1 SIX MONTHLY REPORT OF EMP CLEARANCE [J-11015/227/2007-IA.II(M)] for the period October 14 March 15 (1 st June 2015) ROHINI OPENCAST EXPANSION PROJECT N K AREA CENTRAL COALFIELDS LIMITED (A Miniratna Company)

2 Status of compliance of the terms and conditions given in the Environmental clearance letter No.J-11015/227/2007- IA. II(M) dt issued by MOEF, Govt. of India New Delhi for Rohini Opencast Expansion Coal Mine Project (expansion from 0.8 MTPA to 2 MTPA nominal capacity with a peak production of 2.30 MTPA for the period from October - 14 to March-15 A. SPECIFIC CONDITOINS S.No. Condition Status (i) (ii) (iii) (iv) (v) No mining operations shall be undertaken in the 2.28 ha of forest land until prior forestry clearance has been obtained under the provision of FC Act, Mining shall be carried out as per statute from the streams/nallahs flowing within the lease and along the diverted nallah along the lease boundary. A minimum distance of 100m between River Damodar from the edge of the quarry shall be maintained. The embankment constructed and to be extended further along the quarry along the quarry shall be at least 5m higher than the HFL of river Damodar and at least 15M from the bank of river Damodar and ML boundary shall be maintained. The slope of the embankment shall at least 2:1 towards the ML and enforced with stone pitching and grouting any weak portion of the embankment; and shall be stabilized with plantation. OB shall not be used for the construction of embankment. Top soil shall be stacked properly with proper slope at earmarked site(s) and shall not be kept active and shall be used for reclamation and development of green belt. No external OB dump shall be created for the expansion project. Monitoring and management of reclaimed existing dump site shall continue until the vegetation becomes self -sustaining. Compliance status shall be submitted to the Ministry of Environment & Forest and its Regional Office located at Bhubaneshwar on yearly basis. No mining is being done under Forest land for which forestry clearance has not been obtained. Mining is being done as per statute & project report. Kendua nallah is about 300m from mine. Stipulated distance is being maintained and will be maintained in future. Embankment constructed. Stone pitching upto HFL and grassing upto top of dump is proposed. Top soil is being used for reclamation and development of green belt. No external OB dump will be created for the expansion project. Planting of trees is done through State forest department. Monitoring and management is done for 3 years by state forest department and there after it is taken care by CCL.

3 (vi) (vii) (viii) (ix) (x) (xi) (xii) Catch drains and siltation ponds of appropriate size shall be constructed to arrest silt and sediment flows from soil, OB and mineral dumps. The water so collected shall be utilized for watering the mine area, roads, green belt development etc. The drain shall be regularly desilted and maintained properly. Garland drains (size, gradient and length) and sump capacity shall be designed keeping 50% safety margin over and above the peak sudden rain fall and maximum discharge in the area adjoining the mine site. Sump capacity shall also provide adequate retention period to allow proper settling of silt material. Dimension of the retaining wall at the toe of the dumps and OB benches within the mine to check run-off and siltation shall be based on the rainfall data. All internal roads shall be metal topped. A 3-tier green belt shall be developed on both sides of the roads. Green belt (3-tier) shall also be developed at the Railway siding. High efficiency water sprinkling system provided to check fugitive emissions at the transfer points, haulage roads etc. shall be provided for crushing/ loading operations for dust control at the CHP. Drill shall be wet operated only. Controlled blasting shall be practiced with use of delay detonators. The mitigative measures for control of ground vibrations and to arrest the fly rocks and boulders shall be implemented. All mine water is collected to the mine sum acting as siltation pond. The water from there is used for sprinkling on roads, mining areas and other purposes. Garland drains and sump capacity has been designed taking due care of sudden rainfall and water make of the nearby area. One new Sedimentation pond has been proposed. Rainfall will be taken into consideration for construction of retaining wall as and where necessary. Mineral transportation from mine to washery shall be by rail. All internal roads shall be metal topped. Green belt shall be developed on both sides of the roads. Green belt shall be developed at the Railway siding. This is strictly followed. All drills are equipped with Wet drilling arrangements. Nonels of different sizes and CED are used for controlled blasting. All steps suggested in EMP for mitigative measures

4 (xiii) (xiv) (xv) The total area that shall be brought out under afforestation at the time of mining closure shall not be less than ha which includes reclaimed external OB dump, back filled area (190 ha) along ML boundary, embankment(20.77 ha), safety zone(8.41 ha) and undisturbed area (30 ha), along roads and infrastructure, green belt and in township outside the lease by planting native species in consultation with the DFO/Agriculture Department. The density of the trees shall be around 2500 plants per ha. A progressive mine Closure Plan shall be implemented by reclamation of quarry area of 190 ha. which shall be backfield and afforested by planting native plant species in consultation with the local DFO/Agriculture Department. The density of the trees shall be around 2500 plants per ha. The balance 7.55 ha. of de-coaled area/void being converted in to a water reservoir shall be gently sloped and the upper benches of the reservoir shall be terraced and stabilized with plantation. No groundwater (bore well) shall be used for mining operations. Rain water harvesting structure and water recharge structures which include two weirs of 50m and 30m length in Kendua nala and two recharge pits shall be shall be erected and for additional use, if any, during mining operations along with mine sump water. for control of ground vibrations and to arrest the fly rocks and boulders is being implemented This will be done after mining is over. Afforestation will be done as per mine closure plan and planting of native species in consultation with the DFO/Agriculture Department will be done. The density of the trees shall be around 2500 plants per ha will be ensured. Progressive mine closure plan will be implemented. Backfilled area is being planted and will continue plantation of native plant species in consultation with the local DFO/Agriculture Department. The density of the trees shall be around 2500 plants per ha. The balance 7.55 ha. of de-coaled area/void being converted in to a water reservoir sloped as per condition and the upper benches of the reservoir shall be terraced and stabilized with plantation after mining. is completed. No groundwater (bore well) shall be used for mining operations. This will be ensured. Rain water harvesting scheme is prepared and implemented.

5 (xvi) (xvii) (xviii) (xx) (xxi) (xxii) Regular monitoring of ground water level and quality shall be carried out by establishing a network of existing wells and construction of new peizometers. The monitoring for quality shall be done four times in a year in pre-monsoon (May), monsoon (August), postmonsoon (November) and winter (January) seasons and for quality in May. Data thus collected shall be submitted to the Ministry of Environment & Forest and to the Central Pollution Control Board quarterly within one month of monitoring. The Project authorities shall meet water requirement of nearby village(s) in case in the village wells go dry due to dewatering mine. Besides carrying out regular practice health check of their workers, 10% of the workers identified from workforce engaged in active mining operations shall be subjected to health check-up for occupational diseases and hearing impairment, if any, through an agency such as NIOH, Ahmadabad within a period of one year and the result reported to this Ministry and to DGMS. A detailed CSR plan involving an annual expenditure of Rs. 1 crore shall also be prepared for and in consultation with the local communities to be implemented over the balance life of the project. The details of CSR shall be posted on the company s website and updated every 6 months. For monitoring land use pattern and for post mining land use, a time series of land use maps based on satellite imagery (on a scale of 1:5000) of the core zone and buffer zone from the start of the project until end of mine life shall be prepared once in 3 years (for any one particular season which is consistent on the time series) and the report submitted to MOEF and its Regional office at Bhubaneshwar. A final mine closure plan along with details of Corpus Fund shall be submitted to the Ministry of Environment & Forests 5 years in advance of final mine closure for approval. Regular monitoring of ground water level and quality is being done and new peizometers will be constructed for this purpose. The project authorities are providing all other facilities under CSR scheme of the company. Agreed CSR scheme has been implemented. The expenditure done in the year is Rs.2,05,95000/ in N.K.Area as a whole. This will be made. A final mine closure plan is under preparation and will be submitted shortly.

