1 ADDENDUM 2 CHINO DESALTER AUTHORITY CHINO CREEK WELLFIELD WELLS I-19, I-20 AND I-21 CONSTRUCTION CDA SPEC NO. CDAEXP The following ADDENDUM 2 shall be made part of the Notice Inviting Bids with revisions as described below: 1. Revision to the Bid Submission Deadline advertised in the Notice Inviting Bids: On behalf of the Chino Basin Desalter Authority ( Authority ), the Western Municipal Water District ( District ) will receive in a sealed envelope plainly marked on the outside SEALED BID FOR CONSTRUCTION OF CHINO CREEK WELLFIELD, WELLS I-19, I-20 AND I-21 CONSTRUCTION, SPEC NO. CDAEXP DO NOT OPEN WITH REGULAR MAIL for the CHINO CREEK WELLFIELD, WELLS I-19, I-20 AND I-21 CONSTRUCTION, SPEC NO. CDAEXP project ( Project ) from qualified Bidders at the office of the front reception at Meridian Parkway, Riverside, CA no later than Thursday, September 1, 2011 at 2:00 PM, at which time or thereafter said Bids will be opened and read aloud. Bids received after this time will be returned unopened. Bids shall be valid for ninety-five (95) calendar days after the Bid opening date. 2. Revision to Appendix C: Project Schedule Replace Appendix C with the revised Project Schedule in Attachment A of this Addendum. Note that bids based on an alternative schedule will be accepted. 3. Revision to Appendix E: Title 22 Parameters Replace Appendix E with Parameters for Water Quality Analyses in Attachment B of this Addendum. 4. Revision to Bid Schedule I, Item 110 (per Attachment C): hr Rush Water Quality Analyses of Zone Testing Water Samples for Selected Constituents outlined in Appendix E of the Technical Specifications (1 sample set/ zone). 3 Samples dollars per sample Chino Basin Desalter Authority 1 Spec CDAEXP Addendum 2

2 5. Addition to Bid Schedule I, Item 136 (per Attachement C): 136 Modification and extension of existing chain link fence to maintain airport security. 6. Revision to Bid Schedule II: Item 210 (per Attachment C): hr Rush Water Quality Analyses of Zone Testing Water Samples for Selected Constituents outlined in Appendix E of the Technical Specifications (1 sample set/ zone). 3 Samples dollars per sample 7. Revision to Bid Schedule III, Item 310 (per Attachment C): hr Rush Water Quality Analyses of Zone Testing Water Samples for Selected Constituents outlined in Appendix E of the Technical Specifications (1 sample set/ zone). 3 Samples dollars per sample 8. Technical Specifications Section 1.08 B: Work Hours, Page G-6 should be changed to read as follows: Work operations will be continuous (seven days per week, 24-hours per day) at each well site from the start of the pilot hole drilling through the well construction and initial development by airlifting and swabbing other than the down time mandated by waiting for Title 22 laboratory results following zone testing. To minimize this down time while maximizing work continuity, drilling operations will proceed in succession at each site as described in Section 1.25 Order of Operations. 9. Technical Specifications Section 1.20: Requirements Prior to Mobilization paragraph 2 (Page G-13) should be changed to read as follows: For site I-19, Drilling Contractor will be responsible for modifying the existing chain link fence. The western fence shall be extended northward to intercept the well site property boundary. The existing northern fence shall be removed and replaced. The new northern fence shall coincide with the well site property Chino Basin Desalter Authority 2 Spec CDAEXP Addendum 2

