1 December 2017 Newsletter Detail Commercial Solicitors WHAT THE ELIGIBLE CUSTOMER REGULATION MEANS FOR NIGERIA S POWER SECTOR A. Introduction On 15th May, 2017, the Federal Minister of Power, Works & Housing, Babatunde Raji Fashola, declared four categories of eligible customers in the Nigerian Electricity Supply Industry (NESI). By the declaration, electricity customers who fall within any of the four eligibility categories would now be permitted to buy power directly from Generation Licensees and Trading Licensees (also known as Suppliers). Prior to the declaration of the eligibility criteria, customers were only permitted to purchase electric power from licensed distribution companies (Discos); save for industrial, commercial, and residential customers (off-grid IPPs or captive generators) who generate their own power. Following a nationwide stakeholder consultation held by the Nigerian Electricity Regulatory Commission ( NERC / the Commission ), the Commission issued the Eligible Customer Regulation ( Regulation ) on the 6th of November, This article will discuss the impact of the Regulation on the power sector, and key considerations to be made by NERC towards the successful implementation of the Regulation. B. Key Highlights of the Eligible Customer Regulation, 2017 a) Categories of Customer Qualification Criteria Eligibility and Pre- Source: NERC Note: A comprehensive description of each of the eligibility categories is provided in Section 5 of the Regulation. To qualify as an eligible customer, the Regulation requires that customers should execute a Power Purchase Agreement (PPA); Transmission Use of System Agreement (TUoS); Distribution Use of System Agreement (DUoS); Market Participation Agreement; and Bilateral Agreement with Discos for the construction, installation, and operation of a distribution system, where applicable. (Section 8 of the Regulation).

2 b) Phasing of Implementation The Regulation provides that the eligibility framework will be introduced in two phases, subject to fulfilment of certain conditions set out in Section 34 of the Regulation. emergence of new businesses (especially amongst the youth) and further assuage some of the challenges plaguing the industry. It is expected that these incentives would: i. Phase 1 - Implementation of categories 2, 3, 4 and part of category 1 (i.e., those connected to a metered 33kV delivery point). ii. Phase 2 - Implementation of the second part of category 1 (i.e., those connected to a metered 11kV delivery point). c) Site Aggregation The Regulation (Section 6) allows for site aggregation by end users. This will allow a group of end users to combine multiple sites to meet the eligibility criteria and apply to the Commission for eligibility status, provided that: i. Each of the customers is connected to the same Disco network, Independent Electricity Distribution Networks (IEDN) or off-grid licensee, and are connected to the same feeder. The foregoing appears to imply that IEDNs and off-grid projects could potentially supply power to eligible customers, if they are connected to a distribution or transmission network; ii. The applicant is a single legal entity applying on behalf of the group of end-users and shall be responsible for executing the transaction documents; iii. There is a minimum consumption of 500KVA at each site; and iv. All the end-user sites must be located within the same geographical network as may be determined by the Commission from time to time. d) Financial Requirements The Regulation (Section 9) requires applicants to provide payment security in the form of a Letter of Credit or Bank Guarantee in favour of the Market Operator. This is required to cover market administration, TUoS, and DUoS charges as required in the Market Rules. The Commission may also introduce other charges to be paid by the applicant. It is, however, not clear why the Regulation would require a Letter of Credit or Bank Guarantee to be issued to the Market Operator with respect to the Duos charges, which should be to the benefit of the Discos. e) Supplier Choice Eligible customers are permitted under the Regulation (Section 15(2)) to freely choose between Suppliers; and contract on the pricing, quantity, and time of supply. There must, however, be adequate infrastructure available for the System Operator and Market Operator to reliably account for the energy quantities. f) Switching Rules The Regulation (Chapter VII) further accords eligible customers the right to switch between Suppliers provided that the current supplier is given a minimum of three months notice in writing, of the date of the intended switch. Where there is a switch, the eligible customer will be required to submit the PPA with the prospective Suppliers to the Commission. If the eligible customer intends to reconnect with a previous supplier, the eligible customer will also be required to provide a minimum of three months notice to the initial supplier. The tariff for such reconnection will be at the prevailing tariff rates for customers in the same tariff class. g) Metering Obligations The Regulation (Section 7) mandates end users seeking to attain the eligibility status to procure and install appropriate metering infrastructure at all trading points in compliance with the Metering Code.

3 h) Access to Networks The Regulation (Section 27) allows an eligible customer or its Supplier access to Transmission and Distribution Networks, subject to compliance to applicable standards. The application for access shall be in writing and a decision will be communicated within 30 days of submission of the application. i) Tariff Methodology The Regulation (Section 28) provides for the category of charges to be embedded in the operative tariff methodology for the supply of electricity to an eligible customer. The components of the tariff include: Regulatory Fees, Ancillary Services Charges, Market Administration, and System Operation Charges. The Regulation also provides for TUoS and DUoS Charges to be included in the methodology, where applicable. C. Foreseeable Impact of the Eligibility Framework on the Power Sector a) Healthy Competition for the Sector One of the objectives of the Regulation is to facilitate competition in the supply of electricity and to promote the rapid expansion of generation capacity. In an ideal world, competition in the sector will help improve the quality of supply, increase efficiency, and liquidity for generation companies. However, this would be quite a challenge given the impact that the Regulation could have on the Discos revenues. b) Power to the Eligible As indicated above, the Regulation provides eligible customers fair and non-discriminatory access to Transmission and Distribution Networks, and the freedom to switch Suppliers. The eligible customer regime is not unique to Nigeria, as there are similar regulations in force in other countries. For example, in Brazil, the introduction of free and special consumers regime (synonymous with eligible customers) helped to boost competitiveness in the Brazilian electric power market. c) Supplier of Last Resort (SOLR) Although the Regulation introduces alternative supply options for eligible customers, it is important to note that the current suppliers still have a crucial role to Image courtesy nigeriaconsumers.com play as suppliers of last resort. For example, where a contracted Supplier has failed to supply an eligible customer, a Disco can step in as a supplier of last resort, provided the eligible customer is within its network coverage area. The SOLR service is to be provided under a provisional arrangement at a mutually agreed price. d) Reduction of Discos Revenues The Regulation may result in a loss of majority of Discos highest-paying customers, including industrial clusters and residential estates; leaving them with lower-demand customers, who have minimal willingness to pay for electricity. This could potentially reduce Discos revenues, given that the market is insolvent with tariff shortfalls. As of Q2 2017, the power sector had received over N466 billion worth of credit from banks. (National Bureau of Statistics) This is in addition to the tariff shortfalls estimated to be up to N460 billion (between January 2015 and December 2016). It is, therefore, not surprising that just a few days after the release of the Regulation, the Discos issued a notice of force majeure to the Bureau of Public Enterprise (BPE), arguing that the impact of the Regulation has resulted in a change of law that prevents them from fulfilling their obligations under the Performance Agreement. Although the BPE has rejected the notice, it remains to be seen how the next couple of months will pan out in the sector.