6 B. GENERAL CONDITOIN S.No. Condition Status (i) (ii) (iii) (iv). (v) (vi) No change in technology and scope of working shall be made without prior approval of the Ministry of Environment & Forests. No change in the calendar plan including quantum of mineral coal and waste being produced shall be made. Four ambient air quality monitoring station shall be established in the core zone as well as in the buffer zone for monitoring SPM, RPM, SO2, NOx and heavy metals such as Hg, Pb, Cr, As, etc. Location of the stations shall be decided based on the meteorological data, topographical features and environmentally and ecologically sensitive targets in consultation with the State Pollution Control Board. Monitoring of heavy metal such as Hg, As, Ni, Cd, Cr, in SPM and RSPM etc shall be carried out at-least once in six months. Data on ambient air quality (SPM, RSPM SO2 and NOx and heavy metal such as Hg, As, Ni, Cr, etc.) and other monitoring data shall be regularly submitted to the Ministry including its Regional office at Bhubaneshwar and to the State Pollution Control Board and the Central Pollution Control Board once in six months. Random verification of samples through analysis from independent laboratories recognized under the EP Rules, 1986 shall be furnished as part of the compliance report. Adequate measure shall be taken for control of noise levels below 85 db(a) in the work environment. Workers engaged in blasting and drilling operation, operation of HEMM etc. shall be provided with the plugs/muffs. Industrial waste water (workshop and wastewater from the mine) shall be properly collected, and treated so as to confirm to the standards including for heavy metals before discharge prescribed under GSR 422(E) dated No change is being done in mining technology and scope of working. No change is being done in the calendar plan including excavation, quantum of mineral coal and waste. Air quality monitoring station has been established at PO office, intake well pump and Ashok Vihar colony for monitoring SPM, RPM, SO2, NOx and heavy metals such as Hg, Pb, Cr, As, etc. Data on ambient air quality and water quality are being submitted regularly. The above monitoring is being done by CMPDI, which is the independent laboratory recognized by EP Rules, The report for the period from Oct. 14- March 15 is being enclosed. Adequate measures are being taken. Noise levels are regularly monitored and kept below 85 db(a) in the work environment. Workers engaged in blasting and drilling operation of HEMM etc are provided with ear plugs/muffs. Oil grease trap is working at this project workshop.

7 (vii) (viii) (ix) (x) (xi) (xii) 19 th May 1993 and 31 st December 1993 or as amended from time to time. Oil and grease trap shall be installed before discharge of workshop effluents. Vehicular emissions shall be kept under control and regularly monitored. Vehicles used for transportation of mineral shall be covered with tarpaulins and optimally loaded. Monitoring of Environmental quality parameters shall be carried out through establishment of adequate number and type of pollution monitoring and analysis equipment in consultation with the State Pollution Control Board and data got analyzed through a laboratory recognized under EP Rules, Personnel working in dusty areas shall wear protective respiratory devices and they shall also be provided with adequate training and information on safety and health aspects. Occupational health surveillance programme of the workers shall be undertaken periodically to observe any contractors due to exposure of dust and to take corrective measures, if needed. A separate environmental management cell with suitable qualified personnel shall be set up under the control of a Senior Executive, who will report directly to the Head of the Company. The funds earmarked for environmental protection measures shall be kept in separate account and shall not be diverted for other purpose. Year-wise expenditure shall be reported to this Ministry and its Regional Office at Bhubaneswar. The Project authority shall advertise at least in two local newspapers widely circulated around the Project, one of which shall be in the vernacular language of the locally concerned within seven days of the clearance letter informing that the Project has been accorded Vehicular emission is kept under control and regularly monitored. Vehicles used for transporting the coal is being covered with tarpaulins and optimally loaded. Monitoring of Environmental quality is done by CMPDI having recognized laboratory. Personnel working in dusty areas have been provided with protective respiratory devices and provided with adequate training and information on safety and health aspects.pme is done regularly. In the year , target was 90 nos. & achievement is 90 nos. A separate environmental cell has been established and put under charge of senior Executive, who is looking after the environmental problems. He is reporting directly to Head of Company. The funds earmarked for environmental protection measures are not being diverted for other purpose. Year wise expenditure will be reported to ministry and its Regional office at Bhubaneshwar. Advertised in following news paper. Xerox copies of which are enclosed.

8 (xiii) environment clearance and a copy of the clearance letter is available with the State Pollution Control Board and may also be seen at the website of the Ministry of Environment & Forests at A copy of the Environmental clearance letter shall be marked to concerned Panchayat/Zila Parishad, Municipal corporation or Urban Local Body and Local NGO, if any, from whom any suggestion / representation has been received while processing the proposal. A copy of the clearance letter shall also be displayed at company s website. 1. Hindustan Times, Ranchi Tuesday, dtd. 10 th Nov Prbhat Kabhar, Ranchi Dtd. 10 th Nov Letter of clearance letter will be displayed at company s website shortly. (xiv) (xv) (xvi) (xvii) A Copy of clearance letter shall be displayed on the website of the concerned state pollution control Board. The EC letter shall also be displayed at the Regional office, District Industry centre and collector s office/tehsildar s office for 30 days The clearance letter shall be uploaded on the company s website. The compliance status of the stipulated EC conditions shall also be uploaded by the project authorities in their web site and updated at least once every six months so as to bring the same in the Public domain. The monitoring data of environmental quality parameters (air, water, noise and soil) and critical parameters such as SPM, RPM, SO2, NOx (ambient and stack if any) and critical sectoral parameters shall also be displayed at the entrance of the project premises and mine office and in corporate office and on the company s website. The project proponent shall submit six monthly reports on the status of compliance of the stipulated environmental clearance conditions (both in hard copy and in e mail) to the respective Regional office of the MoEF, the respective Zonal offices of CPCB and the SPCB. The Regional office of this Ministry located at Bhubaneswar shall monitor compliance of the stipulated conditions. The project authorities shall extend full cooperation to the respective Regional office by furnishing the requisite data /information /monitoring reports. Copy of clearance letter has been sent to Jharkhand State pollution control Board. Copy of clearance letter will be displayed at company s website shortly. It is being complied regularly. Agreed.

9

10 Steps taken for improving the environmental quality:. Rohini Opencast Project is a new Coal Project of Central Coalfields Limited. It falls in the South-West part of North Karnapura Coalfields and it is situated in Ranchi District of Jharkhand State. For improving different measures different measures are being taken. The following measures have been taken to control Air pollution: i) Regular sprinkling of water on haul roads and other roads. ii) Wetting of ROM Coal before crushing in CHP/FB. iii) Water sprinkling in coal stock is practiced. iv) Plantation on OB Dumps and in other vacant space. v) Blasting is done during congenial atmosphere. To control water pollution from workshop and mine, the following measures have been taken: i) Central sump on dip side act as settling pond. The clean water from the sump is pumped into the river Damodar. A portion of mine water is utilized for dust suppression on haul and transportation road. ii) iii) iv) One oil & grease tap is installed at workshop to arrest the oil & grease. The catch drain have been constructed around the foot of the OB dumps in order to collect surface run off water from the dumps and convey them to the settling ponds. Each house of the colony has been provided with septic tank with soak pit arrangement. The Project planted about 1,95,000 sapling on external & internal OB Dumps and both sides of roadways to minimize the noise level. In the mine, main sump is acting as a settling tank for settlement of sediments/particles. After settlement, maximum clear water is used for dust suppression by mobile sprinklers and fire fighting in Coal stock. In new workshop, workshop effluent to be passed through Oil & grease trap and clear water is further used for washing of HEMM. For domestic effluent, each & every quarter is equipped septic tank arrangement in the colony for treatment of the same.the year-wise plantation is given below: Name of Project Rohini OCP Year of Area in Category of No. of Main species Plantation Ha Land Plants OB dump Acacia, Gamhar, seasham subbabul,karanj, Kathsagwan, Chakundi, Eucalyptus, Ber, Amla, Emli, Babul Bamboo, Total ,05,000 Menzium, etc. 2015, awarded Mansoon

11

12 CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD. TEST REPORT Lab No. T-2187 Job No Year Type of Sample: Ambient Air Quarter Ending Dec 14 Customer / W. O. no. & Date: CCL/DGM-HOD(E&F)/2014/ Date of Receipt of Dt. 29/04/14 Sample: Mode of Receipt of Sample: Jointly sampling with customer Date of Analysis: Sampling Protocol: IS 5182 (part 14): 2000,R -2010, Methods for Measurement of Air Pollution Date of Reporting: Testing Protocol: Gazette Notification no. G.S.R 742(E) dt.25 th Sept Remarks & Observation: All samplers placed 1.5 m above ground level TEST RESULT The sample has been tested with the following results:- Area : North Karanpura Project: Rohini OCP Stations: Date of Sampling: 1. P.O.Office 04-05/11/ Ashok Vihar Colony 04-05/11/ Intake Well Pump 04-05/11/ Workshop 05-06/11/2014 S.No Test Parameters Units Test Method TEST RESULT Stations: Total Particulate Matter (PM 10+ µg/m 3 Lab.SOP 4 based on IS: /23, 2006 >PM 10) 2 Particulate Matter (PM 10) µg/m 3 IS: 5182/ Sulphur Dioxide (SO 2) 4 Nitrogen Oxides (as NO x) µg/m 3 IS: 5182 / R-2006 µg/m 3 IS: 5182 / R-1998 <25 <25 <25 < Note: Gazette Notification no. G.S.R 742(E) dt.25 th Sept is enclosed along for reference Analysed By Checked By G.M (Chemist) Env. Lab., CMPDI(HQ) N.K - 1 (Authorized Signatory) Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested 2) This Report cannot be reproduced in part or full without written permission of the management. 3) Liability for return of samples ceases as samples cannot be retained for retests.

