1 Chartered Institute of Management Accountants Public Private Partnerships Peter Murray Executive Director, Infrastructure Finance and Advisory 22 October

2 Agenda Overview of Public Private Partnerships (PPPs) Types of PPPs Typical contract arrangements What they seek to achieve Challenges during contract management The ACT Government s new policy framework Pipeline of PPP projects in the ACT Risk Allocation and Value for Money 2

3 What is a Public Private Partnership? A Public Private Partnership or PPP is a long-term contract (up to years) between the public and private sectors, which involves the delivery of an asset, provision of services, and the use of private sector finance Government engages the private sector to deliver infrastructure and related services to support it in its broader remit to the public. These can include: Social infrastructure e.g. hospitals, prisons, schools etc. Economic infrastructure e.g. roads/bridges/tunnels, ports, utilities, rail etc. PPP projects typically include a capital component and an ongoing service delivery component Key PPP characteristics include: Private sector: design, construct, maintenance, operation, financing risks Private sector receiving service payment from government or taking on demand risk for service provision 3

4 Examples of Australian PPPs Social New Royal Children s Hospital (Melbourne) Melbourne Convention Centre Sydney International Convention, Exhibition and Entertainment Centre Precinct Victorian County Court CBD Courts Complex Perth Economic Gold Coast Light Rail Sydney Light Rail Westlink M7 (Sydney) Eastlink (Melbourne) Brisbane Airport Rail Link Lane Cove Tunnel (Sydney) 27 October

5 PPP and related delivery models Build, Own, Operate, Transfer PPP ( BOOT PPP ) A BOOT PPP is typically used for economic infrastructure projects that are fully financed and where demand risk can be transferred to the private sector Availability Payment PPP ( Availability PPP ) Availability PPP is generally used for social infrastructure projects that are fully financed and where Government pays the private sector payments for service availability Design, Construct, Maintain, Operate ( DCMO ) DCMO is used on infrastructure projects where the private sector is contractually obliged to provide construction and comprehensive service delivery but where private finance is not required and the Government wants to retain direct control over the entire life of the project. 27 October

6 Typical PPP contract arrangement TERRITORY Financier Direct Deed Project Agreement Service Payment Service Provision Debt Financiers Project Co Direct Deeds Equity Equity D&C Contract Services (FM) Contract(s) Builder Service Provider(s) 6

7 Why can they be good for Government? Utilises the private sector s ability to innovate and achieve cost saving efficiencies to deliver infrastructure A report by Infrastructure Partnerships Australia (2009) estimated cost savings of up to 11.4%, on average under a PPP, compared to traditional procurement methods Provides an alternative source of funding in a capital constrained environment Transferring project delivery risks to the party best able to handle it Provides delivery model options to expedite a government s infrastructure agenda Locks in financial outcomes for an extended period of time Ensures facilities are well maintained and efficiently operated under long term commitments 7

8 What are the challenges of PPP? PPPs involve longer procurement lead times with far greater up front work Government s procurement costs and proponent bid costs are often higher than other delivery models Private sector cost of capital is higher than government and must be offset through risk transfers and efficiencies PPPs generate life-of-project transactions over their duration such as refinancing, debt and equity assignments, re-gearings, change-of-control, etc PPPs require specialist expertise from within government to procure and manage over the life of the project PPPs can be more inflexible than more traditional models 8

9 ACT Government policy framework The Capital Framework ( TCF ) was introduced in 2013 the overarching policy for infrastructure procurement in the ACT It has 3 objectives: 1. Allocating scarce capital where best justified 2. Achieving optimal risk allocation and delivery models 3. Ensuring fit-for-purpose for size of jurisdiction and project The Partnerships Framework ( TPF ) is an extension of TCF and aligned to broader ACT Government objectives It provides specific guidance on complex infrastructure delivery, such as Public Private Partnerships ( PPP ) and Design Construct Maintain Operate ( DCMO ) 9

10 The Partnerships Framework: intended outcomes The Partnerships Framework: Is a succinct, effective and readily accessible by both the public and private sectors Facilitates co-ordination, selection, funding, implementation, delivery and whole-of-lifecycle asset management of infrastructure Is consistent with existing policy guidance in Australia, i.e. Infrastructure Australia s National PPP Guidelines Informs decisions about infrastructure projects with expert professional analysis and advice 10

11 PPPs in the ACT A project will only be pursued as a PPP if it has been approved by Cabinet based on the recommendation from the Chief Minister, Treasury and Economic Development Directorate ( CMTEDD ). The responsible Minister for PPPs is the Treasurer. CMTEDD will coordinate and manage the PPP project during the transaction period (i.e. pre-procurement, procurement and negotiations). CMTEDD will also manage life of project transactions i.e. refinancings and review contract management practices. Day-to-day responsibilities will be carried out by a central delivery agency post financial close during construction. 11

12 Infrastructure Finance and Advisory A project will only be pursued as a PPP if it has been approved by Cabinet based on the recommendation from CMTEDD. The responsible Minister for PPPs is the Treasurer. The Infrastructure Finance and Advisory unit is established within CMTEDD to: Support and advise on PPP transactions, including procurement Provide whole-of-life project transaction support Develop and implement The Partnerships Framework (TPF) policy Review PPP contract management arrangements Provide commercial support on unsolicited proposals. 12

13 Prospective PPP projects for the ACT ACT Courts Redevelopment The ACT Law Courts project proposes the redevelopment of the Supreme Court to provide a fully functional integrated courts facility. Since its construction in 1963, the requirements of the Supreme Court have changed. The original ACT Law Courts Building was built to service a population of 100,000; today, the population of the Territory is over 380,000. Modifications and additions (including the construction of the Magistrates Court in 1996), have only temporarily alleviated issues with space, circulation, layout, facilities and security, all of which have continued over time. Procurement has commenced with an Expression of Interest process. Six bids have been received and two have been shortlisted to develop detailed proposals.

