 Corpus Christi, TX 78427 Attention: Ms. Emily D. Rozypal, AIA SUBJECT: SUBSURFACE INVESTIGATION, LABORATORY TESTING PROGRAM, AND PAVEMENT RECOMMENDATIONS
More informationApplied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois
AGI Project No. 13-109B Subsurface Investigation Report For the Proposed Roosevelt Middle School Site Improvements 7560 Oak Avenue River Forest, Illinois Prepared for Mr. Jerry Pilipowicz Terra Engineering,
More informationGEOTECHNICAL STUDY HIDDEN VALLEY SPORTS PARK RESTROOM FACILITY MABEL JONES DRIVE CANYON LAKE, TEXAS
FUGRO CONSULTANTS, INC. GEOTECHNICAL STUDY HIDDEN VALLEY SPORTS PARK RESTROOM FACILITY MABEL JONES DRIVE CANYON LAKE, TEXAS COMAL COUNTY Canyon Lake, Texas GEOTECHNICAL STUDY HIDDEN VALLEY SPORTS PARK
More informationGEOTECHNICAL REPORT B-1942
GEOTECHNICAL REPORT TUSCARORA BRIDGE REPLACEMENT B-1942 E.A. 73561 March 2011 MATERIALS DIVISION STATE OF NEVADA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION GEOTECHNICAL SECTION GEOTECHNICAL REPORT
More informationPlease include this addendum in your Bid proposal for the above referenced project. Questions are in black ink, and the answers are in red ink.
JAHarchitects, LLC PROJECT NO. 393 RIVERCREST CDD 11560 RAMBLE CREEK DRIVE, RIVERVIEW FL ADDENDUM TO BID PROJECT: RIVERCREST CDD MULTI PURPOSE FIELD MAINTENANCE BUILDING & DOG PARK POOL & CABANNA JAH PROJECT
More informationThe following sections provide the approved standard infiltration testing specifications.
APPENDIX F.2 INFILTRATION TESTING To properly size and locate stormwater management facilities, it is necessary to characterize the soil infiltration conditions at the location of the proposed facility.
More informationPerformance assessment of ground improvement with rapid impact compaction
Performance assessment of ground improvement with rapid impact compaction Mohammed M. Mohammed, Firas A. Salman & Roslan Hashim Department of Civil Engineering, Faculty of Engineering, University of Malaya,
More informationEffective improvement depth for ground treated with rapid impact compaction
Scientific Research and Essays Vol. 5(18), pp. 2686-2693, 18 September, 2010 Available online at http://www.academicjournals.org/sre ISSN 1992-2248 2010 Academic Journals Full Length Research Paper Effective
More informationGeotechnical Investigation Report
MC Squared, Inc. Geotechnical Investigation Report City of St. Petersburg Forcemain Pinellas County, Florida Prepared for: Hazen and Sawyer 10002. Princess Palm Ave., Suite 200 Tampa, Florida 33610 Prepared
More informationConventional Field Testing Methods and Issues
Conventional Field Testing Methods and Issues Amit Prashant Indian Institute of Technology Gandhinagar Short Course on Geotechnical Investigations for Structural Engineering 15 17 October, 2015 1 Conventional
More informationElectrical Conductivity & Hydraulic Profiling. The Combining of Two Subsurface Investigation Methods (With More to Come)
Electrical Conductivity & Hydraulic Profiling The Combining of Two Subsurface Investigation Methods (With More to Come) How has field work been progressing? Split Spoon and Standard Penetration Testing
More informationGEOTECHNICAL INVESTIGATION For PROPOSED OUTDOOR THEATER 495 Upper Park Road APN Santa Cruz, California
GEOTECHNICAL INVESTIGATION For PROPOSED OUTDOOR THEATER 495 Upper Park Road APN 009-301-06 Santa Cruz, California Prepared For SANTA CRUZ SHAKESPEAR Santa Cruz, California Prepared By DEES & ASSOCIATES,
More informationREPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES
REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES Addendum No.1 5 th Bay Ocean View Norfolk, Virginia G E T Project No: VB15-342G November 18, 2016 PREPARED FOR: 204 Grayson Road Virginia
More informationgeotechnical and construction materials consultants
geotechnical and construction materials consultants City of Dallas Public Works and Transportation Department 320 E. Jefferson Blvd, Room 307 Dallas, Texas 75203 ATTN: Mr. Vincent Lewis, P.E. Email: Vincent.lewis@dallascityhall.com
More informationThis report presents the findings of the subsurface exploration concerning the design of the taxiway rehabilitation. Description
September 22, 2016 American Infrastructure Development, Inc. 3810 Northdale Boulevard, Suite 170 Tampa, Florida 33624 Attn: Mr. Mohsen Mohammadi, Ph.D., P.E. Senior Consultant Mob: (813) 244-6609 E-mail:
More informationREPORT OF SUBSURFACE INVESTIGATION AND GEOTECHNICAL ENGINEERING SERVICES. Proposed Soundside Boardwalk Expansion Duck, North Carolina
REPORT OF SUBSURFACE INVESTIGATION AND GEOTECHNICAL ENGINEERING SERVICES Proposed Soundside Boardwalk Expansion Duck, North Carolina G E T PROJECT NO: EC10-260G November 17, 2010 Prepared for VHB, Inc.