13 CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD. TEST REPORT Lab No. T-2187 Job No Year Type of Sample: Noise Quarter Ending Dec 14 Customer / W. O. no. & CCL/DGM-HOD(E&F)/2014/ Date of Receipt of Date: Dt. 29/04/14 Sample: Mode of Receipt of Sample: Jointly sampling with customer Date of Analysis: - Testing Protocol: Remarks: Gazette Notification no. G.S.R 742(E) dt.25 th Sept The sample has been tested with the following results:- TEST RESULT Date of Reporting: - Area : North Karanpura Project: Rohini OCP Stations: 1. P.O.Office 2. Ashok Vihar Colony Station Name Date of Sampling Noise Level P.O.Office 04/11/ Ashok Vihar Colony 04/11/ Permissible Limit of Noise Level vide Gazette Notification G.S.R. 742(E) Dt. 25th Sep '2K 6.00 AM to PM PM to 6.00 AM Noise Level Leq 75 db(a) Leq 70 db(a) Note: Checked By N.K - 2 1) This Report refers to the values obtained at the time of testing and results related to the items tested 2) This Report cannot be reproduced in part or full without written permission of the management. 3) Liability for return of samples ceases as samples cannot be retained for retests. G.M (Chemist) Env. Lab., CMPDI(HQ) (Authorized Signatory)

14 CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD. TEST REPORT Lab No. T-2187 Job No Year Type of Sample: Surface Water Quarter Ending Dec 14 Customer / W. O. no. & Date: CCL/DGM-HOD(E&F)/2014/ Dt. 29/04/14 Date of Receipt of Sample: Mode of Receipt of Sample: Picked up sample by laboratory Date of Analysis: Testing Protocol: - Date of Reporting: Remarks & Observation: Samples received in 2 ltr plastic Jerri cane, Colour as observed is transparent The sample has been tested with the following results:- TEST RESULT Area : North Karanpura Project: Rohini OCP Stations: Date of Sampling: 1. Damodar U/S of Kandua Conf. 14/11/ Damodar D/S of Kandua Conf. 14/11/ Kendua Nala before Damodar 14/11/2014 Sl. Parameter Sampling Stations Detection BIS Standard & No Limit Method 1 Arsenic (as As), mg/l, Max <0.002 <0.002 < IS 3025/37:1988 R : 2003, AAS-VGA 2 BOD (3 days 27 o C), mg/l, Max IS 3025 /44: 1993, R : day incubation at 27 C 3 Cadmium(as Cd), mg/l, Max < < < APHA, 22 nd Edition AAS-GTA 4 Chlorides (as Cl), mg/l, Max IS-3025/32:1988, R-2007, Argentometric 5 Copper (as Cu), mg/l, Max <0.03 <0.03 < IS 3025 /42 : 1992 R : 2009, AAS-Flame 6 Disolved Oxygen, min IS 3025/381989, R : 2003, Winkler Azide 7 Fluoride (as F) mg/l, Max APHA, 22 nd Edition SPADNS 8 Hexavalent Chromium, mg/l, Max <0.01 <0.01 < APHA, 22 nd Edition, 1,5 - Diphenylcarbohydrazide 9 Iron (as Fe), mg/l, Max <0.06 <0.06 < IS 3025 /53 : 2003, R : 2009, AAS-Flame 10 Lead (as Pb), mg/l, Max <0.005 <0.005 < APHA, 22 nd Edition AAS-GTA 11 Nitrate (as NO3), mg/l, Max APHA, 22 nd Edition, UV-Spectrphotometric 12 ph value IS-3025/11:1983, R-1996, Electrometric 13 Phenolic compounds <0.002 <0.002 < APHA, 22 nd Edition (as C 6H 5OH), mg/l, Max 4-Amino Antipyrine 14 Selenium (as Se), mg/l, Max <0.002 <0.002 < APHA, 22 nd Edition AAS-GTA 15 Sulphate (as SO4) mg/l, Max APHA, 22 nd Edition Turbidity 16 Total Dissolved Solids, mg/l, Max IS 3025 /16:1984 R : 2006, Gravimetric 17 Total Suspended Solids, mg/l, Max IS 3025 /17:1984, R :1996, Gravimetric 18 Zinc (as Zn), mg/l, Max < < IS 3025 /49 : 1994, R : 2009, AAS-Flame Note: Analysed By Checked By G.M (Chemist) Env. Lab., CMPDI(HQ) N.K - 3 (Authorized Signatory) 1) This Report refers to the values obtained at the time of testing and results related to the items tested 2) This Report cannot be reproduced in part or full without written permission of the management. 3) Liability for return of samples ceases as samples cannot be retained for retests.

15 CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD. TEST REPORT Lab No. T-2187 Job No Year Type of Sample: Ambient Air Quarter Ending March 15 Customer / W. O. no. & Date: CCL/DGM-HOD(E&F)/2014/ Date of Receipt of Dt. 29/04/14 Sample: Mode of Receipt of Sample: Jointly sampling with customer Date of Analysis: Sampling Protocol: IS 5182 (part 14): 2000,R -2010, Methods for Measurement of Air Pollution Date of Reporting: Testing Protocol: Gazette Notification no. G.S.R 742(E) dt.25 th Sept Remarks & Observation: All samplers placed 1.5 m above ground level TEST RESULT The sample has been tested with the following results:- Area : North Karanpura Project: Rohini OCP Stations: Date of Sampling: 1. P.O.Office 04-05/02/ Ashok Vihar Colony 04-05/02/ Intake Well Pump 03-04/02/ Workshop 04-05/02/2015 S.No Test Parameters Units Test Method TEST RESULT 1 Total Particulate Matter (PM 10 + >PM 10 ) 2 Particulate Matter (PM 10 ) Stations: µg/m 3 Lab.SOP based on IS: 5182/23, 2006 µg/m 3 IS: 5182/ Sulphur Dioxide (SO 2 ) 4 Nitrogen Oxides (as NO x ) µg/m 3 IS: 5182 / R-2006 µg/m 3 IS: 5182 / R-1998 <25 <25 <25 < Note: Gazette Notification no. G.S.R 742(E) dt.25 th Sept is enclosed along for reference Analysed By Checked By G.M (Chemist) Env. Lab., CMPDI(HQ) N.K - 1 (Authorized Signatory) Note: 1) This Report refers to the values obtained at the time of testing and results related to the items tested 2) This Report cannot be reproduced in part or full without written permission of the management. 3) Liability for return of samples ceases as samples cannot be retained for retests.

16 CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD. TEST REPORT Lab No. T-2187 Job No Year Type of Sample: Noise Quarter Ending March 15 Customer / W. O. no. & CCL/DGM-HOD(E&F)/2014/ Date of Receipt of Date: Dt. 29/04/14 Sample: Mode of Receipt of Sample: Jointly sampling with customer Date of Analysis: - Testing Protocol: Remarks: Gazette Notification no. G.S.R 742(E) dt.25 th Sept The sample has been tested with the following results:- TEST RESULT Date of Reporting: - Area : North Karanpura Project: Rohini OCP Stations: 1. P.O.Office 2. Ashok Vihar Colony Station Name Date of Sampling Noise Level P.O.Office 04/02/ Ashok Vihar Colony 04/02/ Permissible Limit of Noise Level vide Gazette Notification G.S.R. 742(E) Dt. 25th Sep '2K 6.00 AM to PM PM to 6.00 AM Noise Level Leq 75 db(a) Leq 70 db(a) Note: Checked By N.K - 2 1) This Report refers to the values obtained at the time of testing and results related to the items tested 2) This Report cannot be reproduced in part or full without written permission of the management. 3) Liability for return of samples ceases as samples cannot be retained for retests. G.M (Chemist) Env. Lab., CMPDI(HQ) (Authorized Signatory)

