1 DRAFT Green Lake Subwatershed Retrofit Analysis For Areas Draining Directly to the Lake Prepared by: Isanti Soil and Water Conservation District
2 DRAFT June 12, 2014
3 4 Executive Summary Map of stormwater catchments referred to in this report. GL-9 GL-10 GL-8 GL-11 GL-7 Green Lake GL-1 GL-6 GL-5 GL-4 GL-3 GL-2 Isanti County Catchments Flow paths Miles E
4 Executive Summary 5 Executive Summary This study provides recommendations for cost effectively improving treatment of stormwater from areas draining to Green Lake, which is located within Wyanett Township of Isanti County, Minnesota. The 866 acre lake has been designated as impaired for not meeting state water quality standards for nutrient eutrophication excess phosphorus. The lakeshore is heavily developed, but the larger watershed is a mixture of rural residential, agricultural, and open space. The lakeshore homeowners have formed a lake improvement district to organize and fund aquatic invasive species treatment and water quality improvement efforts. This report identifies projects that would reduce pollutant loading to the lake from the areas immediately around the lakeshore that drain to the lake, and ranks those projects by cost effectiveness at phosphorus reduction. This stormwater analysis focuses on stormwater retrofitting. Stormwater retrofitting refers to adding stormwater treatment to an already built up area, where little open land exists. This process is investigative and creative. While stormwater conveyances (curbs, gutters, pipes) are largely absent around Green Lake overland channel flow and practices at the water s edge, do deliver pollutants to the lake. Stormwater treatment is largely absent around Green Lake, but the lack of curb and gutter systems means water flows to the lake across sandy soils which provide infiltration in many areas. Stormwater retrofitting success is sometimes improperly judged by the number of projects installed or by comparing costs alone. Those approaches neglect to consider how much pollution is removed per dollar spent. In this stormwater analysis we estimated both costs and pollutant reductions and used them to calculate cost effectiveness of each possible project. Areas that drain to Green Lake were delineated using available GIS subwatershed information. Those areas were then divided into 11 smaller stormwater drainage areas, or catchments. For each catchment, modeling of stormwater volume and pollutants was completed using the software WinSLAMM. Base and existing conditions were modeled, including existing stormwater treatment practices. The total subwatershed analyzed for this project consisted of 489 acres. These areas contribute an estimated 40.5 acre feet of runoff, 60 pounds of phosphorus, and 15,051 pounds of total suspended solids each year. Lakeshore erosion contributes an estimated additional 24.4 pounds of phosphorus and 137,057 pounds of total suspended solids. Potential stormwater retrofits were identified using GIS tools and field investigation. Green Lake Improvement District members identified some of the projects and gave agency staff a tour of these. Concept designs for a variety of projects at each site were developed and modeled to estimate reductions in volume, total phosphorus, and total suspended solids. Finally, cost estimates were developed for each project, including 30 years of operations and maintenance. Projects were ranked by cost effectiveness with respect to their reduction of total phosphorus. A variety of stormwater retrofit approaches were identified. They included: Residential curb cut rain gardens, DRAFT Green Lake Subwatershed Retrofit Analysis
5 6 Executive Summary Diverting water to swales, Land purchase for protection from further development, Permeable pavement, Trench grate sediment traps, Hydrodynamic separators, and Lakeshore restorations. If all of these practices were installed, significant pollution reduction could be accomplished over 25 pounds of phosphorus. This would be a 30% reduction of the phosphorus from the study area. However, funding limitations and landowner interest makes this goal unlikely. Instead, it is recommended that projects be installed in order of cost effectiveness (pounds of pollution reduced per dollar spent). Other factors, including a project s educational value/visibility, construction timing, total cost, or non target pollutant reduction also affect project installation decisions and will need to be weighed by resource managers when selecting projects to pursue. This report provides conceptual sketches or photos of recommended stormwater retrofitting projects. The intent is to provide an understanding of the approach. If a project is selected, site specific designs must be prepared. In addition, many of the proposed retrofits may require engineered plan sets. This typically occurs after committed partnerships are formed to install the project. Committed partnerships must include willing landowners when installed on private property. The tables on the next pages summarize potential projects. Potential projects are organized from most cost effective to least. Reported treatment levels are dependent upon optimal site selection and sizing. More detail about each project can be found in the remainder of this report. The approaches in this report are consistent with the Green Lake Improvement District Management Plan for Portions of that plan that are at least partially accomplished by this study include producing a survey of shoreline conditions to prioritize need for restoration, providing information about rain gardens and prioritizing placement, and moving closer to shovel ready projects for water quality improvement. While this study covered only areas draining directly to the lake due to funding limitations, a similar study of the remainder of the watershed should be done so that all projects for the lake can be judged relative to each other s cost effectiveness.
