Environmental Impact Assessment (Updated) IND: Bihar New Ganga Bridge Project (Annexes)

Size: px
Start display at page:

Download "Environmental Impact Assessment (Updated) IND: Bihar New Ganga Bridge Project (Annexes)"

Transcription

1 Environmental Impact Assessment (Updated) September 2017 IND: Bihar New Ganga Bridge Project (Annexes) Prepared by Bihar State Road Development Corporation Limited, Government of Bihar for the Asian Development Bank.

2 Annex ANNEX 1: RAPID ENVIRONMENTAL ASSESSMENT (REA) CHECKLIST Rapid Environmental Assessment (REA) Checklist Country/Project Title: India/ Bihar Ganga Bridge Project Sector Division: SARD -SATC Screening Questions Yes No Remarks A. Project Siting Is the project area adjacent to or within any of the following environmentally sensitive areas? Cultural heritage site X It has been observed that no archaeological site or monument and cultural heritage site exists close to highway. Protected Area X Wetland X Mangrove X Estuarine X At the middle of the project is the Raghopur Diara formed by the Ganga River. Buffer zone of protected area X Special area for protecting biodiversity X B. Potential Environmental Impacts Will the Project cause encroachment on historical/cultural areas; X disfiguration of landscape by road embankments, cuts, fills, and quarries? encroachment on precious ecology (e.g. sensitive or protected areas)? X The entire Ganga River is a known habitat of the endangered Gangetic Dolphin (Platanista gangetica ssp. Gangetic) alteration of surface water hydrology of waterways crossed by roads, resulting in increased sediment in streams affected by increased soil erosion at construction site? deterioration of surface water quality due to silt runoff and sanitary wastes from worker-based camps and chemicals used in construction? increased local air pollution due to rock crushing, cutting and filling works, and chemicals from asphalt processing? risks and vulnerabilities related to occupational health and safety due to physical, chemical, biological, and radiological hazards during project construction and operation during project construction and operation? noise and vibration due to blasting and other civil works? X X X X X About 709 trees will be cleared (Annex 4) There is potential risk to increase siltation and change in flow at the bridge foundations along the two streams of the Ganga River and discharge points of drainage canals leading to the Ganga River. All wastewater from the construction camps should be treated to meet surface water quality standards prior to disposal. Short-term increase in dust from rock crusher, materials handling and storage, and cement plants. The scale of the work required will expose a large number of workers to hazardous working conditions in terms of noise, dust, and working on elevated and confined spaces, handling hot works, and co-location of heavy equipment with work areas. No blasting is required but pile driving will create substantial noise and vibration. At the plant site the sources of noise will be: stone crushing, asphalt production plant and batching plants, diesel generators. At the work zones, community residing near to the work zones from temporary construction activities. dislocation or involuntary resettlement of people? X As per the Land Acquisition Plan (LAP) dislocation and compulsory resettlement of people living in right-of-way? X prepared for the project, hectares of land will be required for the project.

3 233 Annex 1 Screening Questions Yes No Remarks disproportionate impacts on the poor, women and children, Indigenous Peoples or other vulnerable groups? X None expected. other social concerns relating to inconveniences X in living conditions in the project areas that may trigger cases of upper respiratory problems and stress? implemented. hazardous driving conditions where construction interferes with pre-existing roads? poor sanitation and solid waste disposal in construction camps and work sites, and possible transmission of communicable diseases (such as STI's and HIV/AIDS) from workers to local populations? creation of temporary breeding habitats for diseases such as those transmitted by mosquitoes and rodents? accident risks associated with increased vehicular traffic, leading to accidental spills of toxic materials? increased noise and air pollution resulting from traffic volume? increased risk of water pollution from oil, grease and fuel spills, and other materials from vehicles using the road? social conflicts if workers from other regions or countries are hired? large population influx during project construction and operation that causes increased burden on social infrastructure and services (such as water supply and sanitation systems)? risks to community health and safety due to the transport, storage, and use and/or disposal of materials such as explosives, fuel and other chemicals during construction and operation? community safety risks due to both accidental and natural causes, especially where the structural elements or components of the project are accessible to members of the affected community or where their failure could result in injury to the community throughout project construction, operation and decommissioning. X X X X The alluvial soil is prone to re-suspension from unpaved road travel and wind erosion. Adequate dust suppression must be The bridge approaches links to existing roads of NH-30 (diverted) near Didargunj, Patna- Mokana Road ROB, and along NH-103 towards Hazipur and Mehnar. Several construction camps will house skilled workers increasing the risk of communicable disease transmission. The civil works contract will compel the contractors to link with state health programs to control diseases. The nearness of the construction area to a major river and the need for substantial borrow area increase the risk of producing habitats for mosquitoes. In compliance to FIDIC provision, the contractors will be required to provide sanitary and hygienic camps including pest control as approved by local health offices. As diverted traffic from the existing MG Bridge will use the new bridge, the risk of accident and spills will also increase. The project operators capacity to respond to contingent events must be enhanced. X During construction temple at Chainage is adjacent to road edge. Noise advisories, speed brakes, and noise barriers will be required. During operation stage, permanent noise barriers may be required to be constructed. X X X X X Discounting major accidents, oil and heavy metals discharges from road users are minimal and in trace amounts. Sourcing of labourers within the city and state will be prioritized to reduce the number of migrant workers and the size of construction camp. Not expected as only skilled workers will be brought by the contractor and majority of the labourers will be sourced from the City. Other than fuel and lubricants, there are hazardous materials that are needed in the construction of the bridge. Accidental spots can be reduced by correcting the curves, improvement of junctions, and complying with design standards for the ROB.

4 Annex A Checklist for Preliminary Climate Risk Screening Country/Project Title: Sector : Subsector: Division/Department: Location and Design of project Materials and Maintenance Performance of project outputs creening Questions Score Remarks 1 Is siting and/or routing of the project (or its components) likely to be affected by climate conditions including extreme weather related events such as floods, droughts, storms, landslides? Would the project design (e.g. the clearance for bridges) need to consider any hydro-meteorological parameters level, (e.g., sea-peak river flow, reliable water level, peak wind speed etc.)? Would weather, current and likely future climate conditions(e.g. prevailing humidity level, temperature contrast between hot summer days and cold winter days, exposure to wind and humidity hydro-meteorological parameters likely affect the selection of project inputs over the life of project outputs (e.g. construction material)? Would weather, current and likely future climate conditions, and related extreme events likely affect the maintenance (scheduling and cost) of project output(s)? Would weather/climate conditions, and related extreme events likely affect the performance (e.g. annual power production) of project output(s) (e.g. hydro-power generation facilities) throughout their design life time? Options for answers and corresponding score are provided below: 2 The preferred alignment was based, among others, on channel stability. 2 The embankment and bridge heights were based on HFL and navigational requirements. 0 Predicted change in climate based on Climate Wizard would not affect construction materials selection. 1 Siltation of the two channels will increase maintenance cost for navigation. The diara has history of breaching. 0 Unlikely Response Not Likely 0 Likely 1 Very Likely 2 Score Responses when added that provide a score of 0 will be considered low risk project. If adding all responses will result to a score of 1-4 and that no score of 2 was given to any single response, the project will be assigned a medium risk category. A total score of 5 or more (which include providing a score of 1 in all responses) or a 2 in any single response, will be categorized as high risk project. Result of Initial Screening (Low, Medium, High): HIGH

5 235 Annex 1 Other Comments: Prepared by: 1 If possible, provide details on the sensitivity of project components to climate conditions, such as how climate parameters are considered in design standards for infrastructure components, how changes in key climate parameters and sea level might affect the siting/routing of project, the selection of construction material and/or scheduling, performances and/or the maintenance cost/scheduling of project outputs.

6 Annex ANNEX 2: COMPARISON OF WB AND GOI AMBIENT AIR QUALITY STANDARDS A comparison between the ambient air quality requirements between the World Bank (WB) Environment, Health and Safety (EHS) guidelines and the National Ambient Air Quality standards (NAAQS) under the Air (Prevention and Control of Pollution) Act, 1981 of GOI as given in table below shows that the NAAQS has requirements on three more parameters (Pb, Co and NH 3) in comparison to the WB EHS. The NAAQS has differentiated standards for two types of areas: i) industrial, residential, rural and other areas and ii) ecologically sensitive areas. The WB EHS has guidelines values which are the required standards but allows for gradual compliance to the guideline values through staged interim targets. Most WB EHS guideline requirements are more stringent than NAAQS except for the NO 2 one-year average in ecologically sensitive areas where the NAAQS requirements are more stringent. Ambient Air Quality Parameter Table A2. 1: Ambient Air Quality standards of WB EHS Vs. the GOI NAAQS Averaging WB Guideline Value Period GOI Standards for Industrial, Residential, Rural and Other Areas GoI Ecologically Sensitive Area (notified by Central Government) Sulfur dioxide 24-hr 125 (Interim target 1) (SO2) (ug/m3) 50 (Interim target 2) 20 (guideline) min 500 (guideline) Annual None Nitrogen 1 Year 40 (guideline) dioxide (NO2) 24 Hour None (µg/m 3 ) 1 Hour 200 (guideline) PM10 1 Year 70 (Interim target 1) (µg/m 3 ) 50 (Interim target 2) 30 (Interim target 3) 20 (guideline) hr 150 (Interim target 1) 100 (Interim target 2) 75 (Interim target 3) 50 (guideline) PM2.5 (µg/m 3 ) 1 year 35 (Interim target 1) 25 (Interim target 2) 15 (Interim target 3) 10 (guideline) Hour 75 (Interim target 1) 50 (Interim target 2) 37.5 (Interim target 3) 25 (guideline) Ozone (O3) 8-hr daily max 160 (Interim target 1) (µg/m 3 ) 100 (guideline) Lead (Pb) Annual µg/m 3 ) Carbon Monoxide (CO) µg/m 3 Ammonia (NH3) µg/m 3 24 hours hours hour Annual hours

7 237 Annex 3 ANNEX 3: COMPARISON OF WB EHS AND GOI AMBIENT NOISE LEVEL STANDARDS A comparison on noise level requirements between the WB EHS guidelines and the NAAQS under the Air (Prevention and Control of Pollution) Act, 1981 of GOI as given in table B shows that the required levels are equal for residential, institutional and educational areas. The NAAQS requirements for commercial areas are more stringent while the WB EHS requirement for daytime noise in industrial area is more stringent. Table A3.1: Ambient Noise level standards of WB EHS Vs. the GOI NAAQS Receptor WB EHS GOI NAAQS Daytime Nighttime Daytime Nighttime 7:00-22:00 22:00-7:00 6: :00-6:00 Residential Institutional; educational None None Industrial Commercial Silence Zone None None 50 40

8 Annex 3a 238 ANNEX 3A. INDIAN STANDARD DRINKING WATER SPECIFICATION: IS 10500:1991 Sl. Permissible Substance/ Characteristic Desirable Limit No. limit Remarks 1 Colour, Hazen units, Max 5 25 Extended to 25 if toxic substance are not suspected in absence of alternate sources 2 Odour Unobjectionable a) Test cold and when heated b) Test at several dilution 3 Taste Agreeable Test to be conducted only after safety has been established 4 Turbidity NTU, Max ph value 6.5 to 8.5 No relaxation 6 Total Hardness (as CaCO mg/lit) 7 Iron (as Fe mg/lit, Max Chlorides (as Cl mg/lit Max Residual Free Chlorine, mg/lit Max 0.2 To be applicable only when water is chlorinated. Treated at consumer end. When protection against viral infection is required, it should be Min 0.5 mg/lit 10 Dissolved Solids mg/l, Max Calcium (as Ca) mg/l, Max Copper (as Cu) mg/l, Max Manganese (Mn) mg/l Max Sulphate (As SO4), Max May be extended up to 400 provided (as Mg) does not exceed Nitrate (as NO3) mg/l, Max Fluoride (as F) mg/l, Max Phenolic Compounds (as C6H6OH) mg/l Max 18 Arsenic (as As mg/l 0.05 No relaxation To be tested when pollution is suspected 19 Lead (as Pb) mg/l 0.05 No relaxation 20 Anionic Detergents (as MBAS) mg/l 21 Chromium (as Cr) mg/l To be tested when pollution is suspected 22 Mineral Oil mg/l Alkalinity mg/l Total Coliform 95% of the sample should not contain coliform in 100 ml. 10 coliform /100 ml

9 239 Annex 4 ANNEX 4: DETAILS OF TREES TO BE CUT A: Details of Trees to be cut along Chainage km to S.No Chainage RHS LHS Total Number Remarks TO Main Alignment TO Main Alignment TO Main Alignment TO Main Alignment TO Main Alignment TO Junction Circle Point TO Junction State Portion TO Main Alignment B. Details of Trees to be cut along Chainage km to S. No. Utility /Inventory Easting Northing Offset (-LHS/ +RHS) Chainage Girth of the tree (m) (m) 1 Tree mm 2 Tree mm 3 Tree mm 4 Tree mm 5 Tree mm 6 Tree mm 7 Tree mm 8 Tree mm 9 Tree mm 10 Tree mm 11 Tree mm 12 Tree mm 13 Tree mm 14 Tree mm 15 Tree mm 16 Tree mm 17 Tree mm 18 Tree mm 19 Tree mm 20 Tree mm 21 Tree mm 22 Tree mm 23 Tree mm 24 Tree mm 25 Tree mm 26 Tree mm 27 Tree mm 28 Tree mm 29 Tree mm 30 Tree mm 31 Tree mm 32 Tree mm 33 Tree mm 34 Tree mm 35 Tree mm

10 Annex S. No. Utility /Inventory Easting Northing Offset (-LHS/ +RHS) Chainage Girth of the tree (m) (m) 36 Tree mm 37 Tree mm 38 Tree mm 39 Tree mm C. Details of Trees to be cut along Chainage km to S. No. Utility /Inventory Easting Northing OFFSET (- LHS/ +RHS) Chainage Girth of the tree 1. Tree mm 2. Tree mm 3. Tree mm 4. Tree mm 5. Tree mm 6. Tree mm 7. Tree mm 8. Tree MM 9. Tree MM 10. Tree mm 11. Tree mm 12. Tree Tree mm 14. Tree mm 15. Tree mm 16. Tree mm 17. Tree mm 18. Tree mm 19. Tree mm 20. Tree mm 21. Tree mm 22. Tree mm 23. Tree mm 24. Tree mm 25. Tree mm 26. Tree mm 27. Tree mm 28. Tree mm 29. Tree mm 30. Tree mm 31. Tree mm 32. Tree mm 33. Tree mm 34. Tree mm 35. Tree mm 36. Tree mm 37. Tree mm 38. Tree mm 39. Tree mm 40. Tree mm 41. Tree mm

11 241 Annex 4 S. No. Utility /Inventory Easting Northing OFFSET (- LHS/ +RHS) Chainage Girth of the tree 42. Tree mm 43. Tree mm 44. Tree mm 45. Tree mm 46. Tree mm 47. Tree mm 48. Tree mm 49. Tree mm 50. Tree mm 51. Tree mm 52. Tree mm 53. Tree mm 54. Tree mm 55. Tree mm 56. Tree mm 57. Tree mm 58. Tree mm 59. Tree mm 60. Tree mm 61. Tree mm 62. Tree mm 63. Tree mm 64. Tree mm 65. Tree mm 66. Tree mm 67. Tree mm 68. Tree mm 69. Tree mm 70. Tree mm 71. Tree mm 72. Tree mm 73. Tree mm 74. Tree mm 75. Tree mm 76. Tree mm 77. Tree mm 78. Tree mm 79. Tree mm 80. Tree mm 81. Tree mm 82. Tree mm 83. Tree mm 84. Tree mm 85. Tree mm 86. Tree mm 87. Tree mm 88. Tree mm 89. Tree mm 90. Tree mm 91. Tree mm 92. Tree mm 93. Tree mm

12 Annex S. No. Utility /Inventory Easting Northing OFFSET (- LHS/ +RHS) Chainage Girth of the tree 94. Tree mm 95. Tree mm 96. Tree mm 97. Tree mm 98. Tree mm 99. Tree mm 100. Tree mm 101. Tree mm 102. Tree mm 103. Tree mm 104. Tree mm 105. Tree mm 106. Tree mm 107. Tree mm 108. Tree mm 109. Tree mm 110. Tree mm 111. Tree mm 112. Tree mm 113. Tree mm 114. Tree mm 115. Tree mm 116. Tree mm 117. Tree mm 118. Tree mm 119. Tree mm 120. Tree mm 121. Tree mm 122. Tree mm 123. Tree mm 124. Tree mm 125. Tree mm 126. Tree mm 127. Tree mm 128. Tree mm 129. Tree mm 130. Tree mm 131. Tree mm 132. Tree mm 133. Tree mm 134. Tree mm 135. Tree mm 136. Tree mm 137. Tree mm 138. Tree mm 139. Tree mm 140. Tree mm 141. Tree mm 142. Tree mm 143. Tree mm 144. Tree mm 145. Tree mm

13 243 Annex 4 S. No. Utility /Inventory Easting Northing OFFSET (- LHS/ +RHS) Chainage Girth of the tree 146. Tree mm 147. Tree mm 148. Tree mm 149. Tree mm 150. Tree mm 151. Tree mm 152. Tree mm 153. Tree mm 154. Tree mm 155. Tree mm 156. Tree mm 157. Tree mm 158. Tree mm 159. Tree mm 160. Tree mm 161. Tree mm 162. Tree mm 163. Tree mm 164. Tree mm 165. Tree mm 166. Tree mm 167. Tree mm 168. Tree mm 169. Tree mm 170. Tree mm 171. Tree mm 172. Tree mm 173. Tree mm 174. Tree mm 175. Tree mm 176. Tree mm 177. Tree mm 178. Tree mm 179. Tree mm 180. Tree mm 181. Tree mm 182. Tree mm 183. Tree mm 184. Tree mm 185. Tree mm 186. Tree mm 187. Tree mm 188. Tree mm 189. Tree mm 190. Tree mm 191. Tree mm 192. Tree mm 193. Tree mm 194. Tree mm 195. Tree mm 196. Tree mm 197. Tree mm

14 Annex S. No. Utility /Inventory Easting Northing OFFSET (- LHS/ +RHS) Chainage Girth of the tree 198. Tree mm 199. Tree mm 200. Tree mm 201. Tree mm 202. Tree mm 203. Tree mm 204. Tree mm 205. Tree mm 206. Tree mm 207. Tree mm 208. Tree mm 209. Tree mm 210. Tree mm 211. Tree mm 212. Tree mm 213. Tree mm 214. Tree mm 215. Tree mm 216. Tree mm 217. Tree mm 218. Tree mm 219. Tree mm 220. Tree mm 221. Tree mm 222. Tree mm 223. Tree mm 224. Tree mm 225. Tree mm 226. Tree mm 227. Tree mm 228. Tree mm 229. Tree mm 230. Tree mm 231. Tree mm 232. Tree mm 233. Tree mm 234. Tree mm 235. Tree mm 236. Tree mm 237. Tree mm 238. Tree mm 239. Tree mm 240. Tree mm 241. Tree mm 242. Tree mm 243. Tree mm 244. Tree mm 245. Tree mm 246. Tree mm 247. Tree mm 248. Tree mm 249. Tree mm

15 245 Annex 4 S. No. Utility /Inventory Easting Northing OFFSET (- LHS/ +RHS) Chainage Girth of the tree 250. Tree mm 251. Tree mm 252. Tree mm 253. Tree mm 254. Tree mm 255. Tree mm 256. Tree mm 257. Tree mm 258. Tree mm 259. Tree mm 260. Tree mm 261. Tree mm 262. Tree mm 263. Tree mm 264. Tree mm 265. Tree mm 266. Tree mm 267. Tree mm 268. Tree mm 269. Tree mm 270. Tree mm 271. Tree mm 272. Tree mm 273. Tree mm 274. Tree mm 275. Tree mm 276. Tree mm 277. Tree mm 278. Tree mm 279. Tree mm 280. Tree mm 281. Tree mm 282. Tree mm 283. Tree mm 284. Tree mm 285. Tree mm 286. Tree mm 287. Tree mm 288. Tree mm 289. Tree mm 290. Tree mm 291. Tree mm 292. Tree mm 293. Tree mm 294. Tree mm 295. Tree mm 296. Tree mm 297. Tree mm 298. Tree mm 299. Tree mm 300. Tree mm 301. Tree mm

16 Annex S. No. Utility /Inventory Easting Northing OFFSET (- LHS/ +RHS) Chainage Girth of the tree 302. Tree mm 303. Tree mm 304. Tree mm 305. Tree mm 306. Tree mm 307. Tree mm 308. Tree mm 309. Tree mm 310. Tree mm 311. Tree mm 312. Tree mm 313. Tree mm 314. Tree mm 315. Tree mm 316. Tree mm 317. Tree mm 318. Tree mm 319. Tree mm 320. Tree mm 321. Tree mm 322. Tree mm 323. Tree mm 324. Tree mm 325. Tree mm 326. Tree mm 327. Tree mm 328. Tree mm 329. Tree mm 330. Tree mm 331. Tree mm 332. Tree mm 333. Tree mm 334. Tree mm 335. Tree mm 336. Tree mm 337. Tree mm 338. Tree mm 339. Tree mm 340. Tree mm 341. Tree mm 342. Tree mm 343. Tree mm 344. Tree mm 345. Tree mm 346. Tree mm 347. Tree mm 348. Tree mm 349. Tree mm 350. Tree mm 351. Tree mm 352. Tree mm 353. Tree mm

17 247 Annex 4 S. No. Utility /Inventory Easting Northing OFFSET (- LHS/ +RHS) Chainage Girth of the tree 354. Tree mm 355. Tree mm 356. Tree mm 357. Tree mm 358. Tree mm 359. Tree mm 360. Tree mm 361. Tree mm 362. Tree mm 363. Tree mm 364. Tree mm 365. Tree mm 366. Tree mm 367. Tree mm 368. Tree mm 369. Tree mm 370. Tree mm 371. Tree mm 372. Tree mm 373. Tree mm 374. Tree mm 375. Tree mm 376. Tree mm 377. Tree mm 378. Tree mm 379. Tree mm 380. Tree mm 381. Tree mm 382. Tree mm 383. Tree mm 384. Tree mm 385. Tree mm 386. Tree mm 387. Tree mm 388. Tree mm 389. Tree mm 390. Tree mm 391. Tree mm 392. Tree mm 393. Tree mm 394. Tree mm 395. Tree mm 396. Tree mm 397. Tree mm 398. Tree mm 399. Tree mm 400. Tree mm 401. Tree mm 402. Tree mm 403. Tree mm 404. Tree mm 405. Tree mm