More informationSteven Dapp, Ph.D., P.E. Steven Dapp, Ph.D., P.E. Dan Brown and Associates
LA Transportation Conference: 10 Jan 2011 Drilled Shaft Foundations For Two Mississippi River Bridges in Louisiana Dan Brown and Associates Projects John James Audubon Bridge, St. Francisville New Construction
More informationTime-Dependent Strength Behavior of Soil-Bentonite Slurry Wall Backfill
Time-Dependent Strength Behavior of Soil-Bentonite Slurry Wall Backfill Jeffrey Evans 1, and Christopher Ryan 2 1 Bucknell University, Department of Civil and Environmental Engineering, Lewisburg, PA 17837
More informationStormwater Standards. Clackamas County Service District No. 1. Infiltration Testing Guide
Stormwater Standards Clackamas County Service District No. 1 APPENDIX E Infiltration Testing Guide Table of Contents Appendix E - Infiltration Testing Guide... Page E.1 General... 1 E.2 Basic Method -
More informationGeotechnical Testing Laboratory, Inc. Engineering and Construction Materials Testing Services
Engineering and Construction Materials Testing Services February 27, 15 Central Louisiana Economic and Development Alliance P.O. Box 465 Alexandria, Louisiana 719 Attention: Mr. Rick Ranson Vice President
More informationGEOTECHNICAL EXPLORATION REPORT. For the. Project ID: th Avenue Vogt Drive to Decorah Road Local Street Washington County.
GEOTECHNICAL EXPLORATION REPORT For the Project ID: 277--9 18 th Avenue Vogt Drive to Decorah Road Local Street Washington County Prepared for: Alfred Benesch & Company 1 West Canal Street, Suite 15 Milwaukee,
More informationIn preparation for constructing buildings on a property, the builder. Site Preparation CHAPTER
CHAPTER 3 Site Preparation In preparation for constructing buildings on a property, the builder must consider a number of factors related to code requirements. The buildings must be located according to
More informationStandard Practice for Thin-Walled Tube Geotechnical Sampling of Soils for Geotechnical Purposes 1
This document is not an ASTM standard and is intended only to provide the user of an ASTM standard an indication of what changes have been made to the previous version. Because it may not be technically
More informationGENERAL SOILS EVALUATION REPORT. For
GENERAL SOILS EVALUATION REPORT For EL PASO WATER UTILITIES (EPWU) PROPOSED AUSTIN STORMWATER POND IMPROVEMENTS NE OF ALTURA AVE. & LACKLAND ST. EL PASO, EL PASO COUNTY, TEXAS Prepared For MORENO CARDENAS
More informationDetermination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities
Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities 1 Introduction This document, developed by the San Francisco Public Utilities Commission
More informationPROJECT NO A. ISSUED: February 29, 2016
INTERPRETIVE REPORT FOR INFILTRATION SYSTEM DESIGN, PROPOSED VILLA VERONA APARTMENT COMMUNITY, ASSESSOR S PARCEL NUMBERS 311-040-015, 311-040-021, 311-040-024, 311-040-026 AND 311-040-013, LOCATED ON THE
More informationGEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax
GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota 57104 Phone 605-335-5512 Fax 605-335-0773 October 28, 2016 City of Vermillion 25 Center Street 57069 Attn:
More informationYou also requested information regarding a sieve analysis at each boring locations. The test results are attached.