6 Executive Summary 7 Summary of preferred stormwater retrofit opportunities ranked by cost effectiveness with respect to total suspended phosphorus solids (TP) (TSS) reduction. Volume and total suspended solids (TSS) reductions are also shown. For more information on each project refer to the catchment profile pages in this report. Project Rank Catchment ID Retrofit Type (refer to catchment profile pages for additional detail) Projects Identified TP Reduction (lb/yr) TSS Reduction (lb/yr) Volume Reduction (ac ft/yr) Total Project Cost Estimated Annual Operations & Maintenance (2014 Dollars) Estimated cost/ 1,000lb TSS (30 year) Estimated cost/ lb TP (30 year) 1 GL 9 Rain gardens Feldspar St $29,550 $450 $7,715 $2,050 2 GL 1 Swale public boat parking $15,541 $100 $4,612 $2,060 3 GL 9 Grass swale at bottom of Feldspar St (road not paved) $22,472 $840 $8,149 $2,648 4 GL 3 Land protection 62 acres $611,910 $6,000 $9,648 $2,966 5 Lakeshore Lakeshore restoration All 95 Candidate Sites , $437,770 $21,375 $262 $3,352 6 Lakeshore Lakeshore restoration 15 High Priority Sites , $70,129 $3,375 $274 $3,505 7 GL 9 Permeable asphalt 20% of Fedlspar St $59,334 $1,000 $13,414 $4,254 8 GL 7 Diversion to swale Rhinestone St $11,509 $100 $18,601 $4,836 9 GL 1 Permeable asphalt 20% public boat parking $61,884 $1,200 $10,293 $5, GL 9 Trench grate sediment traps Feldspar St $35,415 $1,000 $34,591 $5, GL 9 Hydrodynamic device Feldspar St Land 0.0 $41,014 $1,500 $75,451 $7,168 Further examination needed 12 GL 10 Settling pond North Branch Creek 1 undetermined Considered but excluded 13 GL 4 Swale 330th Avenue $8,278 $450 no benefit no benefit Notes/Description lake, install 2 rain gardens. Redirect boat landing runoff into the lakeshore swale. A grass swale at the water's edge of Feldspar St, which currently runs into the lake. Purchase fee title or an easement for property on SW side of the lake, currently for sale. Restore all candidate lakeshore restoration sites, or some lesser amount. Offers habitat benefits in addition to water quality. Restore the 15 candidate lakeshores where active erosion and concentrated flow occur. lake, including 20% permeable pavement. Divert street runoff to roadside swale. Some diversion already occurs due to road crowning. Install permeable asphalt on 20% of public boat landing parking. lake, including trench grate sediment traps. lake, including commercial hydrodynamic separator. Would treat runoff from a greater area than the scope of this study. Swale on undeveloped lot at saddle in road. Modeling found no benefit. DRAFT Green Lake Subwatershed Retrofit Analysis
7 8 Executive Summary Potential Water Quality Improvement Projects Flow paths Potential Project Locations Lakeshore Restoration Candidates Good candidate Highest priority Feldspar Rd - various BMPS North Br settling pond Swale- Rhinestone St Pub access swale/perm pave Green Lake Meyer property purchase Isanti County Miles E
Green Lake Subwatershed Retrofit Analysis For Areas Draining Directly to the Lake
Green Lake Subwatershed Retrofit Analysis For Areas Draining Directly to the Lake Prepared by: Isanti Soil and Water Conservation District in partnership with the Metro Conservation Districts Funding provided
More informationBlue Lake Stormwater Retrofit Analysis
P a g e 1 Blue Lake Stormwater Retrofit Analysis Prepared by: Isanti Soil and Water Conservation District And Sherburne Soil and Water Conservation District P a g e 4 Executive Summary Blue Lake and its
More informationSkogman Fannie Elms Florence Lakes Chain Stormwater Retrofit Analysis
Skogman Fannie Elms Florence Lakes Chain Stormwater Retrofit Analysis Prepared for the ISANTI COUNTY SOIL AND WATER CONSERVATION DISTRICT By Funding provided in part by the Clean Water Fund of the Clean
More informationCARNELIAN-MARINE- ST. CROIX WATERSHED DISTRICT COST SHARE PROGRAM 2013 ANNUAL REPORT PREPARED BY: WASHINGTON CONSERVATION DISTRICT
CARNELIAN-MARINE- ST. CROIX WATERSHED DISTRICT COST SHARE PROGRAM 2013 ANNUAL REPORT PREPARED BY: WASHINGTON CONSERVATION DISTRICT - 2 - - The Carnelian-Marine-St. Croix Watershed District ( District )
More informationArdmore Area Subwatershed Stormwater Retrofit Assessment
Ardmore Area Subwatershed Stormwater Retrofit Assessment Hennepin County Public Works Environment and Energy Prepared by Hakanson Anderson and Hennepin County Department of Environment and Energy with