18 Annex S. No. Utility /Inventory Easting Northing OFFSET (- LHS/ +RHS) Chainage Girth of the tree 406. Tree mm 407. Tree mm 408. Tree mm 409. Tree mm 410. Tree mm 411. Tree mm 412. Tree mm 413. Tree mm 414. Tree mm 415. Tree mm 416. Tree mm 417. Tree mm 418. Tree mm 419. Tree mm 420. Tree mm 421. Tree mm 422. Tree mm 423. Tree mm 424. Tree mm 425. Tree mm 426. Tree mm 427. Tree mm 428. Tree mm 429. Tree mm 430. Tree mm 431. Tree mm 432. Tree mm 433. Tree mm 434. Tree mm 435. Tree mm 436. Tree mm 437. Tree mm 438. Tree mm 439. Tree mm 440. Tree mm 441. Tree mm 442. Tree mm 443. Tree mm 444. Tree mm 445. Tree mm 446. Tree mm 447. Tree mm 448. Tree mm 449. Tree mm 450. Tree mm 451. Tree mm 452. Tree mm 453. Tree mm 454. Tree mm 455. Tree mm 456. Tree mm 457. Tree mm

19 249 Annex 4 S. No. Utility /Inventory Easting Northing OFFSET (- LHS/ +RHS) Chainage Girth of the tree 458. Tree mm 459. Tree mm 460. Tree mm 461. Tree mm 462. Tree mm 463. Tree mm 464. Tree mm 465. Tree mm 466. Tree mm 467. Tree mm 468. Tree mm 469. Tree mm 470. Tree mm 471. Tree mm 472. Tree mm 473. Tree mm 474. Tree mm 475. Tree mm 476. Tree mm 477. Tree mm 478. Tree mm 479. Tree mm 480. Tree mm 481. Tree mm 482. Tree mm 483. Tree mm 484. Tree mm 485. Tree mm 486. Tree mm 487. Tree mm 488. Tree mm 489. Tree mm 490. Tree mm 491. Tree mm 492. Tree mm 493. Tree mm 494. Tree mm 495. Tree mm 496. Tree mm 497. Tree mm 498. Tree mm 499. Tree mm 500. Tree mm 501. Tree mm 502. Tree mm 503. Tree mm 504. Tree mm 505. Tree mm 506. Tree mm 507. Tree mm 508. Tree Tree mm

20 Annex S. No. Utility /Inventory Easting Northing OFFSET (- LHS/ +RHS) Chainage Girth of the tree 510. Tree mm 511. Tree mm 512. Tree mm 513. Tree Tree mm 515. Tree mm 516. Tree mm 517. Tree mm 518. Tree mm 519. Tree mm 520. Tree mm 521. Tree mm 522. Tree mm 523. Tree mm 524. Tree mm 525. Tree mm 526. Tree mm 527. Tree mm 528. Tree mm 529. Tree mm 530. Tree mm 531. Tree mm 532. Tree mm 533. Tree mm 534. Tree mm 535. Tree mm 536. Tree mm 537. Tree mm 538. Tree mm 539. Tree mm 540. Tree mm 541. Tree mm 542. Tree mm 543. Tree mm 544. Tree mm 545. Tree mm 546. Tree mm 547. Tree mm 548. Tree mm 549. Tree mm 550. Tree mm 551. Tree mm 552. Tree mm 553. Tree mm 554. Tree mm 555. Tree mm 556. Tree mm 557. Tree mm 558. Tree mm 559. Tree mm 560. Tree mm 561. Tree mm

21 251 Annex 4 S. No. Utility /Inventory Easting Northing OFFSET (- LHS/ +RHS) Chainage Girth of the tree 562. Tree mm 563. Tree mm 564. Tree mm 565. Tree mm 566. Tree mm 567. Tree mm 568. Tree mm 569. Tree mm 570. Tree mm 571. Tree mm 572. Tree mm 573. Tree mm 574. Tree mm 575. Tree mm 576. Tree mm 577. Tree mm 578. Tree mm 579. Tree mm 580. Tree mm 581. Tree mm 582. Tree mm 583. Tree mm 584. Tree mm 585. Tree mm 586. Tree mm 587. Tree mm 588. Tree mm 589. Tree mm 590. Tree mm 591. Tree mm 592. Tree mm 593. Tree mm 594. Tree mm 595. Tree mm 596. Tree mm 597. Tree mm 598. Tree mm 599. Tree mm 600. Tree mm 601. Tree bambu 602. Tree mm 603. Tree mm 604. Tree bambu 605. Tree mm 606. Tree mm 607. Tree mm 608. Tree mm 609. Tree mm 610. Tree mm 611. Tree mm 612. Tree mm 613. Tree mm

22 Annex S. No. Utility /Inventory Easting Northing OFFSET (- LHS/ +RHS) Chainage Girth of the tree 614. Tree mm 615. Tree mm 616. Tree mm 617. Tree mm 618. Tree mm 619. Tree mm 620. Tree mm 621. Tree mm 622. Tree mm 623. Tree mm 624. Tree mm 625. Tree mm 626. Tree bambu 627. Tree mm 628. Tree mm 629. Tree mm 630. Tree mm 631. Tree mm 632. Tree mm 633. Tree mm 634. Tree mm 635. Tree mm 636. Tree mm 637. Tree mm 638. Tree mm 639. Tree mm 640. Tree mm 641. Tree mm 642. Tree mm 643. Tree mm 644. Tree mm 645. Tree mm 646. Tree mm 647. Tree mm 648. Tree mm 649. Tree mm 650. Tree mm 651. Tree mm 652. Tree mm 653. Tree mm 654. Tree mm 655. Tree mm 656. Tree mm 657. Tree mm 658. Tree mm 659. Tree mm 660. Tree mm 661. Tree mm 662. Tree mm Note: - Sign indicates LHS while +sing indicates RHS. Total no. of tree cutting involved along the alignment is 709.

23 253 Annex 5 A. Photolog of Consultation ANNEX 5: RECORD OF PUBLIC CONSULTATIONS Conduction of FGD at Baans Tal Village Conduction of FGD at Baans Tal Village Conduction of FGD at Dilawarpur Village Conduction of FGD at Fatehpur Village Conduction of FGD at Mohanpur Village Conduction of FGD at Shyampur Village

24 Annex Conduction of FGD at Bishnupur-Telia Village Conduction of FGD at Jamalpur Chakshankar Village Conduction of FGD at Kalyanpur Village Conduction of FGD at Karampur Village Conduction of FGD at Kanpur Pakri Village Conduction of FGD at Nizampur-Sabalpur Village

25 255 Annex 5 Conduction of FGD at Rustampur Village Conduction of FGD at Saifabad Village Awareness programme regarding social and environmental issues at Himmatpur Village in June 2016 Consultation meeting regarding project process with villagers at BSRDCL office in January 2017 Awareness programme regarding social and environmental issues at Rustampur Village in March 2017 Awareness programme regarding social and environmental issues at Jamalpur School in April 2017

26 Annex B. Attendance Sheets of FGDs i. List of Participants in FGD at Baans Tal Village

27 257 Annex 5

28 Annex ii. List of Participants in FGD at Diwalapur Village

29 259 Annex 5 iii. List of Participants in FGD at Fatehpur Village

30 Annex iv. List of Participants in FGD at Mohanpur Village

31 261 Annex 5

32 v. List of Participants in FGD at Shyampur Village Annex 5 262

33 263 Annex 5

34 Annex vi. List of Participants in FGD at Bishnupur Telia

35 265 Annex 5 vii. List of Participants in FGD at Jamalpur Chakshankar

36 Annex 5 266

37 267 Annex 5 viii. List of Participants in FGD at Kalyanpur

38 Annex 5 268

39 269 Annex 5 ix. List of Participants in FGD at Karampur

40 Annex 5 270

41 271 Annex 5 x. List of Participants in FGD at Khanpur Pakri

42 Annex 5 272

43 273 Annex 5 xi. List of Participants in FGD at Nizampur-Sabalpur Village

44 Annex xii. List of Participants in FGD at Rustampur Village

45 275 Annex 5

46 Annex xiii. List of Participants in FGD at Saifabad

47 277 Annex 5

48 Annex Environmental Issue/ Component Avoidance/Mitigation/ Compensation Measures ANNEX 6: ENVIRONMENTAL MANAGEMENT PLAN Referenc e to laws/ guideline Location indicators (MI)/ Performance Target (PT) Methods A. DESIGN AND PRE-CONSTRUCTION STAGE 1. Establishment of Contractors Environmental Management System 1.1 Establishment of Upon contract award, Environmental Contractors shall be Management advised by BSRDCL on the System EMP requirements. 1.2 Conduction of further studies and The Contractor, before the start of physical works shall prepare an Environmental Management System that outlines the minimum environmental management requirements for the implementation of the Project. Contractor s conduct monthly coordination meetings on environment safeguards. Records on all such meetings will be systematically maintained On a weekly basis as a minimum, environmental communications shall be delivered by the contractor to its workers to present information on the management of environmental risks or key site environmental issues. Since the EPC contractor will prepare the detailed MI: No later than 60 days from NTP these activities shall be initiated and completed before the start of physical works on site. PT: CA clear and robust Environment Management System approved by PMAE and BSRDCL is in place at least 2 months before the start of physical works on site MI: Updated EIA report Review the Contractors Environment al Managemen t System Review the updated Mitigation Costs Part of contractor s costs Part of contractor s Institutional Responsibility Implementation Supervision Contractor Contractor BSRDCL PMAE, BSRDCL

49 279 Annex 6 Environmental Issue/ Component investigations Avoidance/Mitigation/ Compensation Measures design of the bridge and approach roads and bridge end facilities, the contractor will do the following: 1) Update the EIA report and EMP to include information on design changes, further details of the design, additional information such as on the exact location of the construction camps, quarry and borrow areas and construction material haul routes, access routes to the diara etc. 2) Conduct further hydrological investigations to ensure accurate design of bridge foundation, stabilization and protection works on the diara (see item 5.1 below). Incorporate findings of such investigations in the updated EMP 3) Incorporate findings of the biodiversity baseline study that will be conducted by the External Monitor for Environment Safeguards in the EIA report 4) Reconfirm the number and location of Referenc e to laws/ guideline Location indicators (MI)/ Performance Target (PT) with further details on exact location and size of construction camps; quarries, borrow areas and construction material haul routes; access routes to the diara; additional hydrology studies; findings of baseline biodiversity study that will be prepared by the External Monitor for Environment Safeguards PT: Update EIA is finalized and approved by the PMAE and BSRDCL before start of the construction works for the main bridge Methods EIA and Baseline Biodiversity study report Mitigation Costs costs Institutional Responsibility Implementation Supervision

50 Annex Environmental Issue/ Component 1.3 Contractor Personnel and Resources Avoidance/Mitigation/ Compensation Measures sensitive receptor (school, religious center, residential building) for air pollution and noise levels and in case where air quality and noise level exceed GOI, WB-EHS limits design appropriate mitigation measures where feasible 5) Coordinate with the respective Archaeological Survey of India Authority if any archaeological or historical artifacts are found. 6) Conduct other studies and investigations as found necessary after reviewing the EIA report and site conditions 7) Collect baseline (preconstruction) data on the air, water and soil quality and noise levels on the construction camp sites, construction sites and approach roads The Contractor shall appoint an on- and off-site environmental representative(s) and alternates who shall be familiar with EMP, legal and other requirements. The Referenc e to laws/ guideline Location indicators (MI)/ Performance Target (PT) and approach roads. MI Nomination of environmental persons. PT Methods Site inspection and discussion with contractor s staff Mitigation Costs Included in Contractors manpower costs Institutional Responsibility Implementation Supervision Contractor PMAE, BSRDCL

51 281 Annex 6 Environmental Issue/ Component 1.4 Contractors training and awareness raising programs Avoidance/Mitigation/ Compensation Measures Contractor appointed environmental representative shall ensure that the environmental requirements set in this document are adequate, relevant and understood by the contractor s management team and supervisors for effective communication to workgroups. He/she will be responsible for implementation and monitoring compliance with, the contractor Environmental Management Plan (EMP). All personnel working for or on behalf of the Contractor shall receive a Project site induction delivered by the Company Representative, including an environmental induction, prior to commencing work on site. The Contractor must organize a Construction Risk Assessment Workshop (CRAW), detailing how specific environmental risks associated with their Scope of Work will be managed, legal compliance, inspection and audits, and progress tracking and reporting. At the completion of the CRAW, the contractor will Referenc e to laws/ guideline Location indicators (MI)/ Performance Target (PT) Environment persons are present on all active construction sites always MI: Records of topics, records of attendance and presenter s name PT:CRAW, site induction and at least one health and safety training conducted before start of physical construction works Methods Review CRAW report, attendance sheets, certificate for all ground breaking activity Mitigation Costs Institutional Responsibility Implementation Supervision

52 Annex Environmental Issue/ Component Avoidance/Mitigation/ Compensation Measures incorporate any additional environmental controls / management requirements identified into the EMP. Referenc e to laws/ guideline Location indicators (MI)/ Performance Target (PT) Methods Mitigation Costs Institutional Responsibility Implementation Supervision All personnel shall be required to undergo a Project site induction that includes the environmental requirements of the Project. Contractor site management, supervisors and all environmental persons including the BSRDC Environment and Resettlement Officers and other nominated environmental representative shall undergo a Health and Safety (Leaders) Awareness Course, which details general environmental awareness and specific performance requirements expected on site. 1.5 Preparation of sub-plans All workers shall be trained on spill response. The contractor shall maintain spill response kits in all worksites. Before the start of physical works on site and establishment of camps, the following sub-plans will be submitted by the contractor to the PMAE for MI: All required subplans are ready and available in the campsite Review of subplans Part of contractor s costs Contractor PMAE, BSRDCL

53 283 Annex 6 Environmental Issue/ Component 2.1 Design of approach road. Design type (high embankment or viaduct type or others) can create problems of soil erosion, poor Avoidance/Mitigation/ Compensation Measures approval: 1) Camp layout and management plan 2) Borrow area management plan (see Annex 9 for guidance) 3) Traffic management plan 4) Hauling route management plan for transporting construction materials from borrow areas and quarries 5) Occupational Health and safety plan 6) Emergency management plan (see Annex 10 for guidance) 7) Waste disposal and management plan (see Annex 11 for guidance) 8) Construction material storage and handling plan (see Annex 17 for guidance) 9) Tree plantation plan A viaduct type of design with elevated road supported by piers is recommended over a solid embankment type design to avoid and minimize problems of soil erosion, dust, road safety, Referenc e to laws/ guideline Design requirement Location indicators (MI)/ Performance Target (PT) PT: All subplans are approved by PMAE and BSRDCL before the start of the respective activity (Example: Camp layout plan is approved before establishment of camp) 2. Design and Planning of Approach roads Approach MI: Final design roads on the that will be northern adopted along and with southern justifications side of main and rationale bridge behind selecting the respective Methods Review of existing preliminary design, conduction of field assessment s and Mitigation Costs To be included in EPC contractor s costs Institutional Responsibility Implementation Supervision Contractor BSRDCL and PMAE

54 Annex Environmental Issue/ Component drainage, worsen flooding, road safety issues, negatively affect nearby agricultural fields and create a barrier for people and domestic animals and wildlife. 2.2 Land acquisition and livelihood loss to affected persons Avoidance/Mitigation/ Compensation Measures drainage, creating barrier for agricultural activities, people, domestic animals and wildlife. The road ROW must be designed to meet the minimum standard requirements and avoid unnecessary acquisition of land. Appropriate compensation or lost land will be paid in accordance with the Land Act of the GOI and the ADB SPS as provided in the Resettlement Plan Referenc e to laws/ guideline The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013.and ADB s involuntary resettlement policy. Contract Clause for preference to local people during employment. Location Approach road location in Kachhi Dargah village (southern side) and Bidupur village (northern side) indicators (MI)/ Performance Target (PT) design PT: Final design will include provisions for mitigating issues of soil erosion, drainage, road safety and minimizing barrier effect for agricultural activities, people, domestic animals and wildlife MI: Payment of compensation and assistance to DPs as per RP Number of complaints/gri evances related to compensation and resettlement PT: Minimal number of complaints/gri evances. All cases of resettlement and Methods preparation of detailed design Check LA records; design drawings vs land plans; Interview with affected persons Check status of employme nt given to local people during constructio n Mitigation Costs Included under project budget for resettlemen t Institutional Responsibility Implementation Supervision BSRDCL and Resettlement NGO BSRDCL, PMAE

55 285 Annex 6 Environmental Issue/ Component Avoidance/Mitigation/ Compensation Measures 3. Design and planning of the main bridge 3.1 Land acquisition The access routes and livelihood loss connecting the road in the to affected persons diara to the main bridge in diara must be designed to meet the minimum standard requirements and avoid unnecessary acquisition of land. 3.2 Impacts on wildlife Gangetic Dolphin, Gangetic Appropriate compensation or lost land will be paid in accordance with the Land Act of the GOI and the ADB SPS as provided in the Resettlement Plan The bridge design must consider having none or minimal impacts on the Referenc e to laws/ guideline The Right to Fair Compensatio n and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, and ADB s Involuntary Resettlement policy. Location Raghopur diara Bridge alignment in the Ganga indicators (MI)/ Performance Target (PT) rehabilitation if any are resolved at GRC level. No case referred to arbitrator or court. MI: Payment of compensation and assistance to DPs as per RP Number of complaints/grie vances related to compensation and resettlement PT: Minimal number of complaints/grie vances. All cases of resettlement and rehabilitation if any are resolved at GRC level. No case referred to arbitrator or court. MI: Final design of the bridge. Methods Check LA records; design drawings vs land plans; Interview with affected persons Check status of employment given to local people during construction Review of: design of the bridge Mitigation Costs Included under project budget for resettlement To be included in the EPC Institutional Responsibility Implementation Supervision BSRDCL and implementing NGO Contractor BSRDCL, PMAE PMAE, BSRDCL,

56 Annex Environmental Issue/ Component turtle, gharial and other mammals, migratory birds, fishes, reptiles and benthic organisms Avoidance/Mitigation/ Compensation Measures local biodiversity. Location and spacing of bridge piers must be designed in a manner to avoid key habitat areas such as breeding and feeding grounds, migration routes etc. of key biodiversity species found in the project area such as dolphins, migratory birds, reptiles and others. The schedule or time of construction of the piers and main bridge must avoid to the extent possible key seasonal wildlife activities such as migration and breeding of the Gangetic dolphin, Gangetic turtle, gharial, and migratory birds, reptiles and mammals. Decisions on method of construction and type of technology and equipment to be used must consider the noise and vibration levels and extent of siltation being generated. Noise and vibration levels must be far below levels that can cause injury to dolphins and other wildlife. Construction of piers must include measures to Referenc e to laws/ guideline Location river and Raghopur diara indicators (MI)/ Performance Target (PT) Number of bridge piers falling inside key habitat sites. Schedule of construction activities. Construction method and type of equipment that will be used. Management plan for wildlife sighting. PT: None of the piers should be in key habitat areas. There will be minimal or no overlaps in timing of construction and key seasonal wildlife activities. Noise and vibration levels generated by construction method/equip ment will be far below levels that can cause injury to dolphins and Methods substructure and superstructu re; construction method planned and list of equipment to be used; wildlife sighting plan Mitigation Costs contractor s costs Institutional Responsibility Implementation Supervision External Monitor Ecology

57 287 Annex 6 Environmental Issue/ Component Avoidance/Mitigation/ Compensation Measures contain the siltation to a minimum area within the river as excess siltation can hamper wildlife activities. Appropriate protocols and procedures must be prepared for sighting of dolphins and other endangered wildlife species (migratory birds, reptiles etc.) in the construction zone. The objective of the protocols and procedures must be aimed at having no or minimal impacts on the respective wildlife species. Referenc e to laws/ guideline Location indicators (MI)/ Performance Target (PT) other endangered species. There will be a clear and comprehensive management plan for wildlife sighting. Methods Mitigation Costs Institutional Responsibility Implementation Supervision 4.1 The new bridge and access roads may become a new safety hazard and accident zone if adequate safety features are not included in the design The design must provide proper, safe and easy access for the local people, vehicles and cattle to move from one side of the access roads to another. It must also have safe pedestrian paths on the bridge. Appropriate signages and speed control measures must be provided on the bridge and access roads in accordance with relevant IRC requirements as provided in the next column IRC SP: : Highways Safety Code IRC SP: : Manual on Road Safety Audit IRC SP: : Standard Letters and Numerals of Different Heights for Use on Highways 4. Design of Road Safety Features Main bridge, access roads and junctions with NH30 and NH103 MI: Presence of road safety features in the design of the main bridge and access roads. Easy and safe access facilities provided for local people living on either side of the approach roads Review of road safety features and access routes for local traffic and pedestrians in project design Part of contractor s costs Contractor PMAE and BSRDCL

58 Annex Environmental Issue/ Component Avoidance/Mitigation/ Compensation Measures Referenc e to laws/ guideline IRC SP: : Road Markings IRC SP: : Guidelines for Pedestrian Facilities IRC SP: : Code of Practice for Road Signs Location indicators (MI)/ Performance Target (PT) PT: Road safety features included to minimize interactions between the new bridge traffic and local traffic and pedestrians Methods Mitigation Costs Institutional Responsibility Implementation Supervision 5. Construction camps and yards several construction camps and yards will need to be established under the project for housing the contractor s staff and workers; storage of construction material and equipment, having equipment repair and maintenance and o ther purposes. 5.1 The location and sanitation and waste management of the construction camps and yards may result in problems of noise, dust, air pollution, erosion, siltation and pollution of water bodies nearby Camps must be located at least 500m away from settlement areas and water bodies. There should be no construction camp in designated no-go zones as stated in the EIA, chapter V, section E, para 339 (ie. western end of Raghopur diara, river banks/edges) to avoid impacts on migratory birds, reptiles and other wildlife species. A camp layout plan must be prepared and submitted to the PMAE for their review and approval before starting Design Requirement The Water (Prevention and Control of Pollution) Act,1974an d its amendment s thereof The Building and Other Construction workers (Regulation of Employment and Conditions of service) Construction camp and yard locations in the northern and southern side of the main bridge MI: Distance of the camps and yards from settlements and water bodies. PT: The distance should be a minimum of 500m. No construction camp in nogo zones Review of constructi on camp layout plan To be included in the EPC contractor s costs Contractor PMAE, BSRDCL

