Shawnigan Creek Coho

Size: px
Start display at page:

Download "Shawnigan Creek Coho"

Transcription

1 Shawnigan Creek Coho A Salmon Enhancement Success Now in Crisis Jerrod L. Pinder Director, Fish and Habitat Committee Shawnigan Residents Association (SRA)

2 Shawnigan Creek Coho

3 Shawnigan Creek Coho Enhancement Established 1979 with Gold stream Coho introduced into Shawnigan Creek. Coho cannot get passed several locations through impassable falls and are transported by volunteers. In 2013 creek had over 5,000 returning fish making it a significant run size on south island next to other streams. Completely operated by volunteers of Mill Bay and District Conservation Society. Fish are used shared in times of low abundance with Gold stream.gold stream also helps with raising fish for release in Shawnigan Creek. Small private hatchery with Shawnigan lake School has special relationship with project, and serves as education for students.

4 SIA (SIRM) Soil Remediation Site Permit granted by MOE to SIA to accept 5 million tons of contaminated soil for 50 years into the watershed. SIA Permit is wide open except in dumping biomedical or radioactive contaminates. Site is located 100 feet from Upper Shawnigan Creek. This is just downstream from salmon habitat. Two lots of concern: Lot 23 (facility) and 21 (stored material for fill).

5 SIA (SIRM) Soil Remediation Site

6 Current Issues SIA Lot 21 Originally supposed to be clean fill to support LOT23 operation. MEM placed stop work order on LOT 21. It is not known what is dumped and there are no records. Leachate drains directly from this pile into Shawnigan Creek. Recent independent tests by QEP show levels of cobalt above aquatic and provincial standards for drinking water. Hydrocarbons and other materials are observed that do not occur naturally. MOE tested surface soil of pile on LOT21, but refuses to do core soil testing. DFO and Environment Canada have been ineffective. All test data and information have been given to Environment Canada enforcement officer. No RAR assessment done by Province even though it is required.

7 SIA Lot 21- Dec 6,2015

8 Current Issues SIA Lot 23 Groundwater underneath site is flowing into creek. This is documented by CVRD and an independent engineering company as well as independent geologists and scientists. Surface water from site is not being controlled. Several streams are feeding into creek from the site. It is unknown what the increased flow rates will do to the spawning beds or habitat. Health and aquatic risks are unknown. Conflicting water tests done by MOE and CVRD have been done. Again no RAR is done for this area just like LOT21.

9 SIA Lot 23- Dec.2,2015

10 Our Challenges Bill 38. Under the new changes within Fisheries Act the ownership on this issue has transferred to Province. New government. Liberals are not up to speed yet with new fisheries minister. Understaffing of DFO. Simply do not have resources to investigate. The project is not widely known in media, and public. Unknown how these changes to our water will effect fish and future of enhancement project.

11 Why Should You Care? Shawnigan Creek is part of management area from Nanaimo to the Gorge in Victoria. If Shawnigan Creek is impacted by pollution there will be a major impact to Goldstream, Colquitz and Craigflower Creek brood stock in times of low returns. If we are not successful with protecting this creek than this project could happen on any river or stream in BC. Example look at site at Chahalis River. Or the recycling facility on banks of Fraser River. Any stream or river is vulnerable and not protected from these projects.

12 What Is Being Done? CVRD has just won in Supreme Court against MOE that the site is cannot be zoned as contaminated facility. Lawyers for SIA and SIRM will be in appeals court next week to try and overturn injunction, and ruling. SRA alleged fraud case by SIA has been heard in Supreme Court. Awaiting judges decision to throw out the permit, and also grant an injunction against further dumping. Letters continue to be sent out by several interest groups, first nations etc. to the premier, environment minister, prime minister, and fisheries minister for cleanup of LOT21 and the stopping of dumping contaminated soil on LOT23. CVRD has submitted an independent engineering assessment as well as new water testing (completed in December) calling for a complete stop to dumping, and further independent review of site.

13 Questions?

DFO s Fish Habitat Management Program

DFO s Fish Habitat Management Program DFO s Fish Habitat Management Program Overview Fish and Fish Habitat DFO Policy - Objectives and Goals How Do the Fisheries Act and Navigable Waters Protection Act Affect Cattle Producers Riparian Areas,

More information

Fish Habitat Protection Development Permit Area

Fish Habitat Protection Development Permit Area Appendix A2 3 Fish Habitat Protection Development Permit Area 1.0 PURPOSE: The area shown on Map No. 7 as the Fish Habitat Protection Development Permit Area is designated for the purpose of protecting

More information

Development of a Renewed Environmental Management Program for Land-based Aquaculture Facilities

Development of a Renewed Environmental Management Program for Land-based Aquaculture Facilities Development of a Renewed Environmental Management Program for Land-based Aquaculture Facilities Atlantic Salmon Federation Closed-Containment Workshop October 10-11 th, 2012 Troy Lyons Department of Environment

More information

Lowen Hydrogeology Consulting Ltd.

