1 Executive Summary Meeting Date: August 8, 2016 Agenda Item: Briefing: TA/CPA Potable Water and Capital Improvements Text Amendment 10-Year Water Supply Facilities Work Plan Presenter: Melissa Dickens, AICP ext. 355 Action Necessary: No Summary: This is a publicly-initiated amendment to the Imagine 2040: City of Tampa Comprehensive Plan and serves as the official 10-Year Water Supply Facilities Work Plan (Work Plan). The amendment modifies the Potable Water Section to include the Work Plan table and proposes a text change in the Capital Improvements Section related to potable water. A detailed report serves as backup and analysis to the amendment. The purpose of the Work Plan amendment and report is to comply with the statutory requirements for water supply planning, specifically Section , Florida Statutes, which requires that comprehensive plans are to be updated through the Work Plan process within 18 months of when a Water Management District s Governing Board approves a Regional Water Supply Plan. The Southwest Florida Water Management District (SWFWMD) approved an updated Regional Water Supply Plan (RWSP) on November 17, The Work Plan report projects the potable water demand for a 10-year planning period, details water supply sources and future project options, and outlines conservation and reuse programs to help meet future demand. Preparation of the Work Plan was coordinated with SWFWMD, Tampa Bay Water and the City of Tampa. Recommendation: There is no action required at this time. This item will come before the Planning Commission at a public hearing scheduled for September 12, Attachments: Amendment Summary, Work Plan Table, Capital Improvements Section Text Amendment, and Work Plan Report Plan Hillsborough planhillsborough.org planner@plancom.org E Kennedy Blvd 18 th Floor Tampa, FL, 33602

2 This Page Intentionally Left Blank

3 City of Tampa: CPA Text Amendment 10-Year Water Supply Facilities Work Plan Planning Commission Briefing: August 8, 2016 Potable Water and Capital Improvements Text Amendment Summary Information Application Type Agency Review Comments Staff Planner Proposed Text Publicly Initiated None at this time Melissa Dickens, AICP See Attachments Purpose and Intent of Proposed Change An amendment to the Imagine 2040: City of Tampa Comprehensive Plan pertaining to the Potable Water Section and the Capital Improvements Section has been publicly initiated as part of the May 2016 cycle. This amendment serves as the official 10-Year Water Supply Facilities Work Plan (Work Plan), and consists of the Water Supply Facilities Work Plan table, to be adopted as part of the Potable Water Section. This amendment also includes minor edits to policy regarding potable water in the Capital Improvements Section. A detailed report serves as backup and analysis to the amendment. The purpose of the Work Plan is to comply with the statutory requirements for water supply planning, specifically Section , Florida Statutes, which requires that comprehensive plans are to be updated through the Work Plan process within 18 months of when a Water Management District s Governing Board approves a Regional Water Supply Plan. The Southwest Florida Water Management District (SWFWMD) approved an updated Regional Water Supply Plan (RWSP) on November 17, Attachments: 1. Text Amendment - Water Supply Facilities Work Plan Table (Potable Water Section) 2. Text Amendment (Capital Improvements Section) 3. Water Supply Facilities Work Plan Report (Data and Analysis)

4 CITY OF TAMPA - 1O YEAR WATER SUPPLY FACILITIES WORK PLAN PROJECT TABLE Potable Water Projects FY FY FY FY FY FY FY FY FY FY VM Ybor Distribution Line $5,770,273 ( funding source ) Sunset Park Distribution Line - $5,445, ( funding source ) Swann Estates Distribution Line $2,779, ( funding source ) Sun Bay South Distribution Line $2,463,560 - $2,072, ( funding source ) Seminole Heights Distribution Line $5,815, ( funding source ) Port Tampa Distribution Line - $455,890 $4,151, ( funding source ) Palma Ceia Distribution Line $2,451,960 - $2,476, ( funding source ) Misc. Pipeline Replacement $953,600 $1,000,000 - $1,000,000 $995, ( funding source ) Golfwood Estates Pipeline Replacement $5,734, (Distribution) ( funding source ) D.L. Tippen Solids Dewatering Improvement $6,899, ( funding source ) D.L. Tippen Water Plant Treatment $1,179,250 $1,230,000 $1,230,000 $1,230,000 $1,829, Improvements ( funding source ) Cass Street/North A Street CIAC, Phase IV $4,642, ( funding source ) th Street and Hanna Ave CIAC, Phase III $5,495, ( funding source ) 1, Conservation/Reclaimed/AWS Projects Tampa Offset Augmentation Project $500, (funding source) Reclaimed Water System Expansion - $61,000 - $61,000 $61, ( funding source ) TECO Bayside (potential SWFWMD CFI project) - - TBD ( funding source ) - - TBD Conservation Projects $348,105 $325,332 $304,048 $284,157 $265,558 TBD TBD TBD TBD TBD ( funding source ) TBD TBD TBD TBD TBD Source: 1. Water System Revenues 2. State Revolving Loan Notes: This WSFWP table includes significant capital projects known at the time of plan preparation. For a full list of capital projects proposed for funding, please see the City of Tampa CIP. No projects are shown to be funded in this table beyond FY as authorization from City Council for funding has not yet been received, however that does not necessarily mean funding will not be available. Please note that the projects and funding in this table may be modified over time.

5 Capital Improvements Section CAP Policy 1.6.2: The following LOS standards shall be used in reviewing the impacts of new development and redevelopment upon public facility provision Potable Water Maintain raw water sources as permitted by the Southwest Florida Water Management District and provide treated water to provide a minimum gross per capita daily water use of 125 gallons (annual average) on the yearly average and maintain adjusted gross per capita water use of 110 gallons per day on the yearly average. Additional capacity to the City s withdrawal permit to meet this level of service is available through Tampa Bay Water as specified in the existing Interlocal Agreement in Maintain the potable water production capacity at the David L. Tippin Water Treatment Facility of 120 mgd as permitted by the Department of Environmental Protection. Additional treatment capacity is available through Tampa Bay Water (TBW) as specified in the existing Interlocal Agreement in 1998.