59 289 Annex 6 Environmental Issue/ Component Avoidance/Mitigation/ Compensation Measures establishment of the camp sites. Contractors shall clearly delineate the boundary of their lay down areas onsite and install sufficient contractor signage to indicate responsibility for such areas. Referenc e to laws/ guideline Act 1996 Location indicators (MI)/ Performance Target (PT) Methods Mitigation Costs Institutional Responsibility Implementation Supervision 5.2 Livelihood impacts on local people due to need for acquiring or leasing land The construction camps and yards must be sited and planned in a manner to meet minimum requirements and avoid unnecessary acquisition or leasing of land. Budget for appropriate compensation or rental will be set aside to meet requirements of relevant acts and regulations of the GOI and the ADB SPS as provided in the Resettlement Plan. Proper lease agreements with clear terms and conditions must be signed between the contractor and respective land owners. The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, and ADB s involuntary resettlement policy.. Selected areas for establishing construction camps and yards in the northern and southern side of the main bridge MI: Budget amount set aside for payment of compensation and assistance or lease rent Total area of camps and yards. Lease agreement. Number of complaints/grie vances related to compensation and resettlement or leasing of land Check LA records, land plans versus camp layout plan; Interview with affected persons For land acquisition: Included under project budget for resettlement For land leasing: Must be included in the EPC contractor s costs BSRDCL and resettlement NGO for land acquisition Contractor for land leasing BSRDCL, PMAE PT: Minimal number of complaints/grie vances. All cases of resettlement

60 Annex Environmental Issue/ Component Avoidance/Mitigation/ Compensation Measures Referenc e to laws/ guideline Location indicators (MI)/ Performance Target (PT) Methods Mitigation Costs Institutional Responsibility Implementation Supervision and rehabilitation and leasing of land if any are resolved at GRC level. No case referred to arbitrator or court. 6. Managing hydrology, sedimentation and erosion risks protection works will be required in the north and south channel and the diara area in order to ensure the stability of the bridge foundation and piers 6.1 Impacts on the hydrology, sedimentation and erosion patterns of the river 7. Climate Change Risks 7.1 Future climate changes may cause Soil stabilization works on the edges of the two north and south channels and in the diara must consider changes in hydrological flow, current and behavior of the river and must be done in a manner to avoid new problems such as changes in the course of the river, changes in erosion patterns and inundation pattern of the diara etc. Therefore, the contractor must conduct further hydrological studies on expected hydrological patterns of the river and accordingly design the bridge foundation, piers and stabilization works particularly. See para of the EIA report. Recommendations of the climate risk assessment Bridge pier foundation in and piers in the river Raghopur diara Bridge and approach MI: Expected changes in hydrological behavior of river PT: Design of bridge foundation and piers should be able to accommodate future changes in hydrological behavior of river. The design should also have least impact on changing hydrological, sedimentation and erosion patterns of the river MI: climate risks Review of additional hydrological studies, design of soil stabilization works, and design of bridge foundation Review of bridge and To be included in the EPC contractor s costs To be included in Contractor Contractor PMAE, BSRDCL PMAE, BSRDCL

61 291 Annex 6 Environmental Issue/ Component damage to the bridge and approach roads Avoidance/Mitigation/ Compensation Measures section of the Environmental Impact Assessment report must be incorporated in the design of the bridge and approach roads. Further climate change studies maybe carried out as necessary 8. Biodiversity Conservation Plan 8.1 The local biodiversity including the endangered Gangetic dolphin, Gharial, Gangetic turtle and other migratory birds, reptiles and mammals will be affected by the project 9. Cutting of trees 9.1 Need for cutting of trees. The draft biodiversity conservation plan (BCP) given in the EIA report (see Chapter V, section E) must be revised and made elaborated. The BCP must help to enhance the local biodiversity and protect the endangered species on a long term sustainable basis to result in in no net loss of biodiversity in the project area due to the project. Geometric adjustments made to minimize tree cutting. Obtain tree cutting permission from forest department Provision for mandatory compensatory afforestation (1:2) for deposit of payment to Referenc e to laws/ guideline Forest Conservatio n Act, 1980 Location roads location Project influence area Throughout the project area Total number of affected trees=709 Plantation sites along approach indicators (MI)/ Performance Target (PT) considered in bridge and road design PT: Recommenda tion of EIA incorporate and additional studies carried out as necessary MI: BCP PT: Comprehensi ve and clear BCP with activities targeted at conserving endangered species in the project area. MI: Budget amount allocated for compensatory afforestation and additional plantation PT: Budget allocation is adequate, Methods access roads design Review of the BCD Check budget provision for compensat ory afforestatio n and additional plantation. Mitigation Costs EPC contractor s costs To be included under project costs for Biodiversity NGO and external monitoring agencies. To be covered by contractor Institutional Responsibility Implementation Supervision External Monitor for Environment Safeguards or Biodiversity NGO Tree cutting maybe done by contractor under technical guidance of the local Forestry Department PMAE, BSRDCL, External Monitor Ecology, Local Biodiversi ty Experts PMAE, BSRDCL, Local Biodiversi ty Experts

62 Annex Environmental Issue/ Component 10. Shifting of Utilities 10.1 Disruption of utility services to local community 11. Air Quality 11.1 Dust Generation due to construction activities and transport, storage and handling of construction materials Avoidance/Mitigation/ Compensation Measures Forestry Department Provision for additional compensatory plantation on 1: 8 basis to be implemented by contractor All telephone and electrical poles/wires and underground cables should be shifted before start of construction Necessary permission and payments should be made to relevant utility service agencies to allow quick shifting and restoration of utility services Local people must be informed through appropriate means about the time of shifting of utility structures and potential disruption of services if any Transport, loading and unloading of loose and fine materials through covered vehicles. Paved approach roads. Storage areas to be located downwind of Referenc e to laws/ guideline Project requirement MORTH Specification s for Road and Bridge works Air (P and CP) Act Location roads and other areas Along the approach roads on the northern and southern side of the bridge location indicators (MI)/ Performance Target (PT) MI: Number of complaints from local people, number, timing and type of notifications issued to local people, time taken to shift utilities PT: No. of complaints should be 0. Effective and timely notification. Minimal time for utility shifting B. CONSTRUCTION STAGE Crushing plant sites, approach road areas, borrow material storage MI: PM10 level measurements Complaints from locals due to dust PT: PM10 Methods Interaction with concerned utility authorities and local public Standards CPCB methods Observatio ns Public consultatio Mitigation Costs Project costs for utility shifting Included in civil works cost Institutional Responsibility Implementation Supervision Contractor in collaboration with BSRDCL Contractor PMAE, BSRDC L PMAE, BSRDCL

63 293 Annex 6 Environmental Issue/ Component 11.2 Emission of air pollutants (PM10, PM2.5, HC,SO2,NOX,CO, etc) from vehicles due to traffic congestion and use of equipment and machinery Avoidance/Mitigation/ Compensation Measures the habitation area. Water spraying on earthworks, unpaved haulage roads and other dust prone areas. Provision of PPEs to workers. Storage of construction materials to be carried out in accordance with the construction material storage and handling plan Storage areas should be at least 500m from communities Regular maintenance of machinery and equipment. Batching, asphalt mixing plants and crushers at downwind (1km) direction from the nearest settlement. Only crushers licensed by the PCB shall be used DG sets with stacks of adequate height and use of low sulphur diesel as fuel. LPG should be used as fuel source in construction camps instead of wood Ambient air quality monitoring Contractor to prepare traffic management and dust suppression plan Referenc e to laws/ guideline 1974 and Central Motor and Vehicle Act 1988 The Air (Prevention and Control of Pollution) Act, 1981 (Amended 1987) and Rules 1982 Location areas Asphalt mixing plants, crushers, DG sets locations indicators (MI)/ Performance Target (PT) level<50 ug/m 3 Number of complaints should be 0. MI: Levels of HC, SO2, NO2, and CO. Status of PUC certificates PT: SO2 and NO2 levels are both less than 80ug/m 3. PUC certificate of equipment and machinery is up to date Methods n Review of monitoring data maintained by contractor Standards CPCB methods Review of monitoring data maintained by contractor Mitigation Costs Included in civil works cost Institutional Responsibility Implementation Supervision Contractor PMAE, BSRDCL

64 Annex Environmental Issue/ Component 12. Noise 12.1 Disturbance to local residents and sensitive receptors due to excessive noise from construction activities and operation of equipment and machinery Avoidance/Mitigation/ Compensation Measures All equipment to be timely serviced and properly maintained. Construction equipment and machinery to be fitted with silencers and maintained properly. Only IS approved equipment shall be used for construction activities. Timing of noisy construction activities shall be done during night time and weekends near schools, Implement noisy operations intermittently to reduce the total noise generated Manage existing traffic to avoid traffic jams and accumulation of noise beyond standards. Restrict construction near residential, built up and forest areas construction to daylight hours. Initiation of multilayered plantation, to serve as mitigation option for operation Referenc e to laws/ guideline Legal requirement Noise Pollution (Regulation and Control) Rules, 2000 and amendment s thereof + Clause No MORT&H Specificatio ns for Road and Bridge works Location Throughout project area especially at construction sites, residential and identified sensitive locations. indicators (MI)/ Performance Target (PT) MI: day and night Noise levels. Number of complaints from local people PT: Zero complaints or no repeated complaints by local people. Average day and night time noise levels are within permissible limits for work zone areas Methods As per Noise rule, 2000 Consultatio n with local people Review of noise level monitoring data maintained by contractor Observatio n of constructio n site Mitigation Costs Included in civil works costs Institutional Responsibility Implementation Supervision Contractor PMAE, BSRDCL

65 295 Annex 6 Environmental Issue/ Component 13. Landuse and Soil 13.1 Landuse Change and Loss of productive/topsoil 13.2 Soil erosion due to Construction activities, earthwork, and cut and fill, stockpiles etc. Avoidance/Mitigation/ Compensation Measures phase Honking restrictions near sensitive areas PPEs to workers Noise monitoring as per EMoP. Noise barrier for sensitive locations Non-agricultural areas to be used as borrow areas to the extent possible. If using agricultural land, top soil to be preserved and laid over either on the embankment slope for growing vegetation to protect soil erosion. Land for temporary facilities like construction camp, storage areas etc. shall be brought back to its original land use No waste dumping should take place in borrow areas Bio-turfing of embankments to protect slopes. Slope protection by providing frames, dry stone pitching, masonry retaining walls, planting of grass and trees. Side slopes of all cut Referenc e to laws/ guideline Project requirement IRC: recommend ed practice for treatment of embankme nt slopes for erosion control Location Approach roads and construction camps and yards Throughout the entire project road indicators (MI)/ Performance Target (PT) MI: Borrow pit locations Top soil storage area PT: Zero complaints or disputes registered against contractor by land owner MI: Occurrence of slope failure or erosion issues PT: No slope failures. Minimal erosion issues Methods Review borrow area plan, site visits Review of design documents and site observation Mitigation Costs Included in civil works cost Included in civil works cost Institutional Responsibility Implementation Supervision Contractor Design consultant and Contractor, PMAE, BSRDCL PMAE, BSRDCL

66 Annex Environmental Issue/ Component 13.3 Borrow area management Avoidance/Mitigation/ Compensation Measures and fill areas will be graded and covered with stone pitching, grass and shrub as per design specifications. Care should be taken that the slope gradient shall not be greater than 2:1. The earth stock piles to be provided with gentle slopes to soil erosion. Obtain EC from SEIAA before opening any new borrow area. Comply to EC conditions Non-productive, barren lands, upland shall be used for borrowing earth with the necessary permissions/consents. Depths of borrow pits to be regulated and sides not steeper than 25%. Topsoil to be stockpiled and protected for use at the rehabilitation stage. Transportation of earth materials through covered vehicles. Follow IRC recommended Referenc e to laws/ guideline Clause No. 306 and MORT&H Specificatio ns for Road and Bridge works Guidelines IX for Soil erosion IRC Guidelines on borrow areas and for quarries (Environme ntal protection Act and Rules,1986; Water Act, Air Act)+ Clause MO RTH Specificatio ns for Road and Bridge works Guidelines for Borrow Areas manageme nt Location Borrow sites location indicators (MI)/ Performance Target (PT) MI: Existence of borrow areas in inappropriate unauthorized locations. Poor borrow area management practices. Number of accidents. Complaints from local people. PT: No case of noncompliance to conditions stipulated by SEIAA in clearance letter. Zero accidents. Zero Methods Review of design document s and site observatio ns Compare site conditions with EC conditions by SEIAA Mitigation Costs Included in civil works cost Institutional Responsibility Implementation Supervision Contractor PMAE, BSRDCL

67 297 Annex 6 Environmental Issue/ Component 13.4 Quarry Operations Avoidance/Mitigation/ Compensation Measures practice for borrow pits (IRC 10: 1961) for identification of location, its operation and rehabilitation Borrow areas not to be dug continuously. To the extent borrow areas shall be sited away from settlements. Borrow areas shall be leveled with salvaged material or other filling materials which do not pose contamination of soil. Else, it shall be converted into fish pond. Aggregates will be sourced from existing licensed quarries. Copies of consent/ approval / rehabilitation plan for a new quarry or use of existing source will be submitted to BSRDCL. The contractor will develop a Quarry Redevelopment plan, as per the Mining Rules of the state and submit a copy of the approval to EA. Obtain environmental clearance from SEIAA in case of opening Referenc e to laws/ guideline Clause No.111.3M ORT&H Specificati ons for Road and Bridge works Guidelines VI for Quarry Areas Managem ent Environme ntal Protection Rules Location Quarry area locations indicators (MI)/ Performance Target (PT) complaints. MI: Existence of licenses for all quarry areas from which materials are being sourced Existence of a quarry redevelopme nt plan PT: Quarry license is valid.: No case of noncompliance to consent Methods Review of design document s, contractor document s and site observatio n Complian ce to EC conditions in case of opening new quarries Mitigation Costs Included in civil works cost Institutional Responsibility Implementation Supervision Contractor BSRDCL

68 Annex Environmental Issue/ Component 13.5 Compaction of soil and impact on quarry haul roads due to movement of vehicles and equipment 13.6 Contamination of soil due to leakage/ spillage of Avoidance/Mitigation/ Compensation Measures new quarry Construction vehicles, machinery, and equipment to be stationed in the designated ROW to avoid compaction. Approach roads/haulage roads shall be designed along the barren and hard soil area to reduce the compaction. Transportation of quarry material to the dumping site through heavy vehicles shall be done through existing major roads to the extent possible to restrict wear and tear to the village/minor roads. Land taken for construction camp and other temporary facility shall be restored to its original conditions Construction vehicles and equipment will be maintained and Referenc e to laws/ guideline Design requireme nt Design requirement Location Parking areas, Haulage roads and constructio n yards. Fueling station, construction indicators (MI)/ Performance Target (PT) /permit conditions and air quality meets the prescribed limit MI: Location of approach and haulage roads Presence of destroyed/ compacted agricultural land or land which has not be restored to its original condition PT: Zero occurrence of destroyed/co mpacted land and undestroyed land MI: Quality of soil near storage area Methods Site observatio n Site observation Mitigation Costs Included in civil works cost Included in civil work Institutional Responsibility Implementation Supervision Contractor Contractor BSRDCL PMAE, BSRDCL

69 299 Annex 6 Environmental Issue/ Component oil, bituminous and non-bituminous debris generated from demolition and road construction Avoidance/Mitigation/ Compensation Measures refueled in such a fashion that oil/diesel spillage does not contaminate the soil. Fuel storage and refueling sites to be kept away from drainage channels. Unusable debris shall be dumped in ditches and low lying areas. To avoid soil contamination Oil- Interceptors shall be provided at wash down and refueling areas. Waste oil and oil soaked cotton/ cloth shall be stored in containers labeled Waste Oil and Hazardous sold off to MOEFCC/SPCB authorized vendors Non-bituminous wastes to be dumped in borrow pits with the concurrence of landowner and covered with a layer of topsoil conserved from opening the pit. Bituminous wastes will be disposed off in an identified dumping site approved by the State Pollution Control Referenc e to laws/ guideline Location sites, and construction camps and disposal location. indicators (MI)/ Performance Target (PT) Presence of spilled oil or bitumen in project area PT: Soil test conforming to no contaminatio n. No sighting of spilled oil or bitumen in construction site or camp site Methods Mitigation Costs cost. Institutional Responsibility Implementation Supervision

70 Annex Environmental Issue/ Component 14. Water Resources 14.1 Sourcing of water during Construction Avoidance/Mitigation/ Compensation Measures Board Requisite permission shall be obtained for abstraction of groundwater from Central Groundwater Authority. Arrangements shall be made by contractor that the water availability and supply to nearby communities remain unaffected. Water intensive activities not to be undertaken during summer season. Provision of water harvesting structure to augment groundwater condition in the area Construction activities should maintain a distance of at least 100m from existing wells. If any existing wells are affected (contaminated or destroyed) by the project construction, alternate arrangements will be made to restore the water quality or well or supply water from another well. Referenc e to laws/ guideline Central Ground Water Authority Guidelines Location Throughout the Project section Check Dam at suitable locations indicators (MI)/ Performance Target (PT) MI: Approval from competent authority Complaints from local people on water availability PT: Valid approval from competent authority. Zero complaints from local people. Methods Checking of document ation Talk to local people Mitigation Costs Included in civil works cost Institutional Responsibility Implementation Supervision Contractor 14.2 Disposal of Provisions shall be ClauseNo. Throughou MI: Condition Standards Included Contractor PMAE, PMAE, BSRDC L

71 301 Annex 6 Environmental Issue/ Component water during construction Avoidance/Mitigation/ Compensation Measures made to connect roadside drains with existing nearby natural drains. Referenc e to laws/ guideline 1010EPAct 1986 MORT&H Specificati ons for Road and Bridge works Location t the Project section indicators (MI)/ Performance Target (PT) of drainage system in construction site. Presence/abs ence of water logging in project area. Methods methods Site observatio n and review of document s Mitigation Costs in civil works cost Institutional Responsibility Implementation Supervision BSRDCL 14.3 Alteration in surface water hydrology Existing drainage system to be maintained and further enhanced. Provision shall be made for adequate size and number of cross drainage structures esp. in the areas where land is sloping towards road alignment. Road level shall be raised above HFL level wherever road level is lesser than HFL. Culverts reconstruction shall be done during lean flow period. In some cases, these minor channels may be Design requireme nt, Clause No MORT&H Specificati ons for Road and Bridge Near all drainage channels, river/nallah crossings etc. PT: Existence of proper drainage system. No water logging in project area MI: Proper flow of water in existing streams and rivers PT: No complain of water shortage by downstream communities. No record of overtopping/ water logging Review of design document s Site observatio n Included in civil works cost Contractor PMAE, BSRDC L

72 Annex Environmental Issue/ Component 14.4 Siltation in water bodies due to construction activities/earthwork 14.5 Deterioration in Surface water quality due to leakage from vehicles and equipment and Avoidance/Mitigation/ Compensation Measures diverted for a very short period (15-30 days) and will be bring back to its original course immediately after construction. Embankment slopes to be modified suitably to restrict the soil debris entering water bodies. Provision of Silt fencing shall be made at water bodies. Silt/sediment should be collected and stockpiled for possible reuse as surfacing of slopes where they have to be revegetated. Earthworks and stone works to be prevented from impeding natural flow of rivers, streams and water canals or existing drainage system. Retaining walls at water bodies /ponds to avoid siltation near ponds No vehicles or equipment should be parked or refueled near water-bodies, so as to avoid contamination from Referenc e to laws/ guideline Design requiremen t, Clause No MORT& H Specific ations for Road and Bridge works Worldwid e best practices The Water (Preventio n and Control of Pollution) Act, 1974 Location Near all water bodies/ waterway Waterbodi es, refueling stations, constructio n camps. indicators (MI)/ Performance Target (PT) MI: Presence/abs ence of siltation in rivers, streams, ponds and other water bodies in project area. Turbidity test levels PT: No records of siltation due to project activities. Surface water quality tests confirm to turbidity and TSS limit MI: Water quality of ponds, streams, rivers and other water bodies in Methods Field observatio n Conductio n of water quality tests as per the monitoring Mitigation Costs Included in civil works cost Included in civil works cost Institutional Responsibility Implementation Supervision Contractor Contractor PMAE, BSRDC L PMAE, BSRDC L

73 303 Annex 6 Environmental Issue/ Component Avoidance/Mitigation/ Compensation Measures Referenc e to laws/ guideline Location indicators (MI)/ Performance Target (PT) project Methods Mitigation Costs Institutional Responsibility Implementation Supervision waste from fuel and lubricants. and plan construction Oil and grease traps amendmen camps. and fueling platforms to be provided at refueling locations. All chemicals and oil shall be stored away from water and concreted platform with catchment pit for spills collection. ts thereof. Presence of oil floating in water bodies in project area PT: Surface water quality meets freshwater Field observatio n All equipment quality operators, drivers, standards and warehouse prescribed by personnel will be CPCB trained in immediate response for spill containment and eventual clean-up. Readily available, simple to understand and preferably written in the local language emergency response procedure, including reporting, will be provided by the contractors Construction camp to be sited away from water bodies. Wastes must be collected, stored and taken to approve disposal site only. Water quality shall be monitored 15. Flora and Fauna 15.1 Vegetation loss Restrict tree cutting Forest Throughout MI: ROW Review of Mandator Mandatory PMAE,

