1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Updated Project Information Document (PID) Report No: AB938 Project Name MOZAMBIQUE - Beira Railway Project Region Africa Regional Office Sector Railways (100%) Theme Other financial and private sector development (P); Other public sector governance(s) Project P Borrower(s) GOVERNMENT OF MOZAMBIQUE Implementing Agency(ies) CFM Address: Caixa Poatal 2158 Praca dos Trabalhadores, Maputo, Mozambique Contact Person: Mr. Rui Fonseca Tel: 258 (1) Fax: 258 (1) ruifonseca@cfmnet.co.mz Environment Category B (Partial Assessment) Date PID Prepared May 24, 2004 Auth Appr/Negs Date June 21, 2004 Bank Approval Date October 28, Country and Sector Background Mozambique has sustained a high economic growth rate since achieving peace in 1992, mainly due to transformation of a centrally planned state-controlled economy into a market-oriented one. As a result of peace, democracy, liberalization, and prudent monetary and fiscal policies, Mozambique s GDP growth rate has been well above the African average. Growth averaged 9% per annum from 1997 to 2002, and is projected at between 7% and 12% annually until Continued growth will require, among others, improvements in basic infrastructure and reduction in impediments to private sector growth. Mozambique is highly dependent upon regional trade and investment flows and regional developments can significantly influence the pace and sustainability of its own development. Mozambique has ratified the Southern Africa Development Community (SADC) trade protocol in 1999, which aims to establish a free trade area in southern Africa, both reflecting and giving greater momentum to regional integration. Effective functioning of the transport sector - roads, railways, airports, and seaports in particular, within the Maputo, Beira and Nampula corridors (which are part of the SADC spatial development initiative) is critical for maintaining this momentum and for managing the increased interdependence between Mozambique and its neighbors. However, the transport sector is constrained by: (i) high freight transport costs (for example, in the railway sector, they are almost twice the rates prevailing in efficiently run

2 railways around the world); (ii) unpredictability of railway operations (delays in wagon and locomotive allocations, improper handling and storage of goods, varying transit times, etc.); (iii) inability of public sector entities in the transport sector to generate enough surplus to keep their assets in a good condition; (iv) deteriorating condition of the rail and road infrastructure because of inadequate and irregular flow of funds for maintenance; (v) inadequate management of public enterprises due to bureaucratic culture, poor incentives structure, cumbersome rules and procedures and political influencing of management decisions; and (vi) inadequate safety consciousness, poor staff training, and inadequate enforcement of safety and environmental regulations, leading to a high rate of accidents, both on roads and railways. To address these issues, GOM is in the process of implementing wide ranging reforms in the transport sector. The reforms in the roads sub-sector include separating funding and planning functions from execution of works, establishing the Road Fund as an autonomous legal entity, and strengthening the capacity of agencies to undertake and monitor road works. In the railway and ports sub-sector, the reforms have focused on involving the private sector in their management and operation, thus laying the foundation for improved efficiency in these sub-sectors. However, the reforms have yet to impact the central region of Mozambique, where poor transport connection of the areas located along the Zambezi river to the port of Beira has adversely affected the growth and compromised regional trade and flow of investments. In the past, the main transport system for the central region in Mozambique was the Sena railway line, which carried coal, wood, cotton, fertilizer, cement, sugar, limestone and other agricultural products. The Sena line is about 600km and passes through the provinces of Sofala, Tete, Manica and Zambezi, with a total population of 4.75 million. If rehabilitated, the Sena line would have a significant impact on improving accessibility of this area, particularly the eastern part of the district of Gorongosa, northwestern part of the Cherigoma district, and southeastern part of Moatize. It would also improve access to the Port of Beira from Malawi. Since 1983, the line had to close and discontinue operations due to extensive damage during the internal conflict. In the absence of appropriate transport systems, poor inhabitants are forced to walk miles to reach markets, satisfy social obligations and, consequently, development of any kind of business, even agri-business is proving difficult. The rehabilitation of the Beira rail system is, therefore, considered critical and GOM is keen do so through the involvement of the private sector not only in rehabilitation, but also in operation and management of the system. Efficient operation of the Beira rail is expected to create economic activities through increased production of coal, wood, cotton and other agricultural products in the area and to increase the incomes of inhabitants through higher consumption and investment. GOM intends to concession the Beira Rail system as a Build-Operate-Transfer (BOT) scheme, with the concessionaire having the responsibility to rehabilitate the Beira rail system and then operate the same for a period of 25 years. The project is expected to require a high share of public funding as the region has a weak economic base which means that it will take time for the economic development of the region and for the build up of traffic. In the mean time, economic benefits are expected to be substantial and

