1 BRIEF SUMMARY OF THE PROJECT This proposal of Nuagaon Iron ore mines of M/s K.J.S.Ahluwalia is for expansion of Iron ore production capacity from 5.62 MTPA to 7.99MTPA of ROM along with existing beneficiation plant of 2.0MTPA capacity and crushing & screening plant in the total lease area of Ha comprising Ha of forest land and Ha of non-forest land for obtaining TOR from MoEF & CC towards getting environmental clearance. Nuagaon Iron ore mines of M/s K.J.S.Ahluwalia is located in the villages Nuagaon, Guali, Topadihi, Barpada & katasahi of Keonjhar district in Odisha. Presently mining of 5.62 million tons per annum iron ore along with crushing & screening plant & 2 MTPA beneficiation plant is operated in this lease area after obtaining the following statutory clearances: Lease validity Up to 31 st March 2020.The supplementary leased deed executed on 8 th May, In pursuance of the Supreme Court order dated in CWP no. 114/2014, the DDM, Joda has raised the demand notices no Dated towards environmental clearance matter, the project proponent has deposited Rs 1072,60,31,101/- as directed Besides, in pursuance of the Supreme Court order dated in CWP no. 114/2014, the DDM, Joda has raised the demand notices no Dated towards forest matter, the project proponent has deposited Rs 2,33,57,557/- as directed. Modified Mining plan approval for expansion of Iron Ore Production from 5.62 MTPA to 7.99MTPA obtained from IBM vide letter No-MSM/FM/48-ORI/BHU/ /322 dated Earlier forest land in lease area was Ha. Permission for diversion of ha of forest area within the mining lease area was granted vide letter no F.No.8-17/2001-FC dated 21st April 2004, out of the applied area of Ha. Part of the non-forest land was included in the forest land based on the guideline of MoEF. Hence, present status of forest land is Ha and Non-forest land is Ha. Environmental clearance for the mining lease area over Ha for a production of 5.62 million tons per annum has been obtained by the Lessee on vide MOEF letter No. J-11015/1156/2007-IA.II (M). i

2 Environmental Clearance for establishment of an Iron ore beneficiation plant of 2 MTPA through put capacity within the lease hold area from Ministry of Environment & Forests vide their letter no. J-11015/317/2009-IA.II (M) dt is also obtained. The lessee has obtained surface right over an area of Ha out of Ha. Consent obtained from Pollution Control Board, Odisha and is valid up to The enhanced resource base has opened the avenues for capacity expansion of this mine from 5.62 MTPA to 7.99MTPA (ROM) for iron ore. This expansion project falls under Category A as per MoEF notification in this respect, because of mining lease being more than 50 Ha. The lease area is bounded by Latitude 21 57'11.09"N to 21 59'34.31"N and Longitude 85 16' 6.04" to 85 19' 24.93"East and falls in Survey in India Topo Sheet No. 73G/5. The mining lease area is approachable from NH 215 road which divides the lease area in to 2 parts. It can be approached from Barbil which is situated at a distance of 23km (by road) in the Northeast or from Koira which is at a distance of 11 km (by road) in the Southwest. The nearest Rail Head is at Barbil (both Passenger and goods train). The area is characterized by hilly as well as flat ground having elevation from 520m to 702m above M.S.L. Exploration has already been carried out by drilling in the form of 215 nos of bore hole from 1999 onwards. A total of Meterage of drilling has been undertaken to assess the resource/reserve. The bore holes of to have been taken into consideration for the resource estimation. Total mineable reserve of iron ore under all the categories (proved and Probable) within the area has been worked and it is estimated that Million Tonne having+45 % Fe grade available as on as per present exploration data. Total waste generation will be Million M3. Presently Open cast fully mechanized mining method with drilling, blasting with shovel dumper combination is adopted and the same will be continued after expansion also. Presently there are 4 waste dumps and 29 subgrade dumps within the lease area. Both lateral and depth ward development in the pit and dump rehandling has been proposed to be undertaken to achieve the targeted production. The working pits in all these quarries have been proposed to be developed with a bench height of 10m in Barpada block and in other block the height of the benches will be kept at 6m. ii

3 Mining equipment like DTH drill of 105mm dia, compressor of 450cfm, dumper (10-35t), hydraulic excavators of cum capacity etc. will be used during ensuing plan period to achieve the targeted production. Out of Mm3 of waste to be generated totally, Mm3 is to be utilized as minor mineral, 4.712Mm3 for the internal haul road maintenance, Mm3 is to be dumped at the at the earmarked dump sites and M.cum will be utilized for backfilling & reclamation of mined out land. Waste to be generate from the beneficiation plant is proposed to be dumped at waste dump in the plan period and in the conceptual period will be used for backfilling. At the end of life of mine, Ha of lease area will be developed with plantation and the remaining area of Ha will be left for public use. Part of the generated sub grade ore / mineral rejects will be blended directly, part will be up graded in the existing 2.0 MTPA beneficiation plant and sold to the consumers. Mineral rejects has been proposed to be stacked temporarily for future use. The mining lease area and the 10 km buffer zone from the periphery of the core zone is devoid of declared ecologically sensitive features like national parks, biospheres, sanctuaries, etc., The area also does not come under CRZ category. In the 10 km buffer zone, water bodies namely Karo Nadi adjacent NW, Kalmang Nala- 0.3Km (SE), Suna Nadi - 0.5Km(SE), Teherei Nala-4.5Km(S), Suna Nala-0.5Km(SE), Samij Nala-5.7Km (W), Korai Nala-5.2Km(SW), Kakarpani Nala 2.9Km(SE), Kunduru Nala 3.7km (NE) are located from the lease area. Topadihi Nala passes adjacent to the North Eastern boundary of the lease area. Forests like Mendhamaruni R.F- 1.8Km(SSW), Sidhhamath R.F-1.3Km(E), Lakhraghat R.F-0.6Km(N), Uliburu R.F-1.5Km(N), Karo R.F 0.6Km(W), Kathamala R.F-5.3Km(SW), Bhabani pararh R.F- 8.3Km(SE), Baitarani R.F-4.7Km(E) and Karampada R.F-4.3Km(NW) are located in the buffer zone. Karo Karampada Elephant corridor is located at a distance of 12.5km from lease area in NW direction. The life of the iron ore mine is estimated to be 44 years. However, the life of the mines may on assessment of reserves by further exploration, pit data and market demands on regular basis the life of the deposit may change. The water requirement for the mines is mainly for green belt, dust suppression, domestic purpose & in beneficiation plant for make-up purpose. The total water requirement will be iii