3 boundary. Fence modifications shall be in accordance with airport requirements to maintain a secure perimeter around the airport property. These modifications shall be included as a line item in the Bid Schedule I. For site I-19 and I-20, Drilling Contractor will be responsible for installing a locking gate in the existing fence. The cost for these two gates this gate should be included as part of the bid price for mobilization. 10. Technical Specifications Section 1.25: Order of Operations, Page G-16 should be changed to read as follows: The purpose of this section is to describe the drilling program as illustrated in the attached schedule (Appendix C). Work shall proceed in a continuous back-to-back fashion, beginning at Well I-20 through well completion, then continuing at Well I-21, followed by Well I-19. Alternative Schedules resulting in increased efficiency, reduction in noise/light disturbance, etc. will be accepted for review. General procedures for the pilot hole drilling and completion of each well are outlined as follows. Detailed procedures for pilot hole drilling and completion of each well are included in Section 2.0 Technical Provisions. Each well shall be constructed in accordance with the American Water Works Association Standards for Water Wells (AWWA A100-06, latest version) except as modified herein to fit the needs of the expected conditions. Strike Subsections A through GG from this Section. 11. Revision to Section 2.03 B: Installation of Conductor Casing and Cement Seal The sanitary seal shall be installed by pressure grouting tremie pipe (Appendix A, Figure 9) in the annular space between the borehole and the conductor casing. 12. Revision to the Technical Specifications Section 2.07: Aquifer Zone Testing, Page G-24 Any reference to Title 22 in this Section shall instead refer to Appendix E: Parameters for Water Quality Analyses. (per Attachment B of this Addendum) 13. Revision to the Technical Specifications Section 2.07 K: Aquifer Zone Testing, Page G-26 Chino Basin Desalter Authority 3 Spec CDAEXP Addendum 2

4 The cost of all water quality analyses associated with the zone testing shall include a 72- hr rush. These costs shall be borne by the Contractor and shall be included in the bid price. 14. Revision to the Technical Specifications Section 2.07 N: Aquifer Zone Testing, Page G-26 At the end of aquifer zone testing, the pilot hole shall be back-filled with pea gravel to 50 feet below ground surface. 15. Technical Specifications Section 2.08, Sealing Pilot Borehole, Page G-26 should be changed to read as follows: After the completion of aquifer zone testing, the pilot bore shall be back-filled with pea gravel to 50 feet below ground surface. A 10-ft bentonite cap shall be placed on top of the pea gravel to form a temporary seal to protect the borehole while pilot hole drilling takes place at the other well sites and while waiting for results from Title 22 water quality analyses from zone testing. A steel cover shall be welded to the conductor casing to protect from any fluids or foreign objects entering the borehole while waiting for final approved well design. Chino Basin Desalter Authority 4 Spec CDAEXP Addendum 2

5 Attachment A (Revision to Appendix C: Proposed Schedule)

6 Estimated Schedule for Proposed CDA Well I-20 Drilling, Construction, Development and Testing October 2011 Well I-20 SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY Conductor Casing /7 Pilot Hole / Reaming /7 Aquifer zone testing Re-mobilize to next site 24/7 Construction November /7 Well development SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY 24/7 Well testing Well Completion Stand-by Time Well design Work on-going at other site Holiday - No work December 2011 SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY * 6* 7* * Drilling Rig to Remob after initial development by airlifting & swabbing January 2012 SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY

7 Estimated Schedule for Proposed CDA Well I-21 Drilling, Construction, Development and Testing October 2011 Well I-21 SUNDAY MONDAY TUESDAY WEDNESDAYTHURSDAY FRIDAY SATURDAY Conductor Casing /7 Pilot Hole / Reaming /7 Aquifer zone testing Re-mobilize to next site 24/7 Construction November /7 Well development SUNDAY MONDAY TUESDAY WEDNESDAYTHURSDAY FRIDAY SATURDAY 24/7 Well testing Well Completion Work on-going at other site Holiday - No work Standby Time Propose/Approve well design December 2011 SUNDAY MONDAY TUESDAY WEDNESDAYTHURSDAY FRIDAY SATURDAY January 2012 SUNDAY MONDAY TUESDAY WEDNESDAYTHURSDAY FRIDAY SATURDAY * Drilling Rig to Remob after initial * development by airlifting & swabbing 22* 23*