74 Annex Environmental Issue/ Component due to site preparation and construction activities and Avoidance/Mitigation/ Compensation Measures up to toe line considering safety to road users. Roadside trees to be removed with prior approval of competent authority. Mandatory compensatory plantation at 1:2 basis to be done by Forestry Department Additional compensatory plantation 1:8 as per the IRC guidelines to be carried out by contractor in partnership with respective village JFM Committee. Local villagers to be employed for afforestation activities. Employment preference to be given to women Regular maintenance of all trees planted. Provision of LPG in construction camp as fuel source to avoid tree cutting. Plantation of trees on both sides of the road where technically feasible. Integrate vegetation management (IVM) Referenc e to laws/ guideline Conservation Act IRCSP:21an d IRCSP:66 Location project corridor Estimated No. of affected tree=2457 Additional Plantation near Sensitive receptors, river banks, borrow areas indicators (MI)/ Performance Target (PT) width Number of trees for felling Compensator y plantation plan Number of trees replanted. PT: Additional compensatory afforestation done on a 1:2 basis by contractor through JFM. Number of trees planted is double the number of trees removed. Tree survival rate is at least 70%. Methods relevant document s tree cutting permit, compensa tory plantation plan. Meeting with JFM Committe e members Field observatio ns Mitigation Costs y Compens atory afforestati on cost is included in project costs under BSRDCL. Additional compens atory afforestati on costs included in civil works costs Institutional Responsibility Implementation Supervision Compensatory plantation by forest Department and Additional plantation by contractor in partnership with respective local JFM Committee BSRDC L

75 305 Annex 6 Environmental Issue/ Component Avoidance/Mitigation/ Compensation Measures with the carriage way completely clear of vegetation. Additional plantation near sensitive receptors, river banks to minimize noise & air pollution, and to check erosion. Controlled use of pesticides/ fertilizers 16. Construction Camps and yards 16.1 Impact associated with location All camps should be 16.2 Worker s Health in construction camp established with prior permission from PCB. Camps to maintain minimum distance from following: # 500 m from habitation # 500 m from forest areas where possible # 500 m from water bodies where possible # 500 m from through traffic route The location, layout and basic facility provision of each labor camp will be submitted for approval by the PMAE and BSRDCL. The contractor will maintain necessary living accommodation and ancillary facilities in Referenc e to laws/ guideline Design Requirement The Water (Prevention and Control of Pollution)Act,1 974and its amendments thereof The Building and Other Construction workers (Regulation of Employment and Conditions of service) Act Location All construction camps All construction camps indicators (MI)/ Performance Target (PT) MI: Location of campsites and distance from habitation, forest areas, water bodies, through traffic route and construction camps PT: Distance of campsite is less than 500m from listed locations MI: Camp health records Existence of proper first aid kit in camp site Complaints Methods On site observation Interaction with workers and local community Camp records Site observatio n Consultati on with contractor Mitigation Costs Included in civil works cost Part of the civil works costs Institutional Responsibility Implementation Supervision Contractor and EO Contractor PMAE, BSRDCL PMAE, BSRDCL

76 Annex Environmental Issue/ Component Avoidance/Mitigation/ Compensation Measures functional and hygienic manner. Adequate water and sanitary latrines with septic tanks with soak pits shall be provided. Preventive medical care facilities in camp. Waste disposal facilities such as dust bins must be provided in the camps and regular disposal of waste must be carried out. The Contractor will take all precautions to protect the workers from insect and pest to reduce the risk to health. This includes the use of insecticides which should comply with local regulations. No alcoholic liquor or prohibited drugs will be imported to, sell, give and barter to the workers of host community. Awareness raising to immigrant workers/local community on communicable and sexually transmitted diseases. 17. Management of Construction Waste/Debris Unproductive/wastelan ds shall be selected 17.1 Selection of Dumping Sites Referenc e to laws/ guideline 1996 and The Water (Prevention and Control of Pollution) Act,1974 and amendments thereof Design Requireme Location At all Dumping indicators (MI)/ Performance Target (PT) from workers. PT: No record of illness due to unhygienic conditions or vectors. Zero cases of STD. Clean and tidy camp site conditions. MI: Location of dumping Methods workers and local people living nearby Field survey Mitigation Costs Included in civil Institutional Responsibility Implementation Supervision Contractor. PMAE, BSRDCL

77 307 Annex 6 Environmental Issue/ Component for solid waste including muck. Avoidance/Mitigation/ Compensation Measures for dumping sites away from residential areas and water bodies Dumping sites must be having adequate capacity equal to the amount of debris generated. Public perception and consent from the village Panchayats has to be obtained before finalizing the location. Develop waste management plan for various specific waste streams (e.g., reusable waste, flammable waste, construction debris, food waste etc.) prior to commencing of construction and submit to BBA for approval. Organize disposal of all wastes generated during construction in an environmentally acceptable manner. This will include consideration of the nature and location of disposal site, so as to cause less environmental impact. Minimize the production of waste materials by 3R (Reduce, Recycle and Referenc e to laws/ guideline nt and MORT&H guidelines Location Sites indicators (MI)/ Performance Target (PT) sites Number of public complaints. PT: No public complaints. Consent letters for all dumping sites available with contractor Methods and interaction with local people. Review of consent letter Mitigation Costs works cost. Institutional Responsibility Implementation Supervision

78 Annex Environmental Issue/ Component Avoidance/Mitigation/ Compensation Measures Reuse) approach. Segregate and reuse or recycle all the wastes, wherever practical. Prohibit burning of solid waste Collect and transport non-hazardous wastes to all the approved disposal sites. Vehicles transporting solid waste shall be covered with tarps or nets to prevent spilling waste along the route Train and instruct all personnel in waste management practices and procedures as a component of the environmental induction process. Provide refuse containers at each worksite. Request suppliers to minimize packaging where practicable. Place a high emphasis on good housekeeping practices. Maintain all construction sites in a cleaner, tidy and safe condition and provide and maintain appropriate facilities as temporary storage of all wastes before transportation and final disposal. Referenc e to laws/ guideline Location indicators (MI)/ Performance Target (PT) Methods Mitigation Costs Institutional Responsibility Implementation Supervision

79 309 Annex 6 Environmental Issue/ Component 17.2 Reuse and disposal of construction and dismantled waste Avoidance/Mitigation/ Compensation Measures The existing bitumen surface shall be utilized for paving of cross roads, access roads, and paving works in construction sites and camps, temporary traffic diversions, and haulage routes. All excavated materials from roadway, shoulders, verges, drains, cross drainage will be used for backfilling embankments, filling pits, and landscaping. Unusable and nonbituminous debris materials should be suitably disposed off at pre-designated disposal locations, with approval of the concerned authority. The bituminous wastes shall be disposed in secure landfill sites only in environmentally accepted manner. For removal of debris, wastes and its disposal MOSRTH guidelines should be followed. Unusable and surplus materials, as determined by the Project Engineer, will be removed and Referenc e to laws/ guideline MORT&H guidelines Location Throughout the project corridor indicators (MI)/ Performance Target (PT) MI: Percentage of reuse of existing surface material Method and location of disposal site of construction debris PT: No public complaint and consent letters for all dumping sites available with contractor or PMAE Methods Contractor records Field observatio n Interaction with local people Contractor records Mitigation Costs Included in civil works cost. Institutional Responsibility Implementation Supervision Contractor. PMAE, BSRDCL

80 Annex Environmental Issue/ Component Avoidance/Mitigation/ Compensation Measures disposed off-site. 18. Traffic Management and Safety 18.1 Management Temporary traffic of existing diversion shall be traffic and planned by the safety contractor and approved by the Engineer. The traffic control plans shall contain details of diversions; traffic safety arrangements during construction; safety measures for night time traffic and precautions for transportation of hazardous materials. Traffic control plans shall be prepared in line with requirements of IRC s SP 55 document. The Contractor will ensure that the diversion/detour is always maintained in running condition, particularly during the monsoon to avoid disruption to traffic flow. On stretches where it is not possible to pass the traffic on the part width of existing carriageway, temporary paved diversions will be constructed. Restriction of construction activity to Referenc e to laws/ guideline Design requirement and IRC: SP: ,Report Containing Recommenda tion of IRC Regional Workshops on Highway Safety IRC:SP: Road Safety for Children (5-12 Years Old) IRC:SP: Highway Safety Code IRC: SP: Guidelin es for Safety in Construction Zones The Building and other Construction Workers Act 1996 and Cess Act of 1996 Location Throughout the project corridor especially at intersections. indicators (MI)/ Performance Target (PT) MI: Traffic management plan. Presence/ absence of safety signs, clear traffic demarcations, flag men etc. on site. Complaints from road users. Number of traffic accidents PT: No complaints. No accidents due to poor traffic management. Traffic signs, demarcation lines etc. present in appropriate locations on site Methods Review traffic managem ent plan Field observatio n of traffic managem ent and safety system Interaction with people in vehicles using the road Mitigation Costs Included in civil works cost. Institutional Responsibility Implementation Supervision Contractor PMAE, BSRDCL

81 311 Annex 6 Environmental Issue/ Component 18.2 Safety of Workers and accident risk from construction activities Avoidance/Mitigation/ Compensation Measures only one side of the existing road. The contractor shall inform local community of changes to traffic routes, and pedestrian access arrangements with assistance from Engineer. Use of adequate signages to ensure traffic management and safety. Conduct of regular safety audit on safety measures. Contractors to adopt and maintain safe working practices. Usage of fluorescent and retro refectory signage, in local language at the construction sites Training to workers on safety procedures and precautions. Mandatory appointment of safety officer. All regulations regarding safe scaffolding, ladders, working platforms, gangway, stairwells, excavations, trenches and safe means of entry and egress shall be complied with. Provision of PPEs to Referenc e to laws/ guideline Factories Act 1948 Same as above Location Construction sites indicators (MI)/ Performance Target (PT) MI: Availability of Safety gears to workers Safety signage Training records on safety Number of safety related accidents PT: Zero fatal accidents. Zero or minor non-fatal accidents. Methods Site observatio n Review records on safety training and accidents Interact with constructio n workers Mitigation Costs Included in civil works cost Institutional Responsibility Implementation Supervision Obligation of Contractor PMAE, BSRDCL

82 Annex Environmental Issue/ Component 18.3 Pedestrian, animal movement Avoidance/Mitigation/ Compensation Measures workers. Provision of a readily available first aid unit including an adequate supply of dressing materials. Thecontractorwillnote mployanypersonbelow theageof18years Use of hazardous material should be minimized and/or restricted. Emergency plan (to be approved by engineer) shall be prepared to respond to any accidents or emergencies. Accident Prevention Officer must be appointed by the contractor. Temporary access and diversion, with proper drainage facilities. Access to the schools, temples and other public places must be maintained when construction takes place near them. Fencing wherever cattle movement is expected. Large number of box culverts with has been proposed..all structures having vertical clearance Referenc e to laws/ guideline Same above as Location Near habitation on both sides of schools, temples, hospitals, graveyards, construction sites, haulage roads, diversion sites. indicators (MI)/ Performance Target (PT) MI: Presence/ absence of access routes for pedestrians. Road signage Number of complaints from local people PT: Easy access to schools, temples and public places. Zero Methods Field observation Interaction with local people Mitigation Costs Included in civil works cost. Institutional Responsibility Implementation Supervision Contractor PMAE, BSRDCL

83 313 Annex 6 Environmental Issue/ Component 18.4 Accident risk to local community Avoidance/Mitigation/ Compensation Measures above 3m and not catering to perennial flow of water may serve as underpass for animals Restrict access to construction sites only to authorized personnel. Physical separation must be provided for movement of vehicular and human traffic. Adequate signage must be provided for safe traffic movement Provision of temporary diversions and awareness to locals before opening new construction fronts. Referenc e to laws/ guideline Same as above Location Construction sites indicators (MI)/ Performance Target (PT) complaints MI: Safety signs and their location Incidents of accidents Complaints from local people PT: Zero incident of accidents. Zero complaints. Methods Site inspection Consultati on with local people Mitigation Costs Included in civil works cost Institutional Responsibility Implementation Supervision Contractor PMAE, BSRDCL 19. Site restoration and rehabilitation 19.1 Clean-up Contractor will prepare Operations, site restoration plans, Restoration which will be approved and by the Engineer. Rehabilitation The clean-up and restoration operations are to be implemented by the contractor prior to demobilization. All construction zones including river-beds, culverts, road-side areas, camps, hot mix plant sites, crushers, Project requirement Throughout the project corridor, construction camp sites and borrow areas MI: Condition of camp sites, construction sites and borrow areas. Presence/abs ence of construction material/debri s after completion of construction works on construction Site observatio n Interaction with locals Issue completion certificate after restoration of all sites are found Included in civil works cost. Contractor PMAE, BSRDCL

84 Annex Environmental Issue/ Component Avoidance/Mitigation/ Compensation Measures batching plant sites and any other area used/affected by the project will be left clean and tidy, to the satisfaction of the Environmental officer. All the opened borrow areas will be rehabilitated and Engineer will certify Referenc e to laws/ guideline Location indicators (MI)/ Performance Target (PT) site. PT: Clean and tidy sites. No trash or debris left on site. Site restored and leveled. Methods satisfactor y Mitigation Costs Institutional Responsibility Implementation Supervision 20. Biodiversity conservation 20.1 Implementation of biodiversity conservation plan (BCP) 21. Air Quality 21.1 Air pollution due to due to vehicular movement Roadside tree plantations and plantation near toll plaza shall be maintained. Regular maintenance of the road will be Project Requireme nt Environmen tal Protection Act, 1986; The Air (Prevention and Control C. OPERATION AND MAINTENANCE STAGE At identified locations in project influence area. Throughout the Corridor MI: reports on implementatio n of BCP PT: Semiannual monitoring reports on BCP implmentation prepared on a timely basis. BCP implementatio n is on track. MI: Ambient air quality (PM10, CO,SO2 NO2) PT: Levels Site Observatio n Review of BCP monitoring reports. Discussion with local People and local Forestry Departme nt and Biodiversit y Experts As per CPCB requireme nts Site Included in Operation / Maintena nce cost Included in Operation / Maintena nce cost BSRDCL field offices/ Forest Department Contractor for maintenance related work BSRDCL External Monitor for ambient air BSRDCL BSRDCL

85 315 Annex 6 Environmental Issue/ Component 22. Land and Soil 22.1 Soil erosion at embankment during heavy rainfall. Avoidance/Mitigation/ Compensation Measures done to ensure good surface condition Ambient air quality monitoring. If monitored parameters exceeds prescribed limit, suitable control measures must be taken. Signages shall be provided reminding them to properly maintain their vehicles to economize on fuel consumption. Enforcement of vehicle emission rules in coordination with transport department or installing emission checking equipment Greenhouse gas emissions will be estimated based on traffic volumes for at least 3 years during project operation Periodic checking to be carried to assess the effectiveness of the stabilization measures viz. turfing, stone pitching, river training structures etc. Necessary measures to be followed wherever there are failures Referenc e to laws/ guideline of Pollution) Act, 1981 Project requireme nt Location At bridge locations and embankme nt slopes and other probable soil erosion areas. indicators (MI)/ Performance Target (PT) are equal to or below baseline levels given in the EIA report MI: Existence of soil erosion sites Number of soil erosion sites PT: Zero or minimal occurrences of soil erosion Methods inspection On site observatio n Mitigation Costs Included in Operation / Maintena nce cost Institutional Responsibility Implementation Supervision quality monitoring and GHG estimation BSRDCL BSRDCL

86 Annex Environmental Issue/ Component Avoidance/Mitigation/ Compensation Measures Referenc e to laws/ guideline 23. Water resources/flooding and Inundation 23.1 Siltation Regular checks shall Project be made for soil requirement erosion and turfing conditions of river training structures for its effective maintenance Water logging due to blockage of drains, culverts or streams Regular visual checks and cleaning of drains shallbedonealongtheali gnmenttoensurethatflo wofwaterismaintainedt hroughcrossdrainsand otherchannels/streams. of water borne diseases due to stagnant water bodies 24. Flora 24.1 Vegetation Planted trees, shrubs, and grasses to be properly maintained. The tree survival audit to be conducted at least once in a year to assess the effectiveness Project requirement Forest Conservati on Act 1980 Location Near surface Water bodies Near surface Water bodies Project tree plantation sites indicators (MI)/ Performance Target (PT) MI: Water quality PT: No turbidity of surface water bodies due to the road MI: Presence/ absence of water logging along the road PT: No record of overtopping/ Water logging MI: Tree/plants survival rate PT: Minimum rate of 70% tree survival Methods Site observatio n Site observatio n Records and field observations. Information from Forestry Department Mitigation Costs Include d in Operati on/ Mainten ance cost Include d in Operati on/main tenance cost Operatio n/ Maintena nce Cost Institutional Responsibility Implementation Supervision BSRDCL BSRDCL BSRDCL/ Forest Department BSRDCL BSRDCL BSRDCL 25. Maintenance of Right of Way and Safety 25.1 Accident Risk due to uncontrolled growth of vegetation Efforts shall be made to make shoulder completely clear of vegetation. Regular maintenance of plantation along the roadside Project requirement Throughout the Project route MI: Presence and extent of vegetation growth on either side of road. Number of accidents. Visual inspection Check accident records Include d in operatio n/maint enance cost BSRDCL BSRDCL

87 317 Annex 6 Environmental Issue/ Component 25.2 Accident risks associated with traffic movement. Avoidance/Mitigation/ Compensation Measures No invasive plantation near the road. All safety features provided in the main bridge and approach roads such as guide rails, speed bumps, sign boards, underpasses for pedestrians, cattle and vehicles etc. will be maintained and kept in good condition. Traffic control measures, including speed limits, will been forced strictly. Further encroachment of squatters within the ROW will be prevented. No school or hospital will be allowed to be established beyond the stipulated planning line as per relevant local law Monitor/ensurethatalls afetyprovisionsinclude dindesignandconstructi onphaseareproperlym aintained Highway patrol unit(s)for round the clock patrolling. Phone booth for accidental reporting and Referenc e to laws/ guideline IRC:SP:55 Location Throughout the Project route indicators (MI)/ Performance Target (PT) PT: No accidents due to vegetation growth MI: Number of accidents Conditions and existence of safety signs, rumble strips etc. on the road Presence/absen ce of sensitive receptor structures inside the stipulated planning line as per relevant local law PT: No fatal accidents. Other accidents are minimal Methods Review of accident records. Site inspection to check condition of road safety features. Talk to the local people who use the bridge and cross over the access roads Mitigation Costs Include d in operatio n /Mainte nance cost Institutional Responsibility Implementation Supervision BSRDCL BSRDCL

88 Annex Environmental Issue/ Component 25.3.Transport of Dangerous Goods Avoidance/Mitigation/ Compensation Measures ambulance services with minimum response time for rescue of any accident victims, if possible. Tow-way facility for the breakdown vehicles if possible. Existence of spill prevention and control and emergency responsive system Emergency plan for vehicles carrying hazardous material Referenc e to laws/ guideline Location - Throughout the project stretch indicators (MI)/ Performance Target (PT) MI: Status of emergency system whether operational or not PT: Fully functional emergency system Methods Review of spill prevention and emergency response plan Spill accident records Mitigation Costs Include d in operatio n/maint enance cost. Institutional Responsibility Implementation Supervision BSRDCL BSRDCL

89 319 Annex 7 Parameter 1. Depth of top Soil ANNEX 7: ENVIRONMENTAL MONITORING PLAN DURING CONSTRUCTION AND OPERATION PHASES Specific Parameters to be Monitored Number and Sampling Locations 43 - At all project sites including construction yards, approach roads, borrow areas, bridge end facilities, etc. 2. Soil Pollution Texture, bulk density, ph, conductivity, cation exchange capacity, organic matter, Total N,P,K, and heavy metals At all project sites including construction yards, approach roads, bridge end facilities. 3. Erosion - Streambank erosion along the upstream of diara, side slopes of the embankments and material storage sites 4. Hydrocarbon and chemical storage Means of Frequency Responsible Agency Est. Cost Implementation Supervision. (US$ 000) A. Construction Phase Top soil of 0.5 m depth should be Contractor BSRDC / Part of excavated and stored properly as PMAE civil work provided in the borrow area cost management plan The stored top soils will be used for bio-engineering or filling materials Ensure no contaminated effluent is leaving from the filling area to the nearby agricultural lands. Water quality sampling of all effluent prior to discharge Visual inspection of erosion prevention measures and occurrence of erosion - Construction camps Visual Inspection of storage facilities. Water quality sampling of all effluent from storage are for oil and grease 5. Local Roads - Approach Roads Visual inspection to ensure local roads are not damaged. Grievance and redress 6. Traffic Safety and Management 7. Air Quality (dust, smoke) - Haul and all affected roads as identified in the traffic management plan PM10, PM2.5, SO2, NOx, CO Construction sites As identified in the management plan Visual inspection to ensure good standard equipment are in use and dust suppression measures Beginning of earth filling works and every 6 months Every 3 months Contractor BSRDC / PMAE Monthly Contractor BSRDC / PMAE Monthly Contractor BSRDC / PMAE Monthly Contractor BSRDC / PMAE Daily Contractor BSRDC / PMAE Daily (visual) Monthly for dust Contractor BSRDC / PMAE $1/ discharge point/ sampling $10/month $1/ sampling point/ sampling Part of civil works As estimated in the managem ent plan $0.5/ sampling point/ Sample 43 Updated sampling locations are detailed in Annex 20b.