FORENSICS CONSULTANTS ENVIRONMENTAL GEOTECHNICAL MATERIALS October 4, 2016 Washington County Public Works 11660 Myeron Road Stillwater, MN 55082 Attn: Mr. Marc Briese Re: Additional Borings CSAH 22 (70
More informationGEOTECHNICAL STUDY FRANKLIN EAST 1A EST AND NORTH 2 EST TANKS EL PASO, TEXAS AMEC PROJECT NO
GEOTECHNICAL TUDY FRANKLIN EAT 1A ET AND NORTH ET TANK EL PAO, TEXA AMEC PROJECT NO. 133719050 ubmitted To: Parkhill, mith & Cooper, Inc. 810 East Yandell 7990 ubmitted By: AMEC Environment & Infrastructure,
More informationA Case History of Pile Freeze Effects in Dense Florida Sands
A Case History of Pile Freeze Effects in Dense Florida Sands By Ching Kuo 1, Guoan Cao 2, Amy L. Guisinger 3, and Paul Passe 4 Submission Date: August 1, 2006 2,804 Words 1 Table 5 Figures 1 Professional
More informationREPORT OF SUBSURFACE EXPLORATION
REPORT OF SUBSURFACE EXPLORATION WELDING & JOINING TECHNOLOGY FACILITY NORTH GEORGIA TECHNICAL COLLEGE CLARKESVILLE, GEORGIA S&ME PROJECT NO. 161-10-061 Prepared For: LW Engineering, P.C. Post Office Box
More informationWashtenaw Community College Design & Construction Facilities Management 4800 East Huron River Drive Ann Arbor, MI
Washtenaw Community College Design & Construction Facilities Management 4800 East Huron River Drive Ann Arbor, MI 4810-4800 GEOTECHNICAL INVESTIGATION FOR Proposed Pavement Rehabilitation Parking Lots
More informationUPDATED 04 OCT GEOTECHNICAL INVESTIGATIONS
8.0 GEOTECHNICAL INVESTIGATIONS Throughout this section, reference to the Contractor simply means the entity responsible for the subject work. The same procedures and requirements generally apply to anyone
More informationA CASE HISTORY ON DESIGN, CONSTRUCTION, AND PERFORMANCE OF STONE COLUMN GROUND IMPROVEMENT BENEATH AN MSE EMBANKMENT
A CASE HISTORY ON DESIGN, CONSTRUCTION, AND PERFORMANCE OF STONE COLUMN GROUND IMPROVEMENT BENEATH AN MSE EMBANKMENT Karen Dawson, P.E. and Seungcheol Shin, Ph.D., P.E., CH2M HILL, Bellevue, WA, USA Suthan
More informationEngineering Units. Multiples Micro ( ) = 10-6 Milli (m) = 10-3 Kilo (k) = Mega (M) = 10 +6
Engineering Units Multiples Micro ( ) = 10-6 Milli (m) = 10-3 Kilo (k) = 10 +3 Mega (M) = 10 +6 Imperial Units SI Units Length feet (ft) meter (m) Area square feet (ft 2 ) square meter (m 2 ) Force pounds
More informationNovember 13, IP3406. Mr. Uriah Sowell Rooney Engineering 115 Inverness Drive East, Suite 300, Englewood, CO 80112
November 13, 2015 103IP3406 Mr. Uriah Sowell Rooney Engineering 115 Inverness Drive East, Suite 300, Englewood, CO 80112 Subject: Infiltration Testing Gates Road Valve Site Sunoco Pennsylvania Pipeline
More information1. Introduction Limitations... 1
Contents 1. Introduction... 1 2. Limitations... 1 3. Subsurface Conditions... 1 3.1 Site Geology... 2 3.2 Subsurface Exploration... 2 3.3 Subsurface Conditions... 2 4. Interpreted Geotechnical Soil Design
More informationNonlinear Modeling of Dynamic Soil-Structure Interaction: A Practitioner s Viewpoint