4 1225KLD.The water requirement is met from bore well. Ground water permission has already been obtained from CGWB. Various site services such as site office, weigh bridge, rest shed, first aid center, blasting shed, security house, magazine, guard house, workshop etc are available in the lease area. The total man power is 709 persons comprising 116 persons on direct basis and 593 on contract basis. Totally Ha area is already covered under plantation in safety zone, dump area etc within the lease area. Further, during ensuing plan period about 7.90Ha will be covered with plantation. At the end of the life of the mine, Ha covering backfilled mined out area, safety zone, bench plantation etc will be covered under plantation. Mining operations are in the lease for many decades. Habitations including Nuagaon village is located in this lease area for a long time. However, the mining & allied activities at present and also in the conceptual period will be confined to this granted surface rights area. Beyond that surface right area there is no such requirement of land acquisition even in private plots like homesteads, agriculture, etc. However, if any such requirement arises in future then and there, the acquisition will be as per the LA and R&R The existing mining operations in the area have already brought about positive impact locally by way of employment generation, increase in income generation, creation of infrastructural facility, marked improvement in the life style and living standards of the entire tribal and scheduled caste population of the surrounding area. There will be continued substantial improvement in case of local population in living standards, receipt of per capita income, cultural patterns, living styles, educational standards, etc. after expansion also. The project proponent has already carried out extensive beneficiary works, under their CSR responsibility objectives. These schemes will be further augmented and implemented after expansion. Future CSR programme will be implemented as per Companies (Corporate Social Responsibility Policy) Rules, 2014 framed under the Companies Act, Besides, proponent will contribute substantially to the overall economy and social development of the area through Corporate Environmental Activities (CER) activities. From the above it is evident that the expansion project will continue to improve the social and physical infrastructural patterns of this interior area in its own way resulting in overall iv

5 improvement of HDI (Human Development Index). Besides, the Central and State Government will also derive good financial benefits by way of receipt of DMF, GST, duties and cess. In view of above aspects of the project, this expansion project can be said to be beneficial to the local community, the local region, the State and to the entire country on the whole. ******* v

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT EXCUTIVE SUMMARY Project : Mining Lease of Iron Ore (Ari Dongri Iron Ore Mine) Name of Company / Mine Owner : Godawari Power and Ispat Limited Location Village : Tehsil : District

More information

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location 1. SUMMARY PRE-FEASIBILITY REPORT Project Stone Quarry Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location Village Taluka District State Rupapali Basna Mahasamund Chhattisgarh 1 Mining Lease

More information

(A govt. of Kerala Undertaking)

(A govt. of Kerala Undertaking) Annexure - 1 Basic Information Important Note: Please send the information by e-mail in word format and a signed & scanned copy to the Member Secretary prior to the EAC meeting. Please also provide a copy

More information

FEASIBILITY REPORT FOR NARAYANPOSHI IRON & MN ORE MINE-AMTC (EXPANSION OF MINE CAPACITY FROM 3.0 MTPA TO 6.0 MTPA (ROM) FOR IRON ORE & EXISTING 0.

FEASIBILITY REPORT FOR NARAYANPOSHI IRON & MN ORE MINE-AMTC (EXPANSION OF MINE CAPACITY FROM 3.0 MTPA TO 6.0 MTPA (ROM) FOR IRON ORE & EXISTING 0. 1 CHAPTER I EXECUTIVE SUMMARY 1.0 INTRODUCTION OF THE PROJECT / BACKGROUND INFORMATION 1.1 BACKGROUND INFORMATION OF PROJECT: Narayanposhi Iron & Manganese Ore Mines of Aryan Mining & Trading Corporation

More information

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3 N to 20 44' 20.7N Longitude  E to 85 35'27.5 E EXECUTIVE SUMMARY 1.0 INTRODUCTION Sri Mahesh Prasad Mishra proposes to mine Sand Quarry from an approved Mining Lease over an area of 14.85 Ac or 6.01 hectares (Non-Forest Land) which is located in at

More information

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT (OPENCAST QUARTZ MINE 40.313 ha) SUBMITTED BY Sri Door No. 39/49/39,

More information

PRE-FEASIBILITY REPORT FOR. GURUDA BLOCK MANGANESE MINES Village-Guruda, Tehsil-Barbil, District-Keonjhar, Odisha. M/s Serajjudin & Co.