Lowen Hydrogeology Consulting Ltd. Consulting Ltd. September 23, 2012 LHC Project File: 1218 Shawnigan Residents Association PO Box 443 Shawnigan Lake, BC V0R 2W0 Attention : Gary Horwood, President Dear Sir: Re: Proposed SIA Contaminated

More information

Regional District of Nanaimo Community Watershed Monitoring Network 2011 Data Summary

Regional District of Nanaimo Community Watershed Monitoring Network 2011 Data Summary With participation from: Mid Vancouver Island Habitat Enhancement Society, Qualicum Beach Streamkeepers, Parksville Fish & Game, Nile Creek Enhancement Society, Friends of French Creek and Nanaimo Area

More information

Facts and Figures. Greater Victoria Water Supply Area. May 2015

Facts and Figures. Greater Victoria Water Supply Area. May 2015 Facts and Figures Greater Victoria Water Supply Area May 2015 Greater Victoria Water Supply Area The Greater Victoria Water Supply Area is made up of 20,549 hectares of land in the Sooke, Goldstream, Council,

More information

REPORT OF THE FEDERAL PROSPERITY REVIEW PANEL EXECUTIVE SUMMARY

REPORT OF THE FEDERAL PROSPERITY REVIEW PANEL EXECUTIVE SUMMARY Taseko Mines Ltd. (Taseko) proposed to develop the Prosperity Gold-Copper Mine (the Project) approximately 125 km southwest of Williams Lake, British Columbia. The Project would involve the construction,

More information

Topics. Lower Columbia River White Sturgeon Conservation Plan. Terms. Background. Background. Conservation Status 6/7/2011

Topics. Lower Columbia River White Sturgeon Conservation Plan. Terms. Background. Background. Conservation Status 6/7/2011 /7/11 Lower Columbia River White Sturgeon Conservation Plan Presentation to the Oregon Fish and Wildlife Commission June 3, 11 1 Topics How the conservation and desired status benchmarks were developed

More information

SNUNEYMUXW TREATY NEGOTIATIONS

SNUNEYMUXW TREATY NEGOTIATIONS SNUNEYMUXW TREATY NEGOTIATIONS DRAFT CONSULTATION AGREEMENTS-IN-PRINCIPLE SUMMARY APRIL, 2003 This is a general summary of the Snuneymuxw Agreements-in-Principle for public information purposes. For complete

More information

EXECUTIVE SUMMARY. Consultative Committee Report Jordan River Water Use Plan

EXECUTIVE SUMMARY. Consultative Committee Report Jordan River Water Use Plan EXECUTIVE SUMMARY The consultative process was initiated in April 2000 and completed in November 2001. The consultative process follows the steps outlined in the 1996 provincial government Water Use Plan

More information

Estuary Working Group

Estuary Working Group Comox Valley Project Watershed Society Box 3007, Courtenay, BC, V9N 5N3 Phone: (250) 703 2871 Fax: 703 2872 Email: projectwatershed@gmail.com www.projectwatershed.ca Estuary Working Group Permission is

More information

Fraser River Water Quality

Fraser River Water Quality Richmond Environmental Project Guidebook Fraser River Water Quality Why You Should Care About This Issue The Fraser River is the largest river in British Columbia. The health of the Fraser River is important

More information

Wildlife Management Area

Wildlife Management Area Proposed Wildlife Management Area A wildlife management area designation is being proposed for the Harrison-Chehalis area to conserve fish and wildlife habitats while also respecting existing and compatible

More information

ORIGINAL EFFECTIVE DATE

ORIGINAL EFFECTIVE DATE APPROVED AMENDMENTS: Effective date Briefing Note Summary of Changes: /Approval March 1, 2014 January 2014 New policy June 15, 2015 June 15, 2015 Administrative changes, additional detail for greater clarity

More information

CVRD AREAS/POPULATION (2011 CENSUS)

CVRD AREAS/POPULATION (2011 CENSUS) CVRD AREAS/POPULATION (2011 CENSUS) AREA LOCATION SIZE (Ha) POPULATION A Malahat/Mill Bay 4,931 4,393 B Shawnigan Lake 36,605 8,127 C Cobble Hill 2,259 4,796 D Cowichan Bay 1,567 2,971 E Cowichan Station

More information

N E W S R E L E A S E

N E W S R E L E A S E For Immediate Release 2013AGRI0018-000570 March 22, 2013 N E W S R E L E A S E B.C. responds to Cohen Commission recommendations VICTORIA The B.C. government has accepted the intent of each of the eight

More information

2018 BC Freshwater Public Opinion Insights Topline Report

2018 BC Freshwater Public Opinion Insights Topline Report 2018 BC Freshwater Public Opinion Insights Topline Report Results of a public opinion survey conducted June 11-21st, 2018 By McAllister Opinion Research Survey Methodology Survey results are based on an

More information

Reasons for Ministers Decision

Reasons for Ministers Decision In the matter of the Environmental Assessment Act S.B.C. 2002, c. 43 (Act) and In the matter of an Application for an Environmental Assessment Certificate (Application) by Teck Coal Limited (Proponent)

More information

Introduction to the Riparian Areas Regulation

Introduction to the Riparian Areas Regulation Information Note #1: Introduction to the Riparian Areas Regulation This Information Note is a guide only. It is not a substitute for the federal Fisheries Act, the provincial Riparian Areas Regulation,

More information

NATIONAL CAPITAL DISTRICT COMMISSION Office of the Governor Hon. Powes Parkop, MP P.O. Box 7270, Boroko. NCD CITY OF PORT MORESBY