6 This Page Intentionally Left Blank

7 Plan Hillsborough planhillsborough.org E Kennedy Blvd 18 th Floor Tampa, FL, City of Tampa 10-Year Water Supply Facilities Work Plan

8 I. Introduction: The purpose of the City of Tampa 10-Year Water Supply Facilities Work Plan (Work Plan) is to comply with the statutory requirements for water supply planning, specifically Section , Florida Statutes, which requires that comprehensive plans are to be updated within 18 months of when a Water Management District s Governing Board approves a Regional Water Supply Plan. The Southwest Florida Water Management District (SWFWMD) approved an updated Regional Water Supply Plan (RWSP) on November 17, Listed below is a summary of statutory requirements, according to the Department of Economic Opportunity (DEO) publication A Guide to the Preparation of the Water Supply Facilities Work Plan: 1. Coordinate appropriate aspects of the comprehensive plan with the appropriate Water Management District s RWSP (s (4)(a), Florida Statutes). 2. Revise the Potable Water Element considering the RWSP of the appropriate water management district (s (6)(c), Florida Statutes). 3. Revise the Potable Water Element to include a Water Supply Facilities Work Plan for at least a 10-year planning period, addressing the water supply facilities necessary to serve existing and new development and for which the local government is responsible (s (6)(c), Florida Statutes). 4. Revise the Conservation Element to assess projected water needs and sources for at least a 10-year planning period considering the appropriate regional water supply plan or, in the absence of an approved RWSP, the district water management plan (s (6)(d), Florida Statutes). 5. Revise the Intergovernmental Coordination Element to ensure coordination of the comprehensive plan with the applicable RWSP (s (6)(h)1, Florida Statutes). 6. During adoption of Evaluation and Appraisal Report based amendments, revise the Potable Water Element to include the Work Plan (s (2), Florida Statues. In summary, the Work Plan and related goals, objectives and policies must address the development of traditional and alternative water supplies, as well as conservation and reuse programs to serve existing and potential increased demand for at least a 10-year planning period. The Work Plan must also be coordinated with SWFWMD s 2015 RWSP. This Work Plan has been developed in accordance with these requirements and serves as data and analysis for the Water Supply Facilities Work Plan Table, which will be included in the Imagine 2040: City of Tampa Comprehensive Plan. II. Coordination Effort Planning Commission staff worked with the City of Tampa Water Department staff, Tampa Bay Water staff and SWFWMD staff to gather and analyze the appropriate data for preparation of this Work Plan. Information in this Work Plan was provided by all three groups, and significant coordination occurred throughout the planning process. 1

9 III. Existing Conditions A. Service Areas The City of Tampa owns, operates and maintains a central potable treatment and distribution system within its corporate limits, as well as beyond its jurisdictional boundaries in unincorporated Hillsborough County and a very small portion of Temple Terrace. The city also owns, operates and maintains a reclaimed water system primarily in South Tampa, with extensions to the Westshore/Tampa International Airport area and to the McKay Bay Waste to Energy Facility. A map of the City s potable and reclaimed service area is included as Exhibit A. B. Water Use Permit and Tampa Bay Water Information The City has a Water Use Permit (WUP) (# ) from SWFWMD for withdrawal of 82 mgd (annual average) from the Hillsborough River Reservoir. The City s permit expires in 2024, within the planning horizon of this Work Plan. Per the SWFWMD Water Use Permit Evaluation Manager, public supply permit renewals are typically not received until the year prior to permit expiration. The City is a member of Tampa Bay Water, which is a regional water supply authority with an unequivocal obligation to provide potable drinking water to its six member governments. The relationship between the City and Tampa Bay Water is governed by the Amended and Restated Interlocal Agreement (1998) and Master Water Supply Contract. The Interlocal Agreement states that Tampa Bay Water is obligated to meet the demand that the City cannot meet through its surface water sources. This obligation is accomplished by providing the City water at two points of connections, Harney Augmentation pump station and Morris Bridge pump station. There is also an emergency interconnection located at Tampa Bay Water s regional facility site in which Tampa Bay Water can provide potable drinking water to the City under certain emergency conditions. Tampa Bay Water is required to update its Long-term Master Water Plan every five years. The current plan was approved in 2013 and provided water demand projections out to the year 2035 (Exhibit B). Tampa Bay Water is currently updating its existing plan which extends the planning horizon to The updated plan will include long-term demand projections to the year 2040 and potential new water supply projects, and will be presented to Tampa Bay Water s Board in December Additional details on the active project concepts and updated status of projects can be found in Exhibit C, the letter from Tampa Bay Water. This letter also confirms sufficient supplies to meet the City s future water needs, above its permitted quantities of 82 mgd. C. City Potable Water Facilities The City maintains potable water treatment, pumping and storage infrastructure. A map of major facilities is included with this report as Exhibit A. The following information is an excerpt from the City Water Department s 2016 Annual Report: Treatment Facilities The David L. Tippin Water Treatment Facility (DLTWTF) utilizes a process of coagulation, flocculation, sedimentation, ozonation, filtration and chloramination to convert raw water into drinking water. Pre-disinfection is achieved through the use of ozone. Chlorine and ammonia are added later in the process to provide post-disinfection with chloramines. The City of Tampa Water Department supplements water from DLTWTF with wholesale water as needed. This water is delivered to the City at the Morris Bridge Repump Station from the Tampa Bay Water system. 2

10 Pumping Facilities A total of 24 pumps are available to pump treated water through the transmission/distribution system. The DLTWTF has eight (8) electrically driven high service pumps, three (3) equipped with variable speed drives, with a total rated capacity of 158 MGD. The Morris Bridge Repump Station has six (6) electrically driven high service pumps, all equipped with variable speed drives, with a total rated capacity of 91 MGD. Emergency generator power is available to operate all of the above pumps. The Northwest Repump Station has three (3) electrically driven pumps with a total rated capacity of 12 MGD. The Interbay Repump Station contains six (6) electrically driven pumps with a total rated capacity of 14 MGD. The West Tampa and Palma Ceia elevated tanks each have one (1) electrically driven pump rated at 7.2 MGD. This provides the City with a pumping capacity of MGD. Backup power is provided at the Northwest and Interbay Repump stations sufficient to operate all the pumps. Storage Facilities Storage capacity at the DLTWTF is provided by four underground clearwells with a combined capacity of 20 million gallons. The Morris Bridge Repump Station has two (2) ground storage tanks with a capacity of 5 million gallons each. Two (2) elevated storage tanks provide 3 million gallons (1.5 MG each) and ground storage tanks at the Northwest Repump Station (3 MG) and Interbay Repump Station (5 MG) provide 8 million gallons of storage. This is a total storage capacity of 41 MG. Additionally, the City projects the following information for the future capacity (mgd): Projected Supply* Treatment Capacity* Pumping Capacity * Includes the permitted Hillsborough River Reservoir amount plus 40 mgd capacity at the Tampa Bay Water Morris Bridge interconnect. Tampa Bay Water has an unequivocal obligation to meet Tampa s water demands. D. Alternative Water Supply Facilities Reclaimed and Aquifer Storage and Recovery Reclaimed The City s Howard F. Curren Advanced Wastewater Treatment Plant treats more than 60 mgd per day of wastewater. The City s reclaimed water system delivers highly treated wastewater to residents and businesses in South Tampa and the Westshore area, as well as Tampa International Airport and business locations along Boy Scout Blvd. Reclaimed water is also used by the City to operate Tampa s McKay Bay Waste to Energy Facility, where 0.6 mgd of reclaimed water is used for evaporative cooling. This effort provides a 1:1 potable water offset. The CF Industries Tampa Ammonia Terminal also uses warm effluent from Howard F. Curren in a heat exchange loop. In 2015, the wastewater treatment plant (WWTP) flow was mgd, the reuse flow was 5.26 mgd and the reuse benefit was 4.35 mgd. The five-year average is mgd (WWTP flow),