8 Estimated Schedule for Proposed CDA Well I-19 Drilling, Construction, Development and Testing October 2011 Well I-19 SUNDAY MONDAY TUESDAY WEDNESDAYTHURSDAY FRIDAY SATURDAY Conductor Casing /7 Pilot Hole / Reaming /7 Aquifer zone testing Re-mobilize to next site 24/7 Construction November /7 Well development SUNDAY MONDAY TUESDAY WEDNESDAYTHURSDAY FRIDAY SATURDAY 24/7 Well testing Well Completion Work on-going at other site Holiday - No work Standby Time Propose/Approve well design December 2011 SUNDAY MONDAY TUESDAY WEDNESDAYTHURSDAY FRIDAY SATURDAY January 2012 SUNDAY MONDAY TUESDAY WEDNESDAYTHURSDAY FRIDAY SATURDAY

9 Estimated Schedule for Proposed CDA Well I-19 Drilling, Construction, Development and Testing Well I-19 February 2012 SUNDAY MONDAY TUESDAY WEDNESDAYTHURSDAY FRIDAY SATURDAY Conductor Casing /7 Pilot Hole / Reaming /7 Aquifer zone testing Re-mobilize to next site 24/7 Construction March /7 Well development SUNDAY MONDAY TUESDAY WEDNESDAYTHURSDAY FRIDAY SATURDAY 24/7 Well testing Well Completion Work on-going at other site Holiday - No work Standby Time Propose/Approve well design

10 Attachment B (Revision to Appendix E: Parameters for Water Quality Analyses)

11 Constituent Required Water Quality Analyses Units Detection Limit Zone Testing Completed Well General Physical Properties Color Color unit 3 * * Odor Odor unit 1 * * Turbidity NTU * * MBAS mg/l * * General Minerals Total Hardness mg/l 3 * * Calcium mg/l 1 * * Magnesium mg/l 1 * * Sodium mg/l 1 * * Potassium mg/l 1 * * Total Alkalinity, as CaCO 3 mg/l 3 * * Hydroxide mg/l 3 * * Carbonate mg/l 3 * * Bicarbonate mg/l 3 * * Sulfate mg/l 0.5 * * Chloride mg/l 1 * * ph ph unit 1 * * Iron μg/l 20.0 * * Zinc μg/l 10.0 * * Manganese μg/l 10.0 * * Copper μg/l 10.0 * * Specific Conductance umhos/cm 3 1 * * Total Dissolved Solids (TDS) mg/l 20 * * Aggressive Index - - * * Langlier Index - - * * Inorganic Chemicals Aluminum μg/l * Antimony μg/l 6.0 Arsenic μg/l 2.0 * Barium μg/l Beryllium μg/l 1.0 Cadmium μg/l 1.0 Chromium (Total) μg/l 1.0 * * Chromium, hexavalent (CrVI) μg/l 1.0 * * Cyanide mg/l 0.1 * Fluoride mg/l 0.1 * * Lead μg/l 5.0 * Mercury μg/l 1.0 * Nickel μg/l 10.0 * Nitrate, as NO 3 mg/l 1.0 * * Nitrate, as N mg/l 0.2 * * Nitrite, as N mg/l 0.1 * * * * * * * * Page 1 of 2

12 Constituent Required Water Quality Analyses Units Detection Limit Zone Testing Completed Well Perchlorate (EPA 314.0) μg/l 4.0 * * Selenium μg/l 5.0 * Silver μg/l 10.0 * Thallium μg/l 1.0 * EPA Organic Methods Volatiles (EPA 524.2) - includes MTBE μg/l various * * EDB and DBCP (EPA 504.1) μg/l various * * Nitrogen & Phosphorus Pesticides (EPA 507) μg/l various * * Chlorinated Pesticides & PCB s as DCP (EPA 508) μg/l various * * Chlorinated Acid Herbicides (EPA 515.3) μg/l various * * DEHP, DEHA, Benzo(EPA a)pyrene (EPA 525.2) μg/l various * * Carbamates (EPA 531.1) μg/l various * * Glyphosate (EPA 547) μg/l 25.0 * * Endothall (EPA 548.1) μg/l 45.0 * * Diquat (EPA 549.1) μg/l 4.0 * * Dioxin (2,3,7,8 TCDD) (EPA 1613) μg/l * * Unregulated Contaminant Monitoring Rule (State and Federal) not Covered Under EPA Organic Methods Vanadium μg/l 3.0 * * Boron μg/l * * 1,2,3-Trichloropropane (1,2,3-TCP) μg/l * * Additional Analysis Radioactivity (Gross Alpha and Gross Beta) pci/l 5 3 * Radon pci/l 10 * Asbestos MFL * Silica (Total) mg/l 1.0 * * 1 nephelometric turbidity units 2 milligrams per liter 3 micromhos per centimeter 4 micrograms per liter 5 picocuries per liter 6 million fibers per liter Page 2 of 2

