2 1. Company Overview 2. Patrons in all Industries 3. Your Partners for: a. Energy Saving Systems INDEX b. Fired Energy Systems c. Special Energy Systems d. Heat Exchangers & Pressure Vessels 4. Infrastructure 5. Manufacturing Facilities 6. Design Capabilities

3 Two decades of Customer service: Since 1998 Core competence: Thermal Engineering Strong technical capabilities Customized systems based on process needs, enormous benefits OVERVIEW Turnkey / EPC Solutions too Focused Process and Quality Assurance Blend of experienced & young team Over 1000 installations across all industries, globally Recognized capabilities: Awards for Innovations in Energy Efficiency (2017) and Best Energy Efficient Project (2018) from Confederation of Indian Industry (CII)

4 PATRONS IN ALL INDUSTRIES

5 YOUR PARTNERS FOR Energy Saving Systems Fired Energy Systems Special Energy Systems Heat Exchangers & Pressure Vessels

6 ENERGY SAVING SYSTEMS Combined-Cycle / Waste-Heat Based Power Plants Waste Heat Recovery - Steam Systems Waste Heat Recovery - Hot Water, Hot Air, Thermal Oil Waste to energy / Incinerator Waste Heat Recovery Process Integrated Boilers, Reformer Gas Boilers

7 ENERGY SAVING SYSTEMS 20 x 10 MW Gas Engine 20 Sets. Waste Heat Recovery Boilers 16 MW Power from Engine Waste Heat at zero cost 200 MW Combined Cycle Power Plant at United Ashuganj, Bangladesh

8 ENERGY SAVING SYSTEMS Annual Cash Saving: USD 19 Million Equivalent to saving: o o o 88,320 Nm 3 /day Natural Gas or 90,000 Litres/ day fuel oil or 220 Tonnes/ day Coal In Operation Since in 2015 CER: 60,000 Tons/ year 200 MW Combined Cycle Power Plant at United Ashuganj, Bangladesh

9 ENERGY SAVING SYSTEMS 113 MW MW + 55 MW Combined Cycle Power Plant Confidence Group, Bangladesh Power savings: o 7.2 MW for Bogra, Phase 1 o 7.2 MW for Bogra, Phase 2 o 3.6 MW for Chittagong plant 15 Sets Waste Heat Recovery Boilers Partial Turnkey: System Integration, Cooling Tower, WTP, BOP etc. Under Execution Likely Payback: 6 months

10 ENERGY SAVING SYSTEMS Indian Oil Corporation Ltd., Vertical WHRB on Incinerator Water Wall, Hanging tube bundle Construction TPH, 14.2 Bar, C Height 14m Turnkey In Operation 2017 IOCL, Mathura (Design) In Operation

11 ENERGY SAVING SYSTEMS WHRB on Sinter Plant, Bhushan Power & Steel WHRB for largest Sinter plant; Second stage Hot Water at 140 Deg c Steam: 40 TPH; HW: 11.6 MW Hot Water Heat Recovery producing 2400 TR chilling Gas: 600,000 kg/ h; C Dust loading 4000 mg/ Nm 3 Modular Construction, Outdoor Total weight: 1200 MT Under Execution

12 ENERGY SAVING SYSTEMS WHRB on 9.6 MW x 6 sets Wartsila HFO Engine Outdoor, Horizontal, Finned Tube 4.2 TPH x 6 Sets. 26 Bar, 260 Deg C Turnkey Project In operation since 2011 WHRB at Mangalore Chemicals & Fertilizers

13 ENERGY SAVING SYSTEMS HRSG on Caterpillar 2 Sets x 5.5 MW Gas Turbines Steam output: 9.2 TPH x 2 Nos 41Bar, 350 Deg C Turnkey Project Commissioned in 2009 HRSG at Deepak Fertilizer

14 ENERGY SAVING SYSTEMS HRSG on Caterpillar 2 sets 15.5 MW Gas Turbines Steam at: 22 TPH x 2 Nos. 45 Bar, 460 Deg C Turnkey Project Commissioned in 2009 HRSG at Gujarat Fluorochemicals Ltd.

15 ENERGY SAVING SYSTEMS Tri Generation System: Three stages heat recovery On Caterpillar 7.5 MW x 1 No. Gas Turbine Steam: 12 TPH, 66 Bar, C Thermal Oil: 10 MkCal/hr Hot Water 1.8 MkCal/ hr to produce 600 TR Chilling Turnkey Project In operation since 2010 Tri Generation System at VVF, India.