More informationSouth Bald Eagle Lake Subwatershed: Urban Stormwater Retrofit Analysis
South Bald Eagle Lake Subwatershed: Urban Stormwater Retrofit Analysis Prepared for Rice Creek Watershed District by: Ramsey Conservation District, June 2016 South Prepared for RCWD by: Andrea Prichard,
More informationThe Town of Chester Stormwater Mapping Report
The Town of Chester Stormwater Mapping Report Prepared by the Warren County Soil & Water Conservation District December 2013 Table of Contents Introduction and Location 3 Stormwater Runoff 3 Assessment
More informationCity of Fairmont Storm Water Pollution Prevention Plan Annual Public Meeting. June 11, 2018
City of Fairmont Storm Water Pollution Prevention Plan Annual Public Meeting June 11, 2018 Why is Water Quality Important? Water has always been important to Minnesota and is a key part of our history,
More informationBig Creek Watershed Retrofit Ranking Project
Big Creek Watershed Retrofit Ranking Project John Stein and Jennifer Olson Tetra Tech, Inc. Bob Gardin, FOBC Innovative Stormwater Conveyance Through Green Infrastructure May 13, 2014 Presentation Outline
More informationGem Lake Stormwater Retrofit Assessment
Gem Lake Stormwater Retrofit Assessment Prepared by: RAMSEY CONSERVATION DISTRICT With assistance from: METRO CONSERVATION DISTRICTS for the VADNAIS LAKE AREA WATERSHED MANAGEMENT ORGANIZATION and CITY
More informationMN Water Resources Conference October 16, Eric Macbeth, Tom Colbert, Russ Matthys, Gregg Thompson, Jessie Koehle
Paying Fair Share for Runoff Impacts: Tailoring Stormwater Utility Fees in Eagan, MN MN Water Resources Conference October 16, 2012 Eric Macbeth, Tom Colbert, Russ Matthys, Gregg Thompson, Jessie Koehle
More informationINDIAN CREEK WATERSHED PLAN EXECUTIVE SUMMARY
INDIAN CREEK WATERSHED PLAN EXECUTIVE SUMMARY The Indian Creek Watershed covers a 38 square mile area in southern Lake County, Illinois that drains 24,116 acres before discharging into the Des Plaines
More informationStevenson Creek Watershed Plan and Project Implementation
Stevenson Creek Watershed Plan and Project Implementation 1999-2007 Stevenson Creek Watershed Management Plan (WMP) Project Site The Watershed Management Plan was completed in 2001 with cooperative funding
More informationComfort Lake-Forest Lake Watershed District Six Lakes Total Maximum Daily Load Implementation Plan
Prepared by: for the Comfort Lake-Forest Lake Watershed District and the Minnesota Pollution Control Agency Comfort Lake-Forest Lake Watershed District Six Lakes Total Maximum Daily Load February 16, 2010
More informationThe Use of WinSLAMM in the Selection, Design and Placement of Stormwater BMPs. Stephen J. Souza, Ph.D. Jacob E. Helminiak, P.E. Princeton Hydro, LLC
The Use of WinSLAMM in the Selection, Design and Placement of Stormwater BMPs Stephen J. Souza, Ph.D. Jacob E. Helminiak, P.E. Princeton Hydro, LLC 1108 Old York Rd., Ringoes, NJ 08551 908.237.5660 The
More informationMeeting the Chesapeake Bay TMDL
Meeting the Chesapeake Bay TMDL Local Stormwater Perspective Presented by Rob Hopper, PE Developed with Mike Morgan, PE September 14, 2015 Chesapeake Bay TMDL Local Stormwater Perspective Virginia Stormwater
More informationCity of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017
City of Fairmont Storm Water Pollution Prevention Plan (SWPPP) January 23, 2017 Why is Water Quality Important? Water has always been important to Minnesota and is a key part of our history, culture, economy
More informationClean Water Optimization Tool Case Study: Queen Anne s County
Clean Water Optimization Tool Case Study: Queen Anne s County Through a grant from the Town Creek Foundation, the Center for Watershed Protection created a userfriendly and simple Clean Water Optimization
More informationCOON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432
PAN 16-112, Westwood Middle School, Page 1 of 6 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: August 22, 2016 AGENDA NUMBER: 10 FILE NUMBER: 16-112 ITEM: Westwood Middle School RECOMMENDATION:
More informationWELCOME. Eastern Subwatersheds Stormwater Management Retrofit Study. Online Information Session #2 June 15 to July 13, 2018