14 Prospective PPP projects for the ACT City to the Lake City to the Lake is a transformational project being developed within The City Plan, and is integral to realising the City s potential as we embark on our second century. City to the Lake is about creating a new public waterfront address and identity for the City. It is about realising Commonwealth Park and City Hill as celebrated urban parks unified with the centre of the City. The includes several important civic projects: New lakeside residential, business and leisure opportunities. Replacement convention centre (Australia Forum). 30,000 seat rectangular stadium Regional aquatic centre.

15 Prospective PPP projects for the ACT Capital Metro Canberra s population growth continues as the city enters is second century. Meeting the needs of the ACT s existing and new residents will require key investments to be made in urban renewal, including in our transport networks. Capital Metro will be a light rail service along a 12 kilometre route from Gungahlin to the City centre. This includes integration of transport and land use planning to create revitalised centres, provide better access to public transport and generate a range of housing and commercial opportunities.

16 Risk Allocation PPPs involve significant allocation of risk to the private sector PPP analysis typically quantifies: Transferred risk Retained risk Further analysis is undertaken to determine the Systematic Risk Adjustment This is the risk of all the components of the PPP interfacing Design, Construct, Maintain, Operate, Finance 27 October

17 Public Sector Comparator ( PSC ) Understanding these risk adjustments including private sector efficiencies allows the preparation of the PSC The PSC is compared against the PPP Proxy and/or bids to assess if the project offers value for money The final financial outcomes are only determined following rate lock at financial close Due to the short term nature of bank debt tenors some risks may revert to Government; i.e. refinancing 27 October

18 Life of Project Risks Signing of the PPP contract is the commencement of a long term commitment ie years Life of project transactions reintroduce risk and need to be managed over the agreement term: Refinancings Regearings Change of Control Good faith negotiations Debt and equity assignments 27 October

19 Failed Projects vs. Failed PPP Commonly misunderstood area A project can fail but the PPP can hold up Did the risk allocation envisaged under the PPP hold up or revert to Government? Cross City Tunnel project collapsed and was resold twice both times with Government consent Ararat Prison project collapsed during construction and require Partnerships Victoria to step in and restructure 27 October

20 Discussion

PPPs as a form of Infrastructure Financing: the Australian Experience

PPPs as a form of Infrastructure Financing: the Australian Experience PPPs as a form of Infrastructure Financing: the Australian Experience ADB/Columbia University: 7 th International Policy Advisory Group Meeting Manila 3-4 August 2015 Asia s Growth and Development Challenges

More information

National Public Private Partnership Guidelines

National Public Private Partnership Guidelines National Public Private Partnership Guidelines December 2008 National PPP Guidelines December 2008 Components of the Guidelines Volume National PPP Policy Framework National PPP Guidelines National PPP

More information

Governance structures of a PPP A review of some projects in Victoria, Australia

Governance structures of a PPP A review of some projects in Victoria, Australia Governance structures of a PPP A review of some projects in Victoria, Australia Abstract. Governance has been identified as a critical aspect of successful project delivery for major projects; yet for

More information

International Experience with PPP Programs: Success, Failure and Key Lessons. 22 February 2012

International Experience with PPP Programs: Success, Failure and Key Lessons. 22 February 2012 International Experience with PPP Programs: Success, Failure and Key Lessons Delivering Public-Private Private Partnerships in PNG 22 February 2012 Why PPPs? Value for Money Synergies between design, construction,

More information

Aboriginal and Torres Strait Islander eye health funding proposal priorities

Aboriginal and Torres Strait Islander eye health funding proposal priorities Aboriginal and Torres Strait Islander eye health funding proposal priorities Purpose This paper is to provide the Assistant Minister for Health, Senator the Hon Fiona Nash, with priorities and supplementary

More information

pwc.com.au PwC Infrastructure Advisory (Brisbane) Darren Black November 2013

pwc.com.au PwC Infrastructure Advisory (Brisbane) Darren Black November 2013 pwc.com.au Infrastructure Advisory (Brisbane) Darren Black November 2013 Discussion Points Commercial Feasibility Objectives o What is the Point of the Business Case? o Risk Development o Updated Business

More information

SUBMISSION ON THE STRATEGIC INFRASTRUCTURE PLAN FOR SOUTH AUSTRALIA

SUBMISSION ON THE STRATEGIC INFRASTRUCTURE PLAN FOR SOUTH AUSTRALIA SUBMISSION ON THE STRATEGIC INFRASTRUCTURE PLAN FOR SOUTH AUSTRALIA FEBRUARY 2011 Infrastructure Partnerships Australia is a national forum, comprising public and private sector CEO Members, advocating

More information

Tomorrow s TAFE Delivering future skills today

Tomorrow s TAFE Delivering future skills today Tomorrow s TAFE Delivering future skills today VET infrastructure in a changing world KPMG.com.au VET infrastructure in a changing world TAFEs in Australia, and VET providers around the globe, face an

More information

The Governance Model NextGen PPP for a Complex World

The Governance Model NextGen PPP for a Complex World Complex Program Group Organising for a Complex World The Governance Model NextGen PPP for a Complex World The Governance Model NextGen PPP for a Complex World Sustainable Development through People First