17 CENTRAL MINE PLANNING AND DESIGN INSTITUTE LTD. TEST REPORT Lab No. T-2187 Job No Year Type of Sample: Surface Water Quarter Ending March 15 Customer / W. O. no. & Date: CCL/DGM-HOD(E&F)/2014/ Dt. 29/04/14 Date of Receipt of Sample: Mode of Receipt of Sample: Picked up sample by laboratory Date of Analysis: Testing Protocol: - Date of Reporting: Remarks & Observation: Samples received in 2 ltr plastic Jerri cane, Colour as observed is transparent The sample has been tested with the following results:- TEST RESULT Area : North Karanpura Project: Rohini OCP Stations: Date of Sampling: 1. Damodar U/S of Kandua Conf. 05/02/ Damodar D/S of Kandua Conf. 05/02/ Kendua Nala before Damodar 05/02/2015 Sl. Parameter Sampling Stations Detection BIS Standard & No Limit Method 1 Arsenic (as As), mg/l, Max <0.002 <0.002 < IS 3025/37:1988 R : 2003, AAS-VGA 2 BOD (3 days 27 o C), mg/l, Max IS 3025 /44: 1993, R : day incubation at 27 C 3 Cadmium(as Cd), mg/l, Max < < < APHA, 22 nd Edition AAS-GTA 4 Chlorides (as Cl), mg/l, Max IS-3025/32:1988, R-2007, Argentometric 5 Copper (as Cu), mg/l, Max <0.03 <0.03 < IS 3025 /42 : 1992 R : 2009, AAS-Flame 6 Disolved Oxygen, min IS 3025/381989, R : 2003, Winkler Azide 7 Fluoride (as F) mg/l, Max APHA, 22 nd Edition SPADNS 8 Hexavalent Chromium, mg/l, Max <0.01 <0.01 < APHA, 22 nd Edition, 1,5 - Diphenylcarbohydrazide 9 Iron (as Fe), mg/l, Max <0.06 <0.06 < IS 3025 /53 : 2003, R : 2009, AAS-Flame 10 Lead (as Pb), mg/l, Max <0.005 <0.005 < APHA, 22 nd Edition AAS-GTA 11 Nitrate (as NO 3 ), mg/l, Max APHA, 22 nd Edition, UV-Spectrphotometric 12 ph value IS-3025/11:1983, R-1996, Electrometric 13 Phenolic compounds <0.002 <0.002 < APHA, 22 nd Edition (as C 6H 5OH), mg/l, Max 4-Amino Antipyrine 14 Selenium (as Se), mg/l, Max <0.002 <0.002 < APHA, 22 nd Edition AAS-GTA 15 Sulphate (as SO 4 ) mg/l, Max APHA, 22 nd Edition Turbidity 16 Total Dissolved Solids, mg/l, Max IS 3025 /16:1984 R : 2006, Gravimetric 17 Total Suspended Solids, mg/l, Max IS 3025 /17:1984, R :1996, Gravimetric 18 Zinc (as Zn), mg/l, Max < < IS 3025 /49 : 1994, R : 2009, AAS-Flame Note: Analysed By Checked By G.M (Chemist) Env. Lab., CMPDI(HQ) N.K - 3 (Authorized Signatory) 1) This Report refers to the values obtained at the time of testing and results related to the items tested 2) This Report cannot be reproduced in part or full without written permission of the management. 3) Liability for return of samples ceases as samples cannot be retained for retests.

SIX MONTHLY REPORT OF EMP CLEARANCE J11015/536/2008- IA-II(M) FOR THE PERIOD OCTOBER-2014 TO MARCH-2015 (1 ST June 2015)

SIX MONTHLY REPORT OF EMP CLEARANCE J11015/536/2008- IA-II(M) FOR THE PERIOD OCTOBER-2014 TO MARCH-2015 (1 ST June 2015) SIX MONTHLY REPORT OF EMP CLEARANCE J11015/536/2008- IA-II(M) FOR THE PERIOD OCTOBER-2014 TO MARCH-2015 (1 ST June 2015) ARA OCP (ARA SARUBERA GROUP OF MINES) KUJU AREA CENTRAL COALFIELDS LIMITED (A Miniratna

More information

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area. ENVIRONMENT CLEARANCE COMPLIANCE STATUS ENVIRONMENT CLEARANCE No. J-11015/406/2006-IA.II(M) dt. 13/04/2007 DHANGARWADI MINES Sr. CONDITIONS COMPLIANCE No. A) Specific Conditions :- i) Top soil to be stacked

More information

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED HALF YEARLY PROGRESS REPORT ON IMPLEMENTATION OF ENVIRONMENTAL CLEARANCE CONDITION BY MoEF (PERIOD FROM OCTOBER 13 TO MARCH 14) HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED SIX MONTHLY

More information

Project Code: Clearance Letter No. : MoEF vide letter No: - J-11015/423/2005-IA-II (M) Dated 18 th May 2006

Project Code: Clearance Letter No. : MoEF vide letter No: - J-11015/423/2005-IA-II (M) Dated 18 th May 2006 Name of the Project: North North Naubasta Limestone Mine (ML 2) (A unit of M/s Jaiprakash Associates Limited) of Mining Capacity 1.85 MTPA at villages Naubasta, Sumeda, Atrauli and Garhwa Tehsil Huzur

More information

ENVIRONMENTAL CLEARANCE (J-11015/121/ IA.II(M) ) October 14 to March 15. INTEGRATED ASHOK WASHERY cum FBC

ENVIRONMENTAL CLEARANCE (J-11015/121/ IA.II(M) ) October 14 to March 15. INTEGRATED ASHOK WASHERY cum FBC ENVIRONMENTAL CLEARANCE (J-11015/121/2009 - IA.II(M) ) October 14 to March 15 INTEGRATED ASHOK WASHERY cum FBC (PIPARWAR AREA) CENTRAL COALFIELDS LIMITED Status of compliance of the terms and conditions

More information

Sl. No. Conditions Compliance

Sl. No. Conditions Compliance Annexure-I CONDITIONS TO BE COMPLIED AS PER ENVIRONMENTAL CLEARANCE APPROVAL KATHAUTIA OPEN CAST COAL MINE, DALTONGANJ EC. No. J-11015 /61//2006-IA.II(M) dated 19 th June, 2006 A. SPECIFIC CONDITIONS Sl.

More information

Mining is being carried out keeping safe distance from seasonal nallah/ stream.

Mining is being carried out keeping safe distance from seasonal nallah/ stream. Name of the Project : Gurha East Lignite Mine Project (1MTPA) of M/s. V.S. Lignite Power Private Ltd. Located at village- Gurha, Kolayat, Bikaner, Rajasthan. Project Code : Raj-456/753/09 Clearance Letter

More information

Scanned by CamScanner

Scanned by CamScanner Scanned by CamScanner Six Monthly COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS (Grant Order no. J-11015/236/2006-IA (M) dated 11.01.2007 to prior allottee, M/s Electrosteel Castings Limited

More information

S.N. Condition in Environmental Clearance Compliance Status upto June (A) Specific Conditions (i)

S.N. Condition in Environmental Clearance Compliance Status upto June (A) Specific Conditions (i) Six Monthly Status of Compliance for Environmental Clearance No J-11015/108/2005- IA.II (M) dated 28.07.2006 for 2.2 MTPA Coal Mining from Utkal B-2 Coal Block by M/s. Monnet Ispat & Energy Limited S.N.

More information

J.K. Cement WORKS, NIMBAHERA (RAJ)

J.K. Cement WORKS, NIMBAHERA (RAJ) A. SPECIFIC CONDITIONS : J.K. Cement WORKS, NIMBAHERA (RAJ) Compliance report of Environment Clearance for Nimbahera - Ahirpura Lime Stone Mine (For the Period from April 2013 to September 2013) Reference

More information

Project Code: Clearance Letter No. : MoEF vide letter No:- J-11016/202/2003-IA-II(M) Dated 6 th Jan 2005

Project Code: Clearance Letter No. : MoEF vide letter No:- J-11016/202/2003-IA-II(M) Dated 6 th Jan 2005 Name of the Project: Naubasta Limestone Mine ( A Unit of M/s Jaiprakash Associates Limited ) for Expansion of Mining Capacity from 3.3 MTPA to 4.0 MTPA at villages Atrauli, Gadhwa, Kachoor, Naubasta, Kauadhan,

More information

A. SPECIFIC CONITIONS:- SL NO. Peak production from Jarangdih OCP is not exceeding 0.88 MTPA

A. SPECIFIC CONITIONS:- SL NO. Peak production from Jarangdih OCP is not exceeding 0.88 MTPA Status of Compliance of the terms and condition given the Environmental Clearance Letter No. J11015/502/2008- I (M) Dated:-1 st March 2012 issued by MOEF, Govt. of India New Delhi for expansion of Production

More information

Deccan Cements Limited, Bhavanipuram Lime stone Mine -2, Mahankaligudam Palakeedu, Suryapet(Dist). Telangana MoEF No: J-11015/497/2007-IA II

Deccan Cements Limited, Bhavanipuram Lime stone Mine -2, Mahankaligudam Palakeedu, Suryapet(Dist). Telangana MoEF No: J-11015/497/2007-IA II Status of Environmental Clearances received from MOEF vide MoEF No.J- 11015/497/2007-IA II(M) dated 18.10.2007-Bhavanipuram Limestone Mine 2(73.93.11 Ha), as on March 2017 1. Compliance reports are enclosed

More information

Sr.No Condition Status A. SPECIFIC CONDITIONS:

Sr.No Condition Status A. SPECIFIC CONDITIONS: J.K. CEMENT WORKS, MANGROL (RAJ.) Compliance report of Mangrol Lime stone mine (For the period from April 2011 to September 2011) Sub:- Conditions of Environment Clearance from MOEF, New Delhi Letter No.