WELCOME Eastern Subwatersheds Stormwater Management Retrofit Study Online Information Session #2 June 15 to July 13, 2018 1 Eastern Subwatersheds Stormwater Management Retrofit Study This study is one
More informationCLEARWATER TOWNSHIP WATER QUALITY ACTION PLAN
CLEARWATER TOWNSHIP WATER QUALITY ACTION PLAN Elk-River-Chain-of-Lakes Gaps Analysis Project The Watershed Center Grand Traverse Bay Michigan Department of Environmental Quality July 2011 Purpose The Grand
More informationCOON CREEK WATERSHED DISTRICT PERMIT REVIEW
16-054 Woodland Creek Wetland Banking Restoration Project, Page 1 of 6 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: August 22, 2016 AGENDA NUMBER: 11 FILE NUMBER: 16-054 ITEM: Woodland Creek
More informationSusan, Ann, and Lucy Subwatershed: Stormwater Retrofit Assessment
Susan, Ann, and Lucy Subwatershed: Stormwater Retrofit Assessment Prepared by: With assistance from: THE METRO CONSERVATION DISTRICTS Table of Contents Executive Summary... 1 Background... 1 Summary of
More informationSTORMWATER MANAGEMENT DIVISION
STORMWATER MANAGEMENT DIVISION Western Branch Restoration Plan Public Meeting January 28, 2019 Welcome from Jerry Maldonado Purpose of Meeting Review why watershed restoration plans are needed in Prince
More informationTORCH LAKE TOWNSHIP WATER QUALITY ACTION PLAN
TORCH LAKE TOWNSHIP WATER QUALITY ACTION PLAN Elk-River-Chain-of-Lakes Gaps Analysis Project The Watershed Center Grand Traverse Bay Tip of the Mitt Watershed Council Michigan Department of Natural Resources
More informationBest Management Practices for Stormwater Quality Treatment in Urban Settings. Lower Mississippi River WMO September 2017
Best Management Practices for Stormwater Quality Treatment in Urban Settings Lower Mississippi River WMO September 2017 Stormwater 101 Impervious surfaces (pavement, parking lots, etc.): quickly produce
More informationVILLAGE OF BELLAIRE WATER QUALITY ACTION PLAN
VILLAGE OF BELLAIRE WATER QUALITY ACTION PLAN Elk-River-Chain-of-Lakes Gaps Analysis Project The Watershed Center Grand Traverse Bay Tip of the Mitt Watershed Council Michigan Department of Natural Resources
More informationGrand Traverse Bay Watershed Protection Plan:
Grand Traverse Bay Watershed Protection Plan: An Overview Sarah U Ren Program Director The Watershed Center 231-935-1514, suren@gtbay.org The Grand Traverse Bay Watershed 973 square miles Bay Volume =
More informationEXECUTIVE SUMMARY - REVISED
EXECUTIVE SUMMARY REVISED INTRODUCTION The purpose of the Town of Salem Storm Water Management Plan is to develop recommendations and implementation strategies for addressing drainage problems and minimizing
More informationWakefield Lake TMDL Public Meeting 3/17/2014. Jen Koehler, PE Barr Engineering
Wakefield Lake TMDL Public Meeting 3/17/2014 Jen Koehler, PE Barr Engineering Outline Project Contacts Introduction to Wakefield Lake Thoughts/Questions/Concerns About TMDL Studies Lake Water Quality and
More informationPrimer introduction to watershed management Plan Process highlight the major steps of plan development Project types look at some examples of common
1 Primer introduction to watershed management Plan Process highlight the major steps of plan development Project types look at some examples of common projects Plan Organization how to read the plan Next
More informationStormwater Retrofitting for Nutrient Reduction
Stormwater Retrofitting for Nutrient Reduction otos: Chesapeake Bay Program Welcome to the Webcast To Ask a Question Submit your question in the chat box located to the left of the slides. We will answer
More informationNutrient Management in. A presentation to the West Metro Water Alliance
Nutrient Management in Developing and Agricultural Areas A presentation to the West Metro Water Alliance Chris Meehan, P.E. May 25, 2011 Agenda Physical Improvements Planning Improvements How to get it
More informationStormwater Bio-Infiltration Pilot Project Concept Proposal Submitted by
Concept Proposal Submitted by Public Works Department 1947 Center Street, Fourth Floor Berkeley, CA 94704 December 17, 2009 Executive Summary The s Public Works Department submits this concept proposal
More informationCROSBY BROOK RESTORATION STUDY BRATTLEBORO, VT
Key Stakeholders: CROSBY BROOK RESTORATION STUDY BRATTLEBORO, VT Funded By: VT Dept. of Environmental Conservation VT Agency of Transportation (VTrans) Town of Brattleboro NEWEA Spring Meeting Omni Mt.