11 mgd (reuse flow) and 5.10 mgd (reuse benefit). Beneficial reuse does not include most internal use at treatment plants, sprayfields or RIBs disposal. Aquifer Storage and Recovery Due to the City s flat topography, seasonal rainfall fluctuation and shallow reservoir depth, the City has difficulty sustaining a water supply storage volume that can meet year-round demand. ASR is one alternative that is used to minimize the extent that the City relies on regional drinking water from Tampa Bay Water during peak demand times. The Tampa ASR system stores up to 1 billion gallons of treated water underground and recovers the water during the annual dry season at a 10 mgd peak rate. E. Conservation Initiatives The City has a very strong, multifaceted water conservation program that employs numerous operational, educational and policy measures. A full description of the City s conservation initiatives is listed in Exhibit D (Tampa Water Department Water Conservation Program), which is incorporated by reference into this report. These measures include the following: 1. Operational Measures Source and finished water, and service connection metering Fixed interval meter reading Meter testing, calibration, repairing and replacing System audit Distribution system pressure control Recycled water for filter backwashing at treatment plants Customer leak notification Water conservation coordinator full time staff member 2. Educational and Program Measures Informative billing and water bill inserts Plumbing retrofit giveaways to thousands of residential and business customers Rain sensor distribution program Commercial pre-rinse spray-valve retrofit program Industrial, commercial and institutional water-use efficiency evaluation program Water use surveys Public information/education program Plumbing workshops Customer surveys 3. Policy Measures Conservation rate structure Landscape/irrigation ordinance Stringent restriction enforcement and reduced irrigation hours Low-volume fixture ordinance Rain sensor ordinance Reclaimed water mandatory hookup for irrigation 4

12 In 2015, the sum of these projects had a cumulative annual savings of.06 mgd and a cumulative total savings of 2.02 mgd. For additional details, including a breakdown of conservation, please see Exhibit D. F. Ongoing Cooperative Funding Initiative Projects The City has two ongoing Cooperative Funding Initiative (CFI) water supply projects with SWFWMD, N601 (Hillsborough County/Tampa/Plant City/Temple Terrace Reclaimed Water Recharge Feasibility Study) and N751 (Tampa Augmentation Project). Details of these projects are included in Section V and VI. IV. Future Population and Demand Projections The City recently analyzed population and demand projections as part of its Potable Water Master Plan (Master Plan) update. Please see Exhibit E, incorporated by reference into this document, for a full discussion and comparison of the various population and demand projections considered. Ultimately, the demand projection used for the Master Plan was an average of the four sources available: SWFWMD 2015 projections, Tampa Bay Water 2015 projections, and high and low projections prepared by the City for Tampa Bay Water. Please see Exhibit E for a comparative analysis. For consistency, the City Water Department requested that the same average demand projections used in the Potable Water Master Plan serve as the demand projections for this Water Supply Work Plan. These projections have also been included in the City s Environmental Element. Table 1: Average Demand Projections Year Projected Demand (Average) Notes and Caveats for Demand Projections Planning Commission staff is aware of the population and demand projections prepared by SWFWMD Water Supply Staff as part of the Community Planning Pages, and the ultimate demand figures in the City s Work Plan are slightly higher than SWFWMD s numbers. However, as the City figure represents an average of the four sources available, it was considered by the City to be the best available data and requested that it be used in the Work Plan update. Population and demand projections will have to be provided at the time of WUP renewal and further discussions between the City and SWFWMD may be necessary at that time. Please note that the SWFWMD calculations included in Exhibit E utilize the same five-year per capita average as noted in the Community Planning sheets (113 gpcd). The population projections contained in Exhibit E differ from population projections elsewhere in the Comprehensive Plan. This is due to the fact that functional population and service area population (different than municipal population) are used to calculate the future projections. 5

13 Comparison of Future Demand and Supply Interpolating the projections above, at the end of the 10-year planning horizon, the City of Tampa will have a potable water demand of approximately 83 mgd. This is slightly higher than the currently permitted quantities of 82 mgd (expiring in 2024) from the Hillsborough River; however, Tampa Bay Water has the unequivocal obligation to meet the City s future needs over its current permitted quantity of 82 mgd. Tampa Bay Water has sufficient supplies existing or planned to meet the City s future needs above its current permitted quantity of 82 mgd see (Exhibit C). The interconnect at Morris Bridge has approximately 40 mgd of capacity in the pipe system. Tampa Bay Water is obligated to meet the demand that the City cannot meet through its surface water sources. A letter is included in Exhibit C of this report confirming adequate future water supply. While future demand can be met by permitted quantities and Tampa Bay Water, the City will continue to employ multiple reclaimed, conservation and alternative water supply projects and consider potential options to help reduce/offset future potable demand. V. Future Project Options - RWSP As part of the RWSP process, SWFWMD is required to identify water supply options from which water users in the planning region can choose to meet their individual needs. SWFWMD s 2015 RWSP identifies several potential future project options for the City of Tampa. Per conversations with SWFWMD Water Supply Staff, there is no obligation for local governments to implement these projects, and the costs/benefits are estimates from SWFWMD staff. Table 2: City of Tampa Water Supply Options Listed in SWFWMD RWSP Option Name and Entity Type Supply Benefit Capital Cost (millions) (mgd) (mgd) COT and McKay Bay Restoration, Interconnect, NSE $57.2 Tampa and the District S. County Recharge/Saltwater Recharge, SWB 20 TBD Intrusion Barrier, Hillsborough County/COT Potable Reuse, COT and TBW Purification HC/COT Interconnect COT and HC Interconnect 32 TBD $84 Bypass Canal Augmentation Rehydrate/Wetland/NSE $ , COT Reuse Expansion Tampa/Current System Expansion 1 1 $8.1 WWTP TECO Bayside , COT Reuse Expansion Tampa/Current WWTP South Reuse Expansion , COT System Expansion $8.1 The HC/COT Interconnect listed in the RWSP options table is being considered as part of a threephase project jointly funded with the Hillsborough County, Plant City and Temple Terrace. The City of Tampa is only contributing funding for Phases 1 and 2. The phases are: N471: Phase 1 - A big picture modeling study examining the quantities and rough costs for developing a regional reuse system in Eastern Hillsborough (Completed) N601: Phase 2 - A more refined study of recharge options to site recharge of 25 mgd of reclaimed water and examine areas, options, benefits and more refined costs (Ongoing) 6