90 Dust monitoring in and around (receptor) construction camp and all active construction camps PM10, PM2.5, SO2, NOx, CO PM10, PM2.5, SO2, NOx, CO - 8. Air Quality PM10, PM2.5, SPM, SO2, NOx, Pb 9. Noise Day time and night time noise level (max, min & Leq levels) Asphalt Plant Material storage sites Five (5) sampling locations Seven (7) sampling locations within the 10- km area of project site. Includes construction sites, construction camp sites, on both banks of the Ganga river including the Diara, among other locations (spraying of waters) are in place. Visual inspection to ensure asphalt plant is located >500 m from residential areas Visual inspection to ensure dust suppression work plan is being implemented 24-hour sampling at each location as per CPCB guide lines (CPCB Gazette notification dated on AAQ 24-hour integrated sound level meter, as per CPCB guidelines Visual inspection to ensure good standard equipment are in use Visual inspection to ensure use of PPEs on work areas with elevated noise. quarterly Monthly BSRDC / PMAE Monthly Contractor BSRDC / PMAE Monthly Weekly Daily Daily Contractor through a nationally recognized laboratory Contractor BSRDC / PMAE BSRDC / PMAE $0.5/ sampling point/sam ple Part of civil works 10. Underwat er noise 11. Surface water quality Peak, sound exposure level (SEL) and sound exposure level (SPL or RMS) noise levels Turbidity, TSS, ph, TDS,TSS, EC, Cl, NH3- N, Fe, As, At a distance of 50m, 250m and 500m from pier construction locations (as directed by PMAE) Two locations, which include the north and south bank of Ganges river. Ensure work restriction between 21:00-06:00 close to the sensitive locations Hourly, day and night time noise levels (db) monitoring using noise meters Noise levels on decibels (db) scale over a range of frequencies which the level is measured (1μP a2 /Hz for Peak, SEL and RMS noise levels using hydrophones Samples will be preserved and transported for analysis for different parameters based on APHA methods. Temperature, Monthly Quarterly during bridge pier constructio n Qua rterly Contractor through a nationally recognized laboratory Contractor through a nationally recognized laboratory Contractor through a nationally BSRDC / External Monitor BSRDC/ External Monitor $1/ sampling site/ sample $75 (lump sum) $0.75/ sampling point/ sample

91 321 Annex Groundwa ter quality As, Mn, Fe, and coliforms 15 sites covering bridge site, other surface waters located near the construction sites (including those locations where baseline water quality monitoring was carried out) Five sampling locations conductivity, DO and ph which were measured instantaneously at site itself. Depth of tube well should be more than 300m. Test water for heavy metals, iron and manganese before installing of casing. If the quality is found not suitable further deepening will be done. During drilling of wells recognized laboratory Contractor through a nationally recognized laboratory PMAE External Monitor $0.5/ sampling site/ sample 13. Waste Managem ent 14. Drinking water and sanitation Construction camps and construction sites In construction yards and construction camps Samples will be preserved, transported and analyzed for different parameters based on APHA methods. Temperature, conductivity and ph will be measured at site Visual inspection that solid waste is disposed at designated site Ensure the construction workers are provided with safe water and sanitation facilities in the site Weekly Contractor BSRDC / PMAE Weekly Contactor BSRDC / PMAE Part of civil works Part of civil works 15. Wildlife 16. Floral Near all the construction sites And other sites identified in the biodiversity conservation plan (BCP) Ensure the adherence of the mitigation measures proposed in BCP. Monthly Contractor External Monitor for Environment Safeguards Plantation survival rate Project area Tree survival of Plantation Site Monthly Contractor through NGO External Monitor $15/ month/site (excluding BCP Implement ation estimated cost of U$500,00 0) $5/mo

92 17. Gangetic Dolphin 18. Air quality PM10, PM2.5, SO2, NOx, CO, hydrocarbons (methane & non methane) and VOCs 19. Greenhou se gas 20. Noise Quality 21. Gangetic Dolphin monitoring Day time and night time noise level (max, min & Leq levels) Project area Five (5) sampling locations From traffic plying on the new bridge and approach roads Toll plaza, bridge end points, diara Within 2 km buffer area from bridge location Counting number, occurrence assessment, and presence of infants will be monitored within 2 km buffer area from bridge location. B. During Operation and Maintenance 24-hour sampling at each location as per CPCB guide lines (CPCB Gazette notification dated on AAQ Seasonal (2x Year) Contractor BSRDC, External Monitor for Environment Safeguards Quarterly External Monitor BSRDCL SPCB CO2, PM Annually External Monitor BSRDCL SPCB Hourly, day and night time noise levels (db) monitoring using noise meters Part of the faunal monitoring Gangetic Dolphin will also be monitored once in a year. Counting number, occurrence assessment, and presence of infants will be monitored within 2 km buffer area Quarterly External Monitor BSRDCL SPCB Annually External Monitor BSRDCL State Wildlife Board $500 Lump Sum $0.5/ sampling point/ sample Included under EMES costs $0.5/ sampling point/ sample Included under EMES costs

93 323 Annex 8 ANNEX 8 : TREE PLANTATION AND MANAGEMENT GUIDELINES Development of project will involve tree cutting. Tree cutting shall be carried out only after obtaining clearance from forest department. Only identified & permitted tree species shall be cut. As per state forest policy compensatory afforestation should be carried out in ratio of 1:3 minimum. Compensatory afforestation shall be carried out by forest department. It is preferable that compensatory afforestation is carried out in nearby land patch. Survival rate of the afforestation carried out by forest department shall be monitored by BSRDCL. Apart from above compensatory plantation as part of environmental management, it is proposed to develop green belt strip all along the ROW. Green belt shall be developed as per the following guidelines. 1. Selection of Tree Species The Project involve movement of vehicle for transportation of material Thus emissions like particulate matter, SO2, NOx & CO shall be generated at site. Also there is potential of generation of coal dust while unloading the materials at stock piles. Thus the plantation species tolerant to these pollutants and mitigate these from air shall be planted. Species selecting criteria is given below: Tolerant to expected pollutants at site Longer duration of foliage Freely exposed foliage (adequate height of crown, openness of foliage, big leaves, small stomata apertures, stomata well exposed) Leaves supported on firm petioles 2. Recommended Plant species Based on nature of pollutants following tree species are recommended to be planted Table A8.1: Recommended plant species S. No. Plant Species Common Name Habit 1. Termanilia catappal Jagali Badam Tree 2. Anthocephalus cadamba Kadam Tree 3. Ficus bengalensis Badh Tree 4. Magnifera indica Aam Tree 5. Tectona grandis Teak Tree 6. Ficus religiosa Peepal Tree 7. Hibiscus rosa sinensi Hibiscus Shrub 8. Wrightia arboriea Dudhi Shrub 9. Tabernaemontana divaricata Chandani Shrub 10. Bougainvillea glavra Bougainvillea Shrub 11. Codium variegates Cockscomb Herb 12. Celosia argentea Croton Herb 13. Ilex rotunda Kurogane holly Tree 14. Cassia surattensis Golden Senna Tree 15. Cinnamomum camphora Camphor tree Tree 16. Lagerstroemia flos-reginae Lagerstroemia Tree 17. Alstonia scholaris Devil tree Tree

94 S. No. Plant Species Common Name Habit 18. Cassia fistula Golden shower Tree 19. Delonix regia Gulmohar Tree 20. Pongamia pinnata Indian beech Tree 21. Terminalia arjuna Arjun Tree 22. Terminalia belerica Baheda Tree 23. Butea superb Tesu Tree 24. Cassuarina sp. Cassuarina Tree 25. Bahunia acuminate White orchid green Tree 26. Swetania mohogini Cuban Mahagony Tree 27. Azadiracta indica Neem Tree 28. Artocarpus integrifolia Jackfruit Tree 29. Gmelina arborea Gamhar Tree 30. Putranjiba roxburghii Putranjiba Tree 3. Plantation Methodology Components of green belts along the alignment should be both absorbers of gases as well as of dust particles, including even lead particulates. Thus the choice of plants should include pollution tolerant shrubs of height 1 to 1.5 m and trees of 3 to 5m. The intermixing of trees and shrubs should be such that the foliage area density in vertical is almost uniform. For effective removal of pollutants, it is necessary that (i) plants should grow under conditions of adequate nutrient supply, (ii) absence of water stress and (iii) plants are well exposed to atmospheric conditions (light & breeze). 4. Plantation Pattern A standard horticultural practice involving planting of saplings in pits of substantial dimensions i.e., 1m 1m 1m for big trees and along half of these dimensions for smaller trees and shrubs. The pits are then filled with earth, sand, silt and manure in pre-determined proportions. Saplings planted in such pits are watered liberally during dry months. 5. Time of Plantation Plantation of the tree sapling should be done only after the first shower during the rainy season. The best time for plantation is after 15 days from the day of first shower during rainy season. 6. Protection of Tree saplings Circular tree guard should be placed after the plantation of the saplings for the protection of these young plants from the ravages of cattle, sheep and goat and other animals. If tree saplings died or damage occur after placing the circular tree guard, timely replacements of damaged plant and thereafter care is important. 7. After Care & The growing plants are cared at least for the first two years under favorable conditions of climate and irrigation. Nutrients in pits are supplemented and the juveniles provided protection. Thinning shall start after the stand is 3-4 years old and repeated every 4 years until the stand is 15 years old. Between years old, thinning should be conducted every 5 years and after 25 years old, thinning shall be done after every 10 years. When the canopy closes, at about 6 years,

95 325 Annex % of the stems shall be thinned to selectively remove suppressed, diseased and badly formed trees. Periodic assessment shall be carried for survivability of the trees. Minimum 70% survival rate shall be achieved. 8. Records Keeping & Reporting The following records shall be maintained: (i) record of tree plantation; and (ii) record of survivability rate. Inspection shall be carried out at site to know the survival rate of the plantation. The tree plantation and survivability report shall be prepared every six monthly. 9. Responsibility Compensatory plantation shall be carried out by forest department. Survival rate of plantation shall be inspected of the by PMAE. Plantation within the alignment shall be carried out by contractor and shall be monitored by PMAE.

96 Annex ANNEX 9: GUIDELINES FOR BORROW AREA MANAGEMENT Selection and Rehabilitation of Borrow Pits: Guidelines for selection of borrow pits, amount that can be borrowed and its rehabilitation in line with The Indian Road Congress (IRC): will be followed and are as follows: Contractor must identify the borrow areas before start of construction and submit these details with rehabilitation plan. Borrow areas will not be located on cultivable lands. However, if it becomes necessary to borrow earth from temporarily acquired cultivated lands, their depth will not exceed 45 cm. The topsoil to a depth of 15cm will be stripped and set aside. Thereafter, soil may be dug out to a further depth not exceeding 30 cm and used in forming the embankment. A 15 cm topsoil will be stripped off from the borrow pit and this will be stored in stockpiles in a designated area for height not exceeding 2m and side slopes not steeper than 1:2 (Vertical: Horizontal). Ridges of not less than 8m widths will be left at intervals not exceeding 300m. Small drains will be cut through the ridges, if necessary, to facilitate drainage. The slope of the edges will be maintained not steeper than 1:4 (vertical: Horizontal). Borrow pit will be selected from wasteland ; Priority will be given to the borrowing from humps above the general ground level within the road land; Priority will be given to the borrowing by excavating/enlarging existing tanks; Borrowing will be from land acquired temporarily and located at least 500m away from the road; Borrowing will be from mounds resulting from the digging of well and lowering of agricultural fields in vicinity of the road; Borrow area near to any surface water body will be at least at a distance of 15m from the toe of the bank or high flood level, whichever is maximum. In case of settlements, borrow pits will not be selected within a distance 800 m from towns or villages. If unavoidable, earth excavation will not exceed 30cm in depth; The haulage distance from site will not be too far. Redevelopment plan will be prepared by the contractor before the start of work which should be duly agreed upon by land owner. Borrow pits will be backfilled with rejected construction wastes and covered with vegetation. Borrow areas might be used for aquaculture in case landowner wants such development. Borrow pits located near habitat areas will be re-developed immediately after borrowing is completed. If spoils are dumped, that will be covered with a layers of stockpiled topsoil in accordance with compliance requirements with respect MOEF/SPCB guidelines. Prohibit dumping of waste except inert construction rubble Records: The following records will be maintained: 1. List of Borrow areas identification with capacity and rehabilitation plan 2. Agreement with land owners where applicable 3. Details of Earth excavated

97 327 Annex 9 Reporting: 4. Closure report of rehabilitated borrow pits. The Borrow area opening, earth borrowed and borrow area rehabilitation details will form part of half yearly report Responsibility: Prime Responsibility: Contractor will be responsible for borrow area management and reporting Supervisory Responsibility: Project Management and Authority Engineer will check compliance with the above guidelines.

98 Annex ANNEX 10: GUIDELINES FOR EMERGENCY MANAGEMENT SYSTEM Many emergencies can occur on any construction site and need to be effectively handled. The environmental and occupational health and safety aspects and related emergency can include incidence such as Collapse / subsidence of soil / Fire / Explosion / Gas Leak, Collapse of Building / Equipment and other Occupational Accidents. On site and off site emergency management plan shall be developed to effectively handle them. Thus every contractor shall have an approved on-site emergency plan. The contractor should submit a copy of this plan to PIU and Supervision consultant before the start of the work. Contractor shall develop the onsite emergency plan considering the potential environmental, occupational health and safety emergency situation at site and activities involved. This plan shall include a list of these potential emergency situations in the onsite emergency preparedness & response plan. Contractor shall get the plan approved from BSRDCL/PMAE. 1. Anticipated Emergencies at Construction Site The potential emergency situations have been defined below for guidance purposes. The contractors can follow these for developing site specific on site emergency preparedness plan. Table A10.1: Emergency at Construction Sites Emergency conditions / Sources situations Collapse / subsidence of Civil structures soil Bulk spillage Hazardous substance / inflammable liquid storage Vehicular movement on highway Fire and explosion Inflammable Storage Areas Gas Cylinder Storage Areas Electrical Circuits Isolated Gas Cylinders (LPG / DA) Welding / Gas Cutting Activity Electrical Shock HT line LT distribution Electrically Operated Machines / Equipment / Hand Tools / Electrical Cables Gaseous Leakage Gas Cylinder Storage Areas Gas Cylinder used in Gas Cutting / Welding Purposes Accidents due to Heavy Earth Moving Machinery Vehicles Cranes Fork Lifts Trucks Workman Transport Vehicles (cars / scooters / motor cycles / cycles) Slips & Falls (Man & Material) Collapse, toppling or collision of transport equipment Work at Height (Roof Work, Steel Erection, Scaffold, Repair & Maintenance, Erection of equipment, Excavation etc.) Slips (Watery surfaces due to rain) Lifting tools & Tackles (Electric Hoist & Forklifts)

99 329 Annex 10 Emergency conditions / situations Collision with stationary/ moving objects Other Hazards Vehicular movement Sources Cuts & Wounds Confined Space (under & inside machinery etc.) Hot Burns Pressure Impacts (Plant contains several Pressure Vessels & pipefitting containing CO 2, air, water, product & steam, which can cause accidents & injuries to person around.) 2. Design of On-site Emergency Plan The On-site emergency plan has been prepared by contractor and includes minimum the following information: Name & Address of Contractor Updating sheet Project Location Name, Designation & Contact Numbers of the organization, nearby hospitals, fire agencies etc. and key personnel including their assigned responsibilities in case of an emergency. The roles and responsibilities of executing personnel Site Layout Diagram showing location of fire extinguishers, emergency collection area and fire alarm Identification of Potential Emergencies Situations/ preventive measures / control & response measures Location of Emergency Control Centre (or designated area for emergency control / coordination) with requisite facilities. Medical services / first aid List of emergency equipment including fire extinguishers, fire suits etc. 3. Emergency Control Centre The emergency control center shall be equipped with following facilities Copy of current on-site emergency plan Display of the name of site emergency controller Two numbers of artificial respiratory sets Two numbers of Stretchers Vehicle for 24 hours (for large construction sites) Inter personnel/section telephone (2 numbers) Site layout diagram with entry and exit routes / Assembly points Directory of internal / external emergency phone Numbers A set of fire extinguishers (DCP type / Foam Type / CO2) List of fire extinguishers installed in the construction site including maintenance record A set of personal protective equipment (PPE)

100 Annex Two numbers of first-aid boxes with prescribed first-aid medicines List of competent first-aiders List of fire trained personnel Two numbers of blankets Drinking water Two numbers of rescue ropes Two numbers of high beam torches Two numbers of gas leak detectors Life boat & jackets (if working in or near water course) 4. Records The following records shall be maintained: 1. Record of emergency preparedness plan with emergency contact numbers 2. Mock drill/emergency preparedness exercise records 3. Corrective preventive action record after emergency is occurred 5. Reporting The accident and incident records and emergency preparedness drill reports shall form part of quarterly report to BSRDCL. 6. Responsibility Contractor shall be responsible to handle emergency condition and shall be liable to compensate the damage against accident, if any occurs at site.

101 331 Annex Introduction ANNEX 11: GUIDELINES FOR WASTE DISPOSAL AND MANAGEMENT Waste will be generated from the construction site and labour camps during the construction phase. Type of the waste to be generated during construction phase is given below. 2. Excavated Soil Site is undulating and thus will require cut & fill for levelling. Top excavated soil of 15 cm shall be stripped and shall be stored separately under covered sheds. This soil shall be used for green belt plantation. Lower layers of excavated soil shall be reused within the site for filling purpose, construction of approach & internal roads. If any extra soil is remained, then that should be disposed of to the approved debris disposal site or for mines rehabilitation located in the nearby areas. 3. Construction Waste Construction waste will comprise of broken bricks, dry cement, discarded timber, metal piece, cement bag, dry asphalt/bitumen, glass, paint/varnishes box etc. These wastes should be segregated into recyclable and non-recyclable waste. Recyclable waste shall be stored in the covered area and shall be sold to authorized vendors regularly. Non-recyclable waste shall be disposed off at approved debris site in covered vehicles. 4. Municipal Waste Municipal waste will be generated from labour camp. Dustbins for recyclable and non-recyclable waste shall be provided in labour camp area. Recyclable waste shall be sold to authorized vendors and non-recyclable shall be disposed off through authorized agency in area responsible for waste collection and management. Waste generated requires proper management so as to minimize the negative impacts on environment. Concept of reduce, re-use and recycle shall be followed at site. The rejected waste should be disposed off in a secured manner. Thus a site should be identified for disposal of the rejected waste. 5. Selection of Disposal Sites: The locations of disposal sites have to be selected such that: Disposal sites are located at least 1000 m away from sensitive locations like settlements, water body, notified forest areas, wildlife/bird/dolphin sanctuaries or any other sensitive locations. Disposal sites shall not contaminate any water sources, rivers etc. so the site should be located away from water body and disposal site should be lined properly to prevent infiltration of water. Public perception about the location of debris disposal site has to be obtained before finalizing the location. Permission from the village/local community is to be obtained for the disposal site selected.

102 Environment Engineer of PMAE and Executive Engineer of Contract Management Unit must approve the Plan before commencement of work. 6. Precautions to be adopted during disposal of debris / waste material The Contractor shall take the following precautions while disposing off the waste material. During the site clearance and disposal of debris, the Contractor will take full care to ensure that public or private properties are not affected, there is no dwellings around the dumpsite and that the traffic is not interrupted. The Contractor will dispose off debris only to the identified places or at other places only with prior permission of Engineer-in-Charge of works. In the event of any spoil or debris from the sites being deposited on any adjacent land, the Contractor will immediately remove all such spoil debris and restore the affected area to its original state to the satisfaction of the Engineer-in-Charge of works. The Contractor will at all times ensure that the entire existing canal and drains within and adjacent to the site are kept safe and free from any debris. Contractor will utilize effective water sprays during the delivery and handling of materials when dust is likely to be created and to dampen stored materials during dry and windy weather. Materials having the potential to produce dust will not the loaded to a level higher than the side and tail boards and will be covered with a tarpaulin in good condition. Any diversion required for traffic during disposal of debris shall be provided with traffic control signals and barriers after the discussion with local people and with the permission of Engineer-in-Charge of works. During the debris disposal, Contractor will take care of surrounding features and avoid any damage to it. The debris should not be disposed along the bridges & culverts and near the water bodies. While disposing debris / waste material, the Contractor will take into account the wind direction and location of settlements to ensure against any dust problems. Contractor should display the board at disposal site stating the name of project, usage of the site and type of debris being disposed. A guard shall be kept at disposal site to prevent any unauthorized disposal of waste at the debris disposal site Material should be disposed off through covered vehicles only No contaminated/hazardous/e-waste shall be disposed off at the debris disposal site 7. Record Keeping Site approved by site engineer only can be used as disposal site. Record of all such site should be maintained along with the area of disposal site, type & quantity of material disposed off daily and capacity of disposal site. 8. Guidelines for disposal sites The dumpsites filled only up to the ground level could be rehabilitated as per guidelines below and to be decided by the Engineer and the supervision consultant.

103 333 Annex 11 The dumpsites have to be suitably rehabilitated by planting local species of shrubs and other plants. Local species of trees has also to be planted so that the landscape is coherent and is in harmony with its various components. In cases where a dumpsite is near to the local village community settlements, it could be converted into a play field by spreading the dump material evenly on the ground. Such playground could be made coherent with the landscape by planting trees all along the periphery of the playground. Closure of the disposal site should be up to the satisfactory level of site engineer. 9. Penalties Stringent action & penalties should be imposed off on contractor for dumping of materials in locations other than the pre-identified locations. Grievance Redressal mechanism should be in place for taking note and action on such complaints. 10. Records The following records will be maintained: Generation and disposal quantity with location of disposal Recyclables waste generation and disposal Domestic waste disposal locations details. 11. Reporting The waste generation and disposal details will form part of quarterly report to BSRDCL. 12. Responsibility Prime Responsibility: Contractor will be responsible for waste management and reporting Supervisory Responsibility: Project Management and Authority Engineer will check the contractor s adherence to the above guidelines.