13 Attachment C (Revision to Bid Tables I, II and III)

14 Item No. BID SCHEDULE I Drilling, Construction, Development, and Testing of Chino Basin Desalter Authority Production Well I-19 Total Item Price in Description Qty Unit Unit Price in Words Numbers per Well 101 Mobilization, demobilization, site clean up and restoration. 1 Site dollars per site 102 Provide Noise Control Measures, as specified. 1 Site dollars per site 103 Testing and disposal of drill cuttings from pilot and conductor boreholes, if required. 1 Site dollars per site 104 NPDES compliance including waste water treatment and water quality sampling. 1 Site dollars per site 105 Drill 48 inch diameter borehole to 50 feet; furnish and install 36 inch by 3/8 inch mild steel conductor casing. Cement into place. 52 feet 106 Drill minimum 17.5 inch diameter pilot hole from 50 to 600 feet. 550 feet 107 Provide Geophysical Borehole Logging, as specified. 1 set dollars per set 108 Install seals, gravel envelope and tools for isolated aquifer zone testing (up to 3 zones). 3 Zones dollars per zone 109 Airlift and pump isolated zones (Est. 20 hours per zone). 60 hrs dollars per sample hr Rush Water Quality Analyses of Zone Testing Water Samples for Selected Constituents outlined in Appendix E of the Technical Specifications (1 sample set/ zone). 3 Samples dollars per sample SDPUB\SAKINS\ C-2 Bidding Documents

15 Item No. BID SCHEDULE I Drilling, Construction, Development, and Testing of Chino Basin Desalter Authority Production Well I-19 Total Item Price in Description Qty Unit Unit Price in Words Numbers per Well 111 Ream pilot borehole to 30 inch diameter ( ft). 75 ft 112 Ream pilot borehole to 26 inch diameter ( ft). 245 ft 113 Provide Caliper Survey of reamed borehole Furnish and install 16-inch ID x inch 304L stainless steel blank casing (+3-70 ft; ft). 93 ft Furnish and install 16-inch ID x inch 304L stainless steel blank casing with factory-installed 3-in x 3-in x 2-ft sounding tube connection port (20 ft; ft 90 ft). Furnish and install 16-inch ID x inch 304L stainless steel blank casing with factory-installed 4-inch x 4-inch x 8-ft camera tube connection port (20 ft; ft). 20 ft 117 Furnish and install 16-inch ID x inch 304L stainless steel louvered full flu casing ( ft; ft). 200 ft 118 Furnish and install 16-inch ID x inch 304L stainless steel casing with end cap ( ft). 20 ft 119 Furnish and install 2-inch (schedule 40) 304L stainless steel sounding tube (+3-78 ft). 81 ft 120 Furnish and install 4-inch diameter 304L stainless steel camera port sounding tube (+3-92 ft). 95 ft SDPUB\SAKINS\ C-3 Bidding Documents

16 Item No. BID SCHEDULE I Drilling, Construction, Development, and Testing of Chino Basin Desalter Authority Production Well I-19 Total Item Price in Description Qty Unit Unit Price in Words Numbers per Well 121 Furnish and install two 3-inch diameter mild steel gravel feed tubes ( ft) x ft 122 Furnish and install filter pack and 5-ft fine sand layer ( ft, ft). 255 ft 123 Furnish and install inner bentonite grout seal (15 ft /well) ( ft). 20 ft 124 Furnish and install annular cement seal (0-100 ft), as specified. 100 ft 125 Develop and clean well by airlifting and dual-swabbing. 60 hrs dollars per hour 126 Furnish, install and remove development/test pump. 127 Provide well development by pumping and surging with turbine pump, as specified. 60 hrs dollars per hour 128 Provide pumping tests for yield and drawdown, as specified. 40 hrs dollars per hour 129 Provide static and dynamic spinner surveys. 130 Provide plumbness and alignment gyroscopic deviation survey. SDPUB\SAKINS\ C-4 Bidding Documents