PRE-FEASIBILITY REPORT FOR. GURUDA BLOCK MANGANESE MINES Village-Guruda, Tehsil-Barbil, District-Keonjhar, Odisha. M/s Serajjudin & Co. PRE-FEASIBILITY REPORT FOR GURUDA BLOCK MANGANESE MINES Village-Guruda, Tehsil-Barbil, District-Keonjhar, Odisha M/s Serajjudin & Co. CONTENTS SECTIONS DESCRIPTION PAGE NO. CHAPTER-1 EXECUTIVE SUMMARY

More information

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.)

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.) Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.) 1) Executive Summary Project Name of Company / Mine Owner Location Village Taluka District State Girgita Limestone Mine M/s KJS

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT M/S. VANAS INFRA PROJECTS PVT. LTD SURVEY NO. 598, CHINTALAPALLY VILLAGE, KOLLAPUR MANDAL, NAGARKURNOOL DISTRICT, TELANGANA PRE-FEASIBILITY REPORT SUBMITTED BY M/s. Sri Soma Jitendra H. No. 7-1-397/150,

More information

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0. ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.920ha) 1.1 Introduction The subject quarry is proposed for metal stone on 0.920

More information

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh.

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh. 1.0 EXECUTIVE SUMMARY 1.1 Introduction Road Metal of M/s. Lakshmi Stone Crusher covering an extent of 2.10 Ac is located at Sy. No. 379/1 of Perecherla Village, Medikonduru Mandal, Guntur District, Andhra

More information

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village: PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT Page1 PRE FEASIBILITY REPORT KALDA FLAG STONE QUARRY AREA OF -1.55 HACTARE STRICTLY AS PER MOEF GUIDELINE DATE 30/12/2006 IN TERMS OF PROVISIONS OF EIA NOTIFICATION 2006 VILLAGE KALDA TEHSIL PAWAI DISTRICT

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1. Introduction 1. Identification of project and project proponent The Pahanbarri Sand Quarry area is located in the Tawa River at Village- Pahanbarri, Tehsil- Itarsi & District-

More information

SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project Building Stone (Basalt) Quarry of M/s. Sharada Construction Pvt. Ltd.

SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project Building Stone (Basalt) Quarry of M/s. Sharada Construction Pvt. Ltd. SEIAA KARTAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS Name of the Project Building Stone (Basalt) Quarry of M/s. Sharada Construction Pvt. Ltd. Sl. No DOCUMENTS / X 1 Form -1 2 Pre-Feasibility Report

More information

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others 1. EXECUTIVE SUMMARY 1.1 Introduction The Road Metal Quarries was granted in Guntur District, Andhra Pradesh has been allotted to M/s. Viswanadha Stone Crusher & 16 others by Assistant Director of Mines

More information

Six monthly EC Compliance report of Nuagaon Iron Ore Beneficiation Plant project of M/s. KJS Ahluwalia for the period October, 2013 to March, 2014.

Six monthly EC Compliance report of Nuagaon Iron Ore Beneficiation Plant project of M/s. KJS Ahluwalia for the period October, 2013 to March, 2014. Six monthly EC Compliance report of Nuagaon Iron Ore Beneficiation Plant project of M/s. KJS Ahluwalia for the period October, 2013 to March, 2014. Status of Environmental Clearance Conditions Nuagaon

More information

PRE-FEASIBILTY REPORT

PRE-FEASIBILTY REPORT Aug 2018 PRE-FEASIBILTY REPORT OF M/S. J.M.R.MINES (MINING OF FELDSPAR, QUARTZ & MICA MINE) Lease Area : 5.78 Hectares(14.29 Acres) Sy.No.941,942,943 &947 Giddalur (V), Sydapuram (M), SPSR Nellore District

More information

PRE-FEASIBILTY REPORT SUNATHAR STONE QUARRY. VILLAGE: Sunathar. TAHASIL: Purushottampur. DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU

PRE-FEASIBILTY REPORT SUNATHAR STONE QUARRY. VILLAGE: Sunathar. TAHASIL: Purushottampur. DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU PRE-FEASIBILTY REPORT OF SUNATHAR STONE QUARRY VILLAGE: Sunathar TAHASIL: Purushottampur DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU Vill/Po- Gandala, P.S.- Hinjili, Dist.-Ganjam Odisha. CONTENTS CHAPTER

More information

M/s Tiffin s Barytes Asbestos and Paints Ltd (VIGNESHWARA BARYTES MINE) Near Ramalayam, Velpula (V&P) Y.S.R. Disrict.

M/s Tiffin s Barytes Asbestos and Paints Ltd (VIGNESHWARA BARYTES MINE) Near Ramalayam, Velpula (V&P) Y.S.R. Disrict. PRE FEASIBILITY REPORT FOR Proposed Barytes Mine over an Extent of 49.46 Ha, In Sy. No. 1021/15, 1021/3, 1021/5 of Vemula Village, Vemula Mandal, Y.S.R.Kadapa District, Andhra Pradesh. Submitted To Ministry

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT Of Shri Upendra Suryawanshi At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla, District-Betul (M.P.) Production Capacity: Max 6,320 Cu.mt/year Area 1.00Hectare Proponent Name

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary Sri D. Ujjinappa has applied for quarry lease for extracting of Building stone in Sy No. 19/2, Chatnihalli Village, Harpanahalli Taluk, Davangere District,

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KATIKELA RIVER SAND BED OVER 15.00 ACRES OR 6.070 HA IN VILLAGE KATIKELA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20)