3 justify rehabilitation of the line. The Government would like to support the initial investment required to rehabilitate and operate the system efficiently. The initial investments would be adequate to carry the traffic on-offer. However, plans are underway to concession the Moatize coalmines to the private sector (estimated to take 8-10 years), at which time the traffic is expected to grow rapidly. Consequently, the design of the Beira Railway concession makes adequate provisions for negotiation among the potential coalmine concessionaire, the rail concessionaire and the Government so as to agree on the standards and the terms and conditions necessary to satisfy the requirements of the additional traffic. Government Strategy for the rail sub-sector The Government has initiated a number of reforms in the past few years to improve operation and maintenance of the railway sub-sector, with a particular focus on: (a) large scale involvement of the private sector in the operation and management of all the ports and railways; (b) rationalization of the CFM staff including retrenchment of surplus staff. In 1996, CFM had close to 20,000 staff. After all the concessions have been operational and the necessary staff transferred, CFM will be left with about 500 staff. The social mitigation measures for the retrenched staff are being implemented satisfactorily; (c) comprehensive restructuring of CFM involving: (i) separation of strategic, corporate and regulatory functions from day-to-day commercial and operating functions; (ii) making the headquarters and the zonal units lean and thin; (iii) replacing traditional railway skills in the headquarters with specialized legal, financial, institutional and corporate functions; (iv) increasing accountability through well structured performance contracts between GoM and CFM; and (d) compliance with the environmental and safety standards as part of the concession agreement as well as strengthen safety and environment related regulation. 2. Objectives The main development objectives of the proposed Project are to: (i) make cost effective and efficient transport available for the freight and passenger traffic in the Zambezi Valley to accelerate economic growth in the sub-region; (ii) increase international traffic through the Beira Railway system; and (iii) improve the operational, managerial and financial sustainability of the Beira railway system. 3. Rationale for Bank s Involvement The Bank Group is ideally suited to help improve the investment climate. It can provide not only full-service policy advice, but also complementary instruments to support implementation. Through its long standing association with Mozambique, IDA has developed a deep knowledge of the country s transport sector and is well positioned to support the implementation of the government transport reform program in continuation

4 of its extensive involvement in the sector and partnership with other Development Partners. IDA is also supporting, or has supported in the past, similar restructuring, revitalization and privatization projects in neighboring countries of Malawi, Zimbabwe and Zambia and is in a position to help Mozambique as well as the neighboring countries reach a common understanding for the efficient management of the rail corridors in the region. As regards the railways transport sub-sector, IDA has by now accumulated substantial experience in designing successful concession agreements, ranging from the hightrafficked Latin American railways to the relatively lower-trafficked African railways. IDA is therefore in a position to provide independent financial and technical advisory services and add value related to: risk allocation between the conceding authority and the concessionaire; internalizing regulatory issues into the concession contracts; mitigation of negative environmental and safety impacts; minimizing emerging post-privatization issues through appropriate contract design; and dispute settlement. IDA is already supporting the on-going Railways and Ports Restructuring Project (RPRP) whose main development objective is to improve the operating efficiency of the three major railway and port systems of Mozambique, namely the Nacala, Beira and Maputo port and railway systems, through the involvement of the private sector in their rehabilitation, operation and management, and through staff retrenchment and rationalization in the CFM. The retrenchment of surplus staff and their social rehabilitation is proceeding well. A total of about 10,500 staff have been retrenched, and another 3,100 are in the process of being retrenched. After completion of the staff rationalization program, including retention of needed staff by concessionaires (approximately 5,000-5,500), CFM will be left with a total of about 500 staff, down from the original total of 19,200. Preparatory activities leading up to the concessioning of the Beira Railway System were supported by IDA under the RPRP and the proposed Beira Railway Project will support its implementation. 4. Description Project Description GOM intends to award a 25 year concession of the Beira Railway System to the private sector. The concessionaire will have the responsibility for: (a) rehabilitation, maintenance, and operation of the Sena line to the town of Tete in the northwestern region of the country, including spur lines to the Moatize coal mines and to the border with Malawi (totaling about 600 km) and (b) realignment, maintenance and operation of the Machipanda line all the way to the border with Zimbabwe (about 300 km). The Machipanda line has adequate traffic and requires relatively little investment to continue operating profitably. However, the Sena line requires extensive rehabilitation, and although the estimated economic benefits are substantial, the relatively slow growth of traffic does not make the line commercially viable without a high share of public sector financial support. The project will support rehabilitation of the Sena rail line to a

5 standard that will carry all of the traffic on-offer and more, including coal produced by the current deep-mining technology. The project consists of two components: Component 1. Improvement of the Beira Railway System. This component comprises rehabilitation, maintenance and operation of the Beira railway system under a concession agreement with the private sector. IDA funds will be used exclusively to finance part or all of the expenditures related to the rehabilitation of the Sena line and its spur lines, totaling 600 km, including the cost of environmental and social enhancement measures. Component 2. Institutional Strengthening. This component comprises technical assistance and consultant services to enhance the capacity of CFM to manage implementation of the project and its restructured functions, supervise the construction and rehabilitation works, conduct independent technical and financial audit, and assist CFM in preparation of its long term railway and ports development plans. The total project cost is $185.0 million, of which the cost for improving the Beira Railway system (infrastructure rehabilitation and procurement of locomotives and rolling stock) as estimated by the concessionaire is US$175.2 million (including VAT). Of this, the estimated cost for the rehabilitation of Sena line is US$106 million and realignment of the Machipanda line is US$10 million. The realignment of the Machipanda line as well as provision of locomotives and wagons for both the lines will be the sole responsibility of the concessionaire. However, for the rehabilitation of the Sena Line, the concessionaire is entitled to financial support as per the successful bid. The proposed Credit will support rehabilitation of the Sena railway line in accordance with the terms of the concession agreement. The estimated cost of institutional strengthening and capacity building is $9.8 million, of which IDA will finance about $9.0 million net of taxes. The total project cost is estimated at US$185.0 million, of which IDA will support US$115.0 million. 5. Financing Source (Total ( US$m)) BORROWER ($ ) IDA ($115.0) Total Project Cost: $ Implementation The institutional and implementation arrangements are discussed below. The Concessionaire. The concessionaire would be responsible for the actual rehabilitation of the Sena line, the realignment of the Machipanda Line, and operation