More informationClean Water Optimization Tool Case Study: Kent County
Clean Water Optimization Tool Case Study: Kent County Through a grant from the Town Creek Foundation, the Center for Watershed Protection created a userfriendly and simple Clean Water Optimization Tool
More informationAnacostia River Watershed Restoration Plan. Paint Branch Subwatershed Provisional Restoration Project Inventory
Anacostia River Watershed Restoration Plan Paint Branch Subwatershed Provisional Restoration Project Inventory November 2009 Table of Contents I. Background... 2 II. Restoration Inventory... 3 A. Impervious
More informationUpper Eastern Shore WIP Workshop November 21, 2014
Clean Water Optimization Tool for Maryland s Eastern Shore Karen Cappiella Program Director Center for Watershed Protection Upper Eastern Shore WIP Workshop November 21, 2014 Funded by the Town Creek Foundation
More informationProjects and Practices Application
Projects and Practices Application Grant Name - Water Harvest and Reuse at Oak Glen Golf Course Grant ID - C19-2907 Organization - Browns Creek WD Allocation Projects and Practices 2019 Grant Contact Karen
More informationWatershed master planning, City of Griffin, Georgia, USA
Water Resources Management VII 3 Watershed master planning, City of Griffin, Georgia, USA J. K. Kaplan & B. J. Watson Tetra Tech, Water Resources Group, Atlanta, Georgia, USA Abstract Tetra Tech has assisted
More informationPhase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac)
Permit Application No.: 17-181 Rules: Erosion Control, Wetland Protection, and Waterbody Crossings & Structures Applicant: Hennepin County Received: 4/27/17 Project: CSAH 112 Phase II Complete: 9/5/17
More informationStormwater Retrofit of Highwood Estates Detention Basins to address Water Quality Issues Low Impact Development Symposium Philadelphia, PA
Stormwater Retrofit of Highwood Estates Detention Basins to address Water Quality Issues 2011 Low Impact Development Symposium Philadelphia, PA Co-Authors Steven Trinkaus, PE, CPESC, CPSWQ of Trinkaus
More informationWELCOME. Eastern Subwatersheds Stormwater Management Retrofit Study. Online Information Session
WELCOME Eastern Subwatersheds Stormwater Management Retrofit Study Online Information Session July 31 to Septemberember 19, 2014 1 Eastern Subwatersheds Stormwater Management Retrofit Study This study
More informationBELLEVUE COASTAL COMMUNITY
BELLEVUE COASTAL COMMUNITY Comprehensive Analysis of Stormwater Management and Shoreline Erosion Control April 2011 Prepared by Integrating Engineering and Environment 1321 Mercedes Drive, Suite A Phone:
More informationAppendix 12. Pollutant Load Estimates and Reductions
Appendix 12. Pollutant Load Estimates and Reductions A pollutant loading is a quantifiable amount of pollution that is being delivered to a water body. Pollutant load reductions can be calculated based
More informationSection 6: Stormwater Improvements
Section 6: Stormwater Improvements A major objective of this study was to identify opportunities for improvements to address the widespread water quality impairments caused by stormwater runoff in the
More informationDAKOTA COUNTY SOIL AND WATER CONSERVATION DISTRICT COMPREHENSIVE PLAN
DAKOTA COUNTY SOIL AND WATER CONSERVATION DISTRICT COMPREHENSIVE PLAN 2011-2015 4100 220 th Street West, Suite 102 Farmington, MN 55024 651-480-7777 www.dakotacountyswcd.org I. INTRODUCTION A. Purpose
More informationLong Prairie River Watershed Restoration and Protection Strategies (WRAPS) Report Summary
Long Prairie River Watershed Restoration and Protection Strategies (WRAPS) Report Summary Minnesota has adopted a watershed approach to address the state s 80 major watersheds (denoted by 8-digit hydrologic
More informationRed Rock Lake: A Path Forward
University of Minnesota Morris Digital Well University of Minnesota Morris Digital Well Center for Small Towns 6-2016 Red Rock Lake: A Path Forward Colette Millard Student - University of Minnesota, Morris
More informationBANKS TOWNSHIP WATER QUALITY ACTION PLAN
BANKS TOWNSHIP WATER QUALITY ACTION PLAN Elk-River-Chain-of-Lakes Gaps Analysis Project The Watershed Center Grand Traverse Bay Tip of the Mitt Watershed Council Michigan Department of Natural Resources
More informationPowers Lake Stormwater Retrofit Assessment