14 N755: Phase 3 - A specific modeling study examining specific options, likely benefits and preliminary costs for developing recharge options (Proposed FY 2017 Funding (Hillsborough County only)) Additionally, a multi-year reclaimed expansion project is funded in the City s current CIP. This is limited to expansion of reclaimed water services within the current service area. VI. Future Cooperative Funding Initiative (CFI) Project In addition to the N601 project listed in the previous section, the City s Tampa Augmentation Project (TAP) (N751) is slated to begin shortly. This project proposes to use highly treated reclaimed water to recharge the aquifer adjacent to the Tampa Bypass Canal, as well as evaluate recharging the Avon Park formation with reclaimed water for subsequent recovery from the Suwannee formation and delivery to the Hillsborough River Reservoir. The feasibility study is expected to be completed in December VII. Future Capital Projects 10 Year Water Supply Facilities Work Plan Please see Exhibit F for the 10 Year Water Supply Facilities Work Plan table. This table will also be adopted in the Potable Water Section. VIII. Future Quantifiable Savings from Reclaimed and Conservation Projects Conservation and reclaimed projects will continue to be City strategies to offset future potable use and reduce future potable demand. Although quantifiable estimates are not available for all future projects/components of projects, Table 3 lists out the estimated quantifiable future savings. Additionally, the RWSP project options listed in Section V identify potential future offsets should the City choose to pursue those options. Table 3: Estimated Projected Savings and Offset from Reclaimed and Conservation FY 16 FY 17 FY 18 FY19 FY 20 FY FY FY FY 24 FY 25 FY 26 FY Conservation TBD TBD TBD TBD TBD TBD TBD Projects mgd mgd mgd mgd mgd Reclaimed Projects 4.35 mgd 4.35 mgd 4.35 mgd 4.35 mgd 4.35 mgd 4.35 mgd 4.35 mgd 4.35 mgd 4.35 mgd 4.35 mgd 4.35 mgd 4.35 mgd Source: Conservation: 2015 Tampa Bay Water Regional Report, Appendix B (projections only available until FY 2020) Reclaimed: Projected savings using five year average reclaimed benefit, SWFWMD data. IX. Relevant Goals, Objectives and Policies from Comprehensive Plan The following goals, objectives and policies from the Imagine 2040: City of Tampa Comprehensive Plan support and meet the Work Plan statutory requirements. The policy with an asterisk (*) next to it and with strike-through/underline text is proposed to be modified as part of the Work Plan amendment. Intergovernmental Coordination Section GOV Policy : The City shall collaborate with the Southwest Florida Water Management District and Tampa Bay Water in updating its 10-year Water Supply Work Plan. 7

15 Capital Improvements Section CAP Policy 1.6.2*: The following LOS standards shall be used in reviewing the impacts of new development and redevelopment upon public facility provision Potable Water Maintain raw water sources as permitted by the Southwest Florida Water Management District and provide treated water to provide a minimum gross per capita daily water use of 125 gallons (annual average) on the yearly average and maintain adjusted gross per capita water use of 110 gallons per day on the yearly average. Additional capacity to the City s withdrawal permit to meet this level of service is available through Tampa Bay Water as specified in the existing Interlocal Agreement in Maintain the potable water production capacity at the David L. Tippin Water Treatment Facility of 120 mgd as permitted by the Department of Environmental Protection. Additional treatment capacity is available through Tampa Bay Water (TBW) as specified in the existing Interlocal Agreement in Maintain a system-wide fire reserve as recommended by the Insurance Services Office. Environmental Section ENV Objective 1.26: Strive to reduce potable water demands consistent with state and regional targets through the conservation, reuse, and enhancement of groundwater and surface water supplies, and prevent environmental degradation. ENV Policy : Continue to cooperate with Hillsborough County, the Southwest Florida Water Management District, and Tampa Bay Water, in their efforts to develop an accurate and precise methodology for estimating and communicating groundwater and surface water supply and demand projections. The City shall assist, as appropriate, toward the study of safe yield the volume of groundwater which can be drawn from public water supply aquifers without adverse environmental impacts surface water limitations through the appropriate application of the water budget equations and other means. ENV Policy : Continue to develop and promote educational programs for water conservation through partnerships with the SWFWMD and local initiatives. ENV Policy : Assist the SWFWMD, in developing and enforcing water conservation measures and programs. ENV Policy : To support a sustainable environment, expand the distribution of reclaimed water. ENV Policy : Protect water quality by restricting activities and land uses which would adversely affect the quality and quantity of identified water sources used as a source of public water supply. ENV Policy : As one tool to maximize the conservation of potable water, maintain the escalating user fee rate scale for potable water use. 8

16 ENV Policy : Through the land development review process, promote the application of Florida Friendly Landscaping principles and landscaping as a water conservation measure. Potable Water Section PW Objective 1.1: Appropriately plan for the City s Water Facilities to address current and future demands. PW Policy 1.1.1: Identify, evaluate, and select the most cost effective means of ensuring an adequate water supply including surface water supply, maximizing reclaimed water use, demand reduction, conservation, and peak saving through system integration, and sensible purchase of treated water from Tampa Bay Water. PW Policy 1.1.2: Ensure that Water Facilities are planned in a consistent manner with the City s Comprehensive Plan. PW Policy 1.1.3: Ensure that Water Facilities are planned with the actions defined within the Regional Water Supply Plan prepared by the Southwest Florida Water Management District. PW Objective 1.2: Ensure that the Potable Water System has adequate facilities maintenance and capacity to satisfy the existing and projected demand. PW Policy 1.2.1: Provide regular inspection and preventive maintenance for the water facilities as required. PW Policy 1.2.3: Develop and maintain an aggressive rehabilitation and replacement program directed at the older portions of the utility s existing system. PW Policy 1.2.4: Continue to monitor current and future developments and will determine required improvements to accommodate these developments. PW Policy 1.2.5: Provide treated water to the water distribution system at adequate volume and sufficient pressure to satisfy the demands of the water consumer. PW Objective 1.3: Assure that adequate Levels of Service are provided by water facilities within the Water Service Area for existing and future populations. PW Policy 1.3.1: The Potable Water Level of Service standards established for the City and described in the Capital Improvements Section shall be used in determining the availability of facility capacity and demand. PW Objective 1.4: Improve the efficiency of the City s water conservation and demand reduction programs in order to reduce per capita consumption of potable water. 9