6 and management of the Beira rail system in accordance with the terms of the concession agreement, which among others would clearly specify: (a) the network to be rehabilitated; (b) the technical standards to which the infrastructure is to be rehabilitated along with detailed specifications; (c) the technical standards to which the infrastructure is to be maintained; and (d) terms and conditions for operating freight and passenger services. CFM. CFM s role in the management of the Project would be limited to the one agreed in the concession agreement, viz., (a) monitoring the concessionaire s compliance with the terms of the concession agreements on behalf of the Government; and (b) maintaining an account of all fixed infrastructure and mobile assets concessioned or leased to the concessionaire. The following units within CFM would be actively involved in project implementation: Beira Brigade. For effective discharge of its role, CFM has established the Beira Brigade, whose main tasks would be: (a) making available to the concessionaire facilities to be provided by CFM under the concession agreement; (b) handing over of the concession area including the right of way, without encumbrances: (c) handing over of all designs, drawings, specifications, and other documents to the concessionaire; and (d) to interact with the concessionaire to resolve teething problems. The Brigade will operate with oversight from the CFM headquarters. The Beira Brigade will be responsible for sending all the basic information about delivery and completion of works to CFM headquarters, which will prepare appropriate invoices and arrange for payments as per the agreed procedures. The Finance Directorate of CFM Headquarters will deal with the Financial Management arrangements. Inspection Unit. CFM has also established an inspection unit to inspect sites and facilities to ensure compliance with safety and environmental regulations. Independent Supervision Engineer. CFM would engage an Independent Supervision Engineer (a firm) for the duration of the rehabilitation period to certify quality and quantity of completed works. The certification by the Independent Supervision Engineer will be the basis for the disbursement of funds. To ensure independence, the reports of the Supervision Engineer would be filed systematically and without being influenced by CFM or the Beira Brigade. Any difference of opinion by the Brigade or CFM would need to be put forth in writing and a final decision would also be formally recorded. Regulatory Body. Very little economic regulation is required for the rail and port sectors. Even so, GOM is considering setting up a regulatory body for the transport sector for effective economic, technical, safety and environmental regulation. GOM, based on the Consultants recommendations, is close to making a decision regarding the regulatory framework and once that is done, the consultants will develop details of the organization structure and procedures of working of the regulatory body. Technical assistance for establishing the regulatory body is being financed under the on-going RPRP.

7 Staff Retrenchment Unit. Staff retrenchment and social mitigation of the retrenched staff is being managed through a special staff retrenchment unit and the work regarding this is progressing well assisted by funding under the on-going RPRP. This unit will also manage the retrenchment of staff rendered surplus subsequent to the concessioning of the Beira Rail System. 7. Sustainability The long-term sustainability of the Beira rail system in Mozambique would be considerably enhanced under the Project because of: (a) the involvement of the private sector in the rehabilitation, operation, and management of the system, which will ensure improved management and establishment of an appropriate system of incentives and accountability; (b) a 25-year concession, which will allow the concessionaire to implement long-term strategies for improving performance; (c) addressing the implementation issues early in the project cycle and articulating in sufficient detail the obligations of both the concessionaire and the conceding authority as well as the consequences of non-performance on either side in the concession agreement so as to preempt any possible disputes and legal action; and (d) strengthening the institutional capacity of the Conceding Authority in project management, quality control, environmental management, safety regulation and monitoring and evaluation. Commercial viability of the concession is illustrated by the robust debt service cover ratio, and the high expected rate of return on equity (17%) and that should sustain the concessionaire s interest in the concession and consequently the continued efficient working of the Beira rail system. Furthermore, the Sena line will have a great impact on the districts of the central region (Sofala, Tete, Manica and Zambezi), which are directly served by this line. Excluding the population of Beira, about 1.26 million people living along this line will see their socio-economic development prospects greatly improved. In the long-term, the operation of the line would bolster investor confidence and interest to participate in the coal concessioning and other 8. Lessons learned from past operations in the country/sector Lesson 1: Very few Railway systems in Sub-Saharan Africa and elsewhere have proved financially sustainable under public management. To enable the railways to become financially viable and self-sustaining, the project is conditional upon the successful award of the Beira Railway system concession and signing of the concession agreement. Lesson 2: Massive investments in infrastructure, locomotives, rolling stock, and communication systems have generally been ineffective in improving reliability or efficiency because the investments were not always directed at removing the most critical constraints, viz., removal of constraints associated with public sector inefficiencies in operating complex transport infrastructure. The proposed project, therefore, links the financial support to the concessioning of the railway system to the participation of the private sector.

8 9. Environment Aspects (including any public consultation) The Sena line was operational until Under the proposed project, the line is only being rehabilitated and no additional line is being built. The rehabilitation work involves changing the rails and sleepers and establishing signaling and communication equipment. No major earthwork is being undertaken and there is no cutting of or filling of land. There were only two main environmental issues and both have been resolved. The first pertained to the use of wooden sleepers, which would have affected the forests. A decision has been taken to use only concrete sleepers except at a very few locations where non-standard sleepers need to be used. The second pertained to de-mining along the railway line, which has since been addressed. However, since the assessment was made a few years ago, the report was updated through a supplemental study. A study was conducted to formulate an Environmental Audit Management Plan, with a focus on: (i) establishing environmental base line conditions and examining the present institutional and legal framework; (ii) assessing the physical, biological and socio-cultural environment; (iii) formulating an Environmental Audit and Management Plan which encompasses environmental mitigation, monitoring and research, contingency plans, emergency response plans and health and safety plans; and (iv) evaluating the institutional issues relevant to establishing a well functioning rail operation from an environmental point of view and recommending improvements and institutional changes as needed. The study also reviewed the Mozambique Railways Act and addresses the environmental management obligations of the concessionaire. 10. List of factual technical documents: Beira Railway Concession Agreement 2003 Technical Proposals of short-listed firms Country Assistance Strategy, October 2003 Environmental Management Study, 2004 Beira Rail Project: Economic Analysis Contact Point: Task Manager Anil S. Bhandari The World Bank 1818 H Street, NW Washington D.C Telephone: Fax: For information on other project related documents contact: The InfoShop The World Bank