Powers Lake Stormwater Retrofit Assessment Prepared by: With assistance from: THE METRO CONSERVATION DISTRICTS for the SOUTH WASHINGTON WATERSHED DISTRICT 1 PAGE INTENTIONALLY LEFT BLANK 2 Table of Contents
More informationHickory Creek 319 grant project City of Denton
Hickory Creek 319 grant project City of Denton Kenneth Banks, Division of Environmental Quality, City of Denton PREPARED IN COOPERATION WITH THE TEXAS COMMISSION ON ENVIRONMENTAL QUALITY AND U.S. ENVIRONMENTAL
More informationIn order to develop these comprehensive watershed retrofit plans, six key tasks were undertaken, each of which is described further below:
Date: June 26, 2013 To: From: Christin Jolicoeur, Watershed Planner Jason Papacosma, Watershed Programs Manager Arlington County Department of Environmental Services Laura Gardner, Water Resources Engineer
More informationClean Water SRF WATER RESOURCE RESTORATION Sponsored Projects. APPLICATION COMPLETENESS CHECKLIST September 2014
Clean Water SRF WATER RESOURCE RESTORATION Sponsored Projects APPLICATION COMPLETENESS CHECKLIST September 2014 Pre-application consultation held _January 15 th, 2015_ (date) Hard copy and CD containing
More informationStakeholder Meeting #1
Santa Clara Basin Stormwater Resource Plan Stakeholder Meeting #1 October 4, 2017 Jill Bicknell, P.E. SCVURPPP Presentation Overview Background SCVURPPP Green Infrastructure Stormwater Resource Plan (SWRP)
More informationL-THIA Online and LID in a watershed investigation
L-THIA Online and LID in a watershed investigation Larry Theller Agricultural and Biological Engineering, Purdue University Great Lakes Sedimentation Workshop Ann Arbor Mi. L-THIA On-line watershed delineation
More informationELK RAPIDS TOWNSHIP WATER QUALITY ACTION PLAN
ELK RAPIDS TOWNSHIP WATER QUALITY ACTION PLAN Elk-River-Chain-of-Lakes Gaps Analysis Project The Watershed Center Grand Traverse Bay Tip of the Mitt Watershed Council Michigan Department of Natural Resources
More informationCatchment Scale Stormwater Volume and Pollutant Loading Analyses. Guidance for Municipal Stormwater Program Assessment and Prioritization
Catchment Scale Stormwater Volume and Pollutant Loading Analyses Guidance for Municipal Stormwater Program Assessment and Prioritization May 2016 Catchment Scale Stormwater Volume and Pollutant Loading
More informationIncorporating Restoration Planning and Transportation Controls into the Valley Creek Watershed Act 167 Stormwater Management Plan
Incorporating Restoration Planning and Transportation Controls into the Valley Creek Watershed Act 167 Stormwater Management Plan Pennsylvania State Section American Water Resources Association Fall 2011
More informationInfiltration Trench Factsheet
Infiltration Trench Factsheet Infiltration Trench is a practice that provides temporary storage of runoff using the void spaces within the soil/sand/gravel mixture that is used to backfill the trench for
More informationRequest for Proposals Surface Water Improvement Fund Grants CUYAHOGA COUNTY ONLY 12/01/09
STREET ADDRESS: Lazarus Government Center 50 W. Town St., Suite 700 Columbus, Ohio 43215 State of Ohio Environmental Protection Agency TELE: (614) 644-3020 FAX: (614) 644-3184 www.epa.ohio.gov Request
More informationPROTECTING OUR WATERWAYS: STORMWATER POLLUTION REDUCTION EFFORTS
PROTECTING OUR WATERWAYS: STORMWATER POLLUTION REDUCTION EFFORTS Public Information Meeting ~ May 2, 2018 Public Works Stormwater Management Division OVERVIEW Surface Water Quality Protection Municipal
More informationMILTON TOWNSHIP WATER QUALITY ACTION PLAN
MILTON TOWNSHIP WATER QUALITY ACTION PLAN Elk-River-Chain-of-Lakes Gaps Analysis Project The Watershed Center Grand Traverse Bay Tip of the Mitt Watershed Council Michigan Department of Natural Resources
More informationALMY POND TMDL MANAGEMENT PLAN
ALMY POND TMDL MANAGEMENT PLAN PUBLIC WORKSHOP Presented by: City of Newport Department of Utilities And Pare Corporation May 7, 2014 Presentation Overview Introduction to Almy Pond Project Introduction
More information1. Base Conditions: October 1, 2004, land use conditions with no BMPs applied.
AECOM 1210 Fourier Drive, Suite 100, Madison, Wisconsin 53717 T 608.836.9800 F 608.836.9767 www.aecom.com Memorandum Date: May 18, 2009 To: From: Subject: Peter Nemmetz Assistant Director of Facilities
More informationUrban Stormwater Management Achieving Compliance Goals