17 PW Policy 1.4.1: Continue its program to research, develop and promote efficient, economically feasible and environmentally sensitive water use and conservation techniques and promote their implementation. PW Policy 1.4.2: Continue to reduce potable water consumption by water conservation rates, conservation codes, operational measures, landscape and irrigation efficiency programs, educational initiatives, research and evaluation, and reuse alternatives. PW Policy 1.4.3: Encourage the use of the lowest quality water reasonably available, which is environmentally safe and suitable to a given use, in order to reduce the unnecessary use of potable water. The City shall improve its water conservation efforts to include a water reuse component which includes the reuse of stormwater, treated effluent or other sources, as feasible. PW Policy 1.4.4: The use of reclaimed water will continue to be encouraged in order to reduce the demand for potable water. PW Policy 1.4.5: Continue to expand its distribution of reclaimed water to new development when and where it makes good business sense. PW Policy 1.4.6: Continue its distribution of reclaimed water to industry. PW Objective 1.6: Prioritize and schedule major water facilities improvements as a component of the capital improvement program. PW Objective 1.7: Coordinate and cooperate with state and federal agencies to insure a safe and sufficient water supply to be provided at a cost-effective rate. PW Policy 1.7.1: Coordinate with other City departments on planning capital improvements projects in order to reduce costs and promote efficient use of resources. PW Policy 1.7.2: Continue to participate and assist Tampa Bay Water, the Southwest Florida Water Management District and the U.S. Environmental Protection Agency in developing innovative techniques to augment existing water supplies to provide for future needs. X. Conclusion The City of Tampa, through permitted quantities from the Hillsborough River Reservoir, its status as a member government in Tampa Bay Water, and reclaimed, alternative water supply and conservation efforts, will meet projected demand through the 10-year planning horizon. This Work Plan serves to meet the requirements of Section and coordinate the relevant components of the 2015 RWSP with the Imagine 2040: City of Tampa Comprehensive Plan. 10

18 COUNTY LINE RD Exhibit A City of Tampa LUTZ LAKE FERN RD 10 YEAR WATER SUPPLY FACILITIES WORK PLAN MAP Y 75 RD BR ID GE BL VD W NS MO RR IS DO B BR UC E ANDERSON RD NEBRASKA AVE MCINTOSH RD 42 I opop25 CYPRESS ST KENNEDY BLVD / SR 60 op op 56T H S T 14 CA US EW AY 6 PW Y op op CR 579 WY op AVE DWAY BROA 50 op op op SR 60 / ADAM O V ING BL MLK DR PALM RIVER RD Water Facilities Listing S WEST SHORE BLVD W HERON LN W SLIGH HILLSBOROUGH RIVER E BROADWAY BYPASS CANAL W COURTNEY CAMPBELL CSWY & BAY TAMPA CROSSING N NEBRASKA HILLSBOROUGH RIVER MAYDELL PALM RIVER FISH CREEK & EISENHOWER BLVD CROSSING S HARBOUR ISLAND GARRISON CHANNEL BENEFICIAL GARRISON CHANNEL ADAMO PALM RIVER W SWANN CIR DITCH DAVIS ISLAND BRIDGE CROSSING ROWLETT PARK HILLSBOROUGH RIVER 24 INCH S 50TH PALM RIVER HILLSBOROUGH RIVER RESERVOIR DAM / OPERATION SHELTER PALMA CEIA ELEVATED TANK WEST TAMPA ELEVATED TANK DAVID L TIPPIN SLUDGE PROCESSING FACILITY BUSCH GARDENS BOOSTER PUMP STATION INTERBAY REPUMP STATION SULPHUR SPRINGS PUMP STATION INTERBAY REPUMP STATION STORAGE TANK MORRIS BRIDGE REPUMP STATION DAVID L TIPPIN WATER TREATMENT FACILITY ROME YARD/DISTRIBUTION DIVISION HILLSBOROUGH RIVER AT AMELIA AVE HILLSBOROUGH RIVER JUST NORTH OF I-275 HILLSBOROUGH RIVER TO CURTIS HIXON PARK FROM PORT TO DAVIS ISLANDS POTABLE FROM PORT TO DAVIS ISLANDS RECLAIMED HILLSBOROUGH RIVER AT HILLSBOROUGH AVE. HILLSBOROUGH RIVER AT KIRBY ST. HILLSBOROUGH RIVER ALONG FLORIDA AVE. HILLSBOROUGH RIVER UNDER 40TH ST. BRIDGE HILLSBOROUGH LAMBRIGHT 42-INCH HENRY HILLSBOROUGH RIVER 24-INCH ROWLETT PARK HILLSBOROUGH RIVER 30-INCH SUBAQ. CROSSING ROWLETT PARK HILLSBOROUGH RIVER 36-INCH ROWLETT PARK HILLSBOROUGH RIVER 12-INCH/8-INCH US HWY TAMPA BYPASS CANAL 36-INCH TAMPA BYPASS CANAL 16-INCH FLETCHER HILLSBOROUGH RIVER (TEMPLE TERRACE) HILLSBOROUGH ROCKY CREEK 12-INCH MEMORIAL ROCKY CREEK 8-INCH CHANNEL WEBB ROAD 8-INCH CHANNEL HANLEY ROAD 12-INCH NORTHWEST REPUMP STATION AND STORAGE TANK MORRIS BRIDGE WELLFIELD N. BLVD. CONNECTION FOR TBW US HWY 301 TBW POC - EMERGENCY Location Diagram and Reference Information SR 60 / BRANDON BLVD Ë BL VD Hillsborough County, Florida 0 Hillsborough Bay BLOOMINGDALE AVE 3,375 6,750 13,500 20,250 DATA SOURCES AND LIMITATIONS: WATER SERVICE AREAS AND FACILITIES: City oftampa. MAJOR ROADS: See Adopted MPO Long Range Transportation Plan for specific improvements. 1 REPRODUCTION: This sheet may not be reproduced in part or full for sale to anyone without specific approval of the Hillsborough County City-County Planning Commission. ACCURACY: It is intended that the accuracy of the base map comply with U.S. national map accuracy standards. However, such accuracy is not guaranteed by the Hillsborough County City-County Planning Commission. RIVERVIEW DR BOYETTE RD BA LM R Author: Date: 4/11/2016 Path: G:\gisroot\Projects\Cathy\Arcmap\NEW_MXD\Tampa\Tampa_10_Year_Water_Supply_Facilities.mxd R IV E VI E W RD Pinellas County D I-75 op ROY SELMON EX US H KINGSWAY RD US HW Y 301 ORIENT RD 40 L EE I-4 VE HA 41 4 WY MANHATTAN AVE MACDILL AVE opop 29 op2220 I-4 3 op op 28 op8 op 9 p o 12 IG SL H US D GAN VD Y BL HANNA AVE op BLVD Old Tampa Bay 16 BAYSHORE WESTSHORE BLVD I-27 op 34 VALRICO RD 17 op Limited Access Roads BELL SHOALS RD 7 op op Tampa 26 Existing Major Road Network W PARSONS AVE op COLUMBUS DR Jurisdiction Boundary PROVIDENCE RD 4 County Boundary RD FALKENBURG RD BELL CSWY op opop EY RN HA 78TH ST CAMP COURTNEY ARMENIA AVE op op o p op opop5 op 2 op op 31 op Temple Terrace 22ND ST NEBRASKA AVE HIMES AVE 46 op op19 Bays, Rivers and Streams RD 45 op AV E op47 HABANA AVE BUSCH BLVD Water Facilities Roads and Boundary Lines S AM LI IL SB OR OU GH I-275 FOWLER AVE N BOULEVARD GH AV E Reclaimed Water Service Area op GU NN HW Y BA U Legend op 40TH ST HI LL FLORIDA AVE 49 op HER AVE FLETC LIN E op op48 23 Potable Water Service Area RD SHELDON RD COUNTRYWA YB LV D CE RA K AC RECLAIMED WATER SERVICE AREA, POTABLE WATER SERVICE AREA AND MAJOR FACILITIES I- 2 DALE MABRY HWY RD VE RSS A BEA TR CROSS CREEK BLVD LIVINGSTON AVE XPWY NS E RA TE VE VAN DYKE RD PAT TE RS ON US HWY 41 PK W Y HW SU N C OA ST N GUN S RD RING ON SP TARP Tampa Bay RHODINE RD For more information about our organization visit website: 27,000 Feet