9 1818 H Street, NW Washington, D.C Telephone: (202) Fax: (202) Web:

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4706. Project Name

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4706. Project Name Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project Borrower(s) Implementing Agency PROJECT INFORMATION

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Project Name Region: Sector Project ID Borrower Report No. PID9819 Guinea-Third Water Supply & (@) Sanitation Project Africa Water & Sanitation GNPE73567 Republic of Guinea Date this PID was prepared March

More information

Borrower IDA Credit Arab Republic of Egypt. Principal Bank for Development and. Agricultural Credit (PBDAC) Contact Dr. Hassan Khedr, Chairman,

Borrower IDA Credit Arab Republic of Egypt. Principal Bank for Development and. Agricultural Credit (PBDAC) Contact Dr. Hassan Khedr, Chairman, Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No. PID7086 Project Name Egypt-Private Sector and Agricultural (+) Development

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT

SECTOR ASSESSMENT (SUMMARY): TRANSPORT Country Partnership Strategy: Pakistan, 2015 2019 SECTOR ASSESSMENT (SUMMARY): TRANSPORT Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Sector performance and problems. The transport

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Lahendong II Geothermal Power Project

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Lahendong II Geothermal Power Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Lahendong II Geothermal

More information

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6220 Operation Name. P GOVERNMENT OF MOROCCO Kingdom of Morocco Morocco

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6220 Operation Name. P GOVERNMENT OF MOROCCO Kingdom of Morocco Morocco Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6220 Operation Name

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. RY-Second Vocational Training Project

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. RY-Second Vocational Training Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE RY-Second Vocational

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Africa Sector Project ID Borrower(s) Implementing Agency Environment

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Yerevan Urban Transport Project

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Yerevan Urban Transport Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Yerevan Urban Transport

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sectors Project ID Borrower Responsible Agency Report No. PID6537

More information

Mozambique ProIrri Sustainable Irrigation Development Project Region. 1. Key Development Issues and Rationale for Bank Involvement

Mozambique ProIrri Sustainable Irrigation Development Project Region. 1. Key Development Issues and Rationale for Bank Involvement PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No. AB4683 : Project Name Mozambique ProIrri Sustainable Irrigation Development Project Region AFRICA Sector Irrigation and drainage (50%); Crops

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name Large Enterprises Energy

More information

The effectiveness of the Umbrella Strategic Environmental and Social Assessment (SESA) for Spatial Development Planning Project

The effectiveness of the Umbrella Strategic Environmental and Social Assessment (SESA) for Spatial Development Planning Project The effectiveness of the Umbrella Strategic Environmental and Social Assessment (SESA) for Spatial Development Planning Project Ministry of Transport and Communication Spatial Development Program By Deolinda

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5610 Indonesia Power Transmission Development Project

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5610 Indonesia Power Transmission Development Project Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5610 Indonesia Power Transmission Development Project Region EAST

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Shandong Provincial Biogas CDM Program EAST ASIA AND PACIFIC Rural Development P115878

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Shandong Provincial Biogas CDM Program EAST ASIA AND PACIFIC Rural Development P115878 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION

More information

PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No. PIDC Sindh Jobs and Competitiveness Program

PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No. PIDC Sindh Jobs and Competitiveness Program Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM-FOR-RESULTS INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No. PIDC0147966 Program

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The Republic of Mozambique Project: Mandimba Lichinga Road Upgrading Project Loan Agreement: November 29, 2013

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Project Name Region Sector Project ID Implementing Agency Environment Category Report No. PID9361 Kenya-Public Sector Management (@) Technical Assistance Credit Africa Regional Office Other Public Sector

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE CG - FCPF

More information

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Gambia Emergency Development Policy Financing Region AFRICA

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Gambia Emergency Development Policy Financing Region AFRICA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE April 26, 2017 Report No.: AB7886

More information

Bridging the gaps Implementation challenges for transport PPPs in OIC member states

Bridging the gaps Implementation challenges for transport PPPs in OIC member states Bridging the gaps Implementation challenges for transport PPPs in OIC member states March 28, 2013 Vanesa Sanchez, Senior Analyst Economist Intelligence Unit What are PPPs? Introduction PPPs are public-private

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE ZhangHu

More information

LAW ON PUBLIC-PRIVATE PARTNERSHIP IN THE REPUBLIC OF SRPSKA

LAW ON PUBLIC-PRIVATE PARTNERSHIP IN THE REPUBLIC OF SRPSKA LAW ON PUBLIC-PRIVATE PARTNERSHIP IN THE REPUBLIC OF SRPSKA Article 1 This Law regulates the scope, principles, manner, and forms of public-private partnership, requirements for the establishment of a

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE HT (AF) Electricity Loss

More information

Water Supply and Sewerage

Water Supply and Sewerage Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No. PID3147 Project Name Poland-Bydgoszcz Water & Wastewater (@ +) Region Sector

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower(s)

More information

Principal Barriers/ Constraints to Successful Public-Private Partnerships

Principal Barriers/ Constraints to Successful Public-Private Partnerships High-level Expert Group Meeting on Infrastructure Public-Private Partnerships for Sustainable Development 11-13 November 2012 Tehran, Islamic Republic of Iran Principal Barriers/ Constraints to Successful

More information

SOCIALIST REPUBLIC OF VIETNAM Socialist Republic of Vietnam Vietnam

SOCIALIST REPUBLIC OF VIETNAM Socialist Republic of Vietnam Vietnam Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6048 Expressway

More information

Initial Project Information Document (PID) Report No: AB156. INDIA-Agricultural Higher Education Reforms Project Region.