Celebrating 20 Years of Excellence in Environmental Science & Engineering www.kieser-associates.com Urban Stormwater Management Achieving Compliance Goals MWEA Annual Conference June 25, 2013 K. Brian
More informationCommunity Blue Program Report Grant Name: Funding Sources: Activity or Project Description: Overall Project Costs 2012 Activities
Community Blue Program 2012-2014 Report Grant Name: Community Partners Grant Funding Sources: Minnesota Board of Water and Soil Resources (BWSR) and VLAWMO Activity or Project Description: This is a unique
More informationMCWD Mid-Year Highlights. Key Highlights
MCWD 2015 Mid-Year Highlights Late August evening on Lake Harriet by Stan Waldhauser The Minnehaha Creek Watershed District (MCWD) is a local unit of government responsible for managing and protecting
More informationReservoir age, increasing human population,
B-6249 02/12 Eagle Mountain Watershed Management Brent Clayton, Justin Mechell, David Waidler and Clint Wolfe* Reservoir age, increasing human population, and changing land uses have prompted the development
More informationDEVELOPING A WATERSHED IMPROVEMENT PLAN TO MEET MULTIPLE COMMUNITY OBJECTIVES IN GAINESVILLE AND HALL COUNTY, GEORGIA
DEVELOPING A WATERSHED IMPROVEMENT PLAN TO MEET MULTIPLE COMMUNITY OBJECTIVES IN GAINESVILLE AND HALL COUNTY, GEORGIA Chrissy, Thom 1, David Dockery 2, Kevin McInturff 3, Betsy Massie 1, and Lauren Murphy
More informationJoint Pollutant Reduction Plan
Paxton Creek Watershed TMDL, Chesapeake Bay PRP, Wildwood Lake PRP, and UNT to Spring Creek PRP August 23, 2017 2018 PAG 13 Regulation NPDES (National Pollutant Discharge Elimination System) Individual
More informationNorthern Chain of Lakes
Northern Chain of Lakes Presented by Pat Conrad and Joe Pallardy on behalf of the Brown s Creek Watershed District Board of Managers w a t e r I e c o l o g y I c o m m u n i t y Lake by Lake Analysis
More informationImplementing Watershed Protection and Management Strategies in Hickory Creek
Implementing Watershed Protection and Management Strategies in Hickory Creek Kenneth Banks, Deborah Viera, and David Hunter Environmental Services PREPARED IN COOPERATION WITH THE TEXAS COMMISSION ON ENVIRONMENTAL
More informationStormwater Management - Basic Overview for Municipal Employees
Stormwater Management - Basic Overview for Municipal Employees October 13 th, 2011 Scott D. Cook Environmental Program Specialist 2 NYSDEC - Region 7 Syracuse Division of Water 315-426-7502 sdcook@gw.dec.state.ny.us
More informationThe Status of Pompeston Creek, : From Data to Action. Pompeston Creek Watershed Association
Pompeston Creek Watershed Association P.O. Box 2883 Cinnaminson, NJ 08077 (856) 235-9204 www.pompestoncreek.org The Status of Pompeston Creek, 1998-2008: From Data to Action Pompeston Creek Watershed Association
More informationDC STORMWATER PLAN CONSOLIDATED TOTAL MAXIMUM DAILY LOAD (TDML) IMPLEMENTATION PLAN
DC STORMWATER PLAN CONSOLIDATED TOTAL MAXIMUM DAILY LOAD (TDML) IMPLEMENTATION PLAN CONTENTS Introduction 1 The Challenge 5 The Solution 7 Tracking Progress 11 What can you do? 15 INTRODUCTION The DC Stormwater
More informationResilient Communities Project. Prepared for the City of North St. Paul. Stormwater Quality Improvement Plan for the. Urban Ecology Center Subwatershed
Resilient Communities Project Prepared for the City of North St. Paul Stormwater Quality Improvement Plan for the Urban Ecology Center Subwatershed P. Paulos, A. Tomasek, J. Hunter, B. Sprang, and A. Miller
More information2016 Monitoring Report; Mississippi River Tributaries
2016 Monitoring Report; Mississippi River Tributaries SWWD s East Mississippi watershed (Map 1) is named after the former East Mississippi Watershed Management Organization which managed the area prior
More informationBear Creek/Bear Lake Upper Watershed Information and Education Plan
Bear Creek/Bear Lake Upper Watershed Information and Education Plan Addressing Stormwater Pollution Prevention and the Muskegon Lake Area of Concern Eutrophication Beneficial Use Impairment (BUI) 2010
More informationTotal Suspended Solids: The Hows & Whys of Controlling Runoff Pollution
New State Storm Water Rules: WHAT MUNICIPALITIES NEED TO KNOW Total Suspended Solids: The Hows & Whys of Controlling Runoff Pollution Stormwater management by Wisconsin municipalities is under scrutiny.