19 Long-Term Master Water Plan 2013 December, 2013

20 Table of Contents Executive Summary ES-1 A. Section 1 - Introduction and Overview ES-1 B. Section 2 - Existing Facilities Inventory ES-2 C. Section 3 - Capital and Systems Programs ES-4 D. Section 4 - Staffing ES-7 E. Section 5 - Customers and Water Demands ES-9 F. Section 6 - System Analysis ES-11 G. Section 7- Regulatory Review ES-13 H. Section 8 - Source Water Protection Program ES-15 I. Section 9 - Climate Variability and Long-Term Climate Change ES-16 J. Section 10 - Demand Management ES-17 K. Section 11 - Potential Future Water Supply Sources ES-18 L. Section 12 - System-Wide Reliability and Future Needs ES-25 Section 1- Introduction and Overview 1-1 A. Background 1-1 B. Objectives of Long-Term Master Water Plan C. Review of Agreements 1-5 D. Conclusion 1-7 Section 2- Existing Facilities Inventory 2-1 A. Introduction 2-1 B. General Description of Facilities 2-3 Section 3- Capital and Systems Programs 3-1 A. Capital Improvement Program 3-1 B. Renewal and Replacement Program 3-3 C. Energy Management Program 3-6 Section 4- Staffing 4-1 Section 5- Customers and Water Demands 5-1 A. Introduction 5-1 B. Meeting Member Government Water Demands 5-2 C. Demand Forecasting System 5-5 D. Demand Forecasting System Results ( ) 5-7 E. Interlocal Agreement Requirements and Recommendations 5-10 Section 6 Systems Analysis 6-1

21 A. Systems Analysis Tool 6-1 B. Previous Hydraulic and System Analyses 6-2 C. Current and Future Systems Analyses 6-5 D. Summary of System Analysis Recommendations 6-10 Section 7- Regulatory Review 7-1 A. Introduction 7-1 B. Federal Rules and Regulations 7-2 C. Water Management District Permits 7-5 D. Existing Tampa Bay Water Permitted Sources and Facilities Permits 7-7 E. Regulatory Effect on Operations and Water Supply Development 7-10 Section 8 - Source Water Protection Program 8-1 A. Introduction 8-1 B. Tampa Bay Water s Source Water Protection Program Overview 8-1 C. Source Water Protection Program 8-2 D. Source Water Protection Program Implementation 8-9 Section 9- Climate Variability and Long-Term Climate Change 9-1 A. Overview 9-1 B. Potential Effects on Tampa Bay Water 9-3 C. Risk Assessment and Adaptive Management Strategies 9-5 D. Adaptive Strategies 9-7 E. National Climate Assessment 9-9 F. Key Messages 9-10 Section 10- Demand Management 10-1 A. Introduction 10-1 B. Components of Tampa Bay Water s Demand Management Plan 10-2 C. Profile of Regional Water Demand 10-2 D. Evaluation of Water Efficiency Alternatives 10-5 E. Economic Analysis of Alternative Demand Management Strategies 10-9 F. Board Approved Demand Management Plan Directives Section 11- Potential Future Water Supply Sources 11-1 A. Small Footprint Reverse Osmosis- Pinellas County 11-2 B. Tampa Bay Seawater Desalination Plant Expansion 11-4 C. Gulf Coast (Anclote) Seawater Desalination Plant 11-6 D. Additional Potable Groundwater From Existing Northern Wellfields 11-8 E. Thonotosassa Wells 11-13

22 F. Surface Water Expansion G. Aquifer Recharge Section 12- System-Wide Reliability and Future Needs 12-1 A. Interlocal Agreement Requirements for Water Supply Planning 12-1 B. Introduction 12-2 C. Regional System Performance Evaluation Measures 12-3 D. Regional System Performance Evaluation 12-15

23 Long-Term Master Water Plan 2013 Executive Summary Executive Summary Tampa Bay Water is a regional water supply authority that provides wholesale water for its six Member governments: Hillsborough, Pasco and Pinellas counties, and the cities of New Port Richey, St. Petersburg and Tampa. The Amended and Restated Interlocal Agreement (referred to as the Interlocal Agreement) requires that the Master Water Plan be updated every five years. Tampa Bay Water was formed in 1998, the first revision to the Master Water Plan was approved by the board of directors in 2003, the second was approved by the Board in 2008, and the third revision is required to be completed by the end of This document, entitled Long-Term Master Water Plan 2013, has been developed to meet this requirement and to ensure that Tampa Bay Water meets the unequivocal obligation to provide quality water to the member governments now and in the future. A. Section 1 Introduction and Overview Tampa Bay Water owns and operates a diversified water supply system. The Agency s Long-Term Master Water Plan documents how Tampa Bay Water meets its unequivocal obligation to provide quality water to the member governments now and in the future. The Amended and Restated Interlocal Agreement requires that the Long-Term Master Water Plan be updated every five years. Since its creation in 1998, the Agency has completed three revisions of the Plan. This document, entitled Long- Term Master Water Plan 2013, is the latest revision. The objectives of this update are to meet the requirements set forth in the Interlocal Agreement. According to the Agreement, the five-year update shall, to the extent deemed necessary or advisable by the board: Identify current customers, projects and future customers Review and generally inventory existing Tampa Bay Water facilities Identify a Capital Improvement Program Review current Tampa Bay Water permits along with existing and projected regulations Identify proposed new water supply facilities Evaluate staffing Provide hydraulic analysis of both existing and proposed systems Evaluate present and future sources and treatment requirements in terms of capacity, reliability and economy Update the list of water supply facilities required to meet the anticipated water quality needs of the member governments for the next twenty years Tampa Bay Water Page ES-1