More information

PRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND

PRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND EXECUTIVE SUMMARY Kumhari Stone Mine is situated in Village - Kumhari, P.O. Basia, P.S. - Basia, District : Gumla, Jharkhand over an area of 2.02 Hectares or 5.00 Acres [ Plot no. 2085(P)]. Kumhari Stone

More information

ADITYA BIRLA. EMil. Please find enclosed herewith the environmental statement report duly filled-in Form-V

ADITYA BIRLA. EMil. Please find enclosed herewith the environmental statement report duly filled-in Form-V / ADITYA BIRLA EMil Ref. No. EMILIGEOLI '35, 12017-18 Date-07.09.2017 0V The Member Secretary, State Pollution Control Board, Odisha Department of Forests ft Environment, Govt. of Odisha, Paribesh Bhawan,

More information

PRE FEASIBILITY REPORT. PROJECT Maharkund Manganese Ore Mine (10.62 ha) Village Maharkund; Tehsil Ramtek; District-Nagpur (MS) Project Proponent

PRE FEASIBILITY REPORT. PROJECT Maharkund Manganese Ore Mine (10.62 ha) Village Maharkund; Tehsil Ramtek; District-Nagpur (MS) Project Proponent PRE FEASIBILITY REPORT PROJECT Maharkund Manganese Ore Mine (10.62 ha) Village Maharkund; Tehsil Ramtek; District-Nagpur (MS) Project Proponent M/s Veet Rag Homes Pvt. Ltd. 267, Ganesh Phadnavis Bhavan,

More information

MCDR INSPECTION REPORT IBM/4800/2011

MCDR INSPECTION REPORT IBM/4800/2011 MCDR INSPECTION REPORT 1.0 GENERAL SN Particulars Details Name of the inspecting officer J.S. Hada, AMG Date of Inspection 13.9.2017 Accompanying mine official Shri Sunil Pal, Chief Geologist 1 Name of

More information

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bhubaneshwar regional office

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bhubaneshwar regional office INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bhubaneshwar regional office 1. Mine file No : ORI/IRON/KJR/MCDR-44/BBS (i) Name of the Inspecting : Officer and

More information

Grey Granite (Paradiso) Mine

Grey Granite (Paradiso) Mine Grey Granite (Paradiso) Mine PROJECT PROPONENT M/s. Karunai Granites Private Limited., Jagadevipalayam Village & Post, Krishnagiri Taluk, Krishnagiri District 635 203. Extent : 11.59.0 Hectares S.F. No.

More information

MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.

MODIFIED QUARRYING PLAN FOR SHINGATALOOR SAND MINING BLOCK-2 EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY. MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT -12.00 Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.NO - 129 & 131OF SHINGATALOOR - VILLAGE MUNDARGI - TALUK GADAG - DISTRICT

More information

Bar & Bench ( IA No.61 of 2015 in IA No.40 of 2015 and IA No of 2018 WRIT PETITON (C) NO. 114 OF 2014.

Bar & Bench (  IA No.61 of 2015 in IA No.40 of 2015 and IA No of 2018 WRIT PETITON (C) NO. 114 OF 2014. REPORTABLE IN THE SUPREME COURT OF INDIA CIVIL ORIGINAL JURISDICITON I.A. No. 40 of 2015, I.A.No.42 of 2015, IA No.61 of 2015 in IA No.40 of 2015 and IA No.111989 of 2018 IN WRIT PETITON (C) NO. 114 OF

More information

PRE-FEASIBILIY REPORT

PRE-FEASIBILIY REPORT BENDRI LIMESTONE QUARRY NO. - 4 3 (Quarry No. 1) (Quarry No. 1)MINERALS - DOLOMITE (LEASE PERIOD 20.05.2002 TO 19. 05.2022) LEASE AREA - 42.754 HECTARES MINING PROJECT - CATEGORY- B PRE-FEASIBILIY REPORT

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF ALAMPUR THIKARIYA SAND DEPOSIT QUARRY KHASRA NO. 149, TOTAL AREA- 8.0 Hect. (MALENI RIVER) AT VILLAGE- ALAMPUR THIKARIYA, TEHSIL-JAORA, DISTRICT- RATLAM, STATE-MADHYA PRADESH

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT EXECUTIVE SUMMARY 1.0 Executive Summary The Mining lease was granted in favour of Shri Mukesh Kumar S/o Shri Harish Chandra, R/o Tatol vaya Bagra, Tehsil - Bhinmal, Dist.-Jalore

More information

SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project : Building Stone Quarry of Sri. B. Narendra Kumar

SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project : Building Stone Quarry of Sri. B. Narendra Kumar SEIAA KARTAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS Name of the Project : Building Stone Quarry of Sri. B. Narendra Kumar Sl. No DOCUMENTS / X 1 Form -1 2 Pre-Feasibility Report [PFR] in the format

More information

MCDR INSPECTION REPORT

MCDR INSPECTION REPORT 1 MCDR INSPECTION REPORT General SN Particulars Details Date of Inspection 18.10.2016 1 Name of the Mine Dhobitola Titaniferous Iron Ore Mine 2 Total Lease Area (Ha) 2.61 Ha (Entire Forest Land) with breakup

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary Smt. J N Rukmini, has applied for extracting of Building stone in Sy No. 40, Kuroda Bore Kavala village, Hassan Taluk & District, Karnataka over an extent

More information

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR AT VILLAGE:- BRAHMPURI, TALUKA:- Sayla, DIST.:-Surendranagar 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE

More information

Pre- Feasibility RepoRt

Pre- Feasibility RepoRt Pre- Feasibility RepoRt AREA- 59.28 ACRE (24.0 HA) FOR KEN RIVER SAND/MORRUM MINING AT BLOCK NO-09 KHAND NO-03 GATA NO-337 VILLAGE- KANWARA TEHSIL-BANDA, DISTRICT- BANDA(U.P) SHRI RAVINDRA NATH SINGH JULY

More information

Masonry Stone Mining Project, M. L. No. 27/09, M. L. Area 1.0 ha. Near Village: Velangri, Tehsil & District-Sirohi (Rajasthan) PRE FEASIBILITY REPORT

Masonry Stone Mining Project, M. L. No. 27/09, M. L. Area 1.0 ha. Near Village: Velangri, Tehsil & District-Sirohi (Rajasthan) PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY PRE FEASIBILITY REPORT This is an existing mine, proposal for obtaining Environmental Clearance for Masonry Stone with production capacity 37,300 TPA Near Village: Velangri, Tehsil-Sirohi,

More information

ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING

ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING 1. Name and Address of Quarry Lease Holder: a. Name of applicant Priyesh Singh Thakur S/o Shri Karan Singh Thakur b. Designation of applicant Owner c. Name

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN VILLAGE - KUNDLA TEHSIL - NAGDA DISTRICT - UJJAIN STATE - MADHYA PRADESH KHASRA NO. - 574 AREA - 8.00 Hectare PRODUCTION - 98800 cu.m/ Year PREPARED UNDER RULE 42 C OF MP MINOR

More information

Annexure-I

Annexure-I Annexure-I Annexure-II NOAMUNDI G TATA IRON OF M/S TATA STEEL LIMITED (Lease area: 1160.060 Ha.) MINING PLAN FROM 01.01.2012 TO 2016-17 (SUBMITTED UNDER RULE 24A OF MeR 1960) (i) Name of the

More information

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bhubaneshwar regional office

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bhubaneshwar regional office INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bhubaneshwar regional office 1. Mine file No : ORI/GRPH/NUP/MCDR-4/BBS (i) Name of the Inspecting : Officer and

More information

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bhubaneshwar regional office

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bhubaneshwar regional office INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bhubaneshwar regional office 1. Mine file No : ORI/IRON/SNG/MCDR-11/BBS (i) Name of the Inspecting : Officer and

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For M/s. Shah Shah Mines & Minerals, SY. NO. 206/1, Gangireddipalli Village, Thamballapalli Mandal, Chittoor District, Andhra Pradesh. INDEX ITEM PAGE NO. 1. EXECUTIVE SUMMARY 3

More information

1. PRE-FEASIBILITY REPORT

1. PRE-FEASIBILITY REPORT 1. PRE-FEASIBILITY REPORT 1.1 Executive Summary Sri. T. Thimmegowda, has applies quarry lisence for extracting of Building Stone Quarry in Sy No. 33/2, Kurodbore Kaval village, Hassan Taluk, Hassan District,

More information

Feasibility Report for Increase in Production of Kolmong Manganese Mine

Feasibility Report for Increase in Production of Kolmong Manganese Mine 1.0 EXECUTIVE SUMMARY: Kolmong Manganese Mine of M/s. Rungta Mines Limited is in operation since 01.01.1939 after execution of mining lease on 08.05.1939. The area is situated in Sundargarh district of

More information

PRE FEASIBILITY REPORT For SILICA SAND MINE. At Village- Karlapudi, Tehsil- Kota, Nellore, Andhra Pradesh ha.

PRE FEASIBILITY REPORT For SILICA SAND MINE. At Village- Karlapudi, Tehsil- Kota, Nellore, Andhra Pradesh ha. PRE FEASIBILITY REPORT For SILICA SAND MINE At Village- Karlapudi, Tehsil- Kota, Nellore, Andhra Pradesh 11.797 ha. Project Proponent Sri Yashpal Mendon 1 st Floor Mineral House, Hampankatta, Mangalore

More information

Short Narrative & Justification on Project

Short Narrative & Justification on Project Short Narrative & Justification on Project 1) M/s NMDC LIMITED Incorporated in 1958 as a Government of India, public sector enterprise under the administrative control of the Ministry of Steel, Government

More information

EXECUTIVE SUMMARY. 1.2 SALIENT FEATURES OF THE PROJECT The mine lease area falls under the Toposheet No. 65 N/11 bearing following Toposheet details:

EXECUTIVE SUMMARY. 1.2 SALIENT FEATURES OF THE PROJECT The mine lease area falls under the Toposheet No. 65 N/11 bearing following Toposheet details: 2015 PRE-FEASIBILITY REPORT (FOR TOR) OF GADABAVALASA MANGANESE ORE MINES, AT: GADABAVALASA, GARIVIDI MANDAL, DIST: VIZIANAGRAM FOR PRODUCTION OF 12,000TPA OF MANGANESE ORE OVER AN AREA OF 12.691 HA. OF

More information

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha 1. EXECUTIVE SUMMARY 1.1 Introduction The Eknampuram Quartz mine of 89.80 Acres/ 36.34 ha is located in Sy. No. 60, Eknampuram Village, C.S. Puram Mandal, Prakasam District, Andhra Pradesh has been allotted

More information

Scrutiny comments on examination of FMCP ( lease expiring on 31/03/2020 )of Teherai Iron and Manganese Mine of M/s Bonai Industrial Co.