More information

INSEAD PPPs as Policy Instruments. Abraham Akkawi November 29, 2010

INSEAD PPPs as Policy Instruments. Abraham Akkawi November 29, 2010 INSEAD PPPs as Policy Instruments Abraham Akkawi November 29, 2010 Content PPP Defined PPP Advantages PPP Types Public Sectors Readiness Sample PPP example in the MENA region Case Study: Mafraq-Gweifat

More information

Government of Grenada PPP Policy July 2014

Government of Grenada PPP Policy July 2014 Government of Grenada PPP Policy July 2014 1 Contents 1 Introduction 3 2 PPP Definition 4 3 Objectives and Scope 6 3.1 Objectives and Scope of Grenada s PPP Programme 6 3.2 Objectives of Grenada s National

More information

Comparative Procurement Methodology Analysis in Australia: A New Approach

Comparative Procurement Methodology Analysis in Australia: A New Approach Comparative Procurement Methodology Analysis in Australia: A New Approach Love, P. Department of Construction Management, Curtin University, Perth, Australia (email: plove@iinet.net.au) Smith, J. School

More information

The Planning and Funding of Road Infrastructure via PPPs

The Planning and Funding of Road Infrastructure via PPPs The Planning and Funding of Road Infrastructure via PPPs John Gardiner a Abstract: The shortfall in the funding for construction, operation and maintenance of road infrastructure in Australia is substantial

More information

ARTC INTERMODAL CONNECTIONS & ACCESS

ARTC INTERMODAL CONNECTIONS & ACCESS ARTC INTERMODAL CONNECTIONS & ACCESS Ed Walker General Manager Corporate Development 28 March 2017 1 ARTC OVERVIEW Controlling, operating and maintaining 8,500 kilometres of standard gauge rail infrastructure:

More information

Interdepartmental Group on Public Private Partnerships (PPPs) Framework for PPP Awareness and Training. Background and Explanatory Note

Interdepartmental Group on Public Private Partnerships (PPPs) Framework for PPP Awareness and Training. Background and Explanatory Note Interdepartmental Group on Public Private Partnerships (PPPs) Framework for PPP Awareness and Training: Background and Explanatory Note Introduction Public Private Partnerships (PPPs) are a central element

More information

Guide - Alternative Procurement - Unsolicited Proposals

Guide - Alternative Procurement - Unsolicited Proposals 1 Introduction 1.1 The Guidelines Good ideas are not the preserve of the public sector. AT welcomes unique, innovative and opportune proposals from business and individuals that support its vision and

More information

Strategic policy. International Relations

Strategic policy. International Relations Strategic policy International Relations Corporate Plan reference: A smart economy A prosperous, high-value economy of choice for business, investment and employment - Strong local to global connections

More information

GETTING THE SUPPLY CHAIN RIGHT

GETTING THE SUPPLY CHAIN RIGHT GETTING THE SUPPLY CHAIN RIGHT BUILDING THE ECONOMY THROUGH EFFICIENT AND SAFE SUPPLY CHAINS SUMMARY GET THE STRUCTURE RIGHT GET PLANNING RIGHT GET RAIL RIGHT GET ROAD PRICING RIGHT GET ROAD SAFETY RIGHT

More information

The Hyde Group Metering & Billing Framework Agreement

The Hyde Group Metering & Billing Framework Agreement The Hyde Group Metering & Billing Framework Agreement User Guide Framework Scope: Lot 1: Credit Metering and Billing Services Lot 2: Pre-Payment Metering and Billing Services Contract Notice Number in

More information

Public Values Embedded in Australian Public Works Procurement

Public Values Embedded in Australian Public Works Procurement 167 Public Values Embedded in Australian Public Works Procurement Craig W. Furneaux, Kerry Brown and Don Allan Procurement arrangements for public works are highly contextualized as jurisdictions adapt

More information

NATIONAL PUBLIC PRIVATE PARTNERSHIP POLICY

NATIONAL PUBLIC PRIVATE PARTNERSHIP POLICY NATIONAL PUBLIC PRIVATE PARTNERSHIP POLICY Prepared by: PUBLIC PRIVATE PARTNERSHIP TASK FORCE 1 PREAMBLE The provision of public infrastructure and government services to its citizens is one of the prime

More information

BANG FOR BUCK. Delivering better business cases to realise more value from our infrastructure investments INTRODUCTION

BANG FOR BUCK. Delivering better business cases to realise more value from our infrastructure investments INTRODUCTION BANG FOR BUCK Delivering better business cases to realise more value from our infrastructure investments INTRODUCTION Traditionally infrastructure projects have been valued and assessed using methods which

More information

National Transport Commission Submission to Infrastructure Victoria

National Transport Commission Submission to Infrastructure Victoria National Transport Commission Submission to Infrastructure Victoria Automated and zero emission vehicles March 2018 Submission outline 1 Introduction 3 1.1 The purpose of this submission 3 About the NTC

More information

Global Infrastructure practice in East Africa

Global Infrastructure practice in East Africa Global Infrastructure practice in East Africa KPMG East Africa kpmg.com/eastafrica/infrastructure Our purpose: To inspire confidence and empower change KPMG s Global Infrastructure practice has over 3,000

More information

4 Investigate 25 case studies

4 Investigate 25 case studies MANAGING PPP CONTRACTS AFTER FINANCIAL CLOSE Foreword Chris Heathcote, Chief Executive Officer, Global Infrastructure Hub Structuring, procurement and negotiation of quality PPPs are important to the success

