Dialogue Session With Datuk Bandar KL. On Road Dispersal System in Bangsar & Brickfields

Size: px
Start display at page:

Download "Dialogue Session With Datuk Bandar KL. On Road Dispersal System in Bangsar & Brickfields"

Transcription

1 Dialogue Session With Datuk Bandar KL On Road Dispersal System in Bangsar & Brickfields

2 CURRENT TRAFFIC SITUATION IN AND AROUND BANGSAR & BRICKFIELDS

3 CURRENT TRAFFIC SITUATION IN AND AROUND BANGSAR & BRICKFIELDS 1) Traffic is heavy on the main roads in and around Bangsar & Brickfields i.e. intersection i of Jalan Travers/ Jalan Bangsar; Jalan Tun Sambanthan/ Jalan Travers; Jalan Tun Sambanthan/ Jalan Tun Sambanthan 4 and Jalan Tun Sambanthan/ Jalan Robson. Side roads in and around residential areas are also heavy. CAUSES OF HEAVY TRAFFIC IN THE AREA i. Current roads are unable to cope with the surge in traffic volume due to the fast paced development in and around Brickfields notably KL Sentral ii. Illegal parking of vehicles (especially on the main roads in Brickfields) compound the situation due to insufficient parking areas iii. Signalised junctions have already reached their optimum capacity

4 CURRENT TRAFFIC SITUATION IN AND AROUND BANGSAR & BRICKFIELDS

5 TRAFFIC SITUATION IN AND AROUND BANGSAR & BRICKFIELDS AFTER TRAFFIC SITUATION IN AND AROUND BANGSAR & BRICKFIELDS AFTER IMPROVEMENT

6 PROPOSED TRAFFIC SOLUTION FOR BANGSAR/BRICKFIELDS Intersection of Jalan Travers/Jalan Bangsar from KL Sentral to Jalan Damansara and Lebuhraya Mahameru Slip road from Jalan Bangsar to Jalan Maarof

7 PROPOSED TRAFFIC SOLUTION UNDER RM110 MILLION STIMULUS PACKAGES Package 1: Construction of Flyover at Jalan Travers/Jalan Bangsar Intersection Package 2: Construction of Flyover from KL Sentral to Jalan Damansara & Lebuhraya Mahameru Package 3: Upgrading of Jalan Tun Sambanthan and its vicinity Package 4: Construction of Pedestrian Bridges & Linkages Package 5: Upgrade and Repair Roads in KL Sentral Package 6: Construction of Elevated Road from Jalan Bangsar to Jalan Maarof

8 STIMULUS PACKAGE 1: CONSTRUCTION OF FLYOVER AT JALAN TRAVERS/JALAN BANGSAR INTERSECTION Flyover at intersection of Jalan Travers/Jalan Bangsar

9 STIMULUS PACKAGE 1: CONSTRUCTION OF FLYOVER AT JALAN TRAVERS/JALAN BANGSAR INTERSECTION View of Flyover from Jalan Bangsar

10 STIMULUS PACKAGE 1: CONSTRUCTION OF FLYOVER AT JALAN TRAVERS/JALAN BANGSAR INTERSECTION View of Flyover from Jl Jalan Travers

11 STIMULUS PACKAGE 1: CONSTRUCTION OF FLYOVER AT JALAN TRAVERS/JALAN BANGSAR INTERSECTION View of flyover from 1 Sentral Building on Jalan Travers

12 STIMULUS PACKAGE 2: CONSTRUCTION OF FLYOVER FROM KL SENTRAL TO JALAN DAMANSARA & LEBUHRAYA MAHAMERU Flyover from KL Sentral to Jalan Damansara/Lebuhraya Mahameru

13 STIMULUS PACKAGE 2: CONSTRUCTION OF FLYOVER FROM KL SENTRAL TO JALAN DAMANSARA & LEBUHRAYA MAHAMERU View of Flyover from KL Sentral to Jalan Mahameru and Jalan Damansara

14 STIMULUS PACKAGE 3: UPGRADING OF JALAN TUN SAMBANTHAN The upgrading works include widening and beautification of roads in Brickfieldsas well as The upgrading works include widening and beautification of roads in Brickfields as well as conversion of roads to one way system

15 STIMULUS PACKAGE 3 PROPOSED BEAUTIFICATION OF JALAN TUN SAMBANTHAN WITH THE UPGRADING & CONVERSION TO ONE-WAY STREET

16 STIMULUS PACKAGE 3 PROPOSED BEAUTIFICATION OF JALAN TUN SAMBANTHAN More artist impression of the new one way street system

17 STIMULUS PACKAGE 3 PROPOSED BEAUTIFICATION OF JALAN TUN SAMBANTHAN Artist impression of the new one way street system alongside Nu Sentral Mall by 2012

18 STIMULUS PACKAGE 4: CONSTRUCTION OF PEDESTRIAN BRIDGES & LINKAGES

19 STIMULUS PACKAGE 4: CONSTRUCTION OF PEDESTRIAN BRIDGES & LINKAGES Artist impression of a pedestrian bridge linking KL Monorail to Nu Sentral Mall

20 STIMULUS PACKAGE 4: CONSTRUCTION OF PEDESTRIAN BRIDGES & LINKAGES Artist impression of a pedestrian bridge near 348 Sentral

21 STIMULUS PACKAGE 4: CONSTRUCTION OF PEDESTRIAN BRIDGES & LINKAGES Artist impression of a pedestrian bridge near 348 Sentral

22 STIMULUS PACKAGE 5: UPGRADE AND REPAIR ROADS AT KL SENTRAL

23 STIMULUS PACKAGE 5: UPGRADE AND REPAIR ROADS AT KL SENTRAL Jalan Stesen Sentral, one of the roads in the KL Sentral would undergo upgrade and repair

24 STIMULUS PACKAGE 6: CONSTRUCTION OF ELEVATED ROAD FROM JALAN BANGSAR TO JALAN MAAROF Elevated road from Jalan Bangsar to Jalan Maarof

25 STIMULUS PACKAGE 6: CONSTRUCTION OF ELEVATED ROAD FROM JALAN BANGSAR TO JALAN MAAROF View of elevated road from Jalan Bangsar

26 ONGOING IMPLEMENTATION OF A PROPOSED TRAFFIC SOLUTION (currently in progress)

27 PROPOSED TRAFFIC SOLUTION FOR BANGSAR/BRICKFIELDS RM110 MILLION TRAFFIC DISPERSAL SCHEME HAS BEEN LAUNCHED PACKAGE 1 HAS COMMENCED WORK ON 1 OCTOBER 2009 SUBSEQUENT PACKAGES WILL BE IMPLEMENTED ACCORDING TO SCHEDULE THE WHOLE PROJECT IS EXPECTED TO BE COMPLETED BY EARLY 2011

28 PROPOSED TRAFFIC SOLUTION FOR BANGSAR/BRICKFIELDS Based on the outcome of the dialogue on 9 October 2009, a one month period has been given to the Bangsar/Brickfields/Federal Hills community to comment & provide feedback on the matter. The agreed deadline was for a month ending by 5pm on 9 November Mohd Khir, Engineer, Public Works Department Dewan Bandaraya Kuala Lumpur 19 th, Menara DBKL 1, Jalan Raja Laut Kuala Lumpur Tel: / Fax: mohdkhir@dbkl.gov.my cc. corp.comm-assistline@mrcb.com.my