Nonlinear Modeling of Dynamic Soil-Structure Interaction: A Practitioner s Viewpoint By (Arul) K. Arulmoli Earth Mechanics, Inc. Fountain Valley, California Workshop on Nonlinear Modeling of Geotechnical
More informationSUBSURFACE EXPLORATION & GEOTECHNICAL ENGINEERING EVALUATION
Report of Subsurface Exploration and Geotechnical Engineering Evaluation Proposed Courtyard Marriott Phenix City, Alabama BHATE Project Number: 112263 October 9, 2012 SUBSURFACE EXPLORATION & GEOTECHNICAL
More informationMinimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08
Minimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08 Table of Contents 1. Title 2. Designation 3. List of Figures 4. Scope 5. Referenced
More informationNovember 13, IP3406. Mr. Uriah Sowell Rooney Engineering 115 Inverness Drive East, Suite 300, Englewood, CO 80112
November 13, 2015 103IP3406 Mr. Uriah Sowell Rooney Engineering 115 Inverness Drive East, Suite 300, Englewood, CO 80112 Subject: Infiltration Testing Hopeland Road Valve Site Sunoco Pennsylvania Pipeline
More informationREPORT OF SUBSURFACE INVESTIGATION AND GEOTECHNICAL ENGINEERING SERVICES
REPORT OF SUBSURFACE INVESTIGATION AND GEOTECHNICAL ENGINEERING SERVICES Elizabeth City, North Carolina G E T Project No: EC14-188G May 30, 2014 PREPARED FOR: 106 Capital Trace, Unit E Elizabeth City,
More informationREPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ANALYSIS DMA TAMPA RED BRICK BUILDING TAMPA, FLORIDA FOR MRI ARCHITECTURAL GROUP, INC.
REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ANALYSIS DMA TAMPA RED BRICK BUILDING TAMPA, FLORIDA FOR MRI ARCHITECTURAL GROUP, INC. JANUARY 7, 2015 January 7, 2015 Mr. Pete Ikegami MRI Architectural
More informationREPORT. Explorations and Geotechnical Engineering Services. Proposed Seaport Village Healthcare Facility Ellsworth, Maine. March 27, S
REPORT March 27, 2013 S Explorations and Geotechnical Engineering Services Proposed Seaport Village Healthcare Facility Ellsworth, Maine PREPARED FOR: First Atlantic Corporation Attention: Craig Coffin,
More informationREPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES
REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES NORTH SHORE SCHOOL DISTRICT 11 HIGHLAND PARK, ILLINOIS ECS PROJECT NO. 1:8 FOR NORTH SHORE SCHOOL DISTRICT 11 SEPTEMBER, 1 REPORT
More informationDUCTILE IRON PILES ARE HIGHLY EFFECTIVE, FAST AND VERSATILE MODULAR DRIVEN MICROPILE SYSTEMS
DUCTILE IRON PILES DUCTILE IRON PILES ARE HIGHLY EFFECTIVE, FAST AND VERSATILE MODULAR DRIVEN MICROPILE SYSTEMS Designed to resist both compression and tension loads in either end-bearing or friction,
More informationSUBSURFACE EXPLORATION, LABORATORY TESTING PROGRAM, AND FOUNDATION AND PAVEMENT RECOMMENDATIONS
GEOTECHNICAL ENGINEERING CONSTRUCTION MATERIALS ENGINEERING & TESTING SOILS ASPHALT CONCRETE Elsasser Architectural Inc. P.O. Box 833 Georgetown, Texas 78627 Attention: Richard Elsasser relsasser@eai-tx.com
More informationEvaluation the Effectiveness of Rapid Impact Compaction (RIC) as a Ground Improvement Technique