More information

Transmission Gully Public Private Partnership (PPP)

Transmission Gully Public Private Partnership (PPP) Wellington Northern Corridor Transmission Gully Public Private Partnership (PPP) Presentation to the Building & Construction Conference 24 September / 22 October 2015 CRAIG NICHOLSON (Principal Project

More information

(pronounced krice'-son) (origin Ancient Greek κρείσσων, ον) (noun) stronger, i.e. greater advantage: better

(pronounced krice'-son) (origin Ancient Greek κρείσσων, ον) (noun) stronger, i.e. greater advantage: better (pronounced krice'-son) (origin Ancient Greek κρείσσων, ον) (noun) stronger, i.e. greater advantage: better ABOUT US Kreisson is a construction, engineering and property law firm based in Sydney. We act

More information

Social Services Investment Framework

Social Services Investment Framework Social Services Investment Framework Queensland Treasury and Trade Great state. Great opportunity. Foreword The Queensland Government invests in social services to support all Queenslanders, particularly

More information

CONSTRUCTION AND INFRASTRUCTURE

CONSTRUCTION AND INFRASTRUCTURE CONSTRUCTION AND INFRASTRUCTURE Chapter 20 Construction and Infrastructure Australia s construction and infrastructure market continues to grow. With the mining industry experiencing a slight recession

More information

IRF and Roads Australia Regional Conference - Asia and Australasia

IRF and Roads Australia Regional Conference - Asia and Australasia IRF and Roads Australia Regional Conference - Asia and Australasia Sydney, 4-6 May 2015 Where to next for road PPPs? Owen Hayford and Marko Misko, Clayton Utz The road PPP model continues to change in

More information

Public-Private Partnership (PPP) for Transmission Gully Highway

Public-Private Partnership (PPP) for Transmission Gully Highway Public-Private Partnership (PPP) for Transmission Gully Highway Questions and Answers 21 November 2012 Questions and answers on how the NZTA will use a Public-Private Partnership to finance and build the

More information

Position Description

Position Description Position Description Associate Director, Student Recruitment and Services William Angliss Institute About William Angliss Institute William Angliss Institute is the Government endorsed specialist training

More information

Court Network Head Office in Melbourne CBD and various courts in metropolitan Melbourne.

Court Network Head Office in Melbourne CBD and various courts in metropolitan Melbourne. POSITION DESCRIPTION Position Title Reports To Location Job Specifications Program Manager Victorian State Manager Court Network Head Office in Melbourne CBD and various courts in metropolitan Melbourne..8

More information

Auckland Light Rail Industry Briefing. 31 July 2018, Viaduct Events Centre, Auckland Nau mai, Haere mai Welcome all

Auckland Light Rail Industry Briefing. 31 July 2018, Viaduct Events Centre, Auckland Nau mai, Haere mai Welcome all Auckland Light Rail Industry Briefing 31 July 2018, Viaduct Events Centre, Auckland Nau mai, Haere mai Welcome all Agenda Vision of Auckland s transport future with light rail Our project Project governance

More information

European Experiences in PPP (and some regional countries)

European Experiences in PPP (and some regional countries) European Experiences in PPP (and some regional countries) Session on Yong Hee Kong PPP Resource & Research Centre, Kuala Lumpur Main Topics Examples of PPP projects in some European countries Status of

More information

HEALTH PURCHASING VICTORIA

HEALTH PURCHASING VICTORIA HEALTH PURCHASING VICTORIA Procurement Strategy 2018-2022 30 May 2018 HPV Procurement Strategy 2018-2022 May 2018 30 May 2018 1 Author Version Joe Neill FINAL Implementation Approval Data Classification

More information

Audit report Written statement of response to the audit report from the health service CEO

Audit report Written statement of response to the audit report from the health service CEO 1.1 Background From 26 June 2016, hospitals and health services mandated under Schedule 1 and 5 of the Health Services Act 1988 (Vic) must comply with the new Health Purchasing Victoria (HPV) Health Purchasing

More information

Public private partnership units

Public private partnership units Bond University epublications@bond Mirvac School of Sustainable Development Institute of Sustainable Development and Architecture 6-1-2012 Public private partnership units Michael Regan Bond University,

More information

Fraud in focus March Fraud & Corruption in the Victorian Public Sector learnings and insight for 2017 and beyond

Fraud in focus March Fraud & Corruption in the Victorian Public Sector learnings and insight for 2017 and beyond Fraud in focus March 2017 Fraud & Corruption in the Victorian Public Sector learnings and insight for 2017 and beyond Introduction The Victorian Public Sector has a comprehensive integrity framework with

More information

State Transit Authority. Corporate Plan June 2016 (Issue 5) State Transit Authority. Corporate Plan June 2016 (Issue 5) 1

State Transit Authority. Corporate Plan June 2016 (Issue 5) State Transit Authority. Corporate Plan June 2016 (Issue 5) 1 Corporate Plan 2012-2017 June 2016 (Issue 5) Corporate Plan 2012-2017 June 2016 (Issue 5) 1 Contents Chief Executive s Message...3 Our Business...4 Our Challenges...4 Our Ambition...5 Our Initiatives...5

More information

INFRASTRUCTURE PROCUREMENT IN A RESOURCE CONSTRAINED MARKET

INFRASTRUCTURE PROCUREMENT IN A RESOURCE CONSTRAINED MARKET INFRASTRUCTURE PROCUREMENT IN A RESOURCE CONSTRAINED MARKET EXECUTIVE SUMMARY INFRASTRUCTURE PROCUREMENT IN A RESOURCE CONSTRAINED MARKET Urbanization is driving strong infrastructure investment, but for