More information

NOC GRANTED FOR THE EXPANSION OF KASHLOG LIMESTONE MINES OF AMBUJA CEMENTS TIMITED

NOC GRANTED FOR THE EXPANSION OF KASHLOG LIMESTONE MINES OF AMBUJA CEMENTS TIMITED Sr. STIPULATION ACTION No. 2A. Specific Conditions (i) (ii) All the conditions stipulated by the State Pollution Control Board in their Consent should be effectively implemented. The project proponent

More information

Deccan Cements Limited, Bhavanipuram Lime stone Mine -2, Mahankaligudam Palakeedu, Suryapet(Dist). Telangana MoEF No: J-11015/497/2007-IA II

Deccan Cements Limited, Bhavanipuram Lime stone Mine -2, Mahankaligudam Palakeedu, Suryapet(Dist). Telangana MoEF No: J-11015/497/2007-IA II Status of Environmental Clearances received from MOEF vide MoEF No.J- 11015/497/2007-IA II(M) dated 18.10.2007-Bhavanipuram Limestone Mine 2 (73.93.11 Ha), as on September 2018 1. Compliance reports are

More information

NMDC Limited Arki Limestone Project, Post: Arki, Tehsil: Arki, District: Solan, H.P.

NMDC Limited Arki Limestone Project, Post: Arki, Tehsil: Arki, District: Solan, H.P. NMDC Limited Arki Limestone Project, Post: Arki, Tehsil: Arki, District: Solan, H.P. Sub: Ref: Period: Six Monthly Environmental Progress Report Environmental clearance no: No.J-11015/82/2009-IA.II(M),

More information

Period of Compliance Report : April, 2017 to September, 2017

Period of Compliance Report : April, 2017 to September, 2017 Name of the Project Project Code Clearance Letter No. with date : OSTAPAL CHROMITE MINES, M/S. FACOR LTD. : Mining (Non-Coal) : No. J-11015/183/2007-IA-II (M) dt.13-05-09 Period of Compliance Report :

More information

THE RAMCO CEMENTS LIMITED

THE RAMCO CEMENTS LIMITED 1 P a g e 2 P a g e THE RAMCO CEMENTS LIMITED (Formerly Madras Cements Ltd.) COMPLIANCE REPORT FOR ENVIRONMENTAL CLEARANCE JAYANTHIPURAM NORTH BAND MINING LEASE 2.0 MILLION TPA CAPACITY EC Lr. No. : J-11015/377/2006-IA.II

More information

A. SPECIFIC CONDITIONS. No. Conditions Status of Compliance. Noted and Agreed

A. SPECIFIC CONDITIONS. No. Conditions Status of Compliance. Noted and Agreed Status of compliance as on 1 st March, 2015 (Period :, 2014 March 2015) to the conditions stipulated in Environmental clearance granted by MoEF vide letter No:- J- 11015/42/2005-IA-II(M) Dated 18 th May

More information

The project proponent shall develop fodder plots in the non-mineralized area in lieu of use of grazing land.

The project proponent shall develop fodder plots in the non-mineralized area in lieu of use of grazing land. J.K. Cement WORKS, MANGROL (RAJ) Dated 29.05.2018 Compliance report of Environment Clearance for Mangrol Lime Stone Mine (For the Period from October 2017 to March 2018) Reference Letter from MOEF, New

More information

1 Name of the Project Gonua Iron & Mn. Mine of Sri Pawan Kumar Ahluwalia

1 Name of the Project Gonua Iron & Mn. Mine of Sri Pawan Kumar Ahluwalia HALF YEARLY PROGRESSIVE CLEARANCE ACCORDED BY THE MINISTRY OF ENVIRONMENT & FOREST, GOVT. OF INDIA, TO THE PROJECT EXPANSION OF GANUA IRON & MN. MINE OF SHRI PAWAN KUMAR AHLUWALIA (FROM 0.140 MTPA TO 0.36

More information

Agreed. 8 The project proponent shall ensure that no natural watercourse and/or water resources shall Shall be complied with.

Agreed. 8 The project proponent shall ensure that no natural watercourse and/or water resources shall Shall be complied with. Compliance Report for the period June 2012 - November 2012, to the conditions specified in the Environmental Clearance (EC), granted by MOEF, vide letter No. J-11015/889/2007 - IA.II (M) dated 22nd Feb,

More information

Environmental Clearance Maliparbat Bauxite Mines-Compliance Report Page 2

Environmental Clearance Maliparbat Bauxite Mines-Compliance Report Page 2 A. Specific Conditions: (i) All the conditions stipulated by the State Pollution Control Board in their consent to establish should be effectively implemented. Submission: Implementation is ongoing. (ii)

More information

Name of Project: Panchagavi Laterite Mine, M/s J.K. Cement Works, Muddapur (Karnataka)

Name of Project: Panchagavi Laterite Mine, M/s J.K. Cement Works, Muddapur (Karnataka) Panchagavi Laterite Mine, Village- Panchagavi, Taluka-Ramdurg, District- Belgaum, Karnataka Ref: - MoEF Letter No. SEIAA 107 MIN 2014 dtd. 24th December 2014 Compliance Report for the period from October

More information

PKA/Gonua/MoEF/ Date:

PKA/Gonua/MoEF/ Date: PKA/Gonua/MoEF/ Date: -18.06.2018 To The Director, Ministry of Environment & Forests (Central) Eastern Regional Office A/3 - Chandrasekharpur Bhubaneswar-751023 Sub:- Sir, Half Yearly Progressive Compliance

More information

V.S LIGNITE POWER Pvt. Ltd. [Gurha East Lignite Mine (1 MPTA)] AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

V.S LIGNITE POWER Pvt. Ltd. [Gurha East Lignite Mine (1 MPTA)] AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN V.S LIGNITE POWER Pvt. Ltd [Gurha East Lignite Mine (1 MPTA)] AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 Name of the Project : Gurha East

More information

[LOGO] Ministry of Environment & Forests (MOEF) BY SPEED POST. No.J-11015/44/2009-IA.II (M) Paryavaran Bhawan, C.G.O.Complex, New Delhi

[LOGO] Ministry of Environment & Forests (MOEF) BY SPEED POST. No.J-11015/44/2009-IA.II (M) Paryavaran Bhawan, C.G.O.Complex, New Delhi [LOGO] No.J-11015/44/2009-IA.II (M) To General Manager (E&F), M/s South Eastern Coalfields Ltd., Bilaspur, Chhattisgarh. Ministry of Environment & Forests (MOEF) BY SPEED POST Paryavaran Bhawan, C.G.O.Complex,

More information

Name of the Project:- J&K Mineral Development Corporation Limited.

Name of the Project:- J&K Mineral Development Corporation Limited. Name of the Project:- J&K Mineral Development Corporation Limited. Sub:- Six Monthly report of the status of the compliance of the stipulated environment condition of Environment clearance granted vide

More information

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests Madhya Pradesh Pollution Control Board E 5. Arera Colony Bhopal 4620 16 visit us

More information

By Speed Post. Dated: 30 th September, 2013

By Speed Post. Dated: 30 th September, 2013 By Speed Post No. J-11015/349/2009-IA.II (M) Government of India Ministry of Environment and Forests Impact Assessment Division *** Paryavaran Bhavan, C.G.O. Complex, Lodi Road, New Delhi-110 003 Dated:

More information

J-11015/248/2007-IA.I(M) ) 13, MTPA ( ML

J-11015/248/2007-IA.I(M) ) 13, MTPA ( ML Status of Compliance (Period: October 2012 to March 2013) to the conditions stipulated in the Environment Clearance granted by MoEF vide letter No.- J-11015/248/2007-IA.I(M) dated May 13, 2009 for 0.27

More information

No. J-l1015/313/2010-IA.II (M) Government of India Ministry of Environment & Forests