4 e) Possible Increase in Tariffs There is a high likelihood of a hike in retail tariffs, as was the case in some other jurisdictions. For example, in Spain the introduction of eligible customers resulted in a 9% increase in end-user tariffs. In Nigeria, the tariff structure envisages different classes of customers, with revenue from high-paying customers helping to subsidize tariffs from low-paying customers. Where there is a reduction in the percentage of high-paying customers, the Discos may push for an increase in tariffs, a move that is already overdue. Section 28 of the EPSRA provides for Competition Transition Charge (CTC) to be determined by the Minister in consultation with the President. The CTC is required where the impact of the eligible customer regime significantly affects the ability of a Disco (or a trading licensee) to satisfy its committed expenditures or earn permitted rates of return. It is expected that the CTC, when determined, would help to cushion the effect of the potential loss of customers by the Discos. D. Key Considerations for the Implementation of the Eligible Customer Regulation a) Release of third-party access rules by the Commission Pursuant to the Regulation, NERC is expected to release a set of compliance rules to govern the nature of thirdparty access to transmission and distribution networks. It remains to be seen how this will fare with the Discos especially with respect to the determination of fees payable for access. Delays in the release of the rules may affect the implementation of the eligibility regime, as open access to networks will be crucial to efficient supply of electrical power to the eligible customers. b) Credit worthiness of eligible customers While the Regulation allows the eligible customers to contract directly with the Gencos, a possible issue that may arise is the ability of the eligible customers to commit to long-term PPAs (which is often required by Suppliers), and provide the requisite payment security to the Suppliers. c) Eligibility application process The Mini-Grid Regulations released earlier this year provides for template contracts and a simplified application procedure. It is important for the Commission to continue this trend by providing standard documentation to ease the process and ensure the 30-day timeline for the Commission s approval as provided in the Regulation is achieved. d) Establishment and contributions to the Power Consumer Assistance Fund The Regulation makes provisions for contributions to the Power Consumer Assistance Fund as provided in Section 84 of the Act. However, the fund is yet to be established. It is important to note that the primary essence of the Fund is to subsidise underprivileged power consumers. This will be very crucial towards helping Discos manage the potential loss of revenue. e) Electricity theft As the power sector continues to strive towards attaining competitiveness, it is important that NERC and the Federal Government work together towards tackling the crippling effects of electricity theft in the power sector. It is recommended that the speedy enactment of an electricity theft legislation should be prioritized.

5 E. Conclusion It is a widely known fact that the power sector is still in the early stages of attaining actual competitiveness, and some may argue that the introduction of the eligible customers Regulation is pre-mature. However, the power sector requires such initiatives that will help ease the barriers to entry by interested third parties, which in turn could help drive more investment into the sector. In its transitional phase, the dividends of this Regulation may not be easily quantifiable. It remains to be seen how the market will adjust as the implementation of the categories progress. The fact, however, remains that the sector is in dire need of more investment and flexibility, and this Regulation may be the trigger to propel the industry towards the desired competitiveness. Image courtesy financialtribune.com Detail Commercial Solicitors is distinct as Nigeria's first commercial solicitor firm to specialize exclusively in non-courtroom practice. Based in Lagos, Nigeria s business capital, DETAIL is totally committed to its clients business objectives and reputed for dealing with the minutiae. info@detailsolicitors.com Detail Commercial Solicitors DCS Place, 8, DCS Street, Off Remi Olowude Way Lekki Phase 1, Lagos, Nigeria +234(0)

Walk through the Eligible Customer Regulation. Dr. Seun Amoda

Walk through the Eligible Customer Regulation. Dr. Seun Amoda Walk through the Eligible Customer Regulation Dr. Seun Amoda 1 INTRODUCTION 2 The Nigerian Grid Voltages 330kV 132kV 33KV 11KV 415V 3 The Nigerian Grid 4 Eligibility - EPSRA 2005 Section 100 of EPSR Act

More information

NIGERIAN ELECTRICITY REGULATORY COMMISSION ISSUES OF ELIGIBLE CUSTOMERS BENEFITS AND CHALLENGES

NIGERIAN ELECTRICITY REGULATORY COMMISSION ISSUES OF ELIGIBLE CUSTOMERS BENEFITS AND CHALLENGES NIGERIAN ELECTRICITY REGULATORY COMMISSION ISSUES OF ELIGIBLE CUSTOMERS BENEFITS AND CHALLENGES By Mrs. Aisha Mahmud (Senior Manager) Market Competition & Rates Division Outline Introduction Drivers for

More information

Prospects of Solar Power Generation in Diversifying Nigeria's Energy Mix

Prospects of Solar Power Generation in Diversifying Nigeria's Energy Mix Prospects of Solar Power Generation in Diversifying Nigeria's Energy Mix As at July 2016, the total installed power generation capacity in Nigeria, a country of over 187 million people (www.worldometers.info),

More information

Presentation at 2011 WAPIC Abuja, Nigeria

Presentation at 2011 WAPIC Abuja, Nigeria New Regulatory Framework in the Privatized Power Sector in Nigeria Cost Reflective Tariffs and Subsidies Presentation at 2011 WAPIC Abuja, Nigeria Dr. Sam Amadi Chairman, Nigerian Electricity Regulatory

More information

ELECTRICITY POLICY STATEMENT

ELECTRICITY POLICY STATEMENT 1. INTRODUCTION ELECTRICITY POLICY STATEMENT 1. Today, the electricity systems in the Federation of Bosnia and Herzegovina ("FBiH") and Republica Srpska ("RS"), which function in Bosnia and Herzegovina

More information

UNMIK REGULATION NO. 2004/22 ON THE PROMULGATION OF A LAW ADOPTED BY THE ASSEMBLY OF KOSOVO ON ELECTRICITY

UNMIK REGULATION NO. 2004/22 ON THE PROMULGATION OF A LAW ADOPTED BY THE ASSEMBLY OF KOSOVO ON ELECTRICITY UNITED NATIONS United Nations Interim Administration Mission in Kosovo UNMIK NATIONS UNIES Mission d Administration Intérimaire des Nations Unies au Kosovo UNMIK/REG/2004/22 30 June 2004 REGULATION NO.