Initial Project Information Document (PID) Report No: AB156. INDIA-Agricultural Higher Education Reforms Project Region. Initial Project Information Document () Report No: AB156 Project Name INDIA-Agricultural Higher Education Reforms Project Region South Asia Regional Office Sector Tertiary education (60%); Agricultural

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Report No. PID8331 Project Name Angola-Water Sector Development (*) Region Africa Sector Water Supply And Sanitation Project ID AOPE60512 Borrower(s) Government of Angola Public

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT (RAIL TRANSPORT [NONURBAN])

SECTOR ASSESSMENT (SUMMARY): TRANSPORT (RAIL TRANSPORT [NONURBAN]) Railway Rolling Stock Project (RRP BAN 49094) SECTOR ASSESSMENT (SUMMARY): TRANSPORT (RAIL TRANSPORT [NONURBAN]) Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Bangladesh s transport

More information

NWWEC AND WWC FOR AHWAZ, SHIRAZ, MAZANDARAN AND

NWWEC AND WWC FOR AHWAZ, SHIRAZ, MAZANDARAN AND THE WORL D BANK GROUP AWo,rI r,l, r,l Prvrjr,,' InfoShop Project Name Region Sector Initial Project Information Document () Project ID Supplemental Project Borrower(s) Implementing Agency Address Environment

More information

Rail freight and development

Rail freight and development Rail freight and development Transport Forum & Learning Week Paul Amos: Transport Advisor World Bank Washington, March 2007 0 Contents World Bank and railways: overview Financing sources for public railways

More information

JICA s activity for supporting Regional Integration within the Southern African Development Community (SADC)

JICA s activity for supporting Regional Integration within the Southern African Development Community (SADC) JICA s activity for supporting Regional Integration within the Southern African Development Community (SADC) Toshiyuki NAKAMURA Chief Representative, JICA South Africa Office Japan International Cooperation

More information

Ministry of Capacity Building Address: P.O. Box 1082 Addis Ababa, Ethiopia Contact Person: Ato Tefera Waluwa Tel: Fax:

Ministry of Capacity Building Address: P.O. Box 1082 Addis Ababa, Ethiopia Contact Person: Ato Tefera Waluwa Tel: Fax: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency Environment Category

More information

Burkina Faso Donsin Transport Infrastructure Project Region. Specific Investment Loan Project ID. GOVERNMENT OF BURKINA FASO Implementing Agency

Burkina Faso Donsin Transport Infrastructure Project Region. Specific Investment Loan Project ID. GOVERNMENT OF BURKINA FASO Implementing Agency Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6462 Project Name Burkina

More information

Development Policy Research Unit University of Cape Town The Maputo-Witbank Toll Road: Lessons for Development Corridors?

Development Policy Research Unit University of Cape Town The Maputo-Witbank Toll Road: Lessons for Development Corridors? The Maputo-Witbank Toll Road: Lessons for Development Corridors? Development Policy Research Unit University of Cape Town The Maputo-Witbank Toll Road: Lessons for Development Corridors? DPRU Policy Brief

More information

Promoting regional. food security. 2 March 2010 Washington DC. Lynette Chen NBF.

Promoting regional. food security. 2 March 2010 Washington DC. Lynette Chen NBF. Promoting regional integration and food security in Africa 2 March 2010 Washington DC www.nepadbusinessfoundation.org Lynette Chen NBF NEPAD and NBF structure Assembly of the African Union External Stakeholders

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE ELECTRICTY TRANSMISSION

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE ELECTRICTY TRANSMISSION Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE ELECTRICTY TRANSMISSION

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Istanbul Municipal Infrastructure Project Report No.: AB2946 Region EUROPE AND CENTRAL ASIA Sector Solid waste management (50%); Disaster

More information

Project Name Angola-Luanda Water Supply and Sanitation (+)

Project Name Angola-Luanda Water Supply and Sanitation (+) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No. PID6060 Project Name Angola-Luanda Water Supply and Sanitation (+) Region

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA982. Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA982. Project Name. Region. Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA982 Project Name Electric

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6108 Project Name. Mineral Development Support Project Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6108 Project Name. Mineral Development Support Project Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6108 Project Name Mineral

More information

Work stream 6: Regional growth for southern Africa s prosperity

Work stream 6: Regional growth for southern Africa s prosperity Southern Africa Towards Inclusive Economic Growth (SA-TIED) Laurence Harris 30 November 2017, Pretoria Work stream 6: Regional growth for southern Africa s prosperity Overview Continues and extends work

More information

Initial Project Information Document (PID) Report No: AB350

Initial Project Information Document (PID) Report No: AB350 Project Name Region Sector Theme Project Borrower(s) Implementing Agency(ies) Environment Category Date Prepared September 25, 2003 Auth Appr/Negs Date September 3, 2004 Bank Approval Date June 15, 2005

More information

PROJECT INFORMATION DOCUMENT (PID) Tanzania: Additional Financing to the Agricultural Sector Development Project Stage: Appraisal

PROJECT INFORMATION DOCUMENT (PID) Tanzania: Additional Financing to the Agricultural Sector Development Project Stage: Appraisal Project Name Region Country Sector(s) Lending Instrument Project ID Borrower(s) Implementing Agency PROJECT INFORMATION DOCUMENT (PID) Tanzania: Additional Financing to the Agricultural Sector Development

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Changzhi

More information

SADC ENERGY PROGRAMMES AND PROJECTS.