More information

Bridging the gaps Implementation challenges for transport PPPs in OIC member states

Bridging the gaps Implementation challenges for transport PPPs in OIC member states Bridging the gaps Implementation challenges for transport PPPs in OIC member states March 28, 2013 Vanesa Sanchez, Senior Analyst Economist Intelligence Unit What are PPPs? Introduction PPPs are public-private

More information

CAPABILITY STATEMENT OCTOBER 2017 WT CAPABILITY STATEMENT

CAPABILITY STATEMENT OCTOBER 2017 WT CAPABILITY STATEMENT CAPABILITY STATEMENT OCTOBER 2017 WT CAPABILITY STATEMENT CONTENTS OUR EXPERTISE 1 OUR SERVICES SCOPE 2 QUANTITY SURVEYING & CONSTRUCTION COST MANAGEMENT 3 THE DETAIL 6 INFRASTRUCTURE COST ENGINEERING

More information

Submission in response to: New South Wales Draft Climate Change Strategic Plan and. Draft Plan to Save Energy and Money

Submission in response to: New South Wales Draft Climate Change Strategic Plan and. Draft Plan to Save Energy and Money Submission in response to: New South Wales Draft Climate Change Strategic Plan and Draft Plan to Save Energy and Money December 2016 1 This document has been prepared by the Freight on Rail Group (the

More information

Reflections on the new role of the National Water Commission. Water Law & Policy Conference Canberra, 7 December 2012

Reflections on the new role of the National Water Commission. Water Law & Policy Conference Canberra, 7 December 2012 Reflections on the new role of the National Water Commission Water Law & Policy Conference Canberra, 7 December 2012 The Hon Karlene Maywald Chair Federal framework of water governance Recent advances

More information

Capital Metro. CMA Full Business Case CAPITAL METRO AGENCY. Capital Metro Agency. Prepared by:

Capital Metro. CMA Full Business Case CAPITAL METRO AGENCY. Capital Metro Agency. Prepared by: Full Business Case Prepared by: CAPITAL METRO AGENCY Author: Filename: Version / Date: Capital Metro Agency Document sign-off sheet Contact officers Name Role Directorate Date Signature [name] Contact

More information

South Australian Native Title Services Ltd. Strategic Plan

South Australian Native Title Services Ltd. Strategic Plan South Australian Native Title Services Ltd Strategic Plan 2015 2020 This plan establishes the strategic direction of South Australian Native Title Services (SANTS) for the next five years. Native title

More information

Public affairs Corporate advisory Government relations

Public affairs Corporate advisory Government relations Public affairs Corporate advisory Government relations Corporate and Business Advisory Changes in government priorities and developments in public policy can have significant outcomes for businesses. In

More information

VALUE CAPTURE FUNDING AND INTEGRATED PLANNING

VALUE CAPTURE FUNDING AND INTEGRATED PLANNING THOUGHT LEADERSHIP BREAKFAST VALUE CAPTURE FUNDING AND INTEGRATED PLANNING PULLMAN HOTEL BRISBANE, QLD 4 DECEMBER 2013 Visions for Queen Street Wharf Draft Brisbane City Centre Master Plan 2013 Joe Langley

More information

6.1 CORPORATE ASSET MANAGEMENT POLICY

6.1 CORPORATE ASSET MANAGEMENT POLICY 6.1 CORPORATE ASSET MANAGEMENT POLICY Date Adopted Next Review Officer Responsible 3 February 2011 30 June 2015 Manager, Performance & Delivery Group Policy Purpose: The intent of this policy is to set

More information

on the Vocational Education and Training Fee and Funding Review

on the Vocational Education and Training Fee and Funding Review to Essential Services Commission on the Vocational Education and Training Fee and Funding Review 24 June 2011 1 Contents About HIA... 3 Principles for the review... 3 The VET Sector:... 3 The National

More information

Inquiry into Infrastructure Planning and Procurement

Inquiry into Infrastructure Planning and Procurement Inquiry into Infrastructure Planning and Procurement Submission to the House of Representatives Standing Committee on Infrastructure and Communications Civil Contractors Federation (WA Branch) Submission

More information

International Conference Paper

International Conference Paper Fire Service College Brigade Command Course 2002 International Conference Paper Divisional Officer Gary Phillips West Midlands Fire Service Title: Public Private Partnerships: How far can they go? Abstract:

More information

Financing energy efficient community housing. Presentation to Financial Officers Forum NSW Federation of Housing Associations April 2016

Financing energy efficient community housing. Presentation to Financial Officers Forum NSW Federation of Housing Associations April 2016 Financing energy efficient community housing Presentation to Financial Officers Forum NSW Federation of Housing Associations April 2016 2 Agenda 1. About the CEFC 2. The CEFC s aspirations in the Social

More information

NSW boards and committees: Consultation paper

NSW boards and committees: Consultation paper 4 November 2016 Claudia Solomon NSW Treasury 52 Martin Place Sydney NSW 2000 Email: eliminatingduplication@nsw.gov.au Dear Ms Solomon NSW boards and committees: Consultation paper Governance Institute

More information

Public Private Partnerships in Fiji

Public Private Partnerships in Fiji Public Private Partnerships in Fiji Presentation to the Asia-Pacific Ministerial Conference on Public - Private Partnerships [PPPs] for Infrastructure Development Seoul, Korea, 5 th October 2007 Hon. Poseci

More information

The Victorian Transport Plan (Department of Transport, 2008).