17 Item No. BID SCHEDULE I Drilling, Construction, Development, and Testing of Chino Basin Desalter Authority Production Well I-19 Total Item Price in Description Qty Unit Unit Price in Words Numbers per Well 131 Title 22 Water Quality Analyses. 132 Well disinfection, well head completion and capping. 133 Provide dual-cam video survey on DVD. 134 TCE Treatment by liquid phase GAC filtration $ '100, Abandonment of pilot hole in accordance with county standards, if required. One-hundred-thousand Modification and extension of existing 136 chain link fence to maintain airport security. CHINO BASIN DESALTER AUTHORITY PRODUCTION WELL TOTAL BASE BID PRICE IN WORDS FOR WELL I-19 (ITEMS ): The above prices include any amount payable to The District for taxes by reason of this Contract. (1) Quantities, when called out, are estimated and are for the purpose of comparing Bids only. Payment will be based upon actual quantities furnished, installed or constructed in accordance with Contract Documents. (2) For Payment purposes, Bid Items 101, 201 and 301 will be split 75% for mobilization and 25% for demobilization, site clean-up and restoration. If the sum of Bid Items 101, 201 and 301 exceeds 5% of the total Bid, this may be grounds for rejection of the bid as non-responsive. SDPUB\SAKINS\ C-5 Bidding Documents

18 Item No. BID SCHEDULE II Drilling, Construction, Development, and Testing of Chino Basin Desalter Authority Production Well I-20 Total Item Price in Description Qty Unit Unit Price in Words Numbers per Well 201 Mobilization, demobilization, site clean up and restoration. 1 Site dollars per site 202 Provide Noise Control Measures, as specified. 1 Site dollars per site 203 Testing and disposal of drill cuttings from pilot and conductor boreholes, if required. 1 Site dollars per site 204 NPDES compliance including waste water treatment and water quality sampling. 1 Site dollars per site 205 Drill 48 inch diameter borehole to 50 feet; furnish and install 36 inch by 3/8 inch mild steel conductor casing. Cement into place. 52 feet 206 Drill minimum 17.5 inch diameter pilot 550 feet hole from 50 to 600 feet. 207 Provide Geophysical Borehole Logging, as specified. 1 set dollars per set 208 Install seals, gravel envelope and tools for isolated aquifer zone testing (up to 3 zones). 3 Zones dollars per zone 209 Airlift and pump isolated zones (Est. 20 hours per zone). 60 hrs dollars per sample hr Rush Water Quality Analyses of Zone Testing Water Samples for Selected Constituents outlined in Appendix E of the Technical Specifications (1 sample set/ zone). 3 Samples dollars per sample SDPUB\SAKINS\ C-6 Bidding Documents

19 Item No. BID SCHEDULE II Drilling, Construction, Development, and Testing of Chino Basin Desalter Authority Production Well I-20 Total Item Price in Description Qty Unit Unit Price in Words Numbers per Well 211 Ream pilot borehole to 30 inch diameter ( ft). 75 ft 212 Ream pilot borehole to 26 inch diameter ( ft). 245 ft 213 Provide Caliper Survey of reamed borehole Furnish and install 16-inch ID x inch 304L stainless steel blank casing (+3-70 ft; ft). Furnish and install 16-inch ID x inch 304L stainless steel blank casing with factory-installed 3-in x 3-in x 2-ft sounding tube connection port (20 ft; ft). 93 ft 20 ft Furnish and install 16-inch ID x inch 304L stainless steel blank casing 216 with factory-installed 4-inch x 4-inch x 8-20 ft ft camera tube connection port (20 ft; ft). 217 Furnish and install 16-inch ID x inch 304L stainless steel louvered full flu casing ( ft; ft). 200 ft 218 Furnish and install 16-inch ID x inch 304L stainless steel casing with end cap ( ft). 20 ft 219 Furnish and install 2-inch (schedule 40) 304L stainless steel sounding tube (+3-78 ft). 81 ft 220 Furnish and install 4-inch diameter 304L stainless steel camera port sounding tube (+3-92 ft). 95 ft SDPUB\SAKINS\ C-7 Bidding Documents