SADC ENERGY PROGRAMMES AND PROJECTS. SADC ENERGY PROGRAMMES AND PROJECTS. GABORONE, BOTSWANA October 2006 1. SECTORAL OBJECTIVES 1.1 The overall objective of the SADC Energy Sector is to ensure the availability of sufficient, reliable, least

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1

SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Country Partnership Strategy: Azerbaijan, 2014 2018 SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Sector Road Map 2 1. Sector Performance, Problems, and Opportunities 1. Sector performance. Azerbaijan s transport

More information

Infrastructure and Multi-Modal Transport

Infrastructure and Multi-Modal Transport Infrastructure and Multi-Modal Transport Challenges in Improving Regional Multi-Modal Transport Innovations, Increasing Effectiveness, Measuring results. Presentation Outline What are the Challenges to

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Information Document (PID) Report No: AB787 Not Sent to InfoShop Yet Country

More information

Railways in Africa do we have an ROI?

Railways in Africa do we have an ROI? Fourth African Railway Summit 25-26 February 2016 Birchwood Hotel & O. R. Tambo Conference Centre Railways in Africa do we have an ROI? Andrew Marsay Transport Economist "Aligning financial cost with real

More information

ECONOMIC ANALYSIS. Regional Upgrades of Sanitary and Phytosanitary Measures for Trade (RRP MON 46315)

ECONOMIC ANALYSIS. Regional Upgrades of Sanitary and Phytosanitary Measures for Trade (RRP MON 46315) Regional Upgrades of Sanitary and Phytosanitary Measures for Trade (RRP MON 46315) ECONOMIC ANALYSIS 1. This economic analysis of the Regional Upgrades of Sanitary and Phytosanitary Measures for Trade

More information

EXPRESSION OF INTEREST

EXPRESSION OF INTEREST EXPRESSION OF INTEREST SAFETY REVIEW OF RAILWAY OPERATIONS BY RIFT VALLEY RAILWAYS (KENYA) LTD OVER THE CONCEDED RAILWAY NETWORK IN KENYA The Kenya Railways (KR) is a State Corporation established under

More information

CASE STUDIES IN PRIVATE SECTOR PARTICIPATION: FRANCHISE SHIPPING

CASE STUDIES IN PRIVATE SECTOR PARTICIPATION: FRANCHISE SHIPPING Pacific Private Sector Development Initiative Enabling the private sector to drive sustainable economic growth and lift Pacific people out of poverty CASE STUDIES IN PRIVATE SECTOR PARTICIPATION: FRANCHISE

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA54793 Project Name

More information

SUB-URBAN RAILWAYS WORKSHOP

SUB-URBAN RAILWAYS WORKSHOP SUB-URBAN RAILWAYS WORKSHOP Colmar, June, 2001 Presentation by Eva Molnar, Transport Sector Manager Infrastructure Unit, ECA The World Bank OUTLINE CURRENT RAILWAYS PROJECTS LESSONS FROM CURRENT BANK PROJECTS

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Report No. PID5095 Project Name Turkey-Biodiversity and (@)... Natural Resource Management Project Region Sector Project ID Borrower(s) Implementing Agency Environment Category Europe and Central Asia

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower Implementing Agency Report No. PID6033

More information

Transport Sector Strategy: Sustainable and Integrated Transport for Trade and Economic Growth in Asia

Transport Sector Strategy: Sustainable and Integrated Transport for Trade and Economic Growth in Asia Transport Sector Strategy: Sustainable and Integrated Transport for Trade and Economic Growth in Asia Background 1. Asia is a large and geographically diverse continent, with many land-locked countries.

More information

GABON, NATIONWIDE WATER & POWER. Case Study (Water and Power) Project Summary:

GABON, NATIONWIDE WATER & POWER. Case Study (Water and Power) Project Summary: GABON, NATIONWIDE WATER & POWER Case Study (Water and Power) Project Summary: In July 1997, the government of Gabon signed a twenty-year concession contract with a private French consortium to operate

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) Theme(s) PROJECT INFORMATION DOCUMENT (PID) APPRAISAL

More information

Liberia Development Forestry Sector Management Project

Liberia Development Forestry Sector Management Project Questions & Answers Q1: What has been the World Bank s role in the Liberia forestry sector and what has been the impact of the Liberia Development Forestry Sector Management Project? Since 2004, the Bank

More information

Investment opportunities in agribusiness in Mozambique

Investment opportunities in agribusiness in Mozambique Investment opportunities in agribusiness in Mozambique Winresources is positioned as a strategic partner of economic agents in the countryside, in the definition of investment strategies, "Search for Money",

More information

EAST COAST ROAD, TAMIL NADU, INDIA. Case Study (Transportation) Project Summary:

EAST COAST ROAD, TAMIL NADU, INDIA. Case Study (Transportation) Project Summary: EAST COAST ROAD, TAMIL NADU, INDIA Case Study (Transportation) Project Summary: The southern India state of Tamil Nadu has been a leader in the area of urban sector reforms and has established an efficient

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Kabeli A Hydroelectric Project. Component 2: Ministry of Energy

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Kabeli A Hydroelectric Project. Component 2: Ministry of Energy Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Kabeli A Hydroelectric

More information

The government has adopted a new legal framework for public-private partnership (PPP)

The government has adopted a new legal framework for public-private partnership (PPP) LEGAL & TAX ALERT, May 14 th, 2018 The government has adopted a new legal framework for public-private partnership (PPP) Law no. 233/2016 on public-private partnership, substantially amended by Government