The Victorian Transport Plan (Department of Transport, 2008). 18 TRANSPORT Planning should ensure an integrated and sustainable transport system that provides access to social and economic opportunities, facilitates economic prosperity, contributes to environmental

More information

Industry Engagement in Training Package Development. Discussion Paper Towards a Contestable Model

Industry Engagement in Training Package Development. Discussion Paper Towards a Contestable Model Industry Engagement in Training Package Development Discussion Paper Towards a Contestable Model Published October 2014 Table of Contents Industry Engagement in Training Package Development Discussion

More information

NATIONAL. Urban Development Institute of Australia NATIONAL POLICY AGENDA

NATIONAL. Urban Development Institute of Australia NATIONAL POLICY AGENDA NATIONAL Urban Development Institute of Australia NATIONAL POLICY AGENDA AUSTRALIA S DEVELOPMENT INDUSTRY IN BRIEF ALTHOUGH MANY MAY NOT REALISE IT, URBAN DEVELOPMENT IS AN ACTIVITY THAT HAS WIDE REACHING

More information

Meeting government policy objectives through the adoption of Building Information Modelling (BIM)

Meeting government policy objectives through the adoption of Building Information Modelling (BIM) INDUSTRY RECOMMENDATIONS NOVEMBER 2016 Meeting government policy objectives through the adoption of Building Information Modelling (BIM) ENDORSED BY: Australian governments would be better positioned to

More information

45. Feedlot construction delivery

45. Feedlot construction delivery Client Des i gn/ Builder Design Consultant Construction Sub-contractors and suppliers FEEDLOT DESIGN AND CONSTRUCTION 45. Feedlot construction delivery AUTHORS: Rod Davis and Ross Stafford Introduction

More information

QUEENSLAND URANIUM MINING IMPLEMENTATION COMMITTEE DECEMBER 2012

QUEENSLAND URANIUM MINING IMPLEMENTATION COMMITTEE DECEMBER 2012 QUEENSLAND URANIUM MINING IMPLEMENTATION COMMITTEE DECEMBER 2012 Contact: The Australasian Institute of Mining and Metallurgy W: www.ausimm.com T: +61 3 9658 6100 F: +61 3 9662 3662 Michael Catchpole Chief

More information

RFP Restructuring Advisory Committee: Water and Sewer Question and Answer. Question Cut-Off 2/13/17

RFP Restructuring Advisory Committee: Water and Sewer Question and Answer. Question Cut-Off 2/13/17 RFP 2017-0007 Restructuring Advisory Committee: Water and Sewer Question and Answer Question Cut-Off 2/13/17 1. What is the estimated value of the sewer system? Determining an appropriate valuation of

More information

Attachment 4. Brimbank City Council Submission to EPA Ministerial Advisory Committee 2015

Attachment 4. Brimbank City Council Submission to EPA Ministerial Advisory Committee 2015 Attachment 4 Brimbank City Council Submission to EPA Ministerial Advisory Committee 2015 About Brimbank Brimbank City is located in Melbourne s west, one of the fastest growing regions in Australia. The

More information

ALC Brief Inquiry into National Freight and Supply Chain Priorities 18 May 2018

ALC Brief Inquiry into National Freight and Supply Chain Priorities 18 May 2018 The Federal Government today released the Final Report from the Inquiry into National Freight and Supply Chain Priorities (the Inquiry). You can view the Final Report here. The Final Report was released

More information

The Whittington Hospital NHS Trust. Modernising Clinical Services. Project Initiation Document

The Whittington Hospital NHS Trust. Modernising Clinical Services. Project Initiation Document The Whittington Hospital NHS Trust Modernising Clinical Services Project Initiation Document March 2008 Contents Contents...2 Appendices...2 1.0 Introduction...3 1.1 Overview...3 1.2 Background...3 1.3

More information

Infrastructure and Capital Projects

Infrastructure and Capital Projects Infrastructure and Capital Projects Contents Deloitte s Capabilities in Infrastructure and Capital Projects 1 Strategy and Planning 3 Financing and Procurement 4 Project Organisation, Execution and Construction

More information

Draft COASTAL SUSTAINABILITY CHARTER. and POLICY FRAMEWORK FOR COASTAL AUSTRALIA. Discussion Paper

Draft COASTAL SUSTAINABILITY CHARTER. and POLICY FRAMEWORK FOR COASTAL AUSTRALIA. Discussion Paper Draft COASTAL SUSTAINABILITY CHARTER and POLICY FRAMEWORK FOR COASTAL AUSTRALIA Discussion Paper Towards a national policy framework that integrates the environmental, social and economic wellbeing of

More information

GUIDELINES FOR PUBLIC SECTOR REVIEWS AND EVALUATIONS

GUIDELINES FOR PUBLIC SECTOR REVIEWS AND EVALUATIONS Department of the Premier and Cabinet Government of Western Australia GUIDELINES FOR PUBLIC SECTOR REVIEWS AND EVALUATIONS PUBLIC SECTOR MANAGEMENT DIVISION 19 December 2007 CONTENTS EXECUTIVE SUMMARY

More information

PPP Units and PIMAC of Korea

PPP Units and PIMAC of Korea Disclaimer: The views expressed in this document are those of the author, and do not necessarily reflect the views and polic ies of the Asian Development Bank (ADB), its Board of Directors, or the governments

More information

Memorandum of Understanding:

Memorandum of Understanding: Memorandum of Understanding: Between SSROC Councils and NSW Government regarding Preparing District Plans and Managing Urban Intensification 1. Potential Inclusions to MoU for District Plans SSROC has

More information

Development. conversations. Lessons in Integrated Infrastructure Planning: The Australian Case. Roundtable held on 29 August 2011

Development. conversations. Lessons in Integrated Infrastructure Planning: The Australian Case. Roundtable held on 29 August 2011 Lessons in Integrated Infrastructure Planning: The Australian Case Roundtable held on 29 August 2011 Development conversations Infrastructure such as water, energy, communications and transport has very

More information

Phillip Boyle & Associates. Phillip Boyle. Chief Executive Officer. Career Summary

Phillip Boyle & Associates. Phillip Boyle. Chief Executive Officer. Career Summary Phillip Boyle Chief Executive Officer M: +61 409 144 513 pcboyle@phillipboyle.com.au Internationally recognised and highly experienced public transportation specialist with expertise in scheduling, network

More information

3 Day Master Class on PPP and Project Finance

3 Day Master Class on PPP and Project Finance 3 Day Master Class on PPP and Project Finance Venue: Radisson Blu Hotel, Dubai Deira Creek, Dubai, UAE Dates: 28-30 November 2017 Delivery Type: Group Live Duration: 3 Days Non-residential Organised by

More information

GOVERNMENT OF GRENADA GEOTHERMAL RESOURCE DEVELOPMENT PROJECT

GOVERNMENT OF GRENADA GEOTHERMAL RESOURCE DEVELOPMENT PROJECT GOVERNMENT OF GRENADA GEOTHERMAL RESOURCE DEVELOPMENT PROJECT TERMS OF REFERENCE GEOTHERMAL ENERGY PROJECT COORDINATOR 1 P a g e 1. BACKGROUND The Government of Grenada wishes to progress the development

More information

INFORMAL PARTNERSHIPS TO FACILITATE IMPACT ASSESSMENT FOR MAJOR PROJECTS IN VICTORIA, AUSTRALIA 1

INFORMAL PARTNERSHIPS TO FACILITATE IMPACT ASSESSMENT FOR MAJOR PROJECTS IN VICTORIA, AUSTRALIA 1 1 INFORMAL PARTNERSHIPS TO FACILITATE IMPACT ASSESSMENT FOR MAJOR PROJECTS IN VICTORIA, AUSTRALIA 1 Trevor Blake, Victorian Department of Planning and Community Development, Australia, email: trevor.blake@dpcd.vic.gov.au

More information

National Railway Museum

National Railway Museum 1 of 8 pages National Railway Museum Charter for the Board and Board committees of the Port Dock Station Railway Museum (SA) Inc., trading as National Railway Museum The purpose of this charter is to articulate

More information

Overview on the Development of the Egyptian PPP Program

Overview on the Development of the Egyptian PPP Program Overview on the Development of the Egyptian PPP Program Rania G. Zayed Advisor to Minister Director, Ministry of Finance USAID Infrastructure Workshop December 19, 2008 1 Agenda PPP Drivers Egypt - PPP

More information

Regulating Transport Infrastructure in Australia

Regulating Transport Infrastructure in Australia 2008/SOM3/EC/SEM/008 Agenda Item: 2 Regulating Transport Infrastructure in Australia Submitted by: Australia Seminar on Best Practices in Regulation and Promotion of Efficiency in Transport Infrastructure

More information

Key Institutional Decisions in Public Private Partnerships

Key Institutional Decisions in Public Private Partnerships Policy brief 43012 March 2013 Taz Chaponda Key Institutional Decisions in Public Private Partnerships In brief The main building blocks of any sound public-private partnership are: enabling insitutions,

More information

HEALTH PURCHASING VICTORIA STRATEGY. December 2017

HEALTH PURCHASING VICTORIA STRATEGY. December 2017 HEALTH PURCHASING VICTORIA 2018-2022 STRATEGY December 2017 CONTENTS Contents... 2 Executive Summary... 3 Operating Environment... 5 HPV Vision and Values... 9 HPV Strategy 2018-2022: Framework... 10 HPV

More information

Capability Statement 2017

Capability Statement 2017 Capability Statement 2017 Facility Management Essentials Pty Ltd G01 / 33 Racecourse Road North Melbourne, Vic 3051 t: (03) 9411 1222 ACN 103 439 023 1 FM Essentials Overview FM Essentials provide a one-stop

More information

Catchment management bodies in four Australian states: structures, legislation, and relationships to Government agencies

Catchment management bodies in four Australian states: structures, legislation, and relationships to Government agencies Catchment management bodies in four Australian states: structures, legislation, and relationships to Government agencies David J. Pannell 1,2, Anna Ridley 1,3, Peter Regan 1,4, and Glenn Gale 1,5 1 CRC

More information

Draft Submission to the Inquiry into National Freight and Supply Chain Priorities. August 2017

Draft Submission to the Inquiry into National Freight and Supply Chain Priorities. August 2017 Draft Submission to the Inquiry into National Freight and Supply Chain Priorities August 2017 KEY POINTS Local government welcomes the government s development of a new freight and ports plan and looks

More information

SA Water Strategic Plan Delivering water and wastewater services in efficient, responsive, sustainable and accountable ways

SA Water Strategic Plan Delivering water and wastewater services in efficient, responsive, sustainable and accountable ways SA Water Strategic Plan 2012-16 Delivering water and wastewater services in efficient, responsive, sustainable and accountable ways Contents 3 From the Chairman and Chief Executive 4 Our Business Context