Evaluation the Effectiveness of Rapid Impact Compaction (RIC) as a Ground Improvement Technique Bashar Tarawneh, Ph.D, P.E Assistant Professor Civil Engineering Department The University of Jordan Amman,
More informationGeogrid-Reinforced Segmental Block Retaining Wall Design Computations (Keystone Retaining Wall Systems) D Street Improvements. Purcellville, Virginia
Geogrid-Reinforced Segmental Block Retaining Wall Design Computations (Keystone Retaining Wall Systems) D Street Improvements Purcellville, Virginia 19955 Highland Vista Drive, Suite 170, Ashburn, Virginia
More informationPile Design from Constructability Perspective
Pile Design from Constructability Perspective Prestressed Concrete Piles in Coastal Georgia Presented by: Guoming Lin, Ph.D., G.E., D.GE Senior Principal / Senior Consultant Savannah, Georgia November
More informationPD - 6 THRUST RESTRAINT DESIGN EQUATIONS AND SOIL PARAMETERS FOR DUCTILE IRON AND PVC PIPE
PD - 6 THRUST RESTRAINT DESIGN EQUATIONS AND SOIL PARAMETERS FOR DUCTILE IRON AND PVC PIPE 4 3 2 1 D D C C B B A A 4 3 2 1 Thrust Restraint Design Equations and Soil Parameters These equations and soil
More informationTailings Geotechnical Investigation Work Plan for Keystone Mine
PREPARED FOR MT. EMMONS MINING COMPANY Tailings Geotechnical Investigation Work Plan for Keystone Mine Keystone Mine Gunnison County, Colorado December 2016 WORK PLAN MT. EMMONS MINING COMPANY PAGE i TAILINGS
More informationNONLINER STIFFNESS MATRIX MODELING FOR COMPLEX PILE GROUP FOUNDATION OF THE ANCHORAGE PORT ACCESS BRIDGE
10NCEE Tenth U.S. National Conference on Earthquake Engineering Frontiers of Earthquake Engineering July 21-25, 2014 Anchorage, Alaska NONLINER STIFFNESS MATRIX MODELING FOR COMPLEX PILE GROUP FOUNDATION
More informationLEVELTON CONSULTANTS LTD. 1.0 Introduction. 2.0 Project Description. December 16, Levelton File # R
LEVELTON CONSULTANTS LTD. Abbotsford Office 110-34077 Gladys Avenue Abbotsford, BC V2S 2E8 T: 604.855.0206 F: 604.853.1186 abbotsford@levelton.com www.levelton.com December 16, 2015 Levelton File # R715-1604-00
More informationAugust 17, DCN Number: ALB07WP001 Revision: 0. Prepared By: 8300 Jefferson NE Suite B Albuquerque, New Mexico 87113
WORK PLAN ENERGY FUELS RESOURCE CORPORATION URANIUM MILL LICENSING SUPPORT PHASE 1 GEOTECHNICAL INVESTIGATION KLEINFELDER PROJECT NO. 83088 August 17, 2007 DCN Number: 83088.1.4.2-ALB07WP001 Revision:
More informationREPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING EVALUATION. Panama City, Bay County, Florida
REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING EVALUATION PANAMA CITY MARINA LIGHTHOUSE Panama City, Bay County, Florida Prepared For: PANAMA CITY CRA 803 JENKS AVENUE,SUITE 1 PANAMA CITY,BAY
More informationGround Improvement. Martin G. Taube, P.E., P.G. February 4, 2003
ODOT Geotechnical Information Exchange Seminar Ground Improvement Martin G. Taube, P.E., P.G. February 4, 2003 Nicholson Construction Company 12 McClane Street Cuddy, PA 15031 ph. (412) 221-4500 fax (412)
More informationOur Tour Stops. A Foundation Engineering gtrip down the Mississippi River. Dan Brown, P.E. Dan Brown and Associates 9/6/2010.