More information

Infrastructure and Capital Projects

Infrastructure and Capital Projects Infrastructure and Capital Projects Contents Deloitte s Capabilities in Infrastructure and Capital Projects 1 Strategy and Planning 3 Financing and Procurement 4 Project Organisation, Execution and Construction

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower Implementing Agency Report No. PID7735

More information

ELECTRICITY SUPPLY INDUSTRY OF SOUTH AFRICA

ELECTRICITY SUPPLY INDUSTRY OF SOUTH AFRICA ELECTRICITY SUPPLY INDUSTRY OF SOUTH AFRICA General Information for Potential Investors May 2008 This publication was produced for review by the United States Agency for International Development. It was

More information

Mozambique. Context. Featured project. Mozambique. Land rights in Mozambique. Highlights. Related SDGs. Priority themes

Mozambique. Context. Featured project. Mozambique. Land rights in Mozambique. Highlights. Related SDGs. Priority themes Mozambique Mozambique Priority themes Related SDGs Highlights S exual and Reproductive Health and Rights G ood health and well-being omen s Rights & W Gender Equality Gender equality 312,150 young people

More information

CIRCULAR GENERAL PROVISIONS

CIRCULAR GENERAL PROVISIONS MINISTRY OF CONSTRUCTION -------- SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness --------------- No. 10/2013/TT-BXD Hanoi, July 25, 2013 CIRCULAR ON CONSTRUCTION QUALITY MANAGEMENT Pursuant

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Metro Manila Wastewater

More information

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6411 Additional Financing to the Poverty Alleviation Fund II

Project Name. PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6411 Additional Financing to the Poverty Alleviation Fund II Project Name Region Sector PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB6411 Additional Financing to the Poverty Alleviation Fund II Project ID Borrower(s) Implementing Agency Environment

More information

The Country Partnership Framework Building Blocks for the CPF The PNG Medium Term Development Plan III (MTDPIII) The Systematic Country Diagnostic

The Country Partnership Framework Building Blocks for the CPF The PNG Medium Term Development Plan III (MTDPIII) The Systematic Country Diagnostic The Country Partnership Framework Building Blocks for the CPF The PNG Medium Term Development Plan III (MTDPIII) The Systematic Country Diagnostic (SCD) Lessons learnt Previous CPF Targeting our focus

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Project Name Region Sector Project ID Borrower(s) Implementing Agency Environment Category Gambia,The-Energy Infrastr. Africa Regional Office Report No. PID9527 Other Power & Energy Conversion GMPE57395

More information

Pillar II. Institutional Framework and Management Capacity

Pillar II. Institutional Framework and Management Capacity PILLAR II. INSTITUTIONAL FRAMEWORK AND MANAGEMENT CAPACITY Pillar II. Institutional Framework and Management Capacity Pillar II assesses how the procurement system defined by the legal and regulatory framework

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT, AND INFORMATION AND COMMUNICATION TECHNOLOGY

SECTOR ASSESSMENT (SUMMARY): TRANSPORT, AND INFORMATION AND COMMUNICATION TECHNOLOGY Central Asia Regional Economic Cooperation Corridor 3 (Bishkek Osh Road) Improvement Project, Phase 4 (RRP KGZ 45169) SECTOR ASSESSMENT (SUMMARY): TRANSPORT, AND INFORMATION AND COMMUNICATION TECHNOLOGY

More information

Policies and Constraints Impacting on the Role of the Private Sector in Addressing Food Shortages:

Policies and Constraints Impacting on the Role of the Private Sector in Addressing Food Shortages: Policies and Constraints Impacting on the Role of the Private Sector in Addressing Food Shortages: A Summary of Literature on Malawi, Zambia and Zimbabwe Presentation for the Workshop on: Partnerships

More information

Designing and using public-private partnership units in infrastructure. Lessons from case studies around the world

Designing and using public-private partnership units in infrastructure. Lessons from case studies around the world Public Disclosure Authorized note NO. 27 Sept. 2007 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized GRIDLINES Sharing knowledge, experiences, and innovations in public-private

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Tsunami Disaster Recovery in India

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Tsunami Disaster Recovery in India Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Tsunami Disaster Recovery in India Report No.: AB1770 Region SOUTH ASIA Sector General agriculture, fishing and forestry sector (90%);Other

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT AND INFORMATION AND COMMUNICATION TECHNOLOGY 1

SECTOR ASSESSMENT (SUMMARY): TRANSPORT AND INFORMATION AND COMMUNICATION TECHNOLOGY 1 Country Partnership Strategy: Nepal, NEP, 2013 2017 2013-2017 SECTOR ASSESSMENT (SUMMARY): TRANSPORT AND INFORMATION AND COMMUNICATION TECHNOLOGY 1 A. Overview 1. Road transport is the predominant mode

More information

AGRIBUSINESS OPPORTUNITIES

AGRIBUSINESS OPPORTUNITIES AGRIBUSINESS OPPORTUNITIES MINISTRY OF AGRICULTURE AGRICULTURE PROMOTION CENTRE (CEPAGRI) 1 Content Introduction: Mozambique s economy & agricultural sector Principal crops Market Opportunities Agri-businesses

More information

PUBLIC MANAGEMENT SYSTEMS: AN OVERVIEW

PUBLIC MANAGEMENT SYSTEMS: AN OVERVIEW PUBLIC MANAGEMENT SYSTEMS: AN OVERVIEW Public management systems are the core systems that enable a government to function and to provide services to its citizens. Just as in the private sector, they ensure

More information

Public Procurement Reforms to enhance value for money

Public Procurement Reforms to enhance value for money Public Procurement Reforms to enhance value for money 1. It is my pleasure to be here in the inaugural function of the Seminar on Public Procurement Reforms to enhance value for money being organized by