NATIONAL CAPITAL DISTRICT COMMISSION Office of the Governor Hon. Powes Parkop, MP P.O. Box 7270, Boroko. NCD CITY OF PORT MORESBY NATIONAL CAPITAL DISTRICT COMMISSION Office of the Governor Hon. Powes Parkop, MP P.O. Box 7270, Boroko. NCD CITY OF PORT MORESBY Telephone : : : Facsimile : 3251091/3251092 City Hall 3240500 Tengdui Depot

More information

Environmental Regulation & Mine Permitting in Ontario

Environmental Regulation & Mine Permitting in Ontario Environmental Regulation & Mine Permitting in Ontario A Presentation to the Ad Hoc Committee on Mining Lake Superior Work Group Mark O Brien, Mineral Development Consultant MNDMF, Thunder Bay Agenda Regulatory

More information

TRANSBOUNDARY WATERS. Friends & Neighbors: Background on the Bilateral Working Group FALL Members of the Bilateral Working Group Alaska

TRANSBOUNDARY WATERS. Friends & Neighbors: Background on the Bilateral Working Group FALL Members of the Bilateral Working Group Alaska TRANSBOUNDARY WATERS FALL 2017 Friends & Neighbors: Background on the Bilateral Working Group British Columbia (B.C.) and Alaska share many common interests and have a long history of working together.

More information

Cowichan Lake Lamprey

Cowichan Lake Lamprey Species at Risk Act [DRAFT] Report on the Progress of Recovery Strategy Implementation for Nooksack Dace NOT FOR DISTRIBUTION Recovery Strategy Report Series Report on the Progress of Recovery Strategy

More information

Sustainable Watershed Systems, through Asset Management. Local stream stewardship volunteers may yet be the difference-maker

Sustainable Watershed Systems, through Asset Management. Local stream stewardship volunteers may yet be the difference-maker Sustainable Watershed Systems, through Asset Management Local stream stewardship volunteers may yet be the difference-maker The scope of involvement and influence of local stream stewardship volunteers

More information

ACID MINE DRAINAGE IN THE AMBLER MINING DISTRICT

ACID MINE DRAINAGE IN THE AMBLER MINING DISTRICT ACID MINE DRAINAGE IN THE AMBLER MINING DISTRICT Pete Dronkers Northern Alaska Environmental Center WHAT IS ACID MINE DRAINAGE? (AMD) When a mine is built and operated, thousands or millions of tons of

More information

Risk assessment to salmon from an oil spill on BC s north and central coast

Risk assessment to salmon from an oil spill on BC s north and central coast (The risk analysis in this document was submitted by RCF as evidence to the JRP in 2011) Risk assessment to salmon from an oil spill on BC s north and central coast Background The proposed Enbridge Northern

More information

COASTAL CONSERVANCY. Staff Recommendation September 22, 2011 GREEN VALLEY CREEK COHO HABITAT ENHANCEMENT DESIGN

COASTAL CONSERVANCY. Staff Recommendation September 22, 2011 GREEN VALLEY CREEK COHO HABITAT ENHANCEMENT DESIGN COASTAL CONSERVANCY Staff Recommendation September 22, 2011 GREEN VALLEY CREEK COHO HABITAT ENHANCEMENT DESIGN Project No. 07-106-02 Project Manager: Lisa Ames RECOMMENDED ACTION: Authorization to disburse

More information

To: Dear Living Water Smart Administrator:

To: Dear Living Water Smart Administrator: From: Sent: To: Subject: Attachments: Follow Up Flag: Flag Status: Kieran Broderick [KBroderick@treaty8.bc.ca] May-04-10 9:31 AM Living Water Smart ENV:EX Treaty 8 First Nations Treaty8-Water-Act-Submission-April30-2010.pdf

More information

Coquitlam-Buntzen Water Use Plan

Coquitlam-Buntzen Water Use Plan Monitoring Program Terms of Reference COQMON#6 Lower Coquitlam River Temperature Monitoring Initial submission: October 24, 2005 Revision 1: December 14, 2006 December 14, 2006 Terms of Reference for the

More information

Peter Bruce and Associates R.R. 3 Tiesu Rd, Ladysmith BC VOR 2E0 April, 1993

Peter Bruce and Associates R.R. 3 Tiesu Rd, Ladysmith BC VOR 2E0 April, 1993 A SURVEY OF FISHERIES INFORMATIOM COLLECTED BY FOREST COMPANIES IM THE INTERIOR OF B.C. By Peter Bruce and Associates R.R. 3 Tiesu Rd, Ladysmith BC VOR 2E0 April, 1993 ACKNOWLEDGMENTS We wish to thank

More information

CONSERVATION DISTRICTS PROGRAM FRAMEWORK FOR THE FUTURE

CONSERVATION DISTRICTS PROGRAM FRAMEWORK FOR THE FUTURE CONSERVATION DISTRICTS PROGRAM FRAMEWORK FOR THE FUTURE Prepared by: Conservation District Framework Committee with representation from the Manitoba Conservation Districts Association, Association of Manitoba

More information

Hydrology and Watershed Management

Hydrology and Watershed Management Hydrology and Watershed Management The summaries and their associated interpretations contained in this document are for general information only, not legal advice. To interpret or apply the law, you must