24 Long-Term Master Water Plan 2013 Executive Summary During the 2008 update, the comprehensive project list was updated and approximately 300 potential water supply projects were evaluated based on public input and with the advice of the Planning Advisory Committee. The Tampa Bay Water board approved the update to the Plan in December As the result of the update, the Board directed that seven project concepts and three policy planning areas be further studied. The seven project concepts are: Small Footprint Reverse Osmosis-Pinellas County; Gulf Coast Seawater Desalination Plant; Tampa Bay Seawater Desalination Plant Expansion; Thonotosassa Wells; Additional Potable Groundwater from Existing Northern Wells; Surface Water Expansion Project; and Aquifer Recharge Project. The three policy planning areas were: Source Water Protection Program; Regional Reclaimed Water Planning Assistance; Demand Management and Water Use Efficiency. The studies for all three of the policy planning areas have been completed. Tampa Bay Water s existing supply should meet the region s demands for the next decade and the Long- Term Master Water Plan includes projects to meet the agency s 20-year planning horizon needs. For the 2013 update, no new water supply facilities are recommended for selection and implementation in the next five years due to lower regional demand projections. For planning purposes, future project(s) selection and preparation of water use permits should be based on the supply capacity under average hydrologic conditions since these projects are in development to meet long-term water supply needs. The project concepts approved by the board in the 2008 plan update should be studied further over the next few years to provide information for the board to select the next water supply project(s) for construction when needed. Tampa Bay Water will continue to implement and enhance its planning and management activities to address seasonal and severe drought events and long-term future supply needs. These activities will be conducted along with study of the project concepts in the Long-Term Master Water Plan to ensure that Tampa Bay Water continues to meet its unequivocal obligation to provide quality water to the member governments. B. Section 2 - Existing Facilities Inventory Tampa Bay Water constructed a regional water delivery system that is comprised of groundwater and surface water sources, an off-stream storage reservoir, a seawater desalination plant and a collection of pipes and pumps that distribute quality drinking water to the six member governments. The regional system facilities currently in service are summarized below: Distribution: 3 booster pumping stations 21 points of connection ~115 miles of raw water pipeline ~156 miles of finished water pipeline 2 alkalinity adjustment Groundwater Facilities: 13 wellfields 177 wells 5 individual wellfields 6 groundwater treatment facilities 2 groundwater Surface Water Facilities: 2 river withdrawal points; 1 desalination withdrawal point 1 re-pump station 1 15-billion gallon surface water storage reservoir 1 surface water treatment plant 1 seawater desalination plant Tampa Bay Water Page ES-2

25 Long-Term Master Water Plan 2013 Executive Summary facilities 4 interconnections where the Agency can purchase water from member governments hydrogen sulfide removal facilities 1 booster pump station 1 reservoir pump station 1 augmentation pump station (Harney Canal) The location of these facilities is shown in figure ES-1. Figure ES-1 Tampa Bay Water Regional Water Supply and Delivery System Tampa Bay Water Page ES-3

26 Long-Term Master Water Plan 2013 Executive Summary Tampa Bay Water has completed adding additional water treatment facilities, an expanded surface water system, piping and pumping to form a flexible and adaptable water supply system. These sources are sufficient to meet the region s drinking water demands over the next decade. Due to slowed regional demands for drinking water, Tampa Bay Water does not need to select new supply projects during this update cycle. All potential new water supply projects will be carried into the Master Water Plan feasibility program and will be evaluated over the next 3-4 years. C. Section 3 Capital and Systems Programs Tampa Bay Water s Capital and System Programs includes the Capital Improvement Program, Renewal and Replacement Program, and Energy Management Program. A. Capital Improvement Program Tampa Bay Water s Capital Improvement Program (CIP) is a comprehensive five-year plan of approved and proposed capital projects. The CIP is updated annually, as the need and timing for specific projects change. Figure ES-2 shows the process followed for developing the annual update to the Capital Improvement Program Plan: Figure ES-2 Capital Improvement Program Annual Update Process Tampa Bay Water Page ES-4

27 Long-Term Master Water Plan 2013 Executive Summary A capital project is defined as planned activities that result in a distinct capital asset owned by the Agency and/or a major repair, improvement, renovation or expansion that extends an existing asset s useful life. Table ES-1 outlines the criteria a project has to meet in order to be considered a capital improvement project: Table ES-1 Capital Improvement Project Criteria Criterion Definition Compliance Level of Service Contractual Obligations Security and Safety Outside Funding Project needed to meet: Legal settlement Regulatory agency action (e.g., consent order, administrative order) Permit requirements Project is critical to the existing level of service (i.e., existing operating conditions) Project improves the reliability of the regional system components or extends the components useful life (e.g., pressure, flow, metering equipment) Project needed to meet one or more of the following: Memorandum of understanding Joint project Agreement The Amended and Restated Interlocal Agreement production failure requirements Future water demands; and has been identified in the Master Water Plan Exhibit C & D of the Master Water Supply Contract The project is critical to the facility security The project is recommended by the vulnerability assessment The project addresses a hazard or safety issue to the workforce, public, or water supplies The project addresses State & Federal safety regulations Outside Funding possible such as: State & Federal grants Co-funding agreements Member government contributions Existing Funding agreement in place such as: Co-funding agreement State & Federal grants Member government contributions Annual O&M Effects to Operating (i.e., chemicals & power) and/or Maintenance Costs) B. Renewal and Replacement Program Tampa Bay Water s Renewal and Replacement Program is intended to maintain a sustainable infrastructure. This program helps Tampa Bay Water manage its assets in a cost-effective manner while ensuring that the agency meets its goals of delivering safe and reliable drinking water. The Renewal and Replacement Program development process is shown in Figure ES-3. Tampa Bay Water Page ES-5