No. J-l1015/313/2010-IA.II (M) Government of India Ministry of Environment & Forests No. J-l1015/313/2010-IA.II (M) Government of India Ministry of Environment & Forests Paryavaran Bhavan, C.G.O. Complex, Lodi Road, New Delhi-110 003. Dated the 28th June, 2013 To, M/ s Arbind Kumar Singh

More information

J-11011/45/2009- IA II (I)

J-11011/45/2009- IA II (I) SL SPECIFIC CONDITIONS STATUS 1 Continuous stack monitoring facilities to monitor gaseous emissions from all the stacks shall be provided. The particulate emissions shall be controlled within 50 mg/nm

More information

SreeJayajothi Cements Limited (100% Subsidiary of M/s. My Home Industries Private Limited), Srinagar, Yanakandla , Kurnool Dist, Andhra

SreeJayajothi Cements Limited (100% Subsidiary of M/s. My Home Industries Private Limited), Srinagar, Yanakandla , Kurnool Dist, Andhra 1 Environmental Clearance Point Wise Half Yearly Compliance Report (April- 2015 to September- 2015) Lime Stone Mines: Ref: No. J-11015/338/2009-IA-II(M)) Dated: 13 th July 2011 S.NO CONDITION COMPLIANCE

More information

No.J-11015/42/2006-IA.II (M) Government of India Ministry of Environment & Forests Paryavaran Bhawan, C.G.O. Complex, Lodi Road, New Delhi

No.J-11015/42/2006-IA.II (M) Government of India Ministry of Environment & Forests Paryavaran Bhawan, C.G.O. Complex, Lodi Road, New Delhi No.J-11015/42/2006-IA.II (M) Government of India Ministry of Environment & Forests Paryavaran Bhawan, C.G.O. Complex, Lodi Road, New Delhi 110 003 To, M/s Rajasthan State Mines and Minerals Ltd. SBU&PC-Limestone,

More information

ENVIRONMENTAL CLEARANCE COMPLIANCE OF CLUSTER-II (GRANTED VIDE: J-11015/35/2011-IA II CM), dated ( to )

ENVIRONMENTAL CLEARANCE COMPLIANCE OF CLUSTER-II (GRANTED VIDE: J-11015/35/2011-IA II CM), dated ( to ) ENVIRONMENTAL CLEARANCE COMPLIANCE OF CLUSTER-II (GRANTED VIDE: J-11015/35/2011-IA II CM), dated 06.02.13 (01.10.13 to 31.03.14) Sl. no. A. Specific Conditions by MOEF: Compliance i The maximum production

More information

Implementation of the Conservation Plan for Schedule I species report in the study area namely Pavo cristatus (Indian peafowl).

Implementation of the Conservation Plan for Schedule I species report in the study area namely Pavo cristatus (Indian peafowl). J.K. Cement WORKS, MANGROL (RAJ) Compliance report of Environment Clearance for Mangrol Tilakhera Lime Stone Mine Reference Letter from MOEF, New Delhi - J-11015/25/2011-1A. II (M) dated 23.01.2014 (For

More information

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT Subject: Compliance report of Environmental Clearance for CDR & Revamp Reference: J-11011/272/2007-IA,

More information

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT Subject: Compliance report of Environmental Clearance for Plant 3 Reference: J-11011/603/2010-IA,

More information

Ref: Environment Department, MS, SEIAA Letter SEAC 2010/CR.824/TC-2 Dated 2 nd Nov 2011

Ref: Environment Department, MS, SEIAA Letter SEAC 2010/CR.824/TC-2 Dated 2 nd Nov 2011 Ref.No:POL/U-II/EC/12-13/176 Date : 23.11.2012 To, Dr. A. Mehrotra, Director (S) Ministry of Environment & Forests, Regional Office, Western Region, Kendriya Paryavaran Bhavan Link Road No.3, E-5, Ravi

More information

ENVIRONMENTAL CLEARANCE COMPLIANCE OF CLUSTER-XIII (GRANTED VIDE LETTER NO.J-11015/10/2010-IA.II(M) DATED

ENVIRONMENTAL CLEARANCE COMPLIANCE OF CLUSTER-XIII (GRANTED VIDE LETTER NO.J-11015/10/2010-IA.II(M) DATED ENVIRONMENTAL CLEARANCE COMPLIANCE OF CLUSTER-XIII (GRANTED VIDE LETTER NO.J-11015/10/2010-IA.II(M) DATED 06.06.2013 (Oct.,2013 to March,2014) Sl. No. A. Specific Conditions by MOEF: Compliance i. ii No

More information

From : April 2015 To : October 2015 Status of conditions stipulated in Environmental and CRZ clearance. Adani Vizag Coal Terminal Private Limited

From : April 2015 To : October 2015 Status of conditions stipulated in Environmental and CRZ clearance. Adani Vizag Coal Terminal Private Limited Page 1 of 27 Half yearly Compliance report for Environment and CRZ Clearance for development of East quay -1 (EQ-l) by replacing the existing EQ-l berth and part of EQ-2 berth. Sr. No. Conditions Compliance

More information

S.N SPECIFIC CONDITION COMPLIANCE STATUS

S.N SPECIFIC CONDITION COMPLIANCE STATUS S.N SPECIFIC CONDITION COMPLIANCE STATUS i. Environmental clearance is subject to obtaining clearance under the Wildlife (Protection) Act, 1972 from the competent authority, as may be applicable to this

More information

No. J-11015/308/2010-IA.II (M) Government of India Ministry of Environment & Forests

No. J-11015/308/2010-IA.II (M) Government of India Ministry of Environment & Forests No. J-11015/308/2010-IA.II (M) Government of India Ministry of Environment & Forests Paryavaran Bhawan, CGO Complex, Lodhi Road, New Delhi-110003 Dated: 16 th July, 2013 To, The General Manager M/s Madhya

More information

State Level Environment Impact Assessment Authority

State Level Environment Impact Assessment Authority State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests Research and Development Wing Madhya Pradesh Pollution Control Board Paryavaran

More information

ENVIRONMENTAL STATEMENT

ENVIRONMENTAL STATEMENT ENVIRONMENTAL STATEMENT 2015-16 MAGADH OPENCAST PROJECT M-A AREA, DAKRA SEPTEMBER 15 CENTRAL COALFIELDS LIMITED ENVIRONMENT DIVISION Ranchi EXECUTIVE SUMMARY E-1 This Annual Environmental Statement has

More information

Compliance Status of Environmental Clearance of West Bokaro Opencast Coal Mine

Compliance Status of Environmental Clearance of West Bokaro Opencast Coal Mine Compliance Status of Environmental Clearance of West Bokaro Opencast Coal Mine Tata Steel Ltd. 1 A. Specific Conditions (i) No mining operations shall be undertaken in the forestland until clearance has

More information

Mangalam Cement Ltd. (Unit-II) Stack No.

Mangalam Cement Ltd. (Unit-II) Stack No. Mangalam Cement Ltd. (Unit-II) Name of the Project :- Expansion of cement grinding capacity from 1.7 MTPA to 2.3 MTPA Project Code :- Clearance Letter No. : - F NO. J - 11011 /110 /2012 - IA II (I), dtd

More information

NMDC Limited Arid Limestone Project, Arid, District: Solan ill.p.)

NMDC Limited Arid Limestone Project, Arid, District: Solan ill.p.) NMDC Limited Arid Limestone Project, Arid, District: Solan ill.p.) Sub: Six Monthly EC Progress Report for the period from Apr 2016 to Sept 2016. Ref:Environmental Clearance no: No.J-11015/82/2009-IA.II(M),

More information

Environment Laboratory, Central Mine Planning and Design Institute Limited, Gondwana Place, Kanke Road, Ranchi, Jharkhand

Environment Laboratory, Central Mine Planning and Design Institute Limited, Gondwana Place, Kanke Road, Ranchi, Jharkhand Environment, Central Mine Planning and Design Institute Last Amended on - Page 1 of 9 1. POLLUTION & EFFLUENTS 1. Effluent / Waste Water Ammonical Nitrogen Free Ammonia IS 3025 (Part 34):1988, Nessler

More information

Noted please. Noted please. Noted please.