More information

Anti-Fraud Programs and Control Policy

Anti-Fraud Programs and Control Policy Anti-Fraud Programs and Control Policy OVERVIEW This document provides an overview of the programs and controls Tahoe Resources Inc. ( Tahoe ) follows in order to evaluate fraud risk as it pertains to

More information

Extractives Sector Governance Over View of Global Practices

Extractives Sector Governance Over View of Global Practices World Bank Extractive Industries Extractives Governance Extractives Sector Governance Over View of Global Practices Michael Stanley, Sector Lead Mining Sustainable Energy Oil, Gas and Mining Unit The World

More information

DEMOCRACTIC REPUBLIC OF CONGO Implementing Agency Democratic Republic of Congo Congo, Democratic Republic of

DEMOCRACTIC REPUBLIC OF CONGO Implementing Agency Democratic Republic of Congo Congo, Democratic Republic of Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2795 Regional

More information

Mitsui s Participation in Coal, Railway & Port Business in Mozambique

Mitsui s Participation in Coal, Railway & Port Business in Mozambique Mitsui s Participation in Coal, Railway & Port Business in Mozambique Dec 2014 December 9, 2014 Mitsui & Co., Ltd. Main Points of the Project 1. Promotion of an integrated business model of mineral resources

More information

Characteristics of the most successful supplier development and linkages programmes The case of Mozambique

Characteristics of the most successful supplier development and linkages programmes The case of Mozambique TRADE AND DEVELOPMENT BOARD COMMISSSION ON ENTERPRISE, BUSINESS FACILITATION AND DEVELOPMENT Expert Meeting on "ENHANCING THE PARTICIPATION OF SMALL AND MEDIUM- SIZED ENTERPRISES IN GLOBAL VALUE CHAINS"

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA569

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA569 PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No: PIDA569 Project Name Region Country Sector(s) Lending Instrument Project ID Borrower(s) Implementing Agency Environmental Category Enhancing

More information

NATIONAL TRADE CORRIDOR IMPROVEMENT PROGRAM. Dr. ASAD ALI SHAH MEMBER (INFRASTRUCTURE) PLANNING COMMISSION GOVERNMENT OF PAKISTAN 27 APRIL 2007

NATIONAL TRADE CORRIDOR IMPROVEMENT PROGRAM. Dr. ASAD ALI SHAH MEMBER (INFRASTRUCTURE) PLANNING COMMISSION GOVERNMENT OF PAKISTAN 27 APRIL 2007 NATIONAL TRADE CORRIDOR IMPROVEMENT PROGRAM by Dr. ASAD ALI SHAH MEMBER (INFRASTRUCTURE) PLANNING COMMISSION GOVERNMENT OF PAKISTAN 27 APRIL 2007 Pakistan s Vision 2030 Developed, industrialized, just

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1

SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Inclusive Growth through Improved Connectivity Program (RRP INO 46093-001) SECTOR ASSESSMENT (SUMMARY): TRANSPORT 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Transport system.

More information

PROJECT INFORMATION DOCUMENT (PID) UPDATE - ADDITIONAL FINANCING APPRAISAL STAGE Report No.: TRADE AND TRANSPORT INTEGRATION PROJECT

PROJECT INFORMATION DOCUMENT (PID) UPDATE - ADDITIONAL FINANCING APPRAISAL STAGE Report No.: TRADE AND TRANSPORT INTEGRATION PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) UPDATE - ADDITIONAL FINANCING APPRAISAL

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3455 Project Name. Mauritania Port of Nouakchott Development Project Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3455 Project Name. Mauritania Port of Nouakchott Development Project Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3455 Project Name Mauritania Port of Nouakchott Development Project Region AFRICA Sector Ports, waterways and shipping (100%) Project ID P108554

More information

Private Forest Financing Flows. Review of constraints, challenges, opportunities, and the way forward - preliminary findings from an on-going study

Private Forest Financing Flows. Review of constraints, challenges, opportunities, and the way forward - preliminary findings from an on-going study Private Forest Financing Flows Review of constraints, challenges, opportunities, and the way forward - preliminary findings from an on-going study Forest investment landscape Policies and legislation Social

More information

ETHIOPIA - AGRICULTURAL GROWTH PROJECT (AGP) PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5416 Project Name

ETHIOPIA - AGRICULTURAL GROWTH PROJECT (AGP) PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5416 Project Name Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ETHIOPIA - AGRICULTURAL GROWTH PROJECT (AGP) PROJECT INFORMATION DOCUMENT (PID) APPRAISAL

More information

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE September 25, 2017 Report No.: AB7900

PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE September 25, 2017 Report No.: AB7900 Public Disclosure Authorized Operation Name PROGRAM INFORMATION DOCUMENT (PID) APPRAISAL STAGE September 25, 2017 Report No.: AB7900 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure

More information

Comprehensive Corridor Development Approach of Nacala Corridor. June 2, 2013 Economic Infrastructure Department, JICA

Comprehensive Corridor Development Approach of Nacala Corridor. June 2, 2013 Economic Infrastructure Department, JICA Comprehensive Corridor Development Approach of Nacala Corridor June 2, 2013 Economic Infrastructure Department, JICA 1 Points Comprehensive support of JICA Potential of Nacala Development Corridor JICA

More information

4.3 Future Traffic Demand Forecast

4.3 Future Traffic Demand Forecast 4.3 Future Traffic Demand Forecast 4.3.1 Methodology for Future Traffic Demand Forecast (1) Methodology of Future Traffic Demand Forecast In forecasting future traffic demand, passenger vehicles and freight

More information