More information

The oldest forms of waste disposal are landfills and dumps. Unfortunately there

The oldest forms of waste disposal are landfills and dumps. Unfortunately there Katherine Burgos April 16, 2012 Potential Landfill Leachate runoff into Seneca Lake Introduction The oldest forms of waste disposal are landfills and dumps. Unfortunately there are a lot of problems associated

More information

FNFC Update. for BC Island Marine Aquatic Working Group. Fall 2017 Richard Sparrow Natural Resource Manager

FNFC Update. for BC Island Marine Aquatic Working Group. Fall 2017 Richard Sparrow Natural Resource Manager Photo: Okanagan Sockeye, by Okanagan Nation Alliance & A.M. Bezener FNFC Update for BC Island Marine Aquatic Working Group Fall 2017 Richard Sparrow Natural Resource Manager FNFC Background BC First Nations

More information

Central Assiniboine and Lower Souris River Watershed. Public Consultation What you told us. June 2010

Central Assiniboine and Lower Souris River Watershed. Public Consultation What you told us. June 2010 Central Assiniboine and Lower Souris River Watershed Public Consultation What you told us June 2010 Table of Contents Introduction... 5 Methods... 5 Results of Public Consultation... 6 Individual Watershed

More information

Strength. Performance. Passion. Paris Pit CAP. September 25, 2012

Strength. Performance. Passion. Paris Pit CAP. September 25, 2012 Strength. Performance. Passion. Paris Pit CAP September 25, 2012 2012 Holcim 2012 (Canada) Holcim (Canada) Inc. Inc. Agenda Introductions Minutes from Last Meeting Dufferin Paris Pit - General Update Holcim

More information

BACKGROUNDER. Watershed Watch Salmon Society. February 5, 2009 THE BUTE INLET HYDROELECTRIC PROJECT

BACKGROUNDER. Watershed Watch Salmon Society. February 5, 2009 THE BUTE INLET HYDROELECTRIC PROJECT BACKGROUNDER Watershed Watch Salmon Society February 5, 2009 THE BUTE INLET HYDROELECTRIC PROJECT 1 Q: Where will the proposed project take place? A: Bute Inlet is located on the south coast of British

More information

Environmental Sector Expectations for an Environmental DRAFT Flow Needs Regulation

Environmental Sector Expectations for an Environmental DRAFT Flow Needs Regulation Environmental Sector Expectations for an Environmental DRAFT Flow Needs Regulation The inclusion of environmental flow needs ( EFNs ) in the Water Sustainability Act ( WSA ) is a significant step forward

More information

Fish Habitat Design, Operation and Reclamation Workbook and Worksheets for Placer Mining in the Yukon Territory

Fish Habitat Design, Operation and Reclamation Workbook and Worksheets for Placer Mining in the Yukon Territory Fish Habitat Design, Operation and Reclamation Workbook and Worksheets for Placer Mining in the Yukon Territory Fish Habitat Design, Operation and Reclamation Workbook and Worksheets for Placer Mining

More information

YANKEE GIRL TAILINGS REMEDIATION PROJECT YMIR BC. NOAMI Case Study Presentation Part 1 Friday, November 14

YANKEE GIRL TAILINGS REMEDIATION PROJECT YMIR BC. NOAMI Case Study Presentation Part 1 Friday, November 14 YANKEE GIRL TAILINGS REMEDIATION PROJECT YMIR BC NOAMI Case Study Presentation Part 1 Friday, November 14 HISTORY 2 Morrell, Lester G 1940 courtesy of British Columbia Archives SITE OVERVIEW 3 ENVIRONMENTAL

More information

DFO Fisheries Protection Program

DFO Fisheries Protection Program DFO Fisheries Protection Program Presenter: Brad Fanos Manager, Regulatory Reviews Fisheries Protection Program brad.fanos@dfo-mpo.gc.ca October 15, 2014 Outline What is the Fisheries Protection Program?

More information

McNab Creek Spawning/Rearing Channel Monitoring Project 2006 Annual Report - Final

McNab Creek Spawning/Rearing Channel Monitoring Project 2006 Annual Report - Final McNab Creek Spawning/Rearing Channel Monitoring Project 2006 Annual Report - Final August 2006 Prepared for: Howe Sound Pulp and Paper Limited Partnership Port Mellon, BC MCNAB CREEK SPAWNING/REARING CHANNEL

More information

Russian River Volunteer Drought Initiative Public Information Meeting. May 14 th, 2015 Salmon Creek School, Occidental

Russian River Volunteer Drought Initiative Public Information Meeting. May 14 th, 2015 Salmon Creek School, Occidental Russian River Volunteer Drought Initiative Public Information Meeting May 14 th, 2015 Salmon Creek School, Occidental Agenda Why We re Here CDFW s Concern and Role Why These Watersheds Impacts on Streamflow

More information

Morrison Creek Lamprey

Morrison Creek Lamprey Species at Risk Act Recovery Strategy Report Series Report on the Progress of Recovery Strategy Implementation for the Western Brook Lamprey Morrison Creek Population (Lampetra richardsoni) in Canada for

More information

Conservation Ontario s Response to Climate Ready: Ontario s Adaptation Strategy and Action Plan June 2011

Conservation Ontario s Response to Climate Ready: Ontario s Adaptation Strategy and Action Plan June 2011 Introduction Conservation Ontario s Response to Climate Ready: Ontario s Adaptation Strategy and Action Plan June 2011 C onservation Ontario is the network of 36 Conservation Authorities, local watershed

More information

Santoy 8 Satellite Mine at the Seabee Gold Mine. Technical Review Comments. on the. Environmental Impact Statement.