More information

GOVERNMENT INSTITUTIONS AND INFRASTRUCTURE SKILLS DEVELOPMENT

GOVERNMENT INSTITUTIONS AND INFRASTRUCTURE SKILLS DEVELOPMENT GOVERNMENT INSTITUTIONS AND INFRASTRUCTURE SKILLS DEVELOPMENT Michael Regan 1, Jim Smith 2 and Peter Love 3 1 Michael Regan; Bond University, Gold Coast, Queensland 4229, Australia 2 Jim Smith; Bond University,

More information

6/12/18 DDA AND URA ONE OF THESE THINGS IS NOT LIKE THE OTHER. Dee Wisor Butler Snow LLP URA DDA URA DDA. body-must are. How does formation begin

6/12/18 DDA AND URA ONE OF THESE THINGS IS NOT LIKE THE OTHER. Dee Wisor Butler Snow LLP URA DDA URA DDA. body-must are. How does formation begin AND ONE OF THESE THINGS IS NOT LIKE THE OTHER Dee Wisor Butler Snow LLP How does formation begin Initiated by 25 Initiated by an registered voters ordinance from signing a the petition. governing body.

More information

Administrative Services About Administrative Services

Administrative Services About Administrative Services About The Department oversees and directs the operations of Finance, Human Resources, Sales Tax, Purchasing, Information Technology, Risk Management, Budget, the Public Information Office, Front Desk Reception,

More information

A nationally consistent approach for NMHCCF consumer and carer selection and representation

A nationally consistent approach for NMHCCF consumer and carer selection and representation A nationally consistent approach for NMHCCF consumer and carer selection and representation 1. Introduction The National Mental Health Consumer and Carer Forum (NMHCCF) was established by the Australian

More information

Meet challenges head on

Meet challenges head on Meet challenges head on Deal Advisory / Australia We can help you master Financial Restructuring. Enhancing value through financial restructuring. / 1 Your vision. Our proven capabilities. Despite its

More information

Public-Private Private Partnerships for Highway Infrastructure Scan Trip

Public-Private Private Partnerships for Highway Infrastructure Scan Trip Public-Private Private Partnerships for Highway Infrastructure Scan Trip June 2008 International Technology Scanning Program Sponsors: FHWA, AASHTO, NCHRP Outline Scan Trip Overview Host Nation PPP Program

More information

Role Description Director Asset Management - Building and Facilities

Role Description Director Asset Management - Building and Facilities Role Description Director Asset Management - Building Cluster Agency Division/Branch/Unit Location NSW Health Health Infrastructure Asset Management North Sydney Classification/Grade/Band HSSE Band 1 Senior

More information

BENCHMARKING PPP PROCUREMENT 2017 IN MALAYSIA

BENCHMARKING PPP PROCUREMENT 2017 IN MALAYSIA BENCHMARKING PPP PROCUREMENT 2017 IN MALAYSIA Regulatory and Institutional Framework for PPPs Does the regulatory framework in your country allow procuring PPPs?. specify the relevant regulatory framework

More information

Inquiry into Australian Securities and Investment Commission Amendment (Corporations and Markets Advisory Committee Abolition) Bill 2014

Inquiry into Australian Securities and Investment Commission Amendment (Corporations and Markets Advisory Committee Abolition) Bill 2014 3 March 2015 Dr Kathleen Dermody Committee Secretary Senate Standing Committees on Economics PO Box 6100 Parliament House Canberra ACT 2600 T +61 2 9223 5744 F +61 2 9232 7174 E info@governanceinstitute.com.au

More information

Board Charter POL-00007

Board Charter POL-00007 Charter POL-00007 Revision no. Approved for issue 7 Approved by 31 July 2017 Contents 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. Purpose... 2 Responsibilities... 3 Membership... 4 Committees...

More information

MINUTES. Board of Directors, Scottish Futures Trust Ltd. Arising from the minute the following matters were highlighted:

MINUTES. Board of Directors, Scottish Futures Trust Ltd. Arising from the minute the following matters were highlighted: MINUTES Meeting of: Date & Time: Place: Present: In attendance: Board of Directors, Scottish Futures Trust Ltd Tuesday 5 March 2013, 2.30pm 11-15 Thistle Street, Edinburgh Sir Angus Grossart, Chairman

More information

Professional writer and designer for web-content, business cases, grant applications, white papers, marketing, communications and publicity.

Professional writer and designer for web-content, business cases, grant applications, white papers, marketing, communications and publicity. CURRICULUM VITAE CAROLYN STEPHENS Mob: +61474092823 carolyn@contentplace.com.au P.O Box 51 Woodend, VIC, 3442 Skills Snapshot Professional writer and designer for web-content, business cases, grant applications,

More information

VBA External Wall Cladding Audit Preliminary Report. VBA External Wall Cladding Audit Report. VBA External Wall Clad. Preliminary Report

VBA External Wall Cladding Audit Preliminary Report. VBA External Wall Cladding Audit Report. VBA External Wall Clad. Preliminary Report VBA External Wall Cladding Audit Preliminary Report VBA External Wall Cladding Audit Report VBA External Wall Clad Preliminary Report 17 February 2016 Issued 4 December 2015 www.vba.vic.gov.au Page 0 of

More information

Industrial Estates and Business Parks

Industrial Estates and Business Parks Industrial Estates and Business Parks 25 February 2016 Michael Kilgariff, Managing Director, Australian Logistics Council Focus Areas An overview of Melbourne s industrial estate market as it relates to

More information