28 Long-Term Master Water Plan 2013 Executive Summary Figure ES-3 Renewal and Replacement Program Annual Update Process C. Energy Management Program Tampa Bay Water s Energy Management Program includes energy efficiency, conservation and alternative/renewable energy capital project ideas for our water supply system. This program follows an Energy Roadmap, which was developed to provide a 10-year look at the issues related to energy consumption at our facilities. The Energy Roadmap provides an action plan that sets expectations and principles along with measurable targets; it identifies the elements of technology and energy infrastructure to enhance financial stability and sustainability; and it provides a basis to analyze the relationship between decisions that affect annual operations and maintenance capital budgeting. Figure ES-4 shows the Energy Roadmap. Tampa Bay Water Page ES-6

29 Long-Term Master Water Plan 2013 Executive Summary Figure ES-4 Energy Program Roadmap D. Section 4 Staffing Tampa Bay Water reviews staffing periodically through formal audits and pay plan and benefit package reviews. The board approved the latest pay and classification plan for the Agency in April The Agency maintains a lean staff of 132 full-time equivalent positions to fulfill the Agency s mission while maintaining a fiscally responsible program to serve its member governments. In April 2011, the board approved an Agency Strategic Plan, which consists of four main goals intended to guide the Agency in fulfilling the mission of providing clean, safe and reliable water. During 2012, the Tampa Bay Water Page ES-7

30 Long-Term Master Water Plan 2013 Executive Summary Agency underwent a reorganization process in order to meet the goals of the Strategic Plan. Tampa Bay Water is shifting its focus from building new supplies to maintaining its existing supplies and facilities. As such, the Agency has reorganized to better reflect the new focus and be more efficient in its organizational structure. Figure ES-5 shows current organizational structure. Figure ES-5 Tampa Bay Water Organizational Structure Tampa Bay Water Page ES-8

31 Long-Term Master Water Plan 2013 Executive Summary E. Section 5 - Customers and Water Demands Tampa Bay Water has the unequivocal obligation to meet the water demands of its six member governments. A major component in developing new potable water supplies is the ability to accurately determine future demands so that new projects can be implemented when needed, avoiding the risk of under-or over-estimating when supply is needed. As stated by the American Water Works Association s Manual of Water Supply Practices M 50 (2007), a sound water demand forecast allows utilities and regional suppliers to provide the following: Adequacy of supply Optimum facility location and size Sound transmission and distribution design Tampa Bay Water provides regional water demand forecasts for its member governments specifically to project the amount of water supply needed within Tampa Bay Water s service area. The regional demand forecasts include the total water demand for the City of Tampa. The Agency s Long-term Demand Forecasting models are designed primarily for the purpose of longer-term planning and forecasting over year time horizons. The models provide monthly and annual water demand forecasts for the seven water demand planning areas (WDPAs) of the six member governments through the 2035 planning horizon. This demand planning ensures that adequate supply will be made available to member governments in the future and that supplies are added in such a way as to minimize member government wholesale water rate impacts. Seven water demand planning areas are established which reflect the current service area boundaries for the six member governments. These areas are illustrated in figure ES-6. Tampa Bay Water Page ES-9

32 Long-Term Master Water Plan 2013 Executive Summary Figure ES-6- Tampa Bay Water Member Government Water Demand Planning Areas Tampa Bay Water updated its Long-Term Demand Forecasting models and developed two long-term water demand forecasts through Each model generates demand forecasts based on water demand planning area specific weather and socioeconomic projections. Annual water demands within Tampa Bay Water s service area have been impacted by the economic recession since Figure ES-7 shows Tampa Bay Water demand projections by water demand planning area through Tampa Bay Water Page ES-10

33 Long-Term Master Water Plan 2013 Executive Summary Figure ES-7- Tampa Bay Water Demand Projections by Water Demand Planning Area Tampa Bay Water will continue to update its demand projections annually to ensure that our commitment to provide clean, safe and reliable supply to our member governments is met. F. Section 6 - System Analysis Tampa Bay Water regularly performs hydraulic analyses for its regional supply and transmission system to study current system operating conditions and to evaluate plans for projected future operating conditions. Tampa Bay Water uses a number of tools to perform modeling and analysis. A detailed description of these models can be found in Section 6 of the Long-Term Master Water Plan. In 2006, Tampa Bay Water s system engineer completed the System Analysis Update document, which was performed to determine regional transmission system improvements. As a result of this analysis, 25 recommendations were made to Tampa Bay Water on overall system improvement. Most of the 25 recommendations have been completed. The future water supply options identified in the 2008 Long-Term Water Supply Plan were evaluated in a hydraulic model for the demands projected for the year The results showed certain hydraulic Tampa Bay Water Page ES-11

34 Long-Term Master Water Plan 2013 Executive Summary limitations in the Morris Bridge Transmission Main, Cypress Bridge Transmission Main, Brandon Transmission Main and Brandon South Central Connection. The analysis also determined that the hydraulic limitations would be improved by the addition of new supply capacities downstream of the Cypress Creek Pump Station at the Lithia Water Treatment Facility. The addition of new supply could require parallel or increased diameter piping to be installed. As the decision regarding which long-term water supply projects will be considered for further evaluation and eventual implementation, additional analyses should be completed to evaluate the need for additional operational flexibility and potential system operating restrictions. Tampa Bay Water will update the Tampa Bay Water 2025 System Analysis document completed by Black & Veatch in 2006, based on the expanded surface water system infrastructure and projected future demands. The improvements that were recommended from the last analysis that have not been completed will also be re-evaluated to determine if they are still necessary. The summary of current System Analysis Recommendations is: Regional System and Enhanced Surface Water System Surge Models o Complete the database of system surge features. o Field verify the equipment and settings. o Update and run the system surge models to verify that the system has adequate surge protection. o Update the surge analysis for any major changes to the system. Regional Supply and Transmission System and Enhanced Surface Water System Hydraulic Models o Evaluate system improvements at the Odessa and US 41 Pump Stations resulting from an increase in system pressure from Cypress Creek. o Evaluate options for lowering system pressures in the transmission main between the High Service pump Station and the Cypress Creek Pump Station. o Evaluate the benefits of adding finished water storage. o Update the 2025 Analysis and determine if the previously recommended projects are still necessary. o Evaluate long-term water supply options. Hydraulic Grade Tools (with chemical and electrical cost estimates) Tampa Bay Water Page ES-12

35 Long-Term Master Water Plan 2013 Executive Summary o Project monthly chemical and electrical costs for annual budgeting. Enhanced Surface Water System Operational Model o Project supply availability based on projected regional rainfall forecasts. o Evaluate future surface water system expansion options. Regional System Performance Model o Update the analysis of system reliability in the Regional System Performance Model whenever any changes to supply sources and/or changes demand projections. o Evaluate the improved system reliability with each of the long-term water supply options. G. Section 7 - Regulatory Review As