More information

Reforms of Power Sector & Liberalisation. The Indian Perspective

Reforms of Power Sector & Liberalisation. The Indian Perspective Reforms of Power Sector & Liberalisation The Indian Perspective Background Indian power sector, characterised by vertically integrated Govt-owned State Electricity Boards (SEBs). A structure since Independence

More information

presented by E.C. MOGBO

presented by E.C. MOGBO TRANSMISSION COMPANY OF NIGERIA PLC THE ROLE OF THE MARKET OPERATOR IN THE NIGERIAN ELECTRICITY SUPPLY INDUSTRY presented by E.C. MOGBO Executive Director, MO THE WEST AFRICAN POWER INDUSTRY CONVENTION

More information

Outline. 1. Concept of Embedded Generation 2. Nigerian Power Sector Outlook 3. Potential 4. Challenges

Outline. 1. Concept of Embedded Generation 2. Nigerian Power Sector Outlook 3. Potential 4. Challenges Outline 1. Concept of Embedded Generation 2. Nigerian Power Sector Outlook 3. Potential 4. Challenges 1 The Concept of Embedded Generation (EG) 2 Industry Definition of EG Also known as: q Distributed

More information

Electricity Distribution Network Code. made under the Electricity Act 1994

Electricity Distribution Network Code. made under the Electricity Act 1994 Electricity Distribution Network Code made under the Electricity Act 1994 CHAPTER 1: THIS CODE 4 1.1 Introduction 4 1.1.1 Code objective 4 1.1.2 Scope of the Code 4 1.1.3 Authority 4 1.1.4 Date of effect

More information

(4 November 2016 to date) ELECTRICITY REGULATION ACT 4 OF 2006

(4 November 2016 to date) ELECTRICITY REGULATION ACT 4 OF 2006 (4 November 2016 to date) ELECTRICITY REGULATION ACT 4 OF 2006 Government Notice 660 in Government Gazette 28992, dated 5 July 2006. Commencement date: 1 August 2006 unless otherwise indicated [Proc. R30,

More information

THE REGULATED ELECTRICITY MARKET IN GEORGIA

THE REGULATED ELECTRICITY MARKET IN GEORGIA Hydropower Investment Promotion Project (HIPP) THE REGULATED ELECTRICITY MARKET IN GEORGIA CHAPTER 9 TO GEMM 2015 This publication was produced for review by the United States Agency for International

More information

Rules on Initiation of Power Procurement and Review of Power Purchase Agreements. Eng. Anastas Mbawala, EWURA

Rules on Initiation of Power Procurement and Review of Power Purchase Agreements. Eng. Anastas Mbawala, EWURA Rules on Initiation of Power Procurement and Review of Power Purchase Agreements Eng. Anastas Mbawala, EWURA 1 Overview of this Presentation Background on statutory powers and purpose of the Rules Description

More information

COMMISSION STAFF WORKING PAPER

COMMISSION STAFF WORKING PAPER EN EN EN EUROPEAN COMMISSION Brussels, 22 January 2010 COMMISSION STAFF WORKING PAPER INTERPRETATIVE NOTE ON DIRECTIVE 2009/72/EC CONCERNING COMMON RULES FOR THE INTERNAL MARKET IN ELECTRICITY AND DIRECTIVE

More information

Role of the Public Electricity Supplier and the Supplier of Last Resort in the De-regulated Electricity Market

Role of the Public Electricity Supplier and the Supplier of Last Resort in the De-regulated Electricity Market Role of the Public Electricity Supplier and the Supplier of Last Resort in the De-regulated Electricity Market DOCUMENT Consultation Paper TYPE: REFERENCE: CER 11/039 DATE PUBLISHED: CLOSING DATE: RESPONSES

More information

S T R A T E G I C O B J E C T I V E S & W O R K P R O G R A M M E

S T R A T E G I C O B J E C T I V E S & W O R K P R O G R A M M E TELECOMS (CHANNEL ISLANDS) S T R A T E G I C O B J E C T I V E S & 2 0 1 9 W O R K P R O G R A M M E December 2018 Document No: CICRA 18/48 19 December 2018 Jersey Competition Regulatory Authority 2nd

More information

Role of AERS in natural gas sector reform in Serbia

Role of AERS in natural gas sector reform in Serbia ENERGY AGENCY OF THE REPUBLIC OF SERBIA Role of AERS in natural gas sector reform in Serbia Petar Maksimović Secretary General 16 th MEETING OF THE UNECE GAS CENTRE TASK FORCE GROUP ON THE IMPLEMENTATION

More information

BUSINESS TERMS SOFTWARE AG PARTNER. 1 Definitions EXHIBITS & FORMS SEPTEMBER 2017

BUSINESS TERMS SOFTWARE AG PARTNER. 1 Definitions EXHIBITS & FORMS SEPTEMBER 2017 EXHIBITS & FORMS SEPTEMBER 2017 SOFTWARE AG PARTNER BUSINESS TERMS 1 Definitions 1.1 Definitions: Unless the context requires otherwise the following words and expressions shall bear the meanings set out

More information

Customer Capital Contributions Policy

Customer Capital Contributions Policy TasNetworks Customer Capital Contributions Policy Effective 1 July 2014 Tasmanian Networks Pty Ltd ABN 24 167 357 29 Page 1 of 25 Tasmanian Networks Pty Ltd ABN 24 167 357 299 1-7 Maria Street Lenah Valley

More information

TRANSMISSION COMPLIANCE MONITORING FRAMEWORK FOR THE SOUTH AFRICAN ELECTRICITY INDUSTRY

TRANSMISSION COMPLIANCE MONITORING FRAMEWORK FOR THE SOUTH AFRICAN ELECTRICITY INDUSTRY TRANSMISSION COMPLIANCE MONITORING FRAMEWORK FOR THE SOUTH AFRICAN ELECTRICITY INDUSTRY TABLE OF CONTENTS 1. PURPOSE...2 2. OBJECTIVE...2 3. BACKGROUND...2 3.1 REGULATORY INTERFACE AND COMMUNICATION CHANNELS...2

More information

First Revised Sheet No. 449 Canceling Original WN U-60 Sheet No. 449 PUGET SOUND ENERGY Electric Tariff G SCHEDULE 449 RETAIL WHEELING SERVICE

First Revised Sheet No. 449 Canceling Original WN U-60 Sheet No. 449 PUGET SOUND ENERGY Electric Tariff G SCHEDULE 449 RETAIL WHEELING SERVICE First Revised Sheet No. 449 Canceling Original WN U-60 Sheet No. 449 1. ELIGIBILITY FOR SERVICE RETAIL WHEELING SERVICE All Special Contract Customers, and all Schedule 48 Customers as of March 9, 2001,