20 Item No. BID SCHEDULE II Drilling, Construction, Development, and Testing of Chino Basin Desalter Authority Production Well I-20 Total Item Price in Description Qty Unit Unit Price in Words Numbers per Well 221 Furnish and install two 3-inch diameter mild steel gravel feed tubes ( ft) x ft 222 Furnish and install filter pack and 5-ft fine sand layer ( ft, ft). 255 ft 223 Furnish and install inner bentonite grout seal (15 ft /well) ( ft). 20 ft 224 Furnish and install annular cement seal (0-100 ft), as specified. 100 ft 225 Develop and clean well by airlifting and dual-swabbing. 60 hrs dollars per hour 226 Furnish, install and remove development/test pump. 227 Provide well development by pumping and surging with turbine pump, as specified. 60 hrs dollars per hour 228 Provide pumping tests for yield and drawdown, as specified. 40 hrs dollars per hour 229 Provide static and dynamic spinner surveys. 230 Provide plumbness and alignment gyroscopic deviation survey. SDPUB\SAKINS\ C-8 Bidding Documents

21 Item No. BID SCHEDULE II Drilling, Construction, Development, and Testing of Chino Basin Desalter Authority Production Well I-20 Total Item Price in Description Qty Unit Unit Price in Words Numbers per Well 231 Title 22 Water Quality Analyses. 232 Well disinfection, well head completion and capping. 233 Provide dual-cam video survey on DVD. 234 TCE Treatment by liquid phase GAC filtration $ '100,000 One-hundred-thousand 235 Abandonment of pilot hole in accordance with county standards, if required. CHINO BASIN DESALTER AUTHORITY PRODUCTION WELL TOTAL BASE BID PRICE IN WORDS FOR WELL I-20 (ITEMS ): The above prices include any amount payable to The District for taxes by reason of this Contract. (1) Quantities, when called out, are estimated and are for the purpose of comparing Bids only. Payment will be based upon actual quantities furnished, installed or constructed in accordance with Contract Documents. (2) For Payment purposes, Bid Items 101, 201 and 301 will be split 75% for mobilization and 25% for demobilization, site clean-up and restoration. If the sum of Bid Items 101, 201 and 301 exceeds 5% of the total Bid, this may be grounds for rejection of the bid as non-responsive. SDPUB\SAKINS\ C-9 Bidding Documents

22 Item No. BID SCHEDULE III Drilling, Construction, Development, and Testing of Chino Basin Desalter Authority Production Well I-21 Total Item Price in Description Qty Unit Unit Price in Words Numbers per Well 301 Mobilization, demobilization, site clean up and restoration. 1 Site dollars per site 302 Provide Noise Control Measures, as specified. 1 Site dollars per site 303 Testing and disposal of drill cuttings from pilot and conductor boreholes, if required. 1 Site dollars per site 304 NPDES compliance including waste water treatment and water quality sampling. 1 Site dollars per site 305 Drill 48 inch diameter borehole to 50 feet; furnish and install 36 inch by 3/8 inch mild steel conductor casing. Cement into place. 52 feet 306 Drill minimum 17.5 inch diameter pilot 550 feet hole from 50 to 600 feet. 307 Provide Geophysical Borehole Logging, as specified. 1 set dollars per set 308 Install seals, gravel envelope and tools for isolated aquifer zone testing (up to 3 zones). 3 Zones dollars per zone 309 Airlift and pump isolated zones (Est. 20 hours per zone). 60 hrs dollars per sample hr Rush Water Quality Analyses of Zone Testing Water Samples for Selected Constituents outlined in Appendix E of the Technical Specifications (1 sample set/ zone). 3 Samples dollars per sample SDPUB\SAKINS\ C-10 Bidding Documents