Santoy 8 Satellite Mine at the Seabee Gold Mine. Technical Review Comments. on the. Environmental Impact Statement. Environmental Impact Assessment Technical Review Comments on the Environmental Impact Statement as submitted by Claude Resources Inc. Saskatchewan Ministry of Environment December, 2009 1. INTRODUCTION

More information

Forest Appeals Commission

Forest Appeals Commission Forest Appeals Commission Fourth Floor 747 Fort Street Victoria British Columbia Telephone: (250) 387-3464 Facsimile: (250) 356-9923 Mailing Address: PO Box 9425 Stn Prov Govt Victoria BC V8W 9V1 DECISION

More information

AGRICULTURAL BUILDING SETBACKS FROM WATERCOURSES IN FARMING AREAS

AGRICULTURAL BUILDING SETBACKS FROM WATERCOURSES IN FARMING AREAS Riparian FACTSHEET Order No. 823.400-1 February 2011 AGRICULTURAL BUILDING SETBACKS FROM WATERCOURSES IN FARMING AREAS Principles This factsheet provides an overview on building setback standards from

More information

FCM PROPOSAL OUTLINE NORTHEAST CLIMATE RISK NETWORK

FCM PROPOSAL OUTLINE NORTHEAST CLIMATE RISK NETWORK Received DC Office April 27, 2017 FCM 2017-2018 PROPOSAL OUTLINE NORTHEAST CLIMATE RISK NETWORK Background: Fraser Basin Council in the Northeast Fraser Basin Council (FBC) has been engaged as a project

More information

Overview of Federal Water Law

Overview of Federal Water Law Overview of Federal Water Law 2015 - Statutory and Case Law Update February 23, 2016 Jacqueline Wilson, Counsel OVERVIEW 1. Division of power to regulate water law 2. Overview of selected federal water

More information

Water and Climate Change in British Columbia, Canada

Water and Climate Change in British Columbia, Canada Water and Climate Change in British Columbia, Canada Presentation to RegionsAdapt Water Resources and Management Working Group Jenny Fraser British Columbia Ministry of Environment 8 June 2016 Background

More information

OVERVIEW. What is Drought? Provincial Response Lessons Learned Some suggestions for OWSC

OVERVIEW. What is Drought? Provincial Response Lessons Learned Some suggestions for OWSC DEALING WITH DROUGHT Presentation to: Okanagan Water Stewardship Council 14 December 2006 Wenda Mason Water Stewardship Division Ministry of Environment OVERVIEW What is Drought? Provincial Response Lessons

More information

Salmon River Enhancement Society (SRES) September 15, 2016

Salmon River Enhancement Society (SRES) September 15, 2016 Salmon River Enhancement Society (SRES) September 15, 2016 Overview The following provides an overview of the major points of the conversation relating to the SRES concerns associated with the Trans Mountain

More information

Assessing Fish Passage at Culverts the method, its metrics and preliminary findings from over 4,000 assessments.

Assessing Fish Passage at Culverts the method, its metrics and preliminary findings from over 4,000 assessments. Assessing Fish Passage at Culverts the method, its metrics and preliminary findings from over 4,000 assessments. Richard Thompson, Ministry of Environment, Richard.Thompson@gov.bc.ca ABSTRACT There has

More information

athabasca river water management framework ALBERTA S REGULATORY BACKSTOP TO PROTECT THE ATHABASCA RIVER

athabasca river water management framework ALBERTA S REGULATORY BACKSTOP TO PROTECT THE ATHABASCA RIVER [ athabasca river ] water management framework ALBERTA S REGULATORY BACKSTOP TO PROTECT THE ATHABASCA RIVER The framework achieves a high level of protection while balancing the Athabasca River s needs

More information

Fish-Stream Crossing Guidebook Information Sheet

Fish-Stream Crossing Guidebook Information Sheet The mandate of the Environmental Management Section is to ensure that the Ministry of Transportation and Infrastructure (MOTI) develops and maintains the provincial transportation infrastructure in an

More information

ANNUAL PROGRESS REPORT FOR 2015 ROGUE RIVER SPRING CHINOOK SALMON CONSERVATION PLAN ROGUE WATERSHED DISTRICT OREGON DEPARTMENT OF FISH AND WILDLIFE

ANNUAL PROGRESS REPORT FOR 2015 ROGUE RIVER SPRING CHINOOK SALMON CONSERVATION PLAN ROGUE WATERSHED DISTRICT OREGON DEPARTMENT OF FISH AND WILDLIFE ANNUAL PROGRESS REPORT FOR 2015 ROGUE RIVER SPRING CHINOOK SALMON CONSERVATION PLAN ROGUE WATERSHED DISTRICT OREGON DEPARTMENT OF FISH AND WILDLIFE INTRODUCTION In September of 2007, the Oregon Fish and