A Foundation Engineering gtrip down the Mississippi River Dan Brown, P.E. Dan Brown and Associates Our Tour Stops I 35W Minneapolis US U.S. 61 Bridge, Hastings, MN New Mississippi River Bridge (I 70),
More informationGENERAL SOILS EVALUATION REPORT. For
GENERAL SOILS EVALUATION REPORT For EPWU PROPOSED KENTUCKY DAM (DAM 5) DRAINAGE SYSTEM IMPROVEMENTS KENTUCKY ST. & ALABAMA ST. EL PASO, EL PASO COUNTY, TEXAS Prepared For MORENO CARDENAS INC. 2505 E. MISSOURI
More informationCorrelation between Cone and Standard Penetration tests
1 Correlation between Cone and Standard Penetration tests Salehzadeh H. 1, Hozouri A. 2*, Golestani A.R. 3 1 Assistant Professor, IUST 2 M.Sc Student of geotechnical engineering, IUST 3 M.Sc in geotechnical
More informationAmendment 03 Soils Report. At Air Academy High School 6910 Carlton Drive Colorado Springs, CO 80840
Amendment 03 Soils Report Issued: November 7, 2017 For RFP 18-KG-0928(BF) Design/Build Services for New Synthetic Turf Field At Air Academy High School 6910 Carlton Drive Colorado Springs, CO 80840 Academy
More informationHelical Foundation Systems Engineering Reference Manual
Helical Foundation Systems Engineering Reference Manual TABLE OF CONTENTS SECTION INTRODUCTION 1 GLOSSARY OF TERMS 2 PRODUCT DESIGN AND SELECTION 3 PRELIMINARY CONSIDERATIONS 4 LOADS - FACTOR OR SAFETY
More informationREPORT ON. GEOTECHNICAL INVESTIGATION PROPOSED LIGHT INDUSTRIAL BUILDING 6945 McKEOWN DRIVE OSGOODE WARD, GREELY CITY OF OTTAWA, ONTARIO
Civil Geotechnical Structural Environmental Hydrogeology 210 Prescott Street, Unit 1 (613) 860-0923 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) 258-0475 REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED
More informationAPPENDIX D STORMWATER MANAGEMENT POND SIZING CALCULATIONS
APPENDIX D STORMWATER MANAGEMENT POND SIZING CALCULATIONS PERMANENT POOL AND EXTENDED DETENTION SIZING 11097 Ontario Limited NW Paris Project Number: 1505 Date: September 2014 Designer: M.M.L.B. PERMANENT
More informationAED Design Requirements: Geotechnical Investigations (Provisional)
US Army Corps of Engineers Afghanistan Engineer District AED Design Requirements: (Provisional) Various Locations, Afghanistan January 2010, Version 1.0 TABLE OF CONTENTS AED DESIGN REQUIREMENTS FOR GEOTECHNCIAL
More informationMWH STANDARD OPERATING PROCEDURES SOP-1 DRILLING METHODS
MWH STANDARD OPERATING PROCEDURES SOP-1 DRILLING METHODS STANDARD OPERATING PROCEDURES DRILLING METHODS TABLE OF CONTENTS Section Page 1.0 INTRODUCTION... 1 2.0 DEFINITIONS... 2 3.0 RESPONSIBILITIES...
More informationis a possibility of the existence of permafrost as a result
111.2 CERTAIN ASPECTS OF ALASKA DISTRICT ENGINEERS EXPERIENCE IN AREAS OF MARGINAL PERMAFROST E. L. Long In nearly twenty years of engineering and construction experience in Alaska, the Alaska District
More informationReport of Geotechnical Engineering Investigation OIA SOUTH CELL LOT (W340) AID Project No. GOA16001 Orange County, Florida GEC Project No.
Report of Geotechnical Engineering Investigation OIA SOUTH CELL LOT (W40) AID Project No. GOA16001 Orange County, Florida GEC Project No. 956G July 6, 2017 American Infrastructure Development, Inc. 7 North
More informationPreliminary Geotechnical Engineering Study DCPL Capitol View Branch Library Washington, D.C. HCEA Job No A. Prepared for:
Preliminary Geotechnical Engineering Study DCPL Capitol View Branch Library Washington, D.C. HCEA Job No. 14465A Prepared for: Smoot Construction Company 5335 Wisconsin Avenue, NW Washington, DC 20015
More informationSOIL MECHANICS Assignment #2: Soil Classification Solution.