Scrutiny comments on examination of FMCP ( lease expiring on 31/03/2020 )of Teherai Iron and Manganese Mine of M/s Bonai Industrial Co. Scrutiny comments on examination of FMCP ( lease expiring on 31/03/2020 )of Teherai Iron and Manganese Mine of M/s Bonai Industrial Co. Limited GENERAL: 1. Lease number and lease period since execution

More information

Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P

Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P SITUATED AT KAKKUR VILLAGE KOZHIKODE TALUK KOZHIKODE DISTRICT KERALA STATE EXTENT: 2.0437 Ha STANDARD TERMS OF REFERENCE (TOR)

More information

INDIAN BUREAU OF MINES MINES CONTROL AND CONSERVATION OF MINERAL DIVISION MCDR INSPECTION REPORT Bhubaneshwar regional office

INDIAN BUREAU OF MINES MINES CONTROL AND CONSERVATION OF MINERAL DIVISION MCDR INSPECTION REPORT Bhubaneshwar regional office INDIAN BUREAU OF MINES MINES CONTROL AND CONSERVATION OF MINERAL DIVISION MCDR INSPECTION REPORT Bhubaneshwar regional office Mine file No (i) Name of the Inspecting Officer and ID No. (ii) Designation

More information

EXECUTIVE SUMMARY. 1.1 Executive Summary

EXECUTIVE SUMMARY. 1.1 Executive Summary 1.1 Executive Summary EXECUTIVE SUMMARY Chobe ki Guwari Sand Stone Mining Project (M.L. No- 26-R-01/2001) is situated near village Chobe ki Guwari, Tehsil Sapotra, District Karoli, State Rajasthan over

More information

GHODAPALANA SAND QUARRY (IN GANJAM DISTRICT OF ODISHA)

GHODAPALANA SAND QUARRY (IN GANJAM DISTRICT OF ODISHA) PRE FEASIBILITY REPORT ON GHODAPALANA SAND QUARRY (IN GANJAM DISTRICT OF ODISHA) Lease Area: 18.687 acres or 7.562 Ha. of Sri Rama chandra Dash Polasara CHAPTER 1 EXECUTIVE SUMMARY Ghodapalana sand Quarry

More information

MCDR INSPECTION REPORT S/ No. 1 Name of the Mine Navalutti Iron Ore Mine 2 Total Lease Area (Ha) with breakup of Non-forest & forest land

MCDR INSPECTION REPORT S/ No. 1 Name of the Mine Navalutti Iron Ore Mine 2 Total Lease Area (Ha) with breakup of Non-forest & forest land MCDR INSPECTION REPORT S/ No. Particulars Details 1 Name of the Mine Navalutti Iron Mine 2 Total Lease Area (Ha) with breakup of Non-forest & forest land 32.40Ha (excluding 2.0 Hect. of road). Complete

More information

Feasibility Report for increase in Production of Nadidih Iron and Manganese mine

Feasibility Report for increase in Production of Nadidih Iron and Manganese mine 1.0 EXECUTIVE SUMMARY: Nadidih Iron & Manganese Mine, covering an area of 121.405 ha of M/s Feegrade & Co. (P) Ltd. is in operation since 1961. The site is at a distance of 25km from Barbil and is well

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh.

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh. 1.0 EXECUTIVESUMMARY 1.1 Introduction Road Metal of M/s. Venkata Ramana Stone Crusher covering an extent of 0.89 Ac is located at Sy.No.379/1 of Perecherla Village, Medikonduru Mandal, Guntur District,

More information

Project Code: Clearance Letter No. : MoEF vide letter No: - J-11015/423/2005-IA-II (M) Dated 18 th May 2006

Project Code: Clearance Letter No. : MoEF vide letter No: - J-11015/423/2005-IA-II (M) Dated 18 th May 2006 Name of the Project: North North Naubasta Limestone Mine (ML 2) (A unit of M/s Jaiprakash Associates Limited) of Mining Capacity 1.85 MTPA at villages Naubasta, Sumeda, Atrauli and Garhwa Tehsil Huzur

More information

[FORM-V] PART-A PART-B

[FORM-V] PART-A PART-B [FORM-V] (See Rule 14) Environment Statement for the financial year ending the 31 st March 2015 PART-A (1) Name and address of the owner - M/s. Serajuddin and Co. / Occupier of the industry, Balda Block

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY PRE FEASIBILITY REPORT This is an existing mine. Proposal for obtaining Environmental Clearance for marble with production capacity 72860 TPA Near Village: Sankotra, Tehsil-Jamwa

More information

Project Code: Clearance Letter No. : MoEF vide letter No:- J-11016/202/2003-IA-II(M) Dated 6 th Jan 2005

Project Code: Clearance Letter No. : MoEF vide letter No:- J-11016/202/2003-IA-II(M) Dated 6 th Jan 2005 Name of the Project: Naubasta Limestone Mine ( A Unit of M/s Jaiprakash Associates Limited ) for Expansion of Mining Capacity from 3.3 MTPA to 4.0 MTPA at villages Atrauli, Gadhwa, Kachoor, Naubasta, Kauadhan,

More information

EIA-EMP REPORT GRAVEL QUARRY (Category-B2)

EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EXTENT : 4.00.0 Hectares S. F. No : 436/1A (P) VILLAGE TALUK DISTRICT STATE : IYANPAPPAKKUDI : MADURAI : MADURAI : TAMIL NADU PROJECT PROPONENT Thiru P. Ayyanar

More information

Feasibility Report for Increase in Production of Sanindpur Iron & Bauxite Mine of M/s Rungta Sons Pvt. Ltd.