More information

Solutions for Salt Vulnerable Areas

Solutions for Salt Vulnerable Areas Solutions for Salt Vulnerable Areas 1 What we ll talk about. What is a salt vulnerable area? Why the urgency? Conflicting legislative priorities Leading the charge to find a workable solution: Municipal-Conservation

More information

Tioga County Conservation District Watershed Program

Tioga County Conservation District Watershed Program Tioga County Conservation District Watershed Program What is a watershed? A watershed is the land area that drains into a stream, river, or body of water. In Tioga County, there are seven major watersheds,

More information

Drinking Water and Watershed Protection Program

Drinking Water and Watershed Protection Program Drinking Water and Watershed Protection Program Submission for: 2010 UBCM Community Excellence Awards Regional District of Nanaimo 6300 Hammond Bay Road Nanaimo, BC V9T 6N2 250-390-6560 Summary Here on

More information

Surface Water Management Strategy

Surface Water Management Strategy Interim Report for the Surface Water Management Strategy WHAT WE HEARD SUMMARY November 2012 INTRODUCTION The surface water management strategy will outline a strategic plan to improve the management of

More information

Terms of Reference. for an Approved Water Management Plan to be Developed for the Milk River Basin (Alberta) Phase One.

Terms of Reference. for an Approved Water Management Plan to be Developed for the Milk River Basin (Alberta) Phase One. Terms of Reference for an Approved Water Management Plan to be Developed for the Milk River Basin (Alberta) Phase One March 15, 2016 Table of Contents Statement of Authorization... 2 1.0 Introduction...

More information

Construction Environmental Sediment Management Plan

Construction Environmental Sediment Management Plan Construction Environmental Sediment Management Plan for Little Qualicum River Bridge Upgrades Prepared For: The Regional District of Nanaimo Recreation & Parks Parksville, B.C. V9P 2X4 Prepared By: D.R.

More information

FACT SHEET: Water Rights and Property Rights

FACT SHEET: Water Rights and Property Rights FACT SHEET: Water Rights and Property Rights This fact sheet is intended to provide information on Albertans rights to use surface and groundwater associated with their property. Who owns the water in

More information

INLAND AQUACULTURE LICENCE APPLICATION GUIDE

INLAND AQUACULTURE LICENCE APPLICATION GUIDE INLAND AQUACULTURE LICENCE APPLICATION GUIDE Department of Agriculture and Aquaculture August 2009 TABLE OF CONTENTS INTRODUCTION...1 SECTION 1 - THE AQUACULTURE APPLICATION FORM...1 1.1 APPLICANT INFORMATION...1

More information

FISH HABITAT RESTORATION DESIGNS FOR CAVE CREEK, WITHIN THE NAHWITTI RIVER WATERSHED

FISH HABITAT RESTORATION DESIGNS FOR CAVE CREEK, WITHIN THE NAHWITTI RIVER WATERSHED FISH HABITAT RESTORATION DESIGNS FOR CAVE CREEK, WITHIN THE NAHWITTI RIVER WATERSHED Prepared for: Tom Cole, RPF Richmond Plywood Corporation 13911 Vulcan Way Richmond, B.C. V6V 1K7 March 2004 Prepared

More information

EAD REPORT. TO: Chair and Electoral Area Directors File No: BL900 GEN

EAD REPORT. TO: Chair and Electoral Area Directors File No: BL900 GEN EAD REPORT TO: Chair and Electoral Area Directors File No: BL900 GEN SUBJECT: DESCRIPTION: RECOMMENDATION #1: RECOMMENDATION #2: RECOMMENDATION #3: RECOMMENDATION #4: Changes to Provincial Private Moorage

More information

British Columbia s. VVater Act. Modernization. Policy Proposal on British Columbia s new Water Sustainability Act. December 2010

British Columbia s. VVater Act. Modernization. Policy Proposal on British Columbia s new Water Sustainability Act. December 2010 British Columbia s VVater Act Modernization Policy Proposal on British Columbia s new Water Sustainability Act December 2010 British Columbia has a rich heritage in our lakes, rivers and streams. Linked

More information

How to Reduce Costs While Improving the Reliability and Quality of Water Resources. The water in a watershed is essential for supporting all life.

How to Reduce Costs While Improving the Reliability and Quality of Water Resources. The water in a watershed is essential for supporting all life. Land Use and Watersheds How to Reduce Costs While Improving the Reliability and Quality of Water Resources The water in a watershed is essential for supporting all life. Mary Nichols, Director, UCLA Institute

More information

Boardman River Townships Project EAST BAY TOWNSHIP. WATER QUALITY ACTION PLAN Fall 2009

Boardman River Townships Project EAST BAY TOWNSHIP. WATER QUALITY ACTION PLAN Fall 2009 Boardman River Townships Project EAST BAY TOWNSHIP WATER QUALITY ACTION PLAN Fall 2009 Partners: The Watershed Center Grand Traverse Bay Northwestern Michigan College - Great Lakes Water Studies Institute

More information

Routine Effectiveness Evaluations Port Alberni District (TFL 44)

Routine Effectiveness Evaluations Port Alberni District (TFL 44) Routine Effectiveness Evaluations Port Alberni District (TFL 44) Objective The project objective was to conduct routine effectiveness evaluations (REE) at 14 instream restoration sites in Sarita River,