Noted please. Noted please. Noted please. Compliance Report on Environment Clearance for Gare-Pelma IV/4 coal mining project given by Ministry of Environment Forests & Climate Change vide letter No. J 11011/183/2010- IA.II (M) Dated: - 16th April

More information

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF APRIL-2016 TO SEPTEMBER F. No. J-11011/309/2011-IA-ll (I)

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF APRIL-2016 TO SEPTEMBER F. No. J-11011/309/2011-IA-ll (I) COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF APRIL-2016 TO SEPTEMBER-2016 F. No. J-11011/309/2011-IA-ll (I) SUBMITTED BY- M/S. GASGEN FERRO ALLOYS LLP LOHIA HOUSE, 2ND FLOOR M.G.ROAD,

More information

Six Monthly EC Compliance Report

Six Monthly EC Compliance Report Six Monthly EC Compliance Report Period: October, 2016 to March, 2017 JORURI IRON & MN MINES (54.754 HA) M/s. KALINGA MINING CORPORATION At Joruri, PO Jajnag, Dist. Keonjhar, Odisha 758 052 A. SPECIFIC

More information

State Environment Impact Assessment Authority, M.P. (Government of India, Ministry of Environment & Forests)

State Environment Impact Assessment Authority, M.P. (Government of India, Ministry of Environment & Forests) State Environment Impact Assessment Authority, M.P. (Government of India, Ministry of Environment & Forests) To, Shri Pradeep Jain C/o Jain Medical store, Main Market,Tendukheda, District Narsingpur M.P.

More information

Mangalam Cement Ltd.(Unit I)

Mangalam Cement Ltd.(Unit I) Mangalam Cement Ltd.(Unit I) Name of the Project :- Expansion of cement Project Code :- grinding capacity from 1.3 MTPA to 1.7 MTPA Clearance Letter No. : - F NO. J - 11011 /119 /2012 - IA II (I), dtd

More information

Cement Manufacturing Company Ltd. Page 1

Cement Manufacturing Company Ltd. Page 1 Six Monthly Compliance status of Environment Clearance for Cement Plant (2400 TPD) at Village Lumshnong, Meghalaya July to December 2013 Ref.: Environmental Clearance no. SEIAA/Project-6/2008/23 dtd. 16.03.10.

More information

Environment Management Plan

Environment Management Plan Environment Management Plan Environmental Impact Assessment Statement describing the impact of mining and beneficiation on environment on the following: i) Land area indicating the area likely to be degraded

More information

STATUS OF CONDITIONS OF ENVIRONMENTAL CLEARANCE FOR KIRIBURU -MEGHAHATUBURU IRON ORE MINES, STEEL AUTHORITY OF INDIA LIMITED

STATUS OF CONDITIONS OF ENVIRONMENTAL CLEARANCE FOR KIRIBURU -MEGHAHATUBURU IRON ORE MINES, STEEL AUTHORITY OF INDIA LIMITED STATUS OF CONDITIONS OF ENVIRONMENTAL CLEARANCE FOR KIRIBURU -MEGHAHATUBURU IRON ORE MINES, STEEL AUTHORITY OF INDIA LIMITED Ref. : Env. Clearance No. J-11015/5/2006-IA.II (M) dated 27.12.2006 A. Specific

More information

Janki Corp. Ltd., Six Monthly Compliance Report

Janki Corp. Ltd., Six Monthly Compliance Report Janki Corp. Ltd., Six Monthly Compliance Report Period: October 2014 to March 2015 Project: Expansion of Sponge Iron Plant (1,80,000 to 4,00,000TPA) and Installation of Iron ore Beneficiation Plant (0.6

More information

The mine is opened on The reasons for delay for starting mining operations are:

The mine is opened on The reasons for delay for starting mining operations are: 1 P a g e 2 P a g e THE RAMCO CEMENTS LIMITED (Formerly known as Madras Cements Ltd.) COMPLIANCE REPORT FOR ENVIRONMENTAL CLEARANCE BUDAWADA LIMESTONE MINE - 1.10 MILLION TPA CAPACITY EC Lr. No : J-11015/150/2008-IA.II

More information

LIMESTONE MINE (BLOCK-V)

LIMESTONE MINE (BLOCK-V) LIMESTONE MINE (BLOCK-V) 128.52 ha Mining lease and 19.33 ha outside dump, Production of 2.0 MTPA of M/S. ADHUNIK CEMENT LIMITED (Subsidiary of DALMIA CEMENT (BHARAT) LIMITED) Umsoo Mootang, Vill- Thangskai,P.O.

More information

STEEL AUTHORITY OF INDIA LTD.

STEEL AUTHORITY OF INDIA LTD. STEEL AUTHORITY OF INDIA LTD. RAW MATERIALS DIVISION (A Govt. of India Enterprise) Kiriburu Iron ore Mines Regd. Office: Ispat Bhawan, Lodi Road, P.O. : Kiriburu - 833 222 New Delhi- 110 003 Dist. : Singhbhum

More information

ENVIRONMENTAL MONITORING REPORT BASED ON DATA GENERATED FROM OCTOBER 2016 MARCH 2017 FOR OCL INDIA LIMITED At/Po: RAJGANGPUR, District: SUNDARGARH, ODISHA AT LANJIBERNA LIMESTONE & DOLOMITE MINES PROJECT

More information

COMPLIANCE REPORT PERIOD: APRIL 2015-SEPTEMBER 2015

COMPLIANCE REPORT PERIOD: APRIL 2015-SEPTEMBER 2015 COMPLIANCE REPORT PERIOD: APRIL 2015-SEPTEMBER 2015 ENVIRONMENTAL CLEARANCE TO JODA EAST IRON MINE OF TATA STEEL LIMITED VIDE MoEF s LETTER NO. J-11015/215/2008-IA.II(M), DATED: 11.03.2013 FOR PRODUCTION

More information

MAHAGIRI MINES (CHROMITE) M/S INDIAN METALS & FERRO ALLOYS LTD.

MAHAGIRI MINES (CHROMITE) M/S INDIAN METALS & FERRO ALLOYS LTD. MAHAGIRI MINES (CHROMITE) M/S INDIAN METALS & FERRO ALLOYS LTD. Conditions of MoEF, Govt. of India, New Delhi vide MoEF letter No. J-11015/345/2007-IA.II(M) dated 10 th Dec. 2008 issued with Environmental

More information

Point wise compliance for the conditions stipulated in Environmental Clearance of (Phase- I & II)

Point wise compliance for the conditions stipulated in Environmental Clearance of (Phase- I & II) SIX MONTHLY ENVIRONMENTAL COMPLIANCE STATUS REPORT (PERIOD : OCT, 2017 to MARCH, 2018) Ref: J-13011/23/2007-IA-II (T) Dated: 17/07/2007 (as amended in the Year, 2013 & 2014) and J-13011/46/2007-IA-II (T)

More information

TATA STEEL LIMITED JHARIA DIVISION

TATA STEEL LIMITED JHARIA DIVISION Page 1 HALF YEARLY COMPLIANCE REPORT OF DIGWADIH COLLIERY TATA STEEL LIMITED, P.O.- JEALGORA, DIST. - DHANBAD, STATE- JHARKHAND, PIN CODE 828110. ENVIRONMENTAL CLEARANCE GRANTED VIDE LETTER NO. - J-11015/372/2010-IA.II(M)

More information

Telefax: 011: Dated:10 th May, 2013

Telefax: 011: Dated:10 th May, 2013 F. No. J-11011/41/2011-IA-II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi 110 003 E-mail:vp.upadhyay@nic.in Telefax: 011:

More information

PERIOD : APRIL,2015 TO SEPTEMBER, 2015

PERIOD : APRIL,2015 TO SEPTEMBER, 2015 1 STATUS OF COMPLIANCE CONDITIONS STIPUALTED BY MOEF IN ENVIRONMENTAL CLEARANCE VIDE LTR NO. J-11015/183/2007-IA-II(M) dt.13-05-09 ACCORDED TO KALARANGIATTA CHROMITE MINES OF M/s. FERRO ALLOYS CORPORATION

More information

PERIOD : OCTOBER, 2014 TO MARCH, 2015

PERIOD : OCTOBER, 2014 TO MARCH, 2015 1 STATUS OF COMPLIANCE CONDITIONS STIPUALTED BY MOEF IN ENVIRONMENTAL CLEARANCE VIDE LTR NO. J-11015/183/2007-IA- II(M)dt.13-05-09 ACCORDED TO KALARANGIATTA (BHIMTANGAR) CHROMITE MINES OF M/s.FERRO ALLOYS

More information

Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018)

Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018) Chambal Fertilisers and Chemicals Limited CFG3 Project Environment Clearance_ Compliance Report (Feb 28, 2018) Reference: Environment clearance to CFG3 Project vides MOEF letter.no. J-11011/664/2008-IAII

More information

BHILAI JAYPEE CEMENT LIMITED

BHILAI JAYPEE CEMENT LIMITED BHILAI JAYPEE CEMENT LIMITED BABUPUR (SATNA) MP-485112 Environmental Compliance Half yearly report for the period October-2013 to March -2014 Compliance report for the period Oct-2013 to March-2014 to

More information

HALF YEARLY COMPLIANCE REPORT ON CONDITIONS STIPULATED IN ENVIRONMENTAL CLEARANCE

HALF YEARLY COMPLIANCE REPORT ON CONDITIONS STIPULATED IN ENVIRONMENTAL CLEARANCE HALF YEARLY COMPLIANCE REPORT ON CONDITIONS STIPULATED IN ENVIRONMENTAL CLEARANCE 01. Name of the Project: Enhancement of Production of Iron Ore from 4.2 million TPA to 6.28 million TPA and installation

More information

Six monthly EC Compliance report of Nuagaon Iron Ore Beneficiation Plant project of M/s. KJS Ahluwalia for the period October, 2013 to March, 2014.