Feasibility Report for Increase in Production of Sanindpur Iron & Bauxite Mine of M/s Rungta Sons Pvt. Ltd. 1.0 EXECUTIVE SUMMARY: Sanindpur Iron & Bauxite Mine, over an area of 147.10 hectare of M/s. Rungta Sons Pvt. Ltd. is in operation since 1986 in Sundargarh Dist. of Odisha. The mining lease was granted

More information

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION. MCDR inspection REPORT. Bangalore regional office

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION. MCDR inspection REPORT. Bangalore regional office 1. Mine file No : (i) Name of the Inspecting : Officer and ID No. INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION KNT/BLR/FE/12/BNG (ii) Designation : (iii) Accompaning mine : Official

More information

1 Name of the Project Gonua Iron & Mn. Mine of Sri Pawan Kumar Ahluwalia

1 Name of the Project Gonua Iron & Mn. Mine of Sri Pawan Kumar Ahluwalia HALF YEARLY PROGRESSIVE CLEARANCE ACCORDED BY THE MINISTRY OF ENVIRONMENT & FOREST, GOVT. OF INDIA, TO THE PROJECT EXPANSION OF GANUA IRON & MN. MINE OF SHRI PAWAN KUMAR AHLUWALIA (FROM 0.140 MTPA TO 0.36

More information

PKA/Gonua/MoEF/ Date:

PKA/Gonua/MoEF/ Date: PKA/Gonua/MoEF/ Date: -18.06.2018 To The Director, Ministry of Environment & Forests (Central) Eastern Regional Office A/3 - Chandrasekharpur Bhubaneswar-751023 Sub:- Sir, Half Yearly Progressive Compliance

More information

S. No Parameter Details 1 Name & Address of the Applicant

S. No Parameter Details 1 Name & Address of the Applicant 1. EXECUTIVE SUMMARY S. No Parameter Details 1 Name & Address of the Applicant M/s AMULYA GRANITES Prop: Smt CH.SARALA H. No. FLAT NO.207 Roja Kishore Residency, Chenchupet, Tenali, AP-522 202 Guntur District,

More information

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bhubaneshwar regional office

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bhubaneshwar regional office INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bhubaneshwar regional office 1. Mine file No : (i) Name of Inspecting : Officer and ID No. (ii) Designation :

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE 1 PROPOSED TOR FOR EIA STUDY Kottmeta Limestone Mine, ML Area 801.171 ha, is located in Village Katamater, Tehsil/District Malkangiri, Odisha. Dalmia Cement (Bharat) Limited,

More information

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 PRE-FEASIBILITY REPORT 1. SUMMARY Project Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 Village Kudeli Taluka Baikunthpur District Koriya

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT Village: Bhatakhalli Tahasil: Polsara, District: GANJAM, State: Odisha Lease Area 7.145Ha Sri Rabi Narayana Padhi Village bhatakhali At- P.O- Polsara Dist: Ganjam, Odisha C O N T

More information

PREFEASIBILITY REPORT FOR BRICK EARTH MINE

PREFEASIBILITY REPORT FOR BRICK EARTH MINE Page 1 PREFEASIBILITY REPORT FOR BRICK EARTH MINE Developed By- Village-Chandauhan, Tehsil-Phulpur, District-Allhabaad, Uttar Pradesh. RAI ENVIROMENTAL SERVICES PVT. LTD. Website: www.raienviro.com Email

More information

1.0 PROJECT DESCRIPTION

1.0 PROJECT DESCRIPTION INDEX S.NO. TOPIC PAGE NO. 1.0 PROJECT DESCRIPTION 1 1.1 INTRODUCTION 1 1.2 TYPE OF PROJECT 1 1.3 NEED OF PROJECT 1 1.4 BRIEF DESCRIPTION OF THE PROJECT 2 1.5 LOCATION MAP 4 1.6 PROJECT DETAILS 5 1.6.1

More information

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report Limestone Mining Project (Area: 16.18 ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For MINING ACTIVITY CATEGORY B2 UNDER

More information

WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R.

WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R. WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R.Global Granites Production Granite Black Granits At Survey

More information

SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project : Siddapur Natural Sand Mining in Patta land

SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project : Siddapur Natural Sand Mining in Patta land SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS Name of the Project : Siddapur Natural Sand Mining in Patta land Sl. No DOCUMENTS / X 1 Form -1 2 Pre-Feasibility Report [PFR] 3 Environmental

More information

M/s.NEERAJ KUMAR JAIN

M/s.NEERAJ KUMAR JAIN EXECUTIVE SUMMARY OF DARSHANI LATERITE AND RED OCHRE DEPOSIT Area : 15.00 Ha. Village Budhanwara, Tahsil Bohriband, Dist. Katni MADHYA PRADESH For M/s.NEERAJ KUMAR JAIN KATNI 1 BUDHANWARA LATERITE AND

More information

CONTENT LIST 3.0 PROJECT DESCRIPTION 7 TYPE OF PROJECT INCLUDING INTERLINKED AND INDEPENDENT PROJECTS, IF ANY

CONTENT LIST 3.0 PROJECT DESCRIPTION 7 TYPE OF PROJECT INCLUDING INTERLINKED AND INDEPENDENT PROJECTS, IF ANY CONTENT LIST S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 3 (i) IDENTIFICATION OF PROJECT & PROJECT PROPONENT 3 (ii) BRIEF DESCRIPTION OF NATURE

More information

2) A copy of the document in support of the fact that the Proponent is the rightful lessee of the mine should be given.