More information

FIVE WAYS CONGRESS CAN IMPROVE THE U.S. ELECTRIC POWER SYSTEM

FIVE WAYS CONGRESS CAN IMPROVE THE U.S. ELECTRIC POWER SYSTEM FIVE WAYS CONGRESS CAN IMPROVE THE U.S. ELECTRIC POWER SYSTEM Ideas for federal action to accelerate advanced energy investment and innovation, drive economic growth, and reduce costs to consumers By Advanced

More information

Ohio s Qualifications-Based Selection Law (as amended by Sub. H.B. 153, 129 th Ohio General Assembly, effective Sept. 28, 2011)

Ohio s Qualifications-Based Selection Law (as amended by Sub. H.B. 153, 129 th Ohio General Assembly, effective Sept. 28, 2011) Ohio s Qualifications-Based Selection Law (as amended by Sub. H.B. 153, 129 th Ohio General Assembly, effective Sept. 28, 2011) Sec. 153.65. As used in sections 153.65 to 153.73 of the Revised Code: (A)(1)

More information

Service Standards for Western Power Corporation s South West Interconnected System

Service Standards for Western Power Corporation s South West Interconnected System Service Standards for Western Power Corporation s South West Interconnected System Report prepared for Economic Regulation Authority Western Australia Contents 1 Executive summary 3 2 Introduction 7 2.1

More information

(To be published in the Gazette of India, Part I, Section 1) RESOLUTION. Tariff based Competitive-bidding Guidelines for Transmission Service

(To be published in the Gazette of India, Part I, Section 1) RESOLUTION. Tariff based Competitive-bidding Guidelines for Transmission Service (To be published in the Gazette of India, Part I, Section 1) No. 11/5/2005-PG(i) GOVERNMENT OF INDIA Ministry of Power. RESOLUTION New Delhi, Date: 17th April, 2006 Tariff based Competitive-bidding Guidelines

More information

Independent Power Producers (IPPs)

Independent Power Producers (IPPs) AGRI-SA Commodity Conference 2016 Independent Power Producers (IPPs) 26 February 2016 By: Title: W. Böhmer Regional Manager Eskom Grid Access Unit Overview of the presentation Introduction. Achievements

More information

The CCA Handbook. A Guide to Conducting Business with Southern California Edison under Community Choice Aggregation. Version 3.

The CCA Handbook. A Guide to Conducting Business with Southern California Edison under Community Choice Aggregation. Version 3. The CCA Handbook A Guide to Conducting Business with Southern California Edison under Community Choice Aggregation Version 3.0 February 1, 2017 Welcome Preface Chapter 1: Chapter 2: Chapter 3: Chapter

More information

Financing Renewable Energy Projects. Part I: Government Subsidies

Financing Renewable Energy Projects. Part I: Government Subsidies Financing Renewable Energy Projects Part I: Government Subsidies Part I: Government Subsidies Goals of Government Subsidies Renewable Portfolio Standards and Renewable Energy Certificates Illinois Renewable

More information

Distribution Code Definitions

Distribution Code Definitions Distribution Code Definitions Version 5 Approved September 2007 Comments to this document can be forwarded to: RSA Grid Code Secretariat Attention: Mr. Bernard Magoro Eskom, Transmission System Operator

More information

Final May Corporate Governance Guideline

Final May Corporate Governance Guideline Final May 2006 Corporate Governance Guideline Table of Contents 1. INTRODUCTION 1 2. PURPOSES OF GUIDELINE 1 3. APPLICATION AND SCOPE 2 4. DEFINITIONS OF KEY TERMS 2 5. FRAMEWORK USED BY CENTRAL BANK TO

More information

Chhattisgarh State Electricity Regulatory Commission

Chhattisgarh State Electricity Regulatory Commission Chhattisgarh State Electricity Regulatory Commission Irrigation Colony, Shanti Nagar, Raipur Raipur, Dated September 18, 2013 No. 48/CSERC/2013 - Section 86(1)(e) of the Electricity Act, 2003 (the Act)

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 40. Resource Adequacy Demonstration for all SCs in the CAISO BAA... 3 40.1 Applicability... 3 40.1.1 [Not Used]... 3 40.2 Information Requirements for Resource Adequacy Programs... 3

More information

Appendix D Minimum Requirements For Developmental Resources For

Appendix D Minimum Requirements For Developmental Resources For Minimum For Developmental Resources For 2016 Request For Proposals For Long-Term Renewable Generation Resources For Entergy New Orleans, Inc. Entergy Services, Inc. July 13, 2016 MINIMUM REQUIREMENTS FOR

More information

ATTACHMENT DD. Reliability Pricing Model

ATTACHMENT DD. Reliability Pricing Model OF NEW SERVICE REQUESTS; R - OATT ATTACHMENT DD ATTACHMENT DD Reliability Pricing Model References to section numbers in this Attachment DD refer to sections of this Attachment DD, unless otherwise specified.

More information

CONSULTATION PAPER FOR TARIFF REVIEW ENUGU ELECTRICITY DISTRIBUTION PLC RESPONSES TO THIS CONSULTATION PAPER ARE DUE BY 10 TH JULY, 2015

CONSULTATION PAPER FOR TARIFF REVIEW ENUGU ELECTRICITY DISTRIBUTION PLC RESPONSES TO THIS CONSULTATION PAPER ARE DUE BY 10 TH JULY, 2015 CONSULTATION PAPER FOR TARIFF REVIEW BY ENUGU ELECTRICITY DISTRIBUTION PLC JUNE 2015 RESPONSES TO THIS CONSULTATION PAPER ARE DUE BY 10 TH JULY, 2015 CONTENTS Contents 2 Introduction 3 Background 6 Industry

More information

WORKSHOP ON THE EMBEDDED GENERATION FRAMEWORK IN THE NIGERIAN ELECTRICITY SUPPLY INDUSTRY

WORKSHOP ON THE EMBEDDED GENERATION FRAMEWORK IN THE NIGERIAN ELECTRICITY SUPPLY INDUSTRY WORKSHOP ON THE EMBEDDED GENERATION FRAMEWORK IN THE NIGERIAN ELECTRICITY SUPPLY INDUSTRY 15 th November, 2012 The Concept of Embedded Generation Prospects and Challenges Dolapo Kukoyi, Partner (Power)

More information

Relevant changes will be made to corresponding sections of OA and RAA.

Relevant changes will be made to corresponding sections of OA and RAA. PJM Interconnection - Intra-PJM Tariffs - OPEN ACCESS TRANSMISSION TARIFF PJM OPEN ACCESS TRANSMISSION TARIFF Relevant changes will be made to corresponding sections of OA and RAA. Effective Date: 9/17/2010

More information

Market Liberalization - Electricity Market Competition (wholesale) Mark Vannoy, Chairman. Maine Public Utilities Commission

Market Liberalization - Electricity Market Competition (wholesale) Mark Vannoy, Chairman. Maine Public Utilities Commission Market Liberalization - Electricity Market Competition (wholesale) Mark Vannoy, Chairman. Maine Public Utilities Commission May 13, 2015 AGENDA 1. Review EU energy legislation 2. United States structural

More information

NERSA Consultation Paper

NERSA Consultation Paper NERSA Consultation Paper Renewable Energy Feed - In Tariff December 2008 Page 1 of 14 TABLE OF CONTENTS ABBREVIATIONS...3 1. INTRODUCTION AND BACKGROUND...4 2. SOUTH AFRICAN RENEWABLE ENERGY FEED IN TARIFF

More information

SUBSIDIARY LEGISLATION

SUBSIDIARY LEGISLATION ISSN 0856 034X Supplement No. 42 21 st October, 2016 SUBSIDIARY LEGISLATION to the Gazette of the United Republic of Tanzania No. 44 Vol. 97 dated 21 st October, 2016 Printed by the Government Printer

More information

ON THERMAL ENERGY. Based on Article 65 (1) of the Constitution of the Republic of Kosovo, LAW ON THERMAL ENERGY CHAPTER I GENERAL PROVISIONS

ON THERMAL ENERGY. Based on Article 65 (1) of the Constitution of the Republic of Kosovo, LAW ON THERMAL ENERGY CHAPTER I GENERAL PROVISIONS LAW No. No. 05/L 05/L -058-052 ON ON INDUSTRIAL THERMAL ENERGY DESIGN LAW No. 05/L -052 ON THERMAL ENERGY Assembly of the Republic of Kosovo, Based on Article 65 (1) of the Constitution of the Republic

More information

REPUBLIC OF LITHUANIA LAW ON ELECTRICITY 20 July, 2000, No. VIII 1881 as amended by 26 June, 2001, No. IX-408 Vilnius CHAPTER ONE GENERAL PROVISIONS

REPUBLIC OF LITHUANIA LAW ON ELECTRICITY 20 July, 2000, No. VIII 1881 as amended by 26 June, 2001, No. IX-408 Vilnius CHAPTER ONE GENERAL PROVISIONS Official translation REPUBLIC OF LITHUANIA LAW ON ELECTRICITY 20 July, 2000, No. VIII 1881 as amended by 26 June, 2001, No. IX-408 Vilnius CHAPTER ONE GENERAL PROVISIONS Article 1. Purpose of the Law This

More information

NATIONAL ELECTRICITY RULES ELECTRICITY CONNECTION FOR RETAIL CUSTOMERS CHAPTER 5A. Page 615

NATIONAL ELECTRICITY RULES ELECTRICITY CONNECTION FOR RETAIL CUSTOMERS CHAPTER 5A. Page 615 ELECTRIC ITY CONN ECTION FOR RET AIL CU STOM ERS NATIONAL ELECTRICITY RULES Page 615 Chapter 5A Electricity connection for retail customers Part A 5A.A.1 Preliminary Definitions In this Chapter: basic

More information

RATE DS-4 LARGE GENERAL DELIVERY SERVICE

RATE DS-4 LARGE GENERAL DELIVERY SERVICE d/b/a Ameren Illinois 5 th Revised Sheet No. 14 Electric Service Schedule Ill. C. C. No. 1 (Canceling 4 th Revised Sheet No. 14) AVAILABILITY Service under this Rate is available for any eligible non-residential

More information

Assessment of Wholesale Competition in the Nigerian Electricity Market

Assessment of Wholesale Competition in the Nigerian Electricity Market Assessment of Wholesale Competition in the Nigerian Electricity Market By U. D. Achinanya The Market Operator, PHCN, Nigeria 11/28/2007 WAPIC 2007, Abuja 1 Outline Wholesale Electricity Market:- Definition

More information

AGENDA March 26, :30 P.M. City Council Chambers

AGENDA March 26, :30 P.M. City Council Chambers 03-26-12 Committee of the Whole Meeting http://www.darien.il.us/government/minutes/2012/council/120326/age... 1 of 1 1/19/2015 9:26 PM AGENDA March 26, 2012 6:30 P.M. City Council Chambers 1. CALL TO ORDER

More information

NEPRA. (Supply of Electric Power) Regulations, 2015 (:)

NEPRA. (Supply of Electric Power) Regulations, 2015 (:) NEPRA. (Supply of Electric Power) Regulations, 2015 (:) S.R.O 11-2"1( 7/, 1... 15. In exercise of thepowers conferred by section 47 read with section 7 and 23 of the Regulation of Generation, Transmission

More information

Public Procurement Act

Public Procurement Act Public Procurement Act CHAPTER 12 OF THE ACTS OF 2011 as amended by 2014, c. 34, ss. 35-38 2016 Her Majesty the Queen in right of the Province of Nova Scotia Published by Authority of the Speaker of the

More information

Seminar on African Electrical Interconnection. Module 7 - Market Operational Structures

Seminar on African Electrical Interconnection. Module 7 - Market Operational Structures Seminar on African Electrical Interconnection Module 7 - Market Operational Structures Module 7 - Market Operational Structures Contents 1) Power Market Principles 2) Major Operational Issues 3) Transmission

More information

Billing, Invoicing and Invoice Disputes

Billing, Invoicing and Invoice Disputes PR-MO-005 ver. 1.0 page 1 from 17 Departament: Market Operator Sector: Settlement Billing, Invoicing and Invoice Disputes ver. 1.0 page 2 from 17 TABLE OF CONTENTS 1. PURPOSE... 3 2. SCOPE...3 3. RESPONSIBLE

More information

Process for entry to. the Irish Retail Gas. Market

Process for entry to. the Irish Retail Gas. Market Process for entry to the Irish Retail Gas Market Executive Summary This document outlines and provides information on what is required to enter the Irish retail gas market ( the Market ). Undertakings

More information

November Explanatory memorandum for CERC Regulations for implementation of REC mechanism in India

November Explanatory memorandum for CERC Regulations for implementation of REC mechanism in India Explanatory Memorandum for Central Electricity Regulatory Commission Regulations on Recognition and Issuance of Renewable Energy Certificate (REC) for Renewable Energy Generation November 2009 Explanatory

More information

Electricity Supply Agreement

Electricity Supply Agreement Electricity Supply Agreement 1. General 1.1 Mazoon Electricity Company SAOC (the Supplier) shall on or from the Start Date, subject to the satisfactory completion of a Supply Application Form, provide

More information

BILL NO. 23. (as passed, with amendments) 3rd Session, 61st General Assembly Nova Scotia 60 Elizabeth II, Government Bill

BILL NO. 23. (as passed, with amendments) 3rd Session, 61st General Assembly Nova Scotia 60 Elizabeth II, Government Bill BILL NO. 23 (as passed, with amendments) 3rd Session, 61st General Assembly Nova Scotia 60 Elizabeth II, 2011 Government Bill Public Procurement Act CHAPTER 12 OF THE ACTS OF 2011 The Honourable Percy

More information

Community-Based Renewable Energy

Community-Based Renewable Energy Community-Based Renewable Energy This Act directs the state public utilities commission to set up a pilot program to encourage developing community-based renewable energy facilities. The Act permits the

More information

Appendix D. Minimum Requirements For Developmental Resources For

Appendix D. Minimum Requirements For Developmental Resources For Minimum For Developmental Resources For 2016 Request For Proposals For Long-Term Renewable Generation Resources For Entergy New Orleans, Inc. DRAFT Entergy Services, Inc. May 6July 13, 2016 MINIMUM REQUIREMENTS

More information

The Role of EWURA in Renewable Energy in Tanzania

The Role of EWURA in Renewable Energy in Tanzania THE ENERGY AND WATER UTILITIES REGULATORY AUTHORITY (EWURA) The Role of EWURA in Renewable Energy in Tanzania Presentation to NARUC 1st Mission Anastas P. Mbawala Director of Electricity - EWURA 12 August,

More information

Manager, Sourcing Supply and Contracts, Grid Projects Approved By:

Manager, Sourcing Supply and Contracts, Grid Projects Approved By: Procurement Policy ISSUE DETAILS Effective Date: 1 Policy Owner: Chief Executive Officer Written By: Manager, Sourcing Supply and Contracts, Grid Projects Approved By: Transpower Board of Directors Minute

More information

2018 General Rate Case

2018 General Rate Case Application No.: A.1-0- Exhibit No.: SCE-0, Vol. 0 Witnesses: J. Tran (U -E) 01 General Rate Case Power Supply (PS) Volume Energy Procurement Before the Public Utilities Commission of the State of California

More information

Waste Heat and Carbon Emissions Reduction

Waste Heat and Carbon Emissions Reduction Waste Heat and Carbon Emissions Reduction This Act is based on California law. Under California law, the State Energy Resources Conservation and Development Commission (Energy Commission) is charged with

More information

The Board of Finance of Baltimore City Department of Finance Bureau of Treasury Management

The Board of Finance of Baltimore City Department of Finance Bureau of Treasury Management The Board of Finance of Baltimore City Department of Finance Bureau of Treasury Management Tax Increment Financing Policy and Project Submission Requirements January 23, 2012 PART I: TAX INCREMENT FINANCING

More information

Compressed Natural Gas for transport Licensing arrangements

Compressed Natural Gas for transport Licensing arrangements Compressed Natural Gas for transport Licensing arrangements DOCUMENT TYPE: REFERENCE: DATE PUBLISHED: CLOSING DATE: RESPONSES TO: Consultation Paper D/15/051 March 25 th 2015 May 8 th 2015 bhussey@cer.ie

More information

Long Island Power Authority Seventh Revised Leaf No. 16

Long Island Power Authority Seventh Revised Leaf No. 16 Seventh Revised Leaf No. 16 I. General Information (continued): B. Abbreviations and Definitions (continued): Demand Customer: A Customer who is billed for Demand charges. Demand Meter: The device that

More information

South African Distribution Code

South African Distribution Code South African Distribution Code Tariff Code Version 6.0 July 2014 This document is approved by the National Energy Regulator of South Africa (NERSA) Issued by: RSA Grid Code Secretariat Contact: Mr. Bernard

More information

Competitive Entry Exemption: New Proposal

Competitive Entry Exemption: New Proposal Competitive Entry Exemption: New Proposal Dr. Nicole Bouchez Principal Economist, Market Design New York Independent System Operator Installed Capacity Working Group December 10, 2013 KCC 2013 New York

More information

Sri.P.Naredranath Chowdary, Managing Director,The Andhra Sugars Ltd.,Chemicals & Fertilisers Division, Kovvur, West Godavari Dist

Sri.P.Naredranath Chowdary, Managing Director,The Andhra Sugars Ltd.,Chemicals & Fertilisers Division, Kovvur, West Godavari Dist Sri.P.Naredranath Chowdary, Managing Director,The Andhra Sugars Ltd.,Chemicals & Fertilisers Division, Kovvur, West Godavari Dist. 534 350. 1) ON INCREASE OF DEMAND CHARGES: It is observed that Demand

More information

Tech Credit Union Online Banking & Telephone Teller User Agreement January 11, 2012

Tech Credit Union Online Banking & Telephone Teller User Agreement January 11, 2012 Tech Credit Union Online Banking & Telephone Teller User Agreement January 11, 2012 Your use of either Online Banking or Telephone Teller is considered acknowledgement and agreement that you have read

More information

Design Alternatives Sheet (DAS) 18 Physical Bilateral Procurement

Design Alternatives Sheet (DAS) 18 Physical Bilateral Procurement Design Alternatives Sheet (DAS) 18 Physical Bilateral Procurement Introduction The subject matter discussed within this document forms part of the process for developing a Capacity Market design for Alberta.

More information

Reform and Evolution: The New Nigerian Electric Power Supply Industry ( ESI( ESI ) SEERIL Conference, Lagos, Nigeria, January 2006

Reform and Evolution: The New Nigerian Electric Power Supply Industry ( ESI( ESI ) SEERIL Conference, Lagos, Nigeria, January 2006 SEERIL Conference, Lagos, Nigeria, 29 31 January 2006 Reform and Evolution: The New Nigerian Electric Power Supply Industry ( ESI( ESI ) Asue Ighodalo Partner Banwo & Ighodalo 1. Background History and

More information

PROCEDURE FOR GRANT OF DISTRIBUTION OPEN ACCESS PERMISSION AS PER MERC (DISTRIBUTION OPEN ACCESS) REGULATIONS, 2014

PROCEDURE FOR GRANT OF DISTRIBUTION OPEN ACCESS PERMISSION AS PER MERC (DISTRIBUTION OPEN ACCESS) REGULATIONS, 2014 PROCEDURE FOR GRANT OF DISTRIBUTION OPEN ACCESS PERMISSION AS PER MERC (DISTRIBUTION OPEN ACCESS) REGULATIONS, 2014 Page 1 of 13 Contents 1.0 PREAMBLE:... 3 2.0 DURATION OF OPEN ACCESS:... 3 3.0 ELIGIBILITY

More information

1. CONTEXT OF THE APPROVAL OF ROYAL DECREE-LAW 9/2013

1. CONTEXT OF THE APPROVAL OF ROYAL DECREE-LAW 9/2013 2-2013 July 2013 CHANGES TO THE ENERGY SECTOR INTRODUCED BY ROYAL DECREE-LAW 9/2013, OF JULY 12, 2013, ADOPTING URGENT MEASURES TO GUARANTEE THE FINANCIAL STABILITY OF THE ELECTRICITY SYSTEM Royal Decree-Law

More information

TRIENNIAL ASSESSMENT OF THE COMPETITION IN THE ELECTRICITY MARKET IN KOSOVO

TRIENNIAL ASSESSMENT OF THE COMPETITION IN THE ELECTRICITY MARKET IN KOSOVO TRIENNIAL ASSESSMENT OF THE COMPETITION IN THE ELECTRICITY MARKET IN KOSOVO Address: Dërvish Rozhaja Str., No. 12, 10000 Prishtina, Kosovo Tel: 038 247 615 ext. 101, Fax: 038 247 620, E-mail: info@ero-ks.org,

More information

GENERAL INFORMATION 2. ABBREVIATIONS AND DEFINITIONS

GENERAL INFORMATION 2. ABBREVIATIONS AND DEFINITIONS P.S.C. NO. 3 ELECTRICITY LEAF: 11 2.1 ABBREVIATIONS 2. ABBREVIATIONS AND DEFINITIONS Btu kva kvar kw kwh British Thermal Unit(s) Kilovolt-Ampere(s) Kilovolt-Ampere(s) Reactive Kilowatt(s) Kilowatthour(s)

More information

ELECTRICITY SUPPLIER COORDINATION TARIFF MARYLAND

ELECTRICITY SUPPLIER COORDINATION TARIFF MARYLAND MD Electric Supplier--P.S.C. Md. No. 2 ELECTRICITY SUPPLIER COORDINATION TARIFF IN MARYLAND Date of Issue: April 27, 2015 Date Effective: June 1, 2015 MD Electric Supplier--P.S.C. Md. No. 2 Sixteenth Revised

More information

Rate Schedule FT Firm Transportation Service

Rate Schedule FT Firm Transportation Service Rate Schedule FT Firm Transportation Service 1. Availability This Rate Schedule is available for the transportation of natural gas by Heartland Gas Pipeline for any Customer: 1.1 Where Customer: a) Has

More information

Concept note: Energy regulators contribution to fight climate change

Concept note: Energy regulators contribution to fight climate change Concept note: Energy regulators contribution to fight climate change Side Event in Marrakech, Morocco Dr. Konstantin Petrov 1 SAFER, SMARTER, GREENER Content Sector Trends, Policy Implications, Regulatory

More information

GEODE Amendments Proposals to the European Commission Directive on the internal market for electricity

GEODE Amendments Proposals to the European Commission Directive on the internal market for electricity GEODE Amendments Proposals to the European Commission Directive on the internal market for electricity AMENDMENT 1 Article 2, 20 Definitions near-real time means, in the context of smart metering, the

More information

SCHEDULING COORDINATOR REQUEST FOR INFORMATION

SCHEDULING COORDINATOR REQUEST FOR INFORMATION SCHEDULING COORDINATOR REQUEST FOR INFORMATION For the Demand Response Auction Mechanism Pilot Participant Instructions Version 1.0 August 11, 2015 8.11.15 i TABLE OF CONTENTS ARTICLE ONE. GENERAL INFORMATION...1

More information

Procurement Strategy and Action Plan. Financial Year

Procurement Strategy and Action Plan. Financial Year Procurement Strategy and Action Plan Financial Year 2018-2019 Status Final Owner Procurement Source location Procurement website Consultation APUC Endorsed Audit Committee 11 June 2018 Publication 1 August

More information

Standard Merger Notification Form Information Requirements Part 3: Markets

Standard Merger Notification Form Information Requirements Part 3: Markets Stard Merger Notification Form Information Requirements Part 3: Markets DISCLAIMER: This publication is a compilation of information received from national competition authorities of the European Union

More information

Jammu and Kashmir State Electricity Regulatory Commission

Jammu and Kashmir State Electricity Regulatory Commission DRAFT NOTIFICATION INVITING OBJECTIONS / COMMENTS /SUGGESTIONS Jammu and Kashmir State Electricity Regulatory Commission NOTIFICATION (Draft) No: JKSERC/ Dated: Jammu, In exercise of the power conferred

More information

3. RELATIONSHIP BETWEEN ISO AND PARTICIPATING TOs. Each Participating TO shall enter into a Transmission Control Agreement with the

3. RELATIONSHIP BETWEEN ISO AND PARTICIPATING TOs. Each Participating TO shall enter into a Transmission Control Agreement with the FERC ELECTRIC TARIFF First Revised Sheet No. 121 ORIGINAL VOLUME NO. I Replacing Original Sheet No. 121 3. RELATIONSHIP BETWEEN ISO AND PARTICIPATING TOs. 3.1 Nature of Relationship. Each Participating

More information

Reliability Pricing Model (RPM) DRAFT Business Rules

Reliability Pricing Model (RPM) DRAFT Business Rules Definition and Purpose of Reliability Pricing Model (RPM) 1. The purpose of the RPM is to develop a long term pricing signal for capacity resources and LSE obligations that is consistent with the PJM Regional

More information

The ESP Handbook. A Guide to Conducting Business with Southern California Edison under Direct Access. Version 7.0 February 1, 2017

The ESP Handbook. A Guide to Conducting Business with Southern California Edison under Direct Access. Version 7.0 February 1, 2017 The ESP Handbook A Guide to Conducting Business with Southern California Edison under Direct Access Version 7.0 February 1, 2017 Table of Contents Preface Welcome Chapter 1: Chapter 2: Chapter 3: Chapter

More information

CAPACITY BOOKING... 1 PART I - REQUIREMENTS FOR ACCESS TO THE TRANSPORTATION SERVICE ) REQUIREMENTS... 5

CAPACITY BOOKING... 1 PART I - REQUIREMENTS FOR ACCESS TO THE TRANSPORTATION SERVICE ) REQUIREMENTS... 5 CAPACITY BOOKING CAPACITY BOOKING... 1 PART I - REQUIREMENTS FOR ACCESS TO THE TRANSPORTATION SERVICE... 5 1) REQUIREMENTS... 5 1.1) REQUIREMENTS IN ACCORDANCE WITH RESOLUTION NO. 137/02... 5 1.1.1) Possession

More information

Contents. 1.0 Overview of Roles of Electric Choice Participants 2

Contents. 1.0 Overview of Roles of Electric Choice Participants 2 Contents 1.0 Overview of Roles of Electric Choice Participants 2 1.1 Customer 5 1.1.1 Regulatory Requirements 5 1.1.2 Detroit Edison Requirements 5 1.2 Aggregator 6 1.2.1 Regulatory Requirements 6 1.2.2

More information

S 2185 S T A T E O F R H O D E I S L A N D

S 2185 S T A T E O F R H O D E I S L A N D LC00 0 -- S S T A T E O F R H O D E I S L A N D IN GENERAL ASSEMBLY JANUARY SESSION, A.D. 0 A N A C T RELATING TO PUBLIC UTILITIES AND CARRIERS -- RENEWABLE ENERGY Introduced By: Senators Sosnowski, Conley,

More information

H 7413 S T A T E O F R H O D E I S L A N D

H 7413 S T A T E O F R H O D E I S L A N D LC000 0 -- H S T A T E O F R H O D E I S L A N D IN GENERAL ASSEMBLY JANUARY SESSION, A.D. 0 A N A C T RELATING TO PUBLIC UTILITIES AND CARRIERS -- RENEWABLE ENERGY Introduced By: Representatives Ruggiero,

More information

WORKING PAPER ON NATURAL RESOURCES AND CONCESSIONS IN THE CONTEXT OF THE MAI

WORKING PAPER ON NATURAL RESOURCES AND CONCESSIONS IN THE CONTEXT OF THE MAI Unclassified DAFFE/MAI/ST/RD(97)2/FINAL Organisation for Economic Co-operation and Development 12 January 2000 Organisation de Coopération et de Développement Economiques Negotiating Group on the Multilateral

More information

Official Journal of the European Union DIRECTIVE 2003/54/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL. of 26 June 2003

Official Journal of the European Union DIRECTIVE 2003/54/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL. of 26 June 2003 15.7.2003 L 176/37 DIRECTIVE 2003/54/EC OF THE EUROPEAN PARLIAMT AND OF THE COUNCIL of 26 June 2003 concerning common rules for the internal market in electricity and repealing Directive 96/92/EC THE EUROPEAN

More information

COMMERCIAL CIRCULAR NO.: 194.

COMMERCIAL CIRCULAR NO.: 194. MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD. Commercial Section, 5th Floor, Prakashgad Bandra (East ) MUMBAI- 400 051 Phone No. (P) 26474753 (O) 26474211 / 26472131 Fax - 26472366 ---------------------------------------------------------------------------------------------------------------------------------------------

More information

3.1 Sustainable Procurement Policy

3.1 Sustainable Procurement Policy Policy Statement This policy has been designed to drive best value for the expenditure of public funds on the acquisition of goods, services and construction through maximizing competition, adopting commercially

More information

- Consultation Paper -

- Consultation Paper - UNMIK PISG INSTITUCIONET E PËRKOHSHME VETËQEVERISËSE PRIVREMENE INSTITUCIJE SAMOUPRAVLJANJA PROVISIONAL INSTITUTIONS OF SELF-GOVERNMENT QEVERIA E KOSOVËS GOVERNMENT OF KOSOVA VLADA KOSOVA MINISTRIA E ENERGJISË

More information

BUSINESS ECONOMICS. 16: Project Appraisal and Impact Analysis PAPER NO. 16 : PROJECT APPRAISAL AND IMPACT ANALYSIS MODULE NO. 6 : FEASIBILITY STUDY

BUSINESS ECONOMICS. 16: Project Appraisal and Impact Analysis PAPER NO. 16 : PROJECT APPRAISAL AND IMPACT ANALYSIS MODULE NO. 6 : FEASIBILITY STUDY Subject Paper No and Title Module No and Title Module Tag 16: Project Appraisal and Impact Analysis 6: Feasibility Study BSE_P16_M6 TABLE OF CONTENTS 1. Learning Outcomes 2. Introduction 3. Feasibility

More information

American Municipal Power Proposal to the Capacity Construct/Public Power Senior Task Force Executive Summary

American Municipal Power Proposal to the Capacity Construct/Public Power Senior Task Force Executive Summary American Municipal Power Proposal to the Capacity Construct/Public Power Senior Task Force Executive Summary I. Introduction The genesis of the AMP proposal was in part due to AMP s strong belief that

More information

Business Rules. Incremental Proposal

Business Rules. Incremental Proposal INC00148-14 2 April 2014 DRAFT Business Rules I. Introduction The objective of this document is to specify business rules based on the ACER Guidance for the amendment on the CAM NC and the ACER Tariff

More information

Union Power Cooperative

Union Power Cooperative Union Power Cooperative INTERCONNECTION STANDARD STANDARD FOR INTERCONNECTING SMALL GENERATION 100 kw OR LESS 1. Definitions: 1.1 Area EPS: Area Electric Power System: The electric facilities of the local

More information

RETAILER FEED-IN TARIFF SCHEME TERMS

RETAILER FEED-IN TARIFF SCHEME TERMS RETAILER FEED-IN TARIFF SCHEME TERMS PREAMBLE Under the Electricity Act, all electricity retailers with more than 5,000 Customers must offer to purchase electricity fed back into the grid by Qualifying

More information

The Latest News of NERC of Ukraine in the Sphere of Regulation

The Latest News of NERC of Ukraine in the Sphere of Regulation Energy Regulatory Partnership Program National Association of Regulatory Utility Commissioners With the National Commission for State Energy Regulation Seventh Partnership Activity The Latest News of NERC

More information

Part I PRELIMINARY. Part II MARKET DEFINITION ASSESSING SIGNIFICANT MARKET POWER. Part IV IMPOSITION OF OBLIGATIONS UNDER THE REGULATORY FRAMEWORK

Part I PRELIMINARY. Part II MARKET DEFINITION ASSESSING SIGNIFICANT MARKET POWER. Part IV IMPOSITION OF OBLIGATIONS UNDER THE REGULATORY FRAMEWORK 201[ ] ELECTRONIC COMMUNICATIONS (GUIDELINES ON MARKET ANALYSIS AND THE ASSESSMENT OF SIGNIFICANT MARKET POWER FOR NETWORKS AND SERVICES) (ARRANGEMENT OF GUIDELINES) Table of Contents 1. [Short Title]

More information