Geotechnical Engineering Research Laboratory One University Avenue Lowell, Massachusetts 01854 Edward L. Hajduk, D.Eng, PE Lecturer PA105D Tel: (978) 934 2621 Fax: (978) 934 3052 e mail: Edward_Hajduk@uml.edu
More informationDGeo. Cap Sante Boat Haven M, N, O-Dock Maintenance Dredge Project Anacortes, Washington. June 7, for Port of Anacortes
DGeo Cap Sante Boat Haven M, N, O-Dock Maintenance Dredge Project Anacortes, Washington for Port of Anacortes June 7, 2012 Earth Science + Technology Geotechnical Engineering Services Snoqualmie Switch
More informationDownloaded from Downloaded from /1
PURWANCHAL UNIVERSITY VI SEMESTER FINAL EXAMINATION-2003 LEVEL : B. E. (Civil) SUBJECT: BEG359CI, Foundation Engineering. Full Marks: 80 TIME: 03:00 hrs Pass marks: 32 Candidates are required to give their
More informationSPECIFICATION : BORING AND JACKING
SPECIFICATION 330524: BORING AND JACKING PART 1.0 GENERAL 1.1 DESCRIPTION 1.1.1 The work of this specification includes all labor, machinery, construction equipment and appliances required to perform in
More informationPreliminary Geotechnical Investigation
Preliminary Geotechnical Investigation Lakeview Boulevard Improvements Town of Ajax, Ontario Prepared For: Dionne Bacchus & Associates Consulting Engineers Ltd. GeoPro Project No.: 16-1296-01 Revised Report
More informationASSESSMENT AND MITIGATION OF LIQUEFACTION RISK FOR EXISTING BUILDING FOUNDATION
ASSESSMENT AND MITIGATION OF LIQUEFACTION RISK FOR EXISTING BUILDING FOUNDATION Rolando P. Orense 1, Yukio Morita 2 and Masanori Ide 3 ABSTRACT This paper outlines the mitigation measures performed to
More informationFoundation/Site Work Code Requirements
Q: What is a Foundation Only permit and why did I receive one when I filed for a full Building Permit? All Building Permits for new construction and additions are reviewed for zoning compliance. This review
More informationtechie-touch.blogspot.com www.vidyarthiplus.com CE2305 FOUNDATION ENGINEERING 2 MARKS QUESTIONS & ANSWERS 16 MARKS QUESTIONS UNIT -1 1. What are components of total foundation settlement? elastic settlement,
More informationAddendum 1 - Appendix A - 1 of 22
Addendum 1 - Appendix A - 1 of 22 Erdman Anthony of Florida, Inc. August 1, 2007 1402 Royal Palm Beach Boulevard Building 500 Royal Palm Beach, Florida 33411 Attention: Subject: Ms. Dana I. Gillette, P.E.,
More informationRock Creek Apartments Wheatland, WY
Subsurface Exploration and Geotechnical Engineering Report Prepared for: Rock Creek Apartments, LLC C/O Blue Line Development 1004 South Ave West Missoula, MT 59801 Rock Creek Apartments Wheatland, WY
More informationU.S. Army Corps of Engineers Jacksonville District Sediment Quality Control/Quality Assurance Plan For Maintenance Dredging with Beach Placement
U.S. Army Corps of Engineers Jacksonville District Sediment Quality Control/Quality Assurance Plan For Maintenance Dredging with Beach Placement Name of Project: Maintenance Dredging AIWW Vicinity Jupiter
More informationFOR. by The Structural Committee of The Foundation Performance Association Houston, Texas. Document # FPA-SC-04-0
Issued for Website Publishing Foundation Performance Association Structural Committee Page 1 of 9 RECOMMENDED PRACTICE FOR GEOTECHNICAL EXPLORATIONS AND REPORTS by The Structural Committee of The Foundation
More informationKing County Uses Trenchless Methods to Construct a Large Siphon Under Seattle s Ship Canal
North American Society for Trenchless Technology (NASTT) NASTT s 2013 No-Dig Show Sacramento, California March 3-7, 2013 TA-T1-03 King County Uses Trenchless Methods to Construct a Large Siphon Under Seattle
More informationGROUND IMPROVEMENT USING DYNAMIC REPLACEMENT FOR NCIG CET3 COAL STOCKYARD
FOR NCIG CET3 COAL STOCKYARD Charles CH Chua 1, Ming Lai 2, Graeme Hoffmann 2 and Brett Hawkins 1 1 Connell Hatch, Australia, 2 Keller Ground Engineering Pty Ltd ABSTRACT This paper presents an overview
More informationCHAPTER 7 PAVEMENT DESIGN. 1. Gradation (sieve and hydrometer analysis) 3. Moisture density relationships and curves
CHAPTER 7 PAVEMENT DESIGN 7.0 GENERAL The purpose of this chapter is to define the requirements for design of pavement within proposed and existing roadways for new subdivision streets and secondary roads.
More information