More information

EQ #21- Why is there a Water Crisis in the Klamath Basin? A CASE STUDY OF WATER STRESS

EQ #21- Why is there a Water Crisis in the Klamath Basin? A CASE STUDY OF WATER STRESS EQ #21- Why is there a Water Crisis in the Klamath Basin? A CASE STUDY OF WATER STRESS Where is the Klamath Basin? Where and what is the K Basin?! It is a watershed that straddles Oregon and California

More information

2009 Template for Detailed Proposals:

2009 Template for Detailed Proposals: 2009 Template for Detailed Proposals: When answering the following questions, do not alter the size or shape of the text boxes. Answer the following questions using a minimum of 10 pt font. FSWP File Number

More information

CITY OF NEW WESTMINSTER. Bylaw No. 7033, 2005 RIPARIAN AREAS PROTECTION BYLAW

CITY OF NEW WESTMINSTER. Bylaw No. 7033, 2005 RIPARIAN AREAS PROTECTION BYLAW CITY OF NEW WESTMINSTER Bylaw No. 7033, 2005 RIPARIAN AREAS PROTECTION BYLAW WHEREAS the City may preserve, protect, restore and enhance the natural environment near streams that support fish habitat from

More information

Watershed Management in Alberta Green Area

Watershed Management in Alberta Green Area Watershed Management in Alberta Green Area John Diiwu Alberta Outline What is the green area? Key land use activities Need for watershed management Some provincial policies Need for information and tools

More information

There are three fundamental principles of the Conservation Authority system:

There are three fundamental principles of the Conservation Authority system: Preface The Conservation Authorities Act was created by the Ontario Provincial Legislature in 1946 to ensure the conservation, restoration and responsible management of our water, land and natural habitat

More information

Hon. John A. Fraser Address Pacific Salmon Treaty Workshop Woods Institute for the Environment Stanford University 15 November 2007

Hon. John A. Fraser Address Pacific Salmon Treaty Workshop Woods Institute for the Environment Stanford University 15 November 2007 Hon. John A. Fraser Address Pacific Salmon Treaty Workshop Woods Institute for the Environment Stanford University 15 November 2007 You have asked us to give an overview. I shall try to join with my colleagues

More information

Watershed Assessment on Island Timberlands Private Managed Forest Land. Presented to WIWAG June 14, 2007

Watershed Assessment on Island Timberlands Private Managed Forest Land. Presented to WIWAG June 14, 2007 Watershed Assessment on Island Timberlands Private Managed Forest Land Presented to WIWAG June 14, 2007 Island Timberlands Environmental Policy Island forest management activities will: Use and promote

More information

Section V.H. Fresh Water Resources

Section V.H. Fresh Water Resources Section V.H. Fresh Water Resources Section V.H. Fresh Water Resources 205 I. Fresh Water Resources Though previous comprehensive plans indicate several dozen minor watersheds in Islesboro, each draining

More information

Riparian Areas Regulation Implementation Guidebook January 2006

Riparian Areas Regulation Implementation Guidebook January 2006 Riparian Areas Regulation Implementation Guidebook January 2006 Ministry of Water Land and Air Protection Environmental Stewardship Division Biodiversity Branch Contents Acknowledgements Preface ii iii

More information

FORM 1 Riparian Areas Regulation - Qualified Environmental Professional - Assessment Report

FORM 1 Riparian Areas Regulation - Qualified Environmental Professional - Assessment Report Riparian Areas Regulation: Assessment Report Please refer to submission instructions and assessment report guidelines when completing this report. Date 2006-07-17 I. Primary QEP Information First Name

More information

Alberta Conservation Association 2007/08 Project Summary Report

Alberta Conservation Association 2007/08 Project Summary Report Alberta Conservation Association 2007/08 Project Summary Report Project Name: Beaverlodge River Drainage Conservation Project Leader: Tyler Johns Primary ACA staff on this project: John Hallett and Tyler

More information

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 182 NOVEMBER 2012 GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS TABLE OF CONTENTS

More information

OKLAHOMA CLEAN LAKES AND WATERSHEDS 23rd ANNUAL CONFERENCE AGENDA. SUCCESS STORY: 20 YEARS of HYPOLIMNETIC OXYGENATION of a RESERVOIR

OKLAHOMA CLEAN LAKES AND WATERSHEDS 23rd ANNUAL CONFERENCE AGENDA. SUCCESS STORY: 20 YEARS of HYPOLIMNETIC OXYGENATION of a RESERVOIR OKLAHOMA CLEAN LAKES AND WATERSHEDS 23rd ANNUAL CONFERENCE AGENDA SUCCESS STORY: 20 YEARS of HYPOLIMNETIC OXYGENATION of a RESERVOIR Agenda EBMUD & Camanche Reservoir Water Quality Challenges Speece Cone

More information

Good Afternoon. I'm State Representative Sarah Roberts serving in the Michigan House of

Good Afternoon. I'm State Representative Sarah Roberts serving in the Michigan House of Good Afternoon. I'm State Representative Sarah Roberts serving in the Michigan House of Representatives. I am not a geologist, a scientist nor an expert on nuclear waste. But I am elected to be the voice