104 Annex ANNEX 12: SELECTION AND MANAGEMENT OF CONSTRUCTION CAMPSITE 1. Selection and layout of construction camp Labour camps, plant sites and debris disposal site is not located close to habitations, schools, hospitals, religious places and other community places. A minimum distance of 200 m has been maintained for setting up such facilities. 2. Facilities at camps During the construction stage of the project, the contractor Daewoo L&T (JV) will construct and maintain necessary (temporary) living accommodation, rest area and ancillary facilities for working staff & labour. Facilities required are listed and elaborated below. Site barricading Clean Water Facility Clean kitchen area with provision of clean fuel like LPG Sanitation Facilities Waste Management Facilities Rest area for workers at construction site Adequate Illumination & ventilation Safe access road is required at camps Health Care Facilities Fire-fighting Facility Emergency Response Area Good housekeeping 3. Site Barricading Site should be completely barricaded from all the sides to prevent entry of outsiders and animals into the site. Entry gate should be provided at the site and labour camp which should be guarded by security guard. All workers should be issued ID cards and entry of outsiders shall be maintained in the register at the gate. Board should be displayed at the site and the labour camp, the name of project, capacity of project, authority carrying our projects, restriction of entry without authorization, and no smoking zone and associated risks. 4. Clean Water Facility Potable water shall be provided for working staff & construction labour for drinking & cooking purpose. Clean water shall be provided for bathing, cleaning and washing purpose. Water quality testing for water shall be carried out on quarterly basis. 5. Clean Kitchen Area Provision of clean kitchen area for cooking and storage of eatables shall be provided. Clean fuels like LPG shall be provided for cooking purpose. Burning of firewood, garbage, paper and any other material for cooking or any other purpose shall strictly be prohibited at the site. 6. Sanitation Facilities

105 335 Annex 12 Construction camps shall be provided with sanitary latrines and urinals. Toilets provided should have running water availability all the time. Bathing, washing & cleaning areas shall be provided at the site for construction labour. Washing and bathing places shall be kept in clean and drained condition. Workers shall be hired especially for cleaning of the toilets and bathing area. Septic tanks and soak pits shall be provided at site for disposal of the sewage generated. 7. Waste Management Facilities Waste generated should be segregated at the site by providing the different color bins for recyclable and non-recyclable waste. Recyclable waste shall be sold to authorized vendors and non-recyclable shall be handed over to authority responsible in area for waste management. Waste management for construction site shall be as per waste management plan proposed in EMP. 8. Rest Area for Workers at Site A rest area/shelter shall be provided at the site for construction workers where they can rest after lunch time and shall not lay down at site anywhere. The height of shelter shall not less than 3m from floor level to lowest part of the roof. Sheds shall be kept clean and the space provided shall be on the basis of at least 6X6 sq. feet per head. 9. Adequate Illumination & Ventilation Construction worker camps shall be electrified and adequately illuminated. Illumination level shall be maintained after 5.30 Pm at the site to minimum 200 lux. Labour camps shall be adequately ventilated. Fans shall be provided for ventilation purpose. 10. Safe Access Road for Camps Temporary paved surface shall be constructed to approach the labour camp from the site. Movement shall not be hampered during monsoon season due to water logging and muddiness. 11. Health care Facilities: First aid box, first aid room and personnel trained in first aid shall be available at labour camp and site all the time (24X7). A resident doctor shall be available at camp. Equipment in first-aid box shall be maintained as pet State Factory s Law. Ambulance/ 4 wheeler motorized vehicle shall be available at the site for carrying injured to the nearby hospital. Tie-ups should be made with nearby hospital to handle emergency, if any. Nos. of ambulance, doctors and nearby hospital s hall be displayed in first-aid room, site office & labour camps. Workers shall be made aware about the causes, symptoms and prevention from HIV/AIDS through posters and awareness programs 12. Fire-Fighting facilities Fire-fighting facility such as sand filled buckets and potable fire-extinguishers shall be provided at labour camps and at site. Fire-extinguishers shall be provided as per NBC norms. 13. Emergency Collection Area Area shall be demarcated as emergency collection area near the gate where all the workers shall be guided to collect in case of any emergency like fire, flood and earthquake.

106 Annex Activities prohibited at site Activities which should be strictly prohibited at site shall include Open burning of wood, garbage and any other material at sit for cooking or any other purpose Disturbance to the local community. Operation of the plant and machinery between 10 pm to 6 am unless approved by team leader No animal (wild or domestic or bird) shall be harmed by any construction worker in any condition at site and nearby areas Cutting of tree without permission of team leader/authorized person No indigenous population shall be hurt or teased 15. Guidelines for night time working at the site. No activity generating noise shall be carried out at the site after 10:00 PM. Night working protocol should be followed (if required) as per guidelines prepared by contractor approved by PMAE. Site should be well illuminated to maintain minimum illumination level of 200 lux. Personnel working shall obtain permit to work from the team leader prior carrying out any work in night time and the record of such working shall be maintained in register. Any accidents, if occurs at site during night time working shall be immediately reported and recorded. Penalty shall be imposed on the contractor for the accident. Analysis shall be carried out to find the reason for such accidents for future learning. 16. Record keeping & Maintenance Record of entry/exit of the people in the construction site and labour camp area shall be maintained in register at gate. Record of material coming in and going out from site also shall be maintained. 17. Auditing & Inspection Conditions of labour camp and site shall be inspected and audit report shall be submitted to PMAE on monthly basis. 18. Closure of the Construction Site and Construction labour Camps Construction site and labour camps shall be restored back to the original site conditions. Following measures are required to be taken during closure: 1. Septic tanks/soak pits should be dismantled 2. Any temporary/permanent structure constructed shall be dismantled 3. Construction/demolition waste, hazardous waste and municipal waste at site and labour camp site shall be disposed off as per waste management plan in EMP 4. The site shall be cleaned properly 5. Tree plantation to be carried out, if any required for stabilizing the area 6. Any pit excavated shall be filled back 7. Closure of the site and labour camp shall be approved by authorized person.

107 337 Annex 13 ANNEX 13: MUCK DISPOSAL Bridge construction involves drilling & sinking of well, during pilling and sinking of well Muck generated from excavation of any project component is required to be disposed in a planned manner so that it takes a least possible space and is not hazardous to the environment. An account of the same has been given in the following paragraphs. 1. Quantity of Muck to Be Generated The total quantity of muck expected to be generated has been estimated to be of the order of approximately 3.00 lakh cum (approx.). 2. Muck Disposal sites The identification of muck disposal areas is done in line with the topographic and site specific conditions. 3. Criteria for Selection of Dumping Sites Based on the geological nature of the rocks and engineering properties of the soil, a part of the muck can be used as construction material. The muck is to be disposed at muck disposal sites. The following points will be considered and followed as guidelines for finalization of the areas to be used as dumping sites: i) The dumping sites have been selected as close as possible to the project area to avoid long distance transport of muck. ii) The sites are free from possibility of toe erosion and slope instability. iii) The dumping sites are either at higher level than the flood level or are away from the river course so that the possibility of muck falling into the river is avoided. iv) There is no active channel or stream flowing through the dumping sites. v) The sites are far away from human settlement areas. The muck that needs disposal would be piled at an angle of repose less than 30 at the proposed dumping sites. For this, the slopes would be broken up by creating benches across the slope. This will be done to provide stability to the slopes and also to provide ample space for planting trees, which would further help in holding and consolidating the material stacked at different sites. The description regarding the stabilization of the stacked material along the proposed roads has been discussed in the following paragraphs. The muck is expected to be comprised of fragmented rock mixed with soil and shall have Ø (angle of repose) value of 30 and below. The options like dumping muck in stages and allowing it to consolidate/settle through the monsoon, compacting the dumped muck with Dozer movement, zoning the dump judiciously to ensure the stability of 30 slope under all superimposed conditions will be utilised. 4. Methodology of dumping The main objectives of process of muck dumping and restoration of these muck disposal sites are: to protect and control soil erosion; to create greenery in the muck disposal areas;

108 Annex to improve and develop the sites into recreational sites; to ensure maximum utilization of muck for the construction purpose; to develop the muck disposal sites/ dumping yards to blend with the surrounding landscape; And to minimise damages due to the spoilage of muck in the project area. In the six lane Ganga project a scientific approach and methodology was followed for identification of the dumping sites. All possible alternate sites were inspected and examined before rejecting or selecting any site. The dumping sites should be: i) With minimum possible forest cover. ii) The populated /settlement areas are far away from the identified dump zones and therefore will be least impact on human life. iii) All the dumping sites will be at higher level than the flood level from the river course to provide protection from high flood. iv) The identified muck sites will be located close to the project area to avoid hazards related to transport of muck to long distances. 5. Dumping Process The generated muck will be carried in dumper trucks covered with heavy duty tarpaulin properly tied to the vehicle in tune with international practice. All precautionary measures will be followed during the dumping of muck. All dumpers will be well maintained to avoid any chances of loose soil from being falling during the transportation. All routes will be periodically wetted with the help of tanker prior to the movement of dump trucks. Dumping would be avoided during the high speed wind, so that suspended particulate matters (SPM) level could be maintained. Further, the dumping will be avoided during heavy traffic. After the dumping the surface of dumps will be sprayed with water and then compacted. A retaining wall shall be constructed prior to dumping of muck. Loose muck would be compacted layer-wise. The height of usage/ Gabion Wall is proposed to be 4.5 m on an average. The muck brought by dumpers will be spread in layers behind the wire crate walls and then compacted by rollers till the top level is achieved. The retaining/sausage wall shall be laid with proper berm and the muck dumped behind it in layers and compacted by rollers. The process shall be repeated up to 50 cm level below the desired height which shall be laid with good soil for providing grass cover. At a regular vertical interval of 1.5 m and 3.0 m c/c masonry drains (catch water drains) shall be provided to drain off the rain water. Proper fencing of the entire area will be done. The muck disposal area will ultimately be covered with fertile soil and suitable plants will be planted adopting suitable bio-technological measures. The project authorities would ensure that the dumping yards blend with the natural landscape by developing the site with gentle slope, patches of greenery in and around them. These sites can also be developed later as recreational parks and tourist spots with sufficient greenery by planting trees. All measures would be adopted to ensure that the dumping of muck does not cause injury or inconvenience to the people or the property around the area. The spillage of muck into the river at any site would be prevented by making concrete retaining walls to retain the muck pile. It shall be ensured that dumping is carried out at a minimum distance of 30 m away from the active river bank. The top surface would be leveled and graded after the capacity of any dumping site is exhausted. The top surface will be covered with soil and grass seeding will be ensured to promote vegetation cover. 6. and Compliance

109 339 Annex 13 i) Each layer shall be rolled compacted. ii) A layer of soil shall be spread on top of it to make it suitable for plantation. iii) Water testing facilities shall be set up for checking quality parameter of water. iv) Soil samples shall be regularly collected and tested for checking the level of contamination. v) Prescribed norms and approvals will be sought from BPCB wherever necessary. vi) All norms of BPCB and MoEF and their acts related to muck disposal shall be complied with.

110 Annex ANNEX 14: DETAILS OF TRANSECT WALKS CONDUCTED IN THE PROJECT INFLUENCE AREA SN Area of transect walk 1 Didarganj & Sabalpur Agricultural fields, Patna (Length Travel 2200Meter) 2 Didarganj & Sabalpur along the Ganga river bank (South) South Channel, Patna(Length Travel 1600Meter) 3 Kachhi Dargah Didarganj Ganga Ghat to Rustampur Diara (Length Travel 1000 Meter) Kachhi Dargah Didarganj Ganga Ghat to Rustampur Diara( length travel1500 meter) 4 Jafrabad Dih Village Vishali Diara Area (Distance 3000meter) 5 Saifabad Village Diara Area Vaishali (Distance covered 2500meter) No. of Seaso Date `Status of Remarks Transect Walk n Flora Fauna 1 Dry Agricultural Crops Reptiles, birds common Found in local old crows, rock pigeon, Red buildings, trees & vented bulbul, Common grass land. mina. 1 Wet do- -do- -do- 1 Dry Agricultural crops Birds, fishes-catla, Rohu, Found in local fish Calbasu, Kalabans, market. Tengara, Ponthia etc. 1 Wet do- Found local Fishes -do- Mrigal-Crirrhina mrigala Catla-Catla catla Tengra-Mystus tengara Ponthia-Mystus tengra Singhi-Heyeropneustus 1 Dry Agricultural crops Trees - 1 Wet Agricultural crops Trees - 1 Dry Agricultural crops & trees, Peepal, Bargad, Sissoo, Jamnu, Neem, Sal, Mango, Jackfruit 1 Wet Dry Agricultural crops & trees, Peepal, Bargad, Sissoo, Jamnu, Neem, Sal, fossilis Dolphin sited in Ganga Water Dolphin sited in Ganga Water Birds-Common crow, Cuckoo, House sparrow, Cattle Egret, Spotted dove, Bank Myna Birds-Common crow, Cuckoo, House sparrow, Cattle Egret, Spotted dove, Bank Myna Walk through mechanized Boat along bank of Ganga Walk through mechanized Boat along bank of Ganga Habitat mostly in trees & settlements, grass land & shrubs Habitat mostly in trees & settlements, grass land & shrubs

111 341 Annex 14 SN Area of transect walk Saifabad Village Diara Area Vaishali(Distance covered 2500meter) 6 Samaspur Village, Vaishali(Distance covered 2000meter) Samaspur Village, Vaishali(Distance covered 1800 meter) 7 Bishunpur Kishundas ( Distance covered 1500 meter) Majlishpur Chak (Distance covered 2800 meter) 8 Khanpur Pakri Village Viashali (Distance covered 2200 meter) No. of Transect Walk Seaso n 1 Wet Paddy crops & trees Date `Status of Remarks Flora Fauna Mango, Jackfruit, Jalebi, Palm, Arjan Reptiles Rat snakes (Ptyas mucosus), Common Krait (Bugarus caerulens), Indian cobra (Naja naja) 1 Dry Agricultural crops Mustered, Wheat plant growing in fields. 1 Wet Agricultural crops rice fields (Dhaan) etc. Reptiles House Geiko & Garden Lizard are directly sighted during primary visit. Terrestrial fauna No wild animals sited during the field surveys but local people and secondary data shows reported some of the animals found. However, avifauna with higher diversity are common crows, Indian roller. Avifauna & Terrestrial fauna 1 Dry Agricultural crops Terrestrial fauna Neelgai, wild boar 1 Wet Grasses along the banks, trees are fruit, flower and seed bearing, Banana 1 Dry Agricultural crops Mustered, Wheat plant growing in fields. Mammals- Blue cow, reptiles, fishes, Gangatic dolphin Terrestrial fauna No wild animals sited during the field surveys but local people and secondary data shows reported some of the animals found. However, Collecting feedback local people. from Consultation with community Consultation with community Due to heavy water flow in Ganga no chance to take photographs of Dolphins Through boat Focusing Feeding habitat

112 Annex SN Area of transect walk 9 Kalyanpur Village Vaishali(Distance covered 1500 meter) 10 Madhurapur (Distance covered 2200 meter) 11 Jahangirpur Fuli (Distance covered 1400 meter) TOTAL 22 No. of Transect Walk Seaso n Date `Status of Remarks Flora Fauna avifauna with higher diversity are common crows, Indian roller. 1 Wet Agricultural crops Maize, vegetables etc. 1 Dry Agricultural crops Terrestrial Fauna 1 Wet Agricultural crops- Paddy, Vegetables, Maize 1 Dry Agricultural crops, fruit tree Mango, Jackfruit, Jalebi, Neem, Sissoo etc. 1 Wet Agricultural crops, vegetables & natural growing trees 1 Wet Agricultural crops, vegetables Reptiles, aves, mammals, insects Avian fauna Eagle, great white pelican Reptiles Karait, Indian Cobra Garden Lizard commonly seen. Avian fauna Common crow, Myna, Eagle, sparrow, Babbler, pigeon, Cattle Egrets, Red Vented bulbul, Drongo. Avian fauna House sparrow, Rose ringed parakeet, Bank Myna Note 1. There is no notified forest in the study area. 2. Agricultural crops of various types are grown in the study area. 3. Resident in the project are very happy about the construction of bridge.

113 343 Annex 15 ANNEX 15: SOIL, WATER, AIR, AND NOISE QUALITY SAMPLING LOCATIONS ALONG THE PROJECT ALIGNMENT (A: Air sampling location, S: Soil sampling location, N: Noise sampling location, GW: Ground Water, SW: Surface Water)

114 ANNEX 16: COPY OF ENVIRONMENTAL CLEARANCE OF THE PROJECT Annex

115 345 Annex 16 Summary of Projects:- Green Field Six Lane Extradoses Cable Bridge over river Ganga near Kachhi Dargah in District Patna on NH-30 near Bidupur in District Vasihali Name of Project on NH- 103 (Bihar). Length of the project Km. includes 9.76 km. long main bridge. S. No in the Schedule 8 (b) Project Cost Location Plot/Survey/Khasra No. Village $832 million The proposed bridge across Ganga river from Deedarganj on NH-30 to chak Sikandar in Vaisahli district on NH-103, consisting of six lane bridge structures of the Km, approach viaduct and roads of 1.5 km from South and 8.5 Km from North, tolling and serving faculties, and winding 3 Kilometer of NH-103. The proposed location of the bridge is about 10 Km downstream of existing Mahatama Gandhi Setu in Patna. Start Location: Sabalpur (near Kacchi Dargah) Latitude: N Longitude: E End location: Sarmastpur (near Bidupur), Latitude: N Longitude: N Sl. No. Village Name Thana No. 1. Sabalpur Nasirpur Tajpur Rustampur Himmatpur Diara Jamalpur Chak Shankar Ganga Prasad Diara Jafrabad Dih Saifabad Karampur Jahangirpur Fuli Madhurpur Sadullahpur Chak Farid Bishnupur Majlispur Chak 379 Gangadhar 13. Chak Said Ali@ Darwa Bishnupur Majlispur Mathura Sultanpur Pachkatiya Dilwarpur Gowardhan Kanpur Pakri Kalyanpur Bishnupur Teliya Samastipur 269 The proposed road bridge traverses along 20 villages of the Patna and Vaishali District. Patna and Vaishali Bihar Nearest Railway Station:- Patna Saheb- approx. 5 Km (From Start location) Nearest Airport:- Patna Kms (From Start location) District State Nearest Railway Station, airport along with distance in Kms Name of Applicant Bihar State Road Development Corporation Ltd. Registered Address Central Mechanical Workshop Campus, Near Patna Airport, Patna SPECIFIC CONDITIONS:- I. Construction Phase

116 Annex (i) (ii) (iii) (iv) (v) (vi) (vii) (viii) (ix) (x) (xi) (xii) (xiii) All necessary clearance as applicable to the project shall be obtained from the concerned authorities before initiating the project. Necessary mitigating measure against adverse impact to the water bodies that are to be affected shall be provided. There shall be no disposal of solid and liquid wastes into the water body. The solid waste shall be properly collected, segregated and disposal as per the provision of Solid Waste (Management and Handling) Rules, Installation and operation of DG set, if any shall comply with the guidelines of CPCB. Provision shall be made for the housing of construction labour with all necessary infrastructure and facilities such mobile toilets, mobile STP, safe drinking water, medical health care, etc. The housing may be in the form of temporary structures to be removed after the completion of the Project. All the top soil evacuated during construction activities should be stored for use in horizontal/landscape development within the project site. Disposal of muck during construction phase should not be created any adverse effort on river and the neighbour communities and the disposal off taking the necessary precautions for general safety and health aspects of people, only in approved sites with the approval of competent authority. Vehicles hired for bringing construction material to the site should be in good condition and should have a pollution check certificate and should conform to the applicable air and noise emission standards and should be operated only during non-peak hours. Under the provisions of Environment (Protection) Act, 1986, legal action shall be initiated against the project proponent if it was found that construction of the project has been started without obtaining environmental clearance. Necessary permission for tree felling, if any, from the concerned department shall be obtained before commencement of the project work and copies of the same shall be submitted to this Office Minimum of three times the number of trees to be cut shall be planted. It shall be ensured that the trees planted as a part of the afforestation shall be looked after by the proponent. Tree plantation shall be of the same species/local species and survival shall be monitored Transplantation of trees shall be carried out wherever possible. During construction phase noise pollution should be minimized in the river for the safety of the Gangetic dolphins because they are very sensitive to noise pollution On both flanks of the bridge fencing at suitable height by proper mesh should be provided so that garbage and other unwanted materials are not thrown in the Ganges. Number of pillars should be minimum so as to minimise siltation in Ganga, of course without compromising with structural design. II. Operation Phase. (i) Noise barriers shall be provided at appropriate locations particularly in the areas where the alignment passes through inhabited areas so as to ensure that the noise levels do not exceed the prescribed standards. 2. GENERAL CONDITIONS: (i) (ii) (iii) (iv) (v) In the event of any change in the project profile, a fresh reference shall be made to SEIAA, Bihar. SEIAA reserves the right to revoke this clearance, if any, of the conditions stipulated are not complied with to the satisfaction of SEIAA. SEIAA may stipulate any additional conditions subsequently, if deemed necessary, for environmental protection, which shall be complied with. Full support should be extended to the officers of Bihar State Pollution Control Board by the project proponents during their inspection for monitoring purposes. All other statutory clearances shall be obtained, as applicable by project proponents from the respective competent authorities.

117 347 Annex 16 (vi) (vii) The project Proponent should advertise in at least two Newspapers widely circulated in the region, one of shall be in the vernacular language informing that the project has been accorded Environmental Clearance and copies of clearance letter are available with the Bihar State Pollution Control Board. The Project proponent shall also submit six monthly reports on the status of compliance of the stipulated condition including results of monitored data (both in hard copies as well as the stipulated condition including results of monitored data( both in hard copies as well as by ) to SEIAA, Bihar and regional office, Ranchi

118 Annex ANNEX 17: CAMP LAYOUT Camp Layout for Zero Point

119 349 Annex 17 Camp Layout for Raghopur

120 Annex ANNEX 18: ENVIRONMENTAL CLEARANCE FOR APPROVED QUARRY SITE AND RIVER BED SAND (BY THIRD PARTY)

121 351 Annex 18

122 Annex

123 353 Annex 18

124 Annex

125 355 Annex 19 ANNEX 19: GUIDELINE FOR CONSTRUCTION MATERIAL STORAGE AND HANDLING PLAN The major construction material to be used for this project includes aggregates (40 mm, 20 mm & 10 mm), cement, coarse sand, reinforcement steel, structural steel & Admixture. The material will be loaded and unloaded by the automated machines & engaged labour on site. The entire material will be transported in covered vehicle. The duties of the contractor will include monitoring all aspects of construction activities, commencing with the storing, loading of construction materials and equipment in order to maintain the quality. The work would be completed as per the final construction schedule. Cement would be stored in stacks as shown in Figure below. Other material like aggregate, reinforcement and consumables would also be tidily stored in place and released for use without causing litter around. Reinforcement will be stored in shaded area with above ground support. The contractor will be responsible for management of such construction material during entire construction period of the project. Sufficient quantity of materials would be available before starting each activity. All materials will be tested in order to ensure the quality of materials before construction. This is also the responsibility of the contractor, which is clearly mentioned in the contractor s agreement. All stationary machines will be inspected weekly for maintenance and will be fitted with exhaust pollution control devices. As soon as the construction activity is over the surplus earth will be utilized to fill up the low-lying areas, if any.