Six monthly EC Compliance report of Nuagaon Iron Ore Beneficiation Plant project of M/s. KJS Ahluwalia for the period October, 2013 to March, 2014. Six monthly EC Compliance report of Nuagaon Iron Ore Beneficiation Plant project of M/s. KJS Ahluwalia for the period October, 2013 to March, 2014. Status of Environmental Clearance Conditions Nuagaon

More information

Environment Laboratory, Central Mine Planning & Design Institute Limited, Regional Institute-IV, Kasturba Nagar, Jaripatka, Nagpur, Maharashtra

Environment Laboratory, Central Mine Planning & Design Institute Limited, Regional Institute-IV, Kasturba Nagar, Jaripatka, Nagpur, Maharashtra Last Amended on - Page 1 of 9 I. POLLUTION & ENVIRONMENT 1 Effluent / Waste Water (As per EPA 2000) Ammonical Nitrogen / Free Ammonia IS 3025(Part 34):1988, RA 2009, Nessler s Method 0.02-2.5 mg/l, B.O.D

More information

6 th MONTHLY COMPLIANCE REPORT OF DIBRUGARH-BHOGPARA AREA

6 th MONTHLY COMPLIANCE REPORT OF DIBRUGARH-BHOGPARA AREA 6 th MONTHLY COMPLIANCE REPORT OF DIBRUGARH-BHOGPARA AREA As on 01.04.2014 General Condition: Sl No. CONDITIONS COMPLIANCE I. The project authorities must strictly adhere to the stipulations made by the

More information

HALF YEARLY COMPLIANCE REPORT ON CONDITIONS STIPULATED IN ENVIRONMENTAL CLEARANCE

HALF YEARLY COMPLIANCE REPORT ON CONDITIONS STIPULATED IN ENVIRONMENTAL CLEARANCE HALF YEARLY COMPLIANCE REPORT ON CONDITIONS STIPULATED IN ENVIRONMENTAL CLEARANCE 01. Name of the Project: JILLING LANGALOTA IRON & MANGANESE MINES of M/s. ESSEL MINING & INDUSTRIES LIMITED, Barbil, Keonjhar,

More information

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 01. Name of the Project: Koira Iron Mine of M/S. Essel Mining & Industries Limited, Barbil, Keonjhar, Odisha 02. MoEF Clearance No. &

More information

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 01. Name of the Project: Koira Iron Mine of M/S. Essel Mining & Industries Limited, Barbil, Keonjhar, Odisha 02. MoEF Clearance No. &

More information

COMPLIANCE STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 8.5 MTPA BAUXITE MINING VIDE LETTER NO J-11015/650/2007-IA.II (M), DTD

COMPLIANCE STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 8.5 MTPA BAUXITE MINING VIDE LETTER NO J-11015/650/2007-IA.II (M), DTD COMPLIANCE STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 8.5 MTPA BAUXITE MINING VIDE LETTER NO J-11015/650/2007-IA.II (M), DTD.19.02.09. PROJECT NAME: UTKAL ALUMINA INTERNATIOAL LIMITED.

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

Six Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013

Six Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013 Six Monthly Compliance status of Environment Clearance for Cement Plant (5300 TPD Clinker) at Village Lumshnong, Meghalaya January to June 2013 Ref.: Environmental Clearance no. J-11011/754/2007-IA II

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2015 to September 2015 Ref: 1. MOEF, New Delhi Environment Clearance F. No. J-11011/119/2007- IA II (I) dated

More information

Environmental Policy Statement:

Environmental Policy Statement: 1 Environmental Policy Statement: Coal India Limited (CIL) is committed to protect the environment through prevention, mitigation of pollution, proper disposal and recycling of wastes, conservation of

More information

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 01. Name of the Project: Koira Iron Mine of M/S. Essel Mining & Industries Limited, Barbil, Keonjhar, Odisha 02. MoEF Clearance No. &

More information

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 01. Name of the Project: Koira Iron Mine of M/S. Essel Mining & Industries Limited, Barbil, Keonjhar, Odisha 02. MoEF Clearance No. &

More information

COMPLIANCE STATUS REPORT

COMPLIANCE STATUS REPORT COMPLIANCE STATUS REPORT Sona Alloys Pvt. Ltd. Additional Director (IA) Ministry of Environment & Forests, Paryavaran Bhavan, CGO Complex, Lodhi Road, New Delhi 11003 Date: 08.02.2014 Sub: Compliance Status

More information

STATUS OF COMPLIANCE TO ENVIRONMENTAL CLEARANCE CONDITIONS KIRIBURU MEGHAHATUBURU IRON ORE MINE

STATUS OF COMPLIANCE TO ENVIRONMENTAL CLEARANCE CONDITIONS KIRIBURU MEGHAHATUBURU IRON ORE MINE STATUS OF COMPLIANCE TO ENVIRONMENTAL CLEARANCE CONDITIONS KIRIBURU MEGHAHATUBURU IRON ORE MINE (September, 2012 to March, 2013) Compliance of EC Conditions KIOM-MIOM Page 1 of 27 Steel Authority of India

More information

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 V. S. Lignite Power Pvt. Ltd. Name of the Project : 1x 135 MW Lignite

More information

HINDUSTAN ZINC LIMITED RAMPURA AGUCHA MINE

HINDUSTAN ZINC LIMITED RAMPURA AGUCHA MINE HINDUSTAN ZINC LIMITED RAMPURA AGUCHA MINE MoEF Environmental Clearance for Expansion of Rampura Agucha Lead and Zinc Opencast and Underground Mining Project (from 5.00 to 6.15 mtpa) and Beneficiation

More information

Environment protection measures / technology

Environment protection measures / technology Sr. No. Conditions A. Specific Conditions: i. The gaseous and particulate matter emissions from various units should conform to the standards prescribed by the State Pollution Control Board. At no time,

More information

Calcom Cement India Limited

Calcom Cement India Limited Calcom Cement India Limited (Subsidiary of DALMIA BHARAT CEMENT LIMITED) 2 No. Pipalpukhuri, Lanka, Dist. Nagaon, Assam 782446 Ref: MOEF, New Delhi Environment Clearance F. No. J-1101/312/2006-IA.II (I)

More information

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

4. The ambient air quality monitoring stations We are monitoring the ambient air quality GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions

More information

ENVIRONMENTAL MONITORING REPORT

ENVIRONMENTAL MONITORING REPORT ENVIRONMENTAL MONITORING REPORT BASED ON DATA GENERATED FROM APRIL 2018 SEPTEMBER 2018 FOR OCL INDIA LIMITED At/Po: RAJGANGPUR, District: SUNDARGARH, ODISHA AT LANJIBERNA LIMESTONE & DOLOMITE MINES PROJECT

More information

High efficient ESP s has been provided to maintain an emission level below 100mg/Nm 3 in CPP. Modification of ESPs and.

High efficient ESP s has been provided to maintain an emission level below 100mg/Nm 3 in CPP. Modification of ESPs and. Sl. No. CONDITIONS COMPLIANCE STATUS SPECIFIC CONDITIONS i The gaseous emissions (PM, SO 2, NO X, PAH, HC, VOCs and Fluoride) from various process units shall conform to the standards prescribed by the

More information

MECON LIMITED RANCHI , INDIA

MECON LIMITED RANCHI , INDIA ORISSA MINING CORPORATION LIMITED BANGUR CHROMITE MINING PROJECT POST CLEARANCE ENVIRONMENTAL MONITORING REPORT FOR THE MONTH OF JULY 2011 MECON LIMITED RANCHI 834 002, INDIA 11.S2.2011 SEPTEMBER, 2011

More information

MECON LIMITED RANCHI , INDIA

MECON LIMITED RANCHI , INDIA ORISSA MINING CORPORATION LIMITED BANGUR CHROMITE MINING PROJECT POST CLEARANCE ENVIRONMENTAL MONITORING REPORT FOR THE MONTH OF SEPTEMBER 2011 MECON LIMITED RANCHI 834 002, INDIA 11.S2.2011 OCTOBER, 2011

More information