2) A copy of the document in support of the fact that the Proponent is the rightful lessee of the mine should be given. PROPOSED TERMS OF REFERENCES (A) Suggested by the Applicant 1(a): STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND INFORMATION TO BE INCLUDED

More information

FORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E))

FORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E)) FORM 1 (As per new Notification of MoEF dated 01-12-2009 vide S.O 3067 (E)) I) BASIC INFORMATION Item Details 1 Name of the project/s Sri.Gandi Suryanarayana color Granite 2 S. No. in the schedule Item

More information

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT. Hyderabad regional office

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT. Hyderabad regional office 1. Mine file No : (i) Name of the Inspecting : Officer and ID No. INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION AP/ANP/L.ST-27/ HYD (ii) Designation : (iii) Accompaning mine : Official

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT GRANITE BUILDING STONE QUARRY MINING PROJECT STATE : KERALA DISTRICT : KANNUR THALUK : THALASSERY VILLAGE : THRIPPANGOTTUR BLOCK NO. : NIL SURVEY NO. : 275/1A MINERAL : GRANITE BUILDING

More information

EXECUTIVE SUMMARY 1.0 MADHYA PRADESH STATE MINING CORPORATION LTD

EXECUTIVE SUMMARY 1.0 MADHYA PRADESH STATE MINING CORPORATION LTD EXECUTIVE SUMMARY 1.0 MADHYA PRADESH STATE MINING CORPORATION LTD Madhya Pradesh State Mining Corporation Ltd (MPSMCL), a company of Government of Madhya Pradesh has been allotted Amelia (North) Coal Mining

More information

EXISTING PROJECT FOR ORDINARY SAND MINING

EXISTING PROJECT FOR ORDINARY SAND MINING (C) PROJECT REPORT OF EXISTING PROJECT FOR ORDINARY SAND MINING OF JASHUBEN CHHAGANBHAI OAD AT VILLAGE:-TIMBA, TALUKA:- KAMREJ, DIST.:- SURAT 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED HALF YEARLY PROGRESS REPORT ON IMPLEMENTATION OF ENVIRONMENTAL CLEARANCE CONDITION BY MoEF (PERIOD FROM OCTOBER 13 TO MARCH 14) HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED SIX MONTHLY

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN At Narmada River Mining Project:-Category B2 Lease Area: 20.000 Hect. Khasra No. 735 Vill.-Boras, Tehsil- Udaipura District- Raisen (M.P) Project Proponent M/s Shiva Corporation

More information

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area.

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area. PROJECT BRIEF PROJECT LOCATION: - Pahar Kua Marble Range Mining Project Q L No 235 is located near village Pahar Kua, Tehsil Makrana., District Nagaur Rajasthan. Project is approachable from national highway.

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1. EXECUTIVE SUMMARY Spreading over an area of 45.555 ha, the proposed project is to extract limestone from the proposed mining lease area lying in undeveloped, barren, rocky and

More information

Pramod S. Kambli. Page 1

Pramod S. Kambli. Page 1 PREFEASIBILITY STUDY FOR SHREE. PRAMOD S. KAMBLI Page 1 Executive summary Shree.., has laterite stone quarry in an area 2.61 Ha in the survey No. 1091 With quarrying capacity of 10259.31 TPA. The major

More information

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 01. Name of the Project: Koira Iron Mine of M/S. Essel Mining & Industries Limited, Barbil, Keonjhar, Odisha 02. MoEF Clearance No. &

More information

S.N. Condition in Environmental Clearance Compliance Status upto June (A) Specific Conditions (i)

S.N. Condition in Environmental Clearance Compliance Status upto June (A) Specific Conditions (i) Six Monthly Status of Compliance for Environmental Clearance No J-11015/108/2005- IA.II (M) dated 28.07.2006 for 2.2 MTPA Coal Mining from Utkal B-2 Coal Block by M/s. Monnet Ispat & Energy Limited S.N.

More information

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 01. Name of the Project: Koira Iron Mine of M/S. Essel Mining & Industries Limited, Barbil, Keonjhar, Odisha 02. MoEF Clearance No. &

More information

PROJECT PARTICULARS. Lease address - Village panchayat - Nara, Tahsil -Kanker, Name of the proponent - Village panvhayat Nara

PROJECT PARTICULARS. Lease address - Village panchayat - Nara, Tahsil -Kanker, Name of the proponent - Village panvhayat Nara PROJECT PARTICULARS Name of the project - Sand mining Lease address - Village panchayat - Nara, Tahsil -Kanker, Dist Kanker (C.G.) Khasra No. - 1025 Sand mining area - 5.00 Hectares Name of the mineral

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT (B) PREFEASIBILITY REPORT OF EXISTING SAND MINING PROJECT OF RAJESHBHAI BHAGUBHAI PATEL AT VILLAGE:- Panchlai, TALUKA:- Pardi, DIST.:-Valdad. 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bhubaneshwar regional office

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bhubaneshwar regional office INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bhubaneshwar regional office 1. Mine file No : ORI/IRON/KJR/MCDR-65/BBS (i) Name of the Inspecting : Officer and

More information

EIA Report for ha Bhatia Limestone Mine EXECUTIVE SUMMARY

EIA Report for ha Bhatia Limestone Mine EXECUTIVE SUMMARY EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 Introductions The lease area is being hold by M/s KJS Cement Ltd, and Pawan Kumar Ahluwalia is the Managing Director and correspondence address is M/s KJS