More informationPA Municipal Separate Storm Sewer System (MS4) TMDL Plan
PA Municipal Separate Storm Sewer System (MS4) TMDL Plan Instructor: Bryan Seipp, Watershed Manager- CWP Lee Epstein, Director, Lands Program- CBF 1 To Adjust How the Slides Appear on Your Screen To make
More informationFebruary 17, 2012 MIDS Work Group Meeting
Flexible Treatment Options: Potential performance goal for sites with restrictions and calculator results February 17, 2012 MIDS Work Group Meeting p-gen3-13z Presentation Outline Address comments from
More informationIn order to develop these comprehensive watershed retrofit plans, six key tasks were undertaken, each of which is described further below:
Date: December 12, 2011 To: From: Re: Jason Papacosma, Watershed Planner Christin Jolincoeur, Watershed Planner Arlington County Department of Environmental Services Gregory Hoffmann, P.E., Program Director
More informationPope Branch Subwatershed Action Plan
Pope Branch Subwatershed Action Plan Table of Contents Section 1: Vision and Existing Conditions 7 Need and Purpose 8 10-Year Vision 9 Pope Branch 2020 Restoration Targets 10 Existing Conditions in the
More informationEVALUATING LOW IMPACT DEVELOPMENT BEST MANAGEMENT PRACTICES AS AN ALTERNATIVE TO TRADITIONAL URBAN STORMWATER MANAGEMENT
EVALUATING LOW IMPACT DEVELOPMENT BEST MANAGEMENT PRACTICES AS AN ALTERNATIVE TO TRADITIONAL URBAN STORMWATER MANAGEMENT Brandon Holzbauer-Schweitzer Region 6 Stormwater Conference 10/05/2016 Introduction
More informationSimple Method for Estimating Phosphorus Export
Appendix L Simple Method for Estimating Phosphorus Export 1. The Simple Method The Simple Method is a technique used for estimating storm pollutant export delivered from urban development sites. The method
More informationCLMP+ Report on Grass Lake (Anoka County) Lake ID# CLMP+ Data Summary
CLMP+ Report on Grass Lake (Anoka County) Lake ID# 02-0113-00 2012-2013 CLMP+ Data Summary October 2014 Authors Shannon Martin, MPCA Editing and graphic design Public Information Office Staff The (MPCA)
More informationThe City of Lake Forest Stormwater Management Policy Approved by City Council on March 7, 2016
The City of Lake Forest Stormwater Management Policy Approved by City Council on March 7, 2016 I. Purpose The purpose of this policy is to address home and property drainage issues relating to stormwater
More informationWest Donegal Township. Pollutant Reduction Plan. Prepared for: West Donegal Township. One Municipal Drive Elizabethtown, PA 17022
Elizabethtown, PA Draft June 2017 Prepared for: One Municipal Drive Elizabethtown, PA 17022 Prepared by: LandStudies, Inc. 315 North Street Lititz, PA 17543 717-627-4440 www.landstudies.com Table of Contents
More informationCLMP+ Report on Fleming Lake (Aitkin County)
CLMP+ Report on Fleming Lake (Aitkin County) Lake ID# -5-5-6 CLMP+ Data Summary July 7 Authors Shannon Martin Contributors/acknowledgements Terry Dahlberg Sandy Dahlberg Pam Anderson For questions regarding
More informationCHAPTER 4 WATERSHED PLAN GOALS & OBJECTIVES
4.0 Introduction CHAPTER 4 WATERSHED PLAN GOALS & OBJECTIVES After the watershed analysis had been completed, the next step in the planning process followed by the group was to come up with goals and objectives
More informationHOWARD LAKE SUBWATERSHED Stormwater Retrofit Assessment
HOWARD LAKE SUBWATERSHED Stormwater Retrofit Assessment Prepared by: WRIGHT SOIL AND WATER CONSERVATION DISTRICT With assistance from: THE METRO CONSERVATION DISTRICTS This report details a subwatershed
More informationSchmidt, Pomerleau and Bass Lakes Nutrient TMDL Five Year Review
WENCK File #B1240-0186 July 2017 Schmidt, Pomerleau and Bass Lakes Nutrient TMDL Five Year Review Prepared for: Shingle Creek Watershed Management Commission 3235 Fernbrook Lane Plymouth, MN 55447 shinglecreek.org
More informationCredit Calculations and Calculator Functions
MIDS Work Group Meeting May 20, 2010 Credit Calculations and Calculator Functions p-gen3-13c Today s Goals The Foundation for the Credits & Calculator Discuss proposed calculations Performance goal requirement
More information14(h)EPA-06 City of Springfield 76 East High Street Springfield, Ohio Clark County Greening City Plaza
14(h)EPA-06 City of Springfield 76 East High Street Springfield, Ohio 45502 Clark County Greening City Plaza $100,000 in FY 2014 Section 319(h) Nonpoint Source grant funding is requested to install three
More informationChapter 2. The Great Lakes Protection Fund. Watershed Flow Regime Restoration Evaluaton Process Developing Stormwater BMP Quality Gallon Metrics
Chapter 2 Watershed Flow Regime Restoration Evaluaton Process Developing Stormwater BMP Quality Gallon Metrics Prepared with Funding from The Great Lakes Protection Fund September 2007 Study contact: Mark
More informationNorth Allston Sub watershed Restoration Plan. Green Infrastructure Concept Plan and Strategies
North Allston Sub watershed Restoration Plan Green Infrastructure Concept Plan and Strategies Study Area for Green Infrastructure Retrofits Environmental Design Goals for Study Area: Manage stormwater
More informationPROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM
PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project Name: Essex Point Subdivision/Sellenriek Retention Project ID Number: 2-A Problem: The watershed above the Essex Point Subdivision
More informationVADNAIS LAKE AREA WATER MANAGEMENT ORGANIZATION Sustainable Lake Management Plan Charley Lake, Ramsey County, MN
VADNAIS LAKE AREA WATER MANAGEMENT ORGANIZATION Sustainable Lake Management Plan Charley Lake, Ramsey County, MN Prepared by Kristine Jenson, Tyler Thompson, and Dawn Tanner December 2018 VADNAIS LAKE
More information