16 ENERGY SAVING SYSTEMS DIVERTER DAMPER GAS TURBINE BY PASS DUCT TF HRU BY PASS STACK BOILER MODULES STEAM TO PROCESS HW HRU C H I M N E Y DUCT BURNER DIVERTER DAMPER SUPPLIMENTRY FIRING BURNER OUT TO PROCESS FRESH AIR BLOWER CHILLED WATER IN VAM THERMAL OIL FROM PROCESS

17 ENERGY SAVING SYSTEMS Fully Shop Assembled Water Tube Boilers

18 ENERGY SAVING SYSTEMS Horizontal, Smoke Tube, Packaged Common Boiler for Multiple Engines Exhausts possible Compact Skid Mounted : Plug and Play Systems Many in operation in the field Smoke Tube Waste Heat Recovery Boiler

19 ENERGY SAVING SYSTEMS WHRB containerised Engine : MWM, 1.5 MW Fully automated Commissioned in 2018 Containerized WHRB, Sterling & Wilson, Nigeria

20 ENERGY SAVING SYSTEMS At the back end of Incinerator Flue Gas Inlet Temp : 1200 O C Steam Generation: 10 TPH Design Pressure :18 bar Gas Flow: 23 TPH In operation since 2012 Waste Heat Recovery Boiler for Bayer India, Vapi

21 ENERGY SAVING SYSTEMS Sulphur Condenser Size: 3.2 m OD x 11 m Long Weight : 80 Tons Supplied in 2015 Sulphur Condenser for Shriram EPC

22 ENERGY SAVING SYSTEMS Steam Flow: 10.5 TPH Pressure: 40 Bar Temperature: 252 Deg C Supplied in 2015 Two Drum Smoke Tube Boiler For Coke Oven

23 ENERGY SAVING SYSTEMS Steam Pressure: 21 Bar Gas Pressure: 19 Bar Gas Temperature: 900 Deg C Metal Temperature: 217 Deg C Commissioned in 2011 RG Cum FG Boilers Adani Wilmer Fatty Acid Plant

24 ENERGY SAVING SYSTEMS Tube Side : Reformed Gas at 998 C Gas Outlet: 260 C Gas Pressure:13 Kg/cm 2 Flat head Flexible Tube Sheets Tubes : SA 335 P12 Commissioned in 2009 RG Boiler for Oxo Alcohol plant Andhra Petrochemicals

25 ENERGY SAVING SYSTEMS Thermal Oxidiser PDO,Oman Thermal Oxidiser Bharat Petroleum Corporation (BPCL)

26 FIRED ENERGY SYSTEMS Hot Water Generators Air Heaters High Temperature Thermic Fluid Heaters

27 FIRED ENERGY SYSTEMS Hot Water Generators Horizontal: Lower Head Room for installation Shell & Tube: Easier to clean/ maintain Low Pressure Drop: Lower Operating Cost High Efficiency: Upto 94% Upto 200 Deg C Fuel: Oil/ Gas/ Biomass Waste Heat Fuel Combi too.

28 FIRED ENERGY SYSTEMS Hot Water Generator System 1 MW TVS, Indonesia

29 FIRED ENERGY SYSTEMS Hot Water Generator

30 FIRED ENERGY SYSTEMS Hot Air Generators/ Air Heaters Indirect Fired: Upto 300 Deg C Direct Fired: Upto 300 Deg C Without refractory Fully Custom Built Efficiency upto 98% Easy removal of Heater Complete System with Burner, Process Air Fan etc. Waste Heat Fuel fired combi too.

31 FIRED ENERGY SYSTEMS Indirect Fired Heaters

32 FIRED ENERGY SYSTEMS Thermic Fluid Heaters And Vaporizers too.. Waste Heat or Fuel Fired or Combi High Temperatures: 280 to 400 C For any fuel: Fuel oil, gas, Biomass Efficiencies upto 90% Turnkey Solutions

33 FIRED ENERGY SYSTEMS Thermal Oil Heater for Biscuit baking: 3.5 MW

34 FIRED ENERGY SYSTEMS Custom Built Compact Water Tube Design with external Superheater Steam Generation: 1 TPH Pressure: 80bar Fuel: Natural Gas & HSD HP Boiler for Carotino SDN BHD

35 FIRED ENERGY SYSTEMS Electrical Thermal Oil Heater Custom Built for specific Application Fully skid mounted with circulation pumps, expansion tank, PLC etc. Capacity: 300 KW Inlet/ outlet Temperature : 220/ 250 Deg C Electrical Thermic Fluid Heating System for Malayan Daching Co.