More information

2012 YEAR IN REVIEW FRASER VALLEY WATERSHED PROGRAM. Watershed Program Overview: Watershed Program Projects:

2012 YEAR IN REVIEW FRASER VALLEY WATERSHED PROGRAM. Watershed Program Overview: Watershed Program Projects: FRASER VALLEY 1 WATERSHED PROGRAM April 2013 Issue No.4 2012 YEAR IN REVIEW Lance Lilley Rachel Drennan Natashia Cox Fraser Valley Watersheds Coalition Watershed Program Overview: Formed in 2005, the Fraser

More information

To: Bev Farkas Senior Secretary Regional and Community Utilities ( )

To: Bev Farkas Senior Secretary Regional and Community Utilities ( ) From: Sent: To: Cc: Subject: Attachments: Farkas, Bev [BFarkas@rdn.bc.ca] April-28-10 12:04 PM Living Water Smart NV:X Metherall, Christina FW: Water Act Modernization Discussion Paper Submission RDN WAM

More information

Appendices. A - Curriculum Organizers and Learning Outcomes. B - Glossary. C - Video Script. D - Supplementary Resources, Workshops and Field Trips

Appendices. A - Curriculum Organizers and Learning Outcomes. B - Glossary. C - Video Script. D - Supplementary Resources, Workshops and Field Trips Appendices A - Curriculum Organizers and Learning Outcomes B - Glossary C - Video Script D - Supplementary Resources, Workshops and Field Trips every dr p counts APPENDIX d: SUPPLEMENTARY RESOURCES, WORKSHOPS

More information

Englishman River Program Status Update Prepared For: Drinking Water and Watershed Protection Technical Advisory Committee February 14, 2012

Englishman River Program Status Update Prepared For: Drinking Water and Watershed Protection Technical Advisory Committee February 14, 2012 Englishman River Program Status Update Prepared For: Drinking Water and Watershed Protection Technical Advisory Committee February 14, 2012 Prepared By: Mike Squire, AScT AWS / ERWS Program Manager Program

More information

Solano RCD & Local Agencies Partner to Deliver Multi-audience Stormwater Management Education

Solano RCD & Local Agencies Partner to Deliver Multi-audience Stormwater Management Education Solano RCD & Local Agencies Partner to Deliver Multi-audience Stormwater Management Education Amy King, Watershed Project Manager, Solano Resource Conservation District The Partners Solano Resource Conservation

More information

Top 10 Risks of the Clean Fill Dump Site

Top 10 Risks of the Clean Fill Dump Site Top 10 Risks of the Clean Fill Dump Site Definition in Uxbridge and Scugog Site Alteration By laws commercial fill operation means the placing or dumping of fill involving remuneration paid, or any other

More information

There is a reliable, clean water supply for current and future generations.

There is a reliable, clean water supply for current and future generations. E2 There is a reliable, clean water supply for current and future generations. E2.1. Current and future water supply for municipalities, industries, agriculture, and the environment is reliable. 2.1.1.

More information

SECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE SERVICES 1

SECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE SERVICES 1 Hunan Xiangjiang River Watershed Existing Solid Waste Comprehensive Treatment Project (RRP PRC 48443) SECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE SERVICES 1 Sector Road Map 1. Sector

More information

Irrigation Development in Manitoba

Irrigation Development in Manitoba Irrigation Development in Manitoba Environmental Challenges Environmental Opportunities Bruce Shewfelt, Msc., P.Eng Lead, Irrigation and Drainage Unit, AAFC-PFRA Agriculture and Agri-Food Canada Agriculture

More information

Response of Fish Populations to Weir Construction in Arden Creek

Response of Fish Populations to Weir Construction in Arden Creek Response of Fish Populations to Weir Construction in Arden Creek Tracy A. Michalski Fisheries Section British Columbia Ministry of Environment, Lands and Parks 2080 Labieux Road, Nanaimo, BC, V9T 6J9,

More information

ORDINANCE NO. 33 (2000) MANURE MANAGEMENT ORDINANCE

ORDINANCE NO. 33 (2000) MANURE MANAGEMENT ORDINANCE ORDINANCE NO. 33 (2000) MANURE MANAGEMENT ORDINANCE The Dunn County Board of Supervisors does ordain as follows: 23.01 AUTHORITY. This ordinance is adopted under authority granted by Sections 59.02, 59.03,

More information

Shuswap Watershed Project

Shuswap Watershed Project Note: This is a draft working outline of a handbook being developed by Kim Fulton, Contact: kfultondr_fish@yahoo.ca Shuswap Watershed Project Teacher s Resource Handbook Outline: Objectives: to provide

More information

DRAFT Wild Salmon Policy Implementation Plan For Consultations

DRAFT Wild Salmon Policy Implementation Plan For Consultations Draft Implementation Plan Initial Draft for Consultations Fall 2017 DRAFT 2018-2022 Wild Salmon Policy Implementation Plan For Consultations Initial Draft for Fall 2017 Consultations - This initial draft

More information

Integrated Approach to Watershed Management for Climate Change. Charley Worte Latornell Symposium November 19, 2010

Integrated Approach to Watershed Management for Climate Change. Charley Worte Latornell Symposium November 19, 2010 Integrated Approach to Watershed Management for Climate Change Charley Worte Latornell Symposium November 19, 2010 Outline Implications of climate change to Ontario water resources Expert panel recommendations

More information