126 Schematic layout of Cement Godown Annex

127 357 Annex 20a ANNEX 20A: MONITORING LOCATION COORDINATES WITH SAMPLING MAP FROM DECEMBER 2016 TO MARCH 2017 Air Locations Sl. No. Location Code Name of the Location Geographical Location 1. A1 Zero Point (Near Didarganj) 25 0 γγ γ1.46 N, βγ.16 E Chainage A2 Sabalpur Village Chainage γγ 5β.γ5 N, E 3. A3 Mathurapur γ N, γ7.44 E 4. A4 Sarmastpur N, 85 0 ββ E Ambient Air Quality Locations

128 Annex 20a 358 Noise Locations Sl. Location Name of the Location Source Geographical Location No. Code 1. NQ-1 Zero Point (Near Didarganj) Chainage Residential 25 0 γγ γ1.46 N βγ.16 N 2. NQ-2 Sabalpur Village Chainage Commercial 25 0 γγ 5β.γ5 N N 3. NQ-3 Mathurapur Residential 25 0 γ N γ7.44 N 4. NQ-4 Sarmastpur Residential N 85 0 ββ N Ambient Noise Stations

129 359 Annex 20a Ground Water Sampling Locations Sl. No. Location Name of the Location Geographical Location Code 1. W1 Zero Point (Near Didarganj) 25 0 γγ γ1.46 N, βγ.16 E Chainage W2 Sabalpur Village Chainage γγ 5β.γ5 N, E 3. W3 Mathurapur γ N, γ7.44 E 4. W4 Sarmastpur N, 85 0 ββ E Ground Water Sampling Locations

130 Annex 20a 360 Description of Surface Water S. no. Sampling Location Location Code Geographical Location 1 Nearby Samsan Ghat upstream SWQ γ4 0γ N, E 2 Ganga River, Downstream SWQ γβ 45 N, E Location of Surface Water Quality

131 361 Annex 20a Soil Sampling Locations S. No. Location Code Name of the Location Geographical Location 1 S1 Zero Point (Near Didarganj) Chainage γ1.46 N, βγ.16 E 2 S2 Sabalpur Village Chainage γγ 5β.γ5 N, E 3 S2 Mathurapur γ N, γ7.44 E 4 S4 Sarmastpur N, 85 0 ββ E Soil Sampling Location Maps

132 Annex 20b 362 ANNEX 20B: UPDATED SAMPLING LOCATIONS (AUGUST 2017) Sampling Code Sampling Locations Geographical location Air Location A1 Zero Point (Near Didarganj) 25 0 γγ γ1.46 N, βγ.16 E Chainage A2 Sabalpur Village Chainage γγ 5β.γ5 N, E A3 Raghopur Chainage γ N, E A4 Mathurapur γ N, γ7.44 E A5 Sarmastpur N, 85 0 ββ E Noise Locations NQ-1 Zero Point (Near Didarganj) 25 0 γγ γ1.46 N, βγ.16 E Chainage NQ-2 Raghopur Chainage γ N, E NQ-3 Sabalpur Village Chainage γγ 5β.γ5 N, E NQ-4 Mathurapur γ N, γ7.44 E NQ-5 Sarmastpur N, 85 0 ββ E Ground water Sampling Locations W1 Zero Point (Near Didarganj) 25 0 γγ γ1.46 N, βγ.16 E Chainage W2 Sabalpur Village Chainage γγ 5β.γ5 N, E W3 Raghopur Chainage γ N, E W4 Mathurapur γ N, γ7.44 E W5 Sarmastpur N, 85 0 ββ E Surface water Sampling Locations 1 Nearby Samsan Ghat upstream 25 0 γ4 0γ N, E 2 Ganga River, Downstream β50γβ 45 N, E Soil Sampling Locations S1 Zero Point (Near Didarganj) 25 0 γγ γ1.46 N, βγ.16 E Chainage S2 Sabalpur Village Chainage γγ 5β.γ5 N, E S2 Raghopur Chainage γ N, E S4 Mathurapur γ N, γ7.44 E S5 Sarmastpur N, 85 0 ββ E

133 363 Annex 21 ANNEX 21: BRICK KILN LOCATION ALONG THE SOUTHERN SIDE OF THE PROJECT

GLOBAL TECH. ENVIRO EXPERTS PVT. LTD. (FORMERLY GLOBAL EXPERTS) An ISO-9001:2008 Certified Company

GLOBAL TECH. ENVIRO EXPERTS PVT. LTD. (FORMERLY GLOBAL EXPERTS) An ISO-9001:2008 Certified Company STACK MONITORING RESULT Name of Industry & Address Date of Monitoring 08-11-17 Date of Analysis 12-11-17 Reference No Stk-05/11/17 M/s SHIVA CEMENT LIMITED: Sl. No. Parameters Cement Mill 1 Kiln (Result)

More information

Mahabal Enviro Engineers Pvt. Ltd. Pollution monitoring, Engineers & Contractors in Environmental Management

Mahabal Enviro Engineers Pvt. Ltd. Pollution monitoring, Engineers & Contractors in Environmental Management PROPOSED RESIDENTIAL CUM COMMERCIAL PROJECT WITH MCGM PARKING LOT, AT LOWER PAREL, MUMBAI, MAHARASHTRA GROUND WATER ANALYSIS October, 2017 Parameter Units Sample 1 Source Location Date of collection of

More information

Annex 7.1 National Ambient Air Quality Standards for Nepal, 2003

Annex 7.1 National Ambient Air Quality Standards for Nepal, 2003 Annex 7.1 National Ambient Air Quality Standards for Nepal, 2003 Parameters Units Averaging Time TSP (Total Suspended Particulars) Concentration in Ambient Air, maximum Test method µg/m 3 Annual - 24-hours*

More information

MECON LIMITED RANCHI , INDIA

MECON LIMITED RANCHI , INDIA ORISSA MINING CORPORATION LIMITED BANGUR CHROMITE MINING PROJECT POST CLEARANCE ENVIRONMENTAL MONITORING REPORT FOR THE MONTH OF JULY 2011 MECON LIMITED RANCHI 834 002, INDIA 11.S2.2011 SEPTEMBER, 2011

More information

MECON LIMITED RANCHI , INDIA

MECON LIMITED RANCHI , INDIA ORISSA MINING CORPORATION LIMITED BANGUR CHROMITE MINING PROJECT POST CLEARANCE ENVIRONMENTAL MONITORING REPORT FOR THE MONTH OF SEPTEMBER 2011 MECON LIMITED RANCHI 834 002, INDIA 11.S2.2011 OCTOBER, 2011

More information

DRAFT TERMS OF REFERENCE FOR EIA STUDY

DRAFT TERMS OF REFERENCE FOR EIA STUDY Four laning of Balaghat - Gondia Section of NH 54 from km 0.000 to km 48.070 (Package-1A & Package-1B) under Bharatmala Pariyojana in the State of Madhya Pradesh and Maharashtra DRAFT TERMS OF REFERENCE

More information

Tolerance and Classification

Tolerance and Classification Tolerance and Classification As per ISI-IS: 2296-1982, the tolerance limits of parameters are specified as per classified use of water (Table 1,2,3,4,5 below) depending on various uses of water. The following

More information

Appendix I. Agreement on National Environmental Standards of Lao PDR, 2009

Appendix I. Agreement on National Environmental Standards of Lao PDR, 2009 Appendix I Agreement on National Environmental Standards of Lao PDR, 2009 I.1 DRINKING WATER QUALITY STANDARDS Lao PDR current standards for drinking water of the Lao PDR are provided below for reference.

More information

PAK: Peshawar Sustainable Bus Rapid Transit Corridor Project

PAK: Peshawar Sustainable Bus Rapid Transit Corridor Project Environmental Impact Assessment Project No. 48289-002 October 2017 PAK: Peshawar Sustainable Bus Rapid Transit Corridor Project Annexures A-D Prepared by Peshawar Development Authority (PDA), provincial

More information

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item Checklist: 17. Roads, Railways and Bridges(1) 1. Permits and Approvals, Explanations (1) ESIA and Permits (2) Explanations to the Public Main Check s 1 Have ESIA reports been officially completed? Have

More information

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item Checklist: 17. Roads, Railways and Bridges(1) 1. Permits and Approvals, Explanations (1) ESIA and Permits (2) Explanations to the Public Main Check s 1 Have ESIA reports been officially completed? Have

More information

Environmental Checklist: 26. Forestry Projects(1) Confirmation of Environmental and Social Considerations. Environmental Item.

Environmental Checklist: 26. Forestry Projects(1) Confirmation of Environmental and Social Considerations. Environmental Item. Checklist: 26. Forestry Projects(1) 1. Permits and Approvals, Explanations 2. Antipollution Measures (1) ESIA and Permits (2) Explanations to the Public (1) Air Quality (2) Water Quality (3) Waste (4)

More information

ENVIRONMENTAL AUDIT REPORT [STATEMENT] CONSTRUCTION WORK [ HALF YEARLY ] PERIOD OCTOBER 2012 TO MARCH 2013 FOUNDRY PARK

ENVIRONMENTAL AUDIT REPORT [STATEMENT] CONSTRUCTION WORK [ HALF YEARLY ] PERIOD OCTOBER 2012 TO MARCH 2013 FOUNDRY PARK ENVIRONMENTAL AUDIT REPORT [STATEMENT] ON CONSTRUCTION WORK [ HALF YEARLY ] PERIOD OCTOBER 2012 TO MARCH 2013 FOUNDRY PARK HOULI BAGAN, RANIHATI AMTA ROAD, HOWRAH Prepared by: FOUNDRY CLUSTER DEVELOPMENT

More information

RECOMMENDED SCOPE OF ACCREDITATION (For Testing Laboratories) * Test Method / Standard against which tests are performed

RECOMMENDED SCOPE OF ACCREDITATION (For Testing Laboratories) * Test Method / Standard against which tests are performed Sl Product / Material of test 1 Wastewater Colour, true colour units, 2 Turbidity, NTU 3 Total dissolved solids mg/1, IS-3025 (Part 4) -1983 2005: 2120 /C IS-3025 (Part 10)-1984 2005: 2130/B IS-3025 (Part

More information

Questionnaire (Conventional Energy)

Questionnaire (Conventional Energy) Questionnaire (Conventional Energy) QUESTIONNAIRE FOR CONVENTIONAL ENERGY (SECTOR-RELATED QUESTIONS) The completion of this questionnaire is voluntary. However, replying to the relevant questions as completely

More information

Main Check Items. 1 Are wastes properly treated and disposed of in accordance with the laws and regulations of the host country?

Main Check Items. 1 Are wastes properly treated and disposed of in accordance with the laws and regulations of the host country? Checklist: 16. Power Transmission and Distribution Lines(1) Confirmation of and Social (1) ESIA and Permits 1 Have ESIA reports been officially completed? Have ESIA reports been written in the official

More information

Questionnaire (Wood Processing)

Questionnaire (Wood Processing) Questionnaire (Wood Processing) QUESTIONNAIRE FOR WOOD PROCESSING (SECTOR-RELATED QUESTIONS) The completion of this questionnaire is voluntary. However, replying to the relevant questions as completely

More information

ANNEXURE- II Proposed TOR

ANNEXURE- II Proposed TOR ANNEXURE- II Proposed TOR Annexure II Terms of Reference for EIA for Setting up of Ligno-Cellulosic Biomass based second generation (2G) Ethanol Bio-Refinery with capacity of 100 KLPD at village-sainjani,

More information

Indian Standard DRINKING WATER SPECIFICATION (Second Revision)

Indian Standard DRINKING WATER SPECIFICATION (Second Revision) APPENDIX I BIS (IS 10500: 2012) Indian Standard DRINKING WATER SPECIFICATION (Second Revision) Sl No. Characteristic Requirement (Acceptable Limit) Permissible Limit in the Absence of Alternate Source

More information

4. Agency (or Institution) Responsible for Implementing the Project

4. Agency (or Institution) Responsible for Implementing the Project Summary of Preparatory Study 1. Full Title of the Project Urban Transport Policy and System Development Master Plan for the ity of Dar es Salaam 2. Type of Study Master Plan 3. ategorisation and Its Reason

More information

KKB Micro Testing Labs Pvt. Ltd., , 2 nd Floor, Tarun Plaza, NFC Main Road, Krishna Nagar Colony, Moula Ali, Hyderabad, Telangana

KKB Micro Testing Labs Pvt. Ltd., , 2 nd Floor, Tarun Plaza, NFC Main Road, Krishna Nagar Colony, Moula Ali, Hyderabad, Telangana Last Amended on - Page 1 of 7 I. AIR, GASES & ATMOSPHERE 1. Ambient Air Monitoring RSPM ( PM 10) IS 5182 (Part 23): 2006 (RA ) 5 µg/m 3 to 750 µg/m 3 PM 2.5 SOP 11 dated 17.11.2014 12.5 µg/m 3 to 500 µg/m

More information

30. ENVIRONMENTAL MANAGEMENT, MONITORING AND REPORTING

30. ENVIRONMENTAL MANAGEMENT, MONITORING AND REPORTING 30. ENVIRONMENTAL MANAGEMENT, MONITORING AND REPORTING 30.1 Introduction This chapter outlines the framework for environmental management, monitoring and reporting for the Papua New Guinea Liquefied Natural

More information

10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION

10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION 10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION 10.1 Objective The main objective is to confirm the implementation of mitigation measures recommended in

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN EMP 1 INTRODUCTION In each of the areas of impact, measures have to be taken to reduce potentially significant adverse impacts and where these are beneficial in nature, such impacts are to be enhanced/

More information

Category Environmental Item Main Check Items Confirmation of Environmental Considerations

Category Environmental Item Main Check Items Confirmation of Environmental Considerations al Checklist: 2. Oil and Natural Gas Development 1 1 Permits and Explanation 2 Mitigation (1) EIA and al Permits (2) Explanation to the Public (1) Air Quality (2) Water Quality (3) Wastes Have EIA reports

More information

REVISED NATIONAL ENVIRONMENTAL QUALITY STANDARDS (NEQS)

REVISED NATIONAL ENVIRONMENTAL QUALITY STANDARDS (NEQS) REVISED NATIONAL ENVIRONMENTAL QUALITY STANDARDS (NEQS) Background PEPC in its first meeting held on 10 th May 1993 approved the NEQS. The approved NEQS were uniform standards applicable to all kind of

More information

Annex F Scoping Checklist

Annex F Scoping Checklist Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve

More information

Category Environmental Item Main Check Items Confirmation of Environmental and Social Considerations

Category Environmental Item Main Check Items Confirmation of Environmental and Social Considerations al Checklist: 5. Non-Ferrous Metals Smelting and Refining(1) (1) ESIA and al Permits 1 Have ESIA reports been officially completed? Have ESIA reports been written in the official language or a language

More information

ENVIRONMENTAL MONITORING REPORT BASED ON DATA GENERATED FROM OCTOBER 2016 MARCH 2017 FOR OCL INDIA LIMITED At/Po: RAJGANGPUR, District: SUNDARGARH, ODISHA AT LANJIBERNA LIMESTONE & DOLOMITE MINES PROJECT

More information

The proposed Baddegedara reservoir project could be justified due to following reasons

The proposed Baddegedara reservoir project could be justified due to following reasons CHAPTER 6 6.0 CONCLUSIONS The proposed Baddegedara reservoir project could be justified due to following reasons Salinity survey of existing wells pointed out high salinity in the coastal area of the project.

More information

Nichrome Testing Laboratory and Research Private Limited, No nd Main, German Hospital Road, Narayanpur, Dharwad, Karnataka

Nichrome Testing Laboratory and Research Private Limited, No nd Main, German Hospital Road, Narayanpur, Dharwad, Karnataka Last Amended on - Page 1 of 9 I. WATER 1. Drinking Water Colour 2120 B 1 to 100 Hazen Units ph 4500 H+, B 3 to 12 Electrical conductivity 2510 B 5 to 10,000 µs/cm Turbidity 2130 B 1 to 100 NTU Chloride

More information

Prakruti Environmental Engineers (Environmental Laboratory), 1, Utkanth Society, B/H Alkapuri Club, Alkapuri, Vadodara, Gujarat

Prakruti Environmental Engineers (Environmental Laboratory), 1, Utkanth Society, B/H Alkapuri Club, Alkapuri, Vadodara, Gujarat Prakruti Environmental Engineers (Environmental ), Last Amended on - Page 1 of 7 I. WATER 1. Water (Ground Water/ Surface Water/ Drinking Water/ Treated Water) ph APHA 4500-H + B, Temperature APHA 2550

More information

Annex 2: National Environmental Quality Standards (Extract from the Gazette of Pakistan applicable to STZ CETP)

Annex 2: National Environmental Quality Standards (Extract from the Gazette of Pakistan applicable to STZ CETP) Annex 2: National Environmental Quality Standards (Extract from the Gazette of Pakistan applicable to STZ CETP) 1290 THE GAZETTE OF PAKISTAN, EXTRA, AUGUST 10, 2000 [PART-II] (1) For Annex, I the following

More information

APPENDIX I. LAMPIRAN I - RKL DAN RPL KEGIATAN TERPADU PROYEK PENGEMBANGAN TANGGUH LNG i

APPENDIX I. LAMPIRAN I - RKL DAN RPL KEGIATAN TERPADU PROYEK PENGEMBANGAN TANGGUH LNG i APPENDIX I Table 1 Emission Standards from Flare, Gas Turbine, Boiler, Acid Gas Incinerator and Internal Combustion Engine... 1 Table 2 n-hazardous Waste Incinerator Standard... 3 Table 3 Hazardous Waste

More information

Superintendence Company of India Private Limited, Plot Y-23, Block-EP, Sector-V, Salt Lake City, Kolkata, West Bengal

Superintendence Company of India Private Limited, Plot Y-23, Block-EP, Sector-V, Salt Lake City, Kolkata, West Bengal Last Amended on - Page 1 of 16 I. WATER 1. Drinking Water ph IS 3025 (Part 2): 2004, Colour APHA (22 nd Edition) 2120 B: Turbidity (NTU) IS 3025 (Part 10): 1984 Residual, Free Chlorine IS 3025 Part 26/1986

More information

Discipline Chemical Testing Issue Date Certificate Number T-3790 Valid Until Last Amended on - Page 1 of 5

Discipline Chemical Testing Issue Date Certificate Number T-3790 Valid Until Last Amended on - Page 1 of 5 Last Amended on - Page 1 of 5 AT LABORATORY I. WATER 1. Drinking Water, Colour IS 3025 (Part 4): 1983 (RA 2002) Spectrometer method 2120C Odour IS 3025 (Part 5): 1983 (RA 2002) 2 Hazen units to 500 Hazen

More information

Hagler Bailly Pakistan Associated with PA Consulting Group

Hagler Bailly Pakistan Associated with PA Consulting Group Associated with PA Consulting Group Technical, Management, and Economic Counsel 330 MW Coal-Fired Power Plant in Energy Park, Block II Thar Coalfields Environmental and Social Impact Assessment Final Report

More information

Base Metal and Iron Ore Mining

Base Metal and Iron Ore Mining Multilateral Investment Guarantee Agency Environmental Guidelines for Base Metal and Iron Ore Mining Industry Description and Practices This document addresses the mining of base metal ores (copper, lead

More information

Point wise compliance for the conditions stipulated in Environmental Clearance of (Phase- I & II)

Point wise compliance for the conditions stipulated in Environmental Clearance of (Phase- I & II) SIX MONTHLY ENVIRONMENTAL COMPLIANCE STATUS REPORT (PERIOD : OCT, 2017 to MARCH, 2018) Ref: J-13011/23/2007-IA-II (T) Dated: 17/07/2007 (as amended in the Year, 2013 & 2014) and J-13011/46/2007-IA-II (T)

More information

South Landfill Annual Cover Rate Screening Criteria Checklist

South Landfill Annual Cover Rate Screening Criteria Checklist South Landfill Annual Cover Rate Screening Criteria Checklist The following checklist is taken from the Guide to Environmental Assessments for Waste Management Projects, Part B Environmental Screening

More information

Attachment 1 WORLD BANK ENVIRONMENT, HEALTH AND SAFETY GUIDELINES 1 MINING AND MILLING UNDERGROUND (INTERIM)

Attachment 1 WORLD BANK ENVIRONMENT, HEALTH AND SAFETY GUIDELINES 1 MINING AND MILLING UNDERGROUND (INTERIM) TAILINGS DISPOSAL Attachment 1 WORLD BANK ENVIRONMENT, HEALTH AND SAFETY GUIDELINES 1 MINING AND MILLING UNDERGROUND (INTERIM) Tailings must be disposed of in a manner that optimizes protection of human

More information

Appendix F Project Environmental Standards

Appendix F Project Environmental Standards Appendix F TABLE OF CONTENTS 1 INTRODUCTION... 1-1 1.2 References... 1-1 1.3 Abbreviations and Definitions... 1-2 2 PROJECT AMBIENT AIR QUALITY STANDARDS... 2-3 3 PROJECT AMBIENT NOISE STANDARDS... 3-4

More information

SCHEDULE I LIST I GENERAL STANDARDS AND CRITERIA FOR THE DISCHARGE OF INDUSTRIAL EFFLUENTS INTO INLAND SURFACE WATERS

SCHEDULE I LIST I GENERAL STANDARDS AND CRITERIA FOR THE DISCHARGE OF INDUSTRIAL EFFLUENTS INTO INLAND SURFACE WATERS SCHEDULE I LIST I GENERAL STANDARDS AND CRITERIA FOR THE DISCHARGE OF INDUSTRIAL EFFLUENTS INTO INLAND SURFACE WATERS UNIT TOLERANCE LIMIT NO. PARAMETER TYPE OF LIMIT VALUES 01 Total suspended solids mg/1,

More information

IMPACT OF CEMENT INDUSTRY ON THE GROUND WATER QUALITY A CASE STUDY

IMPACT OF CEMENT INDUSTRY ON THE GROUND WATER QUALITY A CASE STUDY Jr. of Industrial Pollution Control 27(2)(2011) pp 133-137 EM International Printed in India. All rights reserved IMPACT OF CEMENT INDUSTRY ON THE GROUND WATER QUALITY A CASE STUDY N.A. SIDDIQUI*, R.N.

