State of Oregon Department of Forestry - Department of Revenue. No fica on: Opera on Name: Lake Creek South 2 H&S

Size: px
Start display at page:

Download "State of Oregon Department of Forestry - Department of Revenue. No fica on: Opera on Name: Lake Creek South 2 H&S"

Transcription

1 State of Oregon Department of Forestry - Department of Revenue No fica on Number: Opera on Name: Lake Creek South 2 H&S This report is the processed informa on from the No fica on of Opera on/applica on for Permit to Operate Power Driven Machinery submi ed by Rosboro Forester and received by Department of Forestry on 1/1/2015. You must wait at least 15 days a er successful submi al of this no fica on before star ng the ac vi es in the no fica on (see OAR (1)). You may contact the Stewardship Forester to request a waiver of the 15-day wai ng period. The wai ng period remains in effect unless you receive no ce from the Stewardship Forester that it is waived. No ce and Permits No ce is given to the State Forester that an opera on will be conducted on the lands described herein. Oregon Department of Forestry Contact Informa on ODF District: Western Lane ODF Office: Western Lane - State Forests, Western Lane Phone: (541) Stewardship Forester: Robin Biesecker RBIESECKER@ODF.STATE.OR.US ODF District: Western Lane ODF Office: Veneta, Western Lane Phone: (541) Stewardship Forester: Robin Biesecker RBIESECKER@ODF.STATE.OR.US Page 1 of 8

2 Rosboro Forester Rosboro LLC PO Box 20, 2509 Main Street Springfield, Oregon Landowner(s) No ce to Landowner(s) Reforesta on may be required by the landowner if mber harves ng is part of the proposed opera ons. On-site inspec ons may be conducted by Oregon Department of Forestry employees to ensure compliance with all laws and rules governing fire protec on and forest prac ces on private land. Land use conversion to non-forest use involves regula ons administered by other state and local governments, which may apply to the future use or development of this site. No ce to Operator(s) If you are conduc ng mber harves ng or road construc on within 100 feet of overhead u lity lines contact the local u lity in accordance with ORS Oregon's Overhead Safety Act and OAR Power Line Safeguards. Iden fica on tags are located on each pole. Call the Oregon U lity No fica on Center at 811 at least 2 business days before star ng mber harves ng, road construc on, or any other ac vi es involving excava on that may affect an underground u lity line. The Center will coordinate with the appropriate u lity companies to locate underground u lity lines that may be affected by your ac vi es. Toby Eck Fire Emergency Contact LEGAL NOTICE Page 2 of 8

3 The following sec on provides legal no fica on of the requirement to submit a wri en plan before certain por ons of this Opera on may begin. Statutory Wri en Plan A Statutory Wri en Plan may be required before opera on ac vi es begin near the protected resources listed in the following Opera on informa on page(s) or otherwise described to you by the Stewardship Forester, OAR The Statutory Wri en Plan must describe in detail how the resource(s) will be protected during the opera on. There is a wai ng period for Statutory Wri en Plans that is separate from the no fica on wai ng period. Contact the Stewardship Forester listed above for more informa on on Wri en Plans and wai ng periods. A por on or all of your opera on(s) may be eligible for a waiver of the Statutory Wri en Plan requirement. Use the Resource Descrip on informa on provided on the following Opera on page(s) in conjunc on with Technical Note #10 to determine your eligibility. Go to the following link or contact your Stewardship Forester for more informa on: h p:// Non-Statutory Wri en Plan: A Non-Statutory Wri en Plan may be required for resources or condi ons in or near this Opera on as determined by the Stewardship Forester, OAR (10). Page 3 of 8

4 Page 4 of 8

5 Unit: Lake Creek South 2: 53.5 acres Page 5 of 8

6 Unit: Lake Creek South 2 - Ac vi es Ac vity: Herbicide Applica on (Unit) Quan ty: Start: 6/1/2015 End: 12/1/2015 Method(s): Ground - Manual spot applica on, Chemical(s): imazapyr Chemical Carrier(s): water Chemical Addi ve(s): Remarks: Hack & Squirt Operator: Rosboro Forester Rosboro LLC PO Box 20, 2509 Main Street Springfield, Oregon Unit: Lake Creek South 2 - Statutory Wri en Plan A Statutory Wri en Plan may be required for the resources detected in or near this Unit if ac vi es occur within: 100 Feet of 300 Feet of : Medium Type F Stream NS Owl : Small Type F Stream M Murrelet Please consult your Stewardship Forester about streams classified as Unknown. Page 6 of 8

7 Resources that may require a wri en plan: Stream within 100 feet of area. Site Condi ons Map of Opera on Page 7 of 8

8 Page 8 of 8