23 Item No. BID SCHEDULE III Drilling, Construction, Development, and Testing of Chino Basin Desalter Authority Production Well I-21 Total Item Price in Description Qty Unit Unit Price in Words Numbers per Well 311 Ream pilot borehole to 30 inch diameter ( ft). 75 ft 312 Ream pilot borehole to 26 inch diameter ( ft). 245 ft 313 Provide Caliper Survey of reamed borehole Furnish and install 16-inch ID x inch 304L stainless steel blank casing (+3-70 ft; ft). Furnish and install 16-inch ID x inch 304L stainless steel blank casing with factory-installed 3-in x 3-in x 2-ft sounding tube connection port (20 ft; ft). 93 ft 20 ft Furnish and install 16-inch ID x inch 304L stainless steel blank casing 316 with factory-installed 4-inch x 4-inch x 8-20 ft ft camera tube connection port (20 ft; ft). 317 Furnish and install 16-inch ID x inch 304L stainless steel louvered full flu casing ( ft; ft). 200 ft 318 Furnish and install 16-inch ID x inch 304L stainless steel casing with end cap ( ft). 20 ft 319 Furnish and install 2-inch (schedule 40) 304L stainless steel sounding tube (+3-78 ft). 81 ft 320 Furnish and install 4-inch diameter 304L stainless steel camera port sounding tube (+3-92 ft). 95 ft SDPUB\SAKINS\ C-11 Bidding Documents

24 Item No. BID SCHEDULE III Drilling, Construction, Development, and Testing of Chino Basin Desalter Authority Production Well I-21 Total Item Price in Description Qty Unit Unit Price in Words Numbers per Well 321 Furnish and install two 3-inch diameter mild steel gravel feed tubes ( ft) x ft 322 Furnish and install filter pack and 5-ft fine sand layer ( ft, ft). 255 ft 323 Furnish and install inner bentonite grout seal (15 ft /well) ( ft). 20 ft 324 Furnish and install annular cement seal (0-100 ft), as specified. 100 ft 325 Develop and clean well by airlifting and dual-swabbing. 60 hrs dollars per hour 326 Furnish, install and remove development/test pump. 327 Provide well development by pumping and surging with turbine pump, as specified. 60 hrs dollars per hour 328 Provide pumping tests for yield and drawdown, as specified. 40 hrs dollars per hour 329 Provide static and dynamic spinner surveys. 330 Provide plumbness and alignment gyroscopic deviation survey. SDPUB\SAKINS\ C-12 Bidding Documents

25 Item No. BID SCHEDULE III Drilling, Construction, Development, and Testing of Chino Basin Desalter Authority Production Well I-21 Total Item Price in Description Qty Unit Unit Price in Words Numbers per Well 331 Title 22 Water Quality Analyses. 332 Well disinfection, well head completion and capping. 333 Provide dual-cam video survey on DVD. 334 TCE Treatment by liquid phase GAC filtration $ '100,000 One-hundred-thousand 335 Abandonment of pilot hole in accordance with county standards, if required. CHINO BASIN DESALTER AUTHORITY PRODUCTION WELL TOTAL BASE BID PRICE IN WORDS FOR WELL I-21 (ITEMS ): The above prices include any amount payable to The District for taxes by reason of this Contract. (1) Quantities, when called out, are estimated and are for the purpose of comparing Bids only. Payment will be based upon actual quantities furnished, installed or constructed in accordance with Contract Documents. (2) For Payment purposes, Bid Items 101, 201 and 301 will be split 75% for mobilization and 25% for demobilization, site clean-up and restoration. If the sum of Bid Items 101, 201 and 301 exceeds 5% of the total Bid, this may be grounds for rejection of the bid as non-responsive. SDPUB\SAKINS\ C-13 Bidding Documents