More information

Environmental Quality

Environmental Quality Myanmar National Environmental Quality Guidelines Iain Watson Senior Environmental Safeguards Specialist ADB G eate Mekong S b egion ADB Greater Mekong Subregion Environment Operations Center Scope of

More information

CONSTRUCTION AND DEMOLITION DEBRIS DISPOSAL SITE GUIDELINES

CONSTRUCTION AND DEMOLITION DEBRIS DISPOSAL SITE GUIDELINES Nova Scotia Environment and Labour CONSTRUCTION AND DEMOLITION DEBRIS DISPOSAL SITE GUIDELINES Approval Date: October 24, 1997 Effective Date: October 24, 1997 Approved By: Peter Underwood Version Control:

More information

Nexus Test Labs Pvt. Ltd., No. 29, 2 nd Floor, 3 rd Cross, Singaiahnapalya, Mahadevapura, Bangalore, Karnataka

Nexus Test Labs Pvt. Ltd., No. 29, 2 nd Floor, 3 rd Cross, Singaiahnapalya, Mahadevapura, Bangalore, Karnataka Certificate Number TC-5069 (in lieu of T-3362 & T-3363) Page 1 of 17 Range ing / BIOLOGICAL TESTING I. WATER 1. Drinking Water R.O. Water, Ground Water, Surface Water, Treated Water. 2. Waste Water/ Effluents

More information

QESTIONNAIRE FOR THE MINERAL PROCESSING INDUSTRY (SECTOR-RELATED QUESTIONS)

QESTIONNAIRE FOR THE MINERAL PROCESSING INDUSTRY (SECTOR-RELATED QUESTIONS) Questionnaire (Mineral Processing Industry) QESTIONNAIRE FOR THE MINERAL PROCESSING INDUSTRY (SECTOR-RELATED QUESTIONS) The completion of this questionnaire is voluntary. However, replying to the relevant

More information

Environment Management Report Pagsanjan-Luisiana-Lucban-Lucena City Road Section March 31, 2007

Environment Management Report Pagsanjan-Luisiana-Lucban-Lucena City Road Section March 31, 2007 E1467 v 25 Environment Management Report Pagsanjan-Luisiana-Lucban-Lucena City Road Section March 31, 2007 1 losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure

More information

Doc. No H1 Rev. 0 - July 2011 APPENDIX C ENVIRONMENTAL AND SOCIAL ACTION PLAN

Doc. No H1 Rev. 0 - July 2011 APPENDIX C ENVIRONMENTAL AND SOCIAL ACTION PLAN APPENDIX C ENVIRONMENTAL AND SOCIAL ACTION PLAN APPENDIX C ENVIRONMENTAL AND SOCIAL ACTION PLAN Taking into account the findings of the ESDD, an Environmental and Social Plan (ESAP) has been developed

More information

Discipline Chemical Testing Issue Date Certificate Number T-3617 Valid Until Last Amended on

Discipline Chemical Testing Issue Date Certificate Number T-3617 Valid Until Last Amended on Last Amended on 18.01.2016 Page 1 of 8 I. WATER 1. Potable, Domestic and Bore-well Water ph IS 3025 (Part 11): 1983 Electrometric Method Colour IS 3025 (Part 4): 1983 Specific Conductance IS 3025 (Part

More information

Summary of Preparatory Study

Summary of Preparatory Study Summary of Preparatory Study 1. Title of the Cooperation Project, Relevant Project Report Preparatory Survey on the Project for the Establishment of Rural Water Supply System in Kambia Town in the Republic

More information

Environmental Management Plan Prov l. Brdry-Caticlan-Kalibo-Capiz Brdy. May 31, 2007

Environmental Management Plan Prov l. Brdry-Caticlan-Kalibo-Capiz Brdy. May 31, 2007 Environmental Management Plan Prov l. Brdry-Caticlan-Kalibo-Capiz Brdy. May 31, 2007 E1467 v 22 1 losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

More information

QUESTIONNAIRE FOR GENERAL WTP REQUESTED DATA FOR THE WATER TREATMENT PLANT (WTP) - Application : groundwater (well pit); urban wastewater;

QUESTIONNAIRE FOR GENERAL WTP REQUESTED DATA FOR THE WATER TREATMENT PLANT (WTP) - Application : groundwater (well pit); urban wastewater; REQUESTED DATA FOR THE WATER TREATMENT PLANT (WTP) - Application : ENVIRONMENTAL DATA - Temperature min. : C - Temperature max. : C - Altitude (m.a.s.l) : m - Plant location (geographic area, seismic zone,

More information

Water Quality Concerns at Mines for Environmental Impact Assessment

Water Quality Concerns at Mines for Environmental Impact Assessment Water Quality Concerns at Mines for Environmental Impact Assessment Bhargava K. Iyengar Assistant Professor, Dept. of Mining Engineering, MATS University, Raipur, Chhattisgarh, India ABSTRACT: The usefulness

More information

Panasonic India Pvt. Ltd.

Panasonic India Pvt. Ltd. Panasonic India Pvt. Ltd. December-2014 FOR Industrial Building of Panasonic India Ltd At Jhajjar, Haryana 1 Details of Environmental Monitoring INTRODUCTION M/s Panasonic India Pvt Ltd granted its Environmental

More information

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are: 4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:

More information

ENVIRONMENTAL LEGISLATION AND REGULATION IN MALAYSIA

ENVIRONMENTAL LEGISLATION AND REGULATION IN MALAYSIA ENVIRONMENTAL LEGISLATION AND REGULATION IN MALAYSIA Managed by Ministry of Science, Technology And The Environment Malaysia Concept of the National Policy Of The Environment 1 MALAYSIA POLICY ON THE ENVIRONMENT

More information

Water and Waste Water Management in Yangon, Myanmar

Water and Waste Water Management in Yangon, Myanmar Union of Myanmar Ministry of Agriculture and Irrigation Irrigation Department Water and Waste Water Management in Yangon, Myanmar Mu Mu Than Staff Officer, Irrigation Department Myanmar March,2010 Socio-economical

More information

EPA Primary. (mg/l as CaCO3) (mg/l as CaCO3)

EPA Primary. (mg/l as CaCO3) (mg/l as CaCO3) NORTH TEXAS MUNICIPAL WATER DISTRICT - Wylie Water Analysis Jan-2018 Mineral Analysis Raw Treated Standards Residue on Evaporation 412 456 500 1000 Silica (SiO2) 3.63 3.41 Iron (Fe) 0.378 0.259 0.3 0.3

More information

APPENDIX I PROPOSED TERMS OF REFERENCE

APPENDIX I PROPOSED TERMS OF REFERENCE APPENDIX I PROPOSED TERMS OF REFERENCE 1. Environment Impact Assessment/Environment Management Plan document shall be in accordance with the provisions & generic structure stipulated in the EIA Notification

More information

Bosnia and Herzegovina Route Donja Gračanica - Klopče and Svilaj - Odzak (Part of Corridor Vc) ENVIRONMENTAL AND SOCIAL ASSESSMENT

Bosnia and Herzegovina Route Donja Gračanica - Klopče and Svilaj - Odzak (Part of Corridor Vc) ENVIRONMENTAL AND SOCIAL ASSESSMENT Bosnia and Herzegovina Route Donja Gračanica - Klopče and Svilaj - Odzak (Part of Corridor Vc) ENVIRONMENTAL AND SOCIAL ASSESSMENT Environmental and Social Action Plan August 2016 Project: Bosnia and Herzegovina

More information

Chapter 1 (BFC32403) and Standards

Chapter 1 (BFC32403) and Standards Chapter 1 (BFC32403) Environmental Rules, Regulations and Standards 1 ENVIRONMENTAL LEGISLATION AND REGULATION IN MALAYSIA Managed by DOE Concept of the National Policy Of The Environment 2 DEPARTMENT

More information

PROPOSED TERMS OF REFERENCE (TOR) FOR

PROPOSED TERMS OF REFERENCE (TOR) FOR PROPOSED TERMS OF REFERENCE (TOR) FOR ENVIRONMENTAL IMPACT ASSESSMENT (EIA) AND ENVIRONMENTAL MANAGEMENT PLAN (EMP) FOR PROPOSED NEW NATIONAL HIGHWAY -NH-754K GREENFIELD ALIGNMENT SANCHORE-SANTALPUR SECTION

More information

Environmental Clearance Maliparbat Bauxite Mines-Compliance Report Page 2

Environmental Clearance Maliparbat Bauxite Mines-Compliance Report Page 2 A. Specific Conditions: (i) All the conditions stipulated by the State Pollution Control Board in their consent to establish should be effectively implemented. Submission: Implementation is ongoing. (ii)

More information

(1) Bridge, Road and Railway (Adaptation Project) (2) Bridge, Road and Railway (BAU Development with Adaptation Options)

(1) Bridge, Road and Railway (Adaptation Project) (2) Bridge, Road and Railway (BAU Development with Adaptation Options) Sub-sector Guideline: (1) Bridge, Road and Railway (Adaptation Project) (2) Bridge, Road and Railway (BAU Development with Adaptation Options) Basic Concept A. General Concept Climate change will increase

More information

Discipline Chemical Testing Issue Date Certificate Number T-3553 Valid Until Last Amended on - Page 1 of 9

Discipline Chemical Testing Issue Date Certificate Number T-3553 Valid Until Last Amended on - Page 1 of 9 Last Amended on - Page 1 of 9 I. ORES & MINERALS 1. Iron Ore Total Iron IS 1493: 1981 (RA 2006) 10 % to 70 % Silicon IS 1493: 1981 (RA 2006) 0.5 % to 25 % Aluminum IS 1493: 1981 (RA 2006) 0.5 % to 20 %

More information

Environmental Design Criteria for Project Engineering

Environmental Design Criteria for Project Engineering Environmental Design Criteria for Project Engineering Argentina Mining, Salta, September 2018 Simon Catchpole, February 2016 An Environmental Risk Model In the EA phase, the environmental professionals

More information

Environmental Checklist:. 10.Ports and Harbors (1) Yes: Y No: N (a) (b) (c) (d)

Environmental Checklist:. 10.Ports and Harbors (1) Yes: Y No: N (a) (b) (c) (d) Checklist:. 10.Ports and Harbors (1) 1 Permits and Explanation 2 Pollution Control (1) EIA and Permits (2) Explanation to the Local Stakeholders (3) Examination of Alternatives (1) Air Quality (2) Water

More information

Environmental Impact Assessment. GEO: East West Highway (Khevi Ubisa Section) Improvement Project

Environmental Impact Assessment. GEO: East West Highway (Khevi Ubisa Section) Improvement Project May 2018 Third Draft GEO: East West Highway (Khevi Ubisa Section) Improvement Project Section F2 of the Khevi Ubisa Shorapani Argveta Road (E60 Highway) Part 6 Appendices A D Prepared by JV IRD Engineering

More information

QUESTIONNAIRE FOR INFRASTRUCTURE PROJECTS (SECTOR RELATED QUESTIONS)

QUESTIONNAIRE FOR INFRASTRUCTURE PROJECTS (SECTOR RELATED QUESTIONS) Questionnaire (Infrastructure Projects) QUESTIONNAIRE FOR INFRASTRUCTURE PROJECTS (SECTOR RELATED QUESTIONS) The completion of this questionnaire is voluntary. However, replying to the relevant questions

More information

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department 2017 [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull quote

More information

ENVIPRO Laboratories, 2nd Floor, Sy. No. 63/4, Site No. 5, P&T Layout Road, Ashwath Nagar, Srigandhada Kaval, Sunkadakatte, Bangalore, Karnataka

ENVIPRO Laboratories, 2nd Floor, Sy. No. 63/4, Site No. 5, P&T Layout Road, Ashwath Nagar, Srigandhada Kaval, Sunkadakatte, Bangalore, Karnataka Certificate Number TC-6325 Page 1 of 5 Range ing / CHEMICAL TESTING I. WATER 1. Surface Water, Ground Water, Industrial Water, Drinking Water, Irrigation Water, Water From Purifiers & Swimming Pool Water

More information

Potential Impacts and Mitigations from a Saline Discharge into Marine Environment

Potential Impacts and Mitigations from a Saline Discharge into Marine Environment Meliadine Division Potential Impacts and Mitigations from a Saline Discharge into Marine Environment DECEMBER 2017 VERSION 1 Table 1: Potential Impacts and Mitigations Marine Environment Benthic Invertebrates

More information

Drinking Water Supply and

Drinking Water Supply and Drinking Water Supply and Health Engineered Water Systems Water and Health 80% of sickness in the world is caused by inadequate water supply or sanitation 40% of the world population does not have access

More information

ENVIRONMENTAL ASSESSMENT AND REVIEW FRAMEWORK

ENVIRONMENTAL ASSESSMENT AND REVIEW FRAMEWORK Urban Sanitation and Rural Infrastructure Support to the PNPM Mandiri Project (RRP INO 43255-01) A. Introduction ENVIRONMENTAL ASSESSMENT AND REVIEW FRAMEWORK 1. The proposed Urban Sanitation and Rural

More information

2. GUIDELINES FOR THE EVALUATION OF DRINKING-WATER QUALITY FOR HUMAN CONSUMPTION WITH REGARD TO CHEMICAL, PHYSICAL AND BACTERIOLOGICAL QUALITY

2. GUIDELINES FOR THE EVALUATION OF DRINKING-WATER QUALITY FOR HUMAN CONSUMPTION WITH REGARD TO CHEMICAL, PHYSICAL AND BACTERIOLOGICAL QUALITY THE WATER ACT, 1956 (ACT 54 OF 1956 ) AND ITS REQUIREMENTS IN TERMS OF WATER SUPPLIES FOR DRINKING WATER AND FOR WASTE WATER TREATMENT AND DISCHARGE INTO THE ENVIRONMENT 1. INTRODUCTION The provisions

More information

Submitted by: M/s Panasonic India Ltd

Submitted by: M/s Panasonic India Ltd Environmental Monitoring Report (June-2014) FOR Industrial Building of Panasonic India Ltd At Jhajjar, Haryana Submitted by: M/s Panasonic India Ltd INDUSTRIAL PLOT NO-1, VILLAGE- BID DADRI JHAJJAR (HARYANA)

More information

State Expert Appraisal Committee, Punjab Ministry of Environment and Forests, Government of India

State Expert Appraisal Committee, Punjab Ministry of Environment and Forests, Government of India State Expert Appraisal Committee, Punjab Ministry of Environment and Forests, Government of India O/O Punjab Pollution Control Board, Vatavaran Bhawan, Nabha Road, Patiala 147 001 Telefax:- 0175-2215802

More information

Factor Potential Effects Mitigation Measures

Factor Potential Effects Mitigation Measures Natural Environment No impacts of provincial significance to the natural environment are anticipated for the rapid transit project. Other impacts and how they will be mitigated are outlined in the table

More information

Environment Laboratory, Central Mine Planning & Design Institute Limited, Regional Institute-IV, Kasturba Nagar, Jaripatka, Nagpur, Maharashtra

Environment Laboratory, Central Mine Planning & Design Institute Limited, Regional Institute-IV, Kasturba Nagar, Jaripatka, Nagpur, Maharashtra Last Amended on - Page 1 of 9 I. POLLUTION & ENVIRONMENT 1 Effluent / Waste Water (As per EPA 2000) Ammonical Nitrogen / Free Ammonia IS 3025(Part 34):1988, RA 2009, Nessler s Method 0.02-2.5 mg/l, B.O.D

More information

DETERMINING APPROPRIATE DRINKING WATER CHEMICAL AND PHYSICAL MONITORING GUIDELINES

DETERMINING APPROPRIATE DRINKING WATER CHEMICAL AND PHYSICAL MONITORING GUIDELINES Page 1 DETERMINING APPROPRIATE DRINKING WATER CHEMICAL AND PHYSICAL MONITORING GUIDELINES 1. Purpose To assist in determining Chemical Standards that are applicable to the water in a water supply system

More information

APPENDIX M CEQA Initial Study Checklist

APPENDIX M CEQA Initial Study Checklist APPENDIX M CEQA Initial Study Checklist Appendix G ENVIRONMENTAL CHECKLIST FORM (To be Completed by Applicant) 1. Project title: 2. Lead agency name and address: 3. Contact person and phone number: 4.

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Collection of Base line data in any season other than Monsoon season in study area of 10 kms radius from Lease Area. Based on the Meteorological data from

More information

ENVIRONMENTAL GUIDANCE NOTES: ENVIRONMENTAL STANDARDS AND LIMITS

ENVIRONMENTAL GUIDANCE NOTES: ENVIRONMENTAL STANDARDS AND LIMITS ENVIRONMENTAL GUIDANCE NOTES: ENVIRONMENTAL STANDARDS AND LIMITS Disclaimer: The information contained in this communication document is intended solely for the use of guidance cannot be considered as

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN Table of Contents 1 INTRODUCTION... 1 1.1 ENVIRONMENTAL MANAGEMENT PLAN (EMP)... 1 1.2 Impacts on Land Environment... 1 1.2.1 Mitigation Measures... 1 1.3 WATER ENVIRONMENT... 2 1.3.1 Impacts on Water

More information

5.0 LONG-TERM CEQA CONSIDERATIONS

5.0 LONG-TERM CEQA CONSIDERATIONS 5.0 LONG-TERM CEQA CONSIDERATIONS Section 15126 of the CEQA Guidelines requires that all phases of a project must be considered when evaluating its impact on the environment, including planning, acquisition,

More information

D EROSION AND SEDIMENT CONTROL. Table of Contents

D EROSION AND SEDIMENT CONTROL. Table of Contents Table of Contents D1. GENERAL... 1 D2. OBJECTIVE... 1 D3. REFERENCE MATERIAL... 1 D4. REGULATORY REQUIREMENTS... 1 D5. EROSION AND SEDIMENT CONTROL (ESC) PLANS... 2 D5.1 Goals and Objectives:... 2 D5.2

More information

EXECUTIVE SUMMARY of the Environmental Impact Assessment Report

EXECUTIVE SUMMARY of the Environmental Impact Assessment Report Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Introduction Additional Financing for Third East West Highway Improvement Project EXECUTIVE

More information

ROADS: OPERATION AND MAINTENANCE

ROADS: OPERATION AND MAINTENANCE ROADS: OPERATION AND MAINTENANCE GEMS Environmental Compliance- ESDM Training Series Kabul July / August 2016 8/1/2016 1 ROADS AND DEVELOPMENT Improved access = benefits across economic sectors Service

More information

Environment Laboratory, Central Mine Planning and Design Institute Limited, Gondwana Place, Kanke Road, Ranchi, Jharkhand

Environment Laboratory, Central Mine Planning and Design Institute Limited, Gondwana Place, Kanke Road, Ranchi, Jharkhand Environment, Central Mine Planning and Design Institute Last Amended on - Page 1 of 9 1. POLLUTION & EFFLUENTS 1. Effluent / Waste Water Ammonical Nitrogen Free Ammonia IS 3025 (Part 34):1988, Nessler

More information

IN THE KYRGYZ REPUBLIC

IN THE KYRGYZ REPUBLIC Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized NATIONAL ROAD REHABILITATION (OSH-ISFANA) PROJECT (NRRP)- WORLD BANK PPA Q 6240 CONSULTANCY

More information

CERTIFICATE OF ANALYSIS

CERTIFICATE OF ANALYSIS 1 CERTIFICATE OF ANALYSIS ATTENTION: Water Purification Solutions DATE: 29 November 2018 1. GENERAL: Table-1: Tierkloof Borehole & Product - Sampled 1 November 2018 Results expressed in parts per million

More information

Appendix B: Proposed trigger levels for groundwater quality and Response to Breach of Trigger Levels

Appendix B: Proposed trigger levels for groundwater quality and Response to Breach of Trigger Levels Appendix B: Proposed trigger levels for groundwater quality and Response to Breach of Trigger Levels Trigger levels Miners Road and Selwyn McLeans Island Suite 1 - All wells ph field measurement

More information

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e)

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e) Checklist: 3. Hydropower Stations, Dams and Reservoirs (1) 1 Permits and Explanation 2 Pollution Control (1) EIA and Permits (2) Explanation to the Local Stakeholders Main Check s Have EIA reports been

More information

SFG1822 AZERBAIJAN REPUBLIC MINISTRY OF TRANSPORT AZERROADSERVICE OPEN JOINT STOCK COMPANY. October Public Disclosure Authorized

SFG1822 AZERBAIJAN REPUBLIC MINISTRY OF TRANSPORT AZERROADSERVICE OPEN JOINT STOCK COMPANY. October Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SFG1822 AZERBAIJAN REPUBLIC MINISTRY OF TRANSPORT AZERROADSERVICE OPEN JOINT STOCK COMPANY Public Disclosure Authorized October 2015 Public Disclosure

More information

LIFELINE ROAD NETWORK IMPROVEMENT PROJECT ENVIRONMENTAL MANAGEMENT PLAN FOR SMALL SCALE ROAD REHABILITATION

LIFELINE ROAD NETWORK IMPROVEMENT PROJECT ENVIRONMENTAL MANAGEMENT PLAN FOR SMALL SCALE ROAD REHABILITATION REPUBLIC OF ARMENIA MINISTRY OF TRANSPORT AND COMMUNICATION TRANSPORT SI LIFELINE ROAD NETWORK IMPROVEMENT PROJECT ENVIRONMENTAL MANAGEMENT PLAN FOR SMALL SCALE ROAD REHABILITATION REHABILITATION OF THE

More information

ENVIRONMENTAL CHECKLIST (WAC )

ENVIRONMENTAL CHECKLIST (WAC ) Fee: $400.00 Date Fee Paid: Received by: 186 Iron Horse Court, Suite 101, Yakima WA 98901 Phone: (509) 834-2050 Fax: (509) 834-2060 Website: http://www.yakimacleanair.org ENVIRONMENTAL CHECKLIST (WAC 197-11-960)

More information

MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES

MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES Environmental / Social issue/ aspect/ activity Anticipated negative impact Management and mitigation

More information