36 SPECIAL ENERGY SYSTEMS For Biscuit Baking Ovens For Paint Baking & Pre - Treatment High Pressure - Low Capacity for Edible Oil Plants Thermosiphon Systems Incinerator / WHR for Chemical, MSW & Graphite Industry

37 SPECIAL ENERGY SYSTEMS Heating Systems for Special Applications Heating / Cooling System Development for Processes from Basic Description First of a Kind Systems Completed Innovative Projects like: Biscuit Baking Oven, Industrial Latex Gloves procee Pitch Fume Incinerators for Graphic Industries Thermo-roll Heating System for Paper Mills

38 SPECIAL ENERGY SYSTEMS Biscuit baking on Biomass: Huge cash savings, Green Energy Reduction in under baking and over baking losses to 1% or below High system thermal efficiency Fully automated temperature controls, oven process controls Biscuit Baking Ovens

39 SPECIAL ENERGY SYSTEMS Shell & Tube Type (BEMA), TEMA C Lloyds Inspection Design Pressure : Paste - 10 Kg/Cm² & Steam 14 Bar MDMT : C MOC -SA 516 Gr. 70/ SA 240 TP 304 Skid mounted systems, as required Skid mounted heating System Koksan Pet Packaging, Turkey

40 SPECIAL ENERGY SYSTEMS Separator Skid

41 SPECIAL ENERGY SYSTEMS Paper-roll Heating System

42 HEAT EXCHANGERS & PRESSURE VESSELS Shell & Tube Heat Exchangers Finned Tube Heat Exchangers Fin Fan Coolers All other Thermal Equipment

43 HEAT EXCHANGERS & PRESSURE VESSELS Size: 4 m OD x 11.5 m Long Weight : 33 Tons Year of Supply: 2018 Sulphur Storage Tank SVI, Indonesia

44 HEAT EXCHANGERS & PRESSURE VESSELS Stacked Shell & Tube Heat Exchangers Design Code : ASME Sec VIII Div I, TEMA, Documentation as per GOST standards National Board NB Stamping Design Pressure: 83 Bar MDMT : C MOC : SA 516 Gr. 70/ SA 350 LF2 CL1/ SA 333 Gr. 6 Tube Sheet : 110 mm Thick Gas Heat Exchanger for Exterran Belleli Energy, Kazakhstan Tube Length : 9.1 m long x 550 Nos

45 HEAT EXCHANGERS & PRESSURE VESSELS Design Pressure: 20 Bar MDMT : - 45 C MOC : SA 516 Gr. 70/ SA 350 LF2 CL1/ SA 333 Gr. 1 Tube Sheet : 107 mm Thick Tube Length : 11 m x 330 Nos Deethaniser OVHD Exchanger for GASCO TTP Joint: Expanded Only

46 HEAT EXCHANGERS & PRESSURE VESSELS Design Pressure: 27 Bar Design Temperature: 235 C MOC: SA 516 Gr. 70 Shell : 25 mm thick Dished End : 32 mm thick Co2 Solution Reboiler for Andhra Petrochemicals

47 HEAT EXCHANGERS & PRESSURE VESSELS Process Columns & Vessels for Sequoia Energy, US Authorized Inspectors : Lloyds, India

48 HEAT EXCHANGERS & PRESSURE VESSELS Heat Exchangers for GEICO, S.P.A, Italy Hi-Tech, Indian Boiler Regulations Reboiler for Kaltimex, Indonesia

49 HEAT EXCHANGERS & PRESSURE VESSELS Bharat Petroleum Corporation NKN Type

50 HEAT EXCHANGERS & PRESSURE VESSELS Tube Bundles for Takreer Refineries, Abu Dhabi

51 HEAT EXCHANGERS & PRESSURE VESSELS Design Pressure: 99 Bar MDMT: - 29 C Shell: 50 mm thick Dish 56 mm thick Weight : 16 MT Production Separator for APLUS Projects

52 INFRASTRUCTURE

53 INFRASTRUCTURE ISO 9001 : 2015 certified Plant 1 Built Up : 50,000 Sq. ft Expansion project: 66,000 Sq. ft

54 INFRASTRUCTURE Corporate Office

55 MANUFACTURING FACILITIES Manufacturing Plant Approved under Indian Boiler Regulation ISO 9001 : 2015 Certified All procedures are as per Quality Management System Strong Process Assurance & Quality assurance

56 MANUFACTURING FACILITIES Tube Finning Machine

57 MANUFACTURING FACILITIES CNC Plasma Cutting Machine

58 MANUFACTURING FACILITIES Nozzle Opening Machine SAW Machine

59 DESIGN CAPABILITIES Mechanical Engineering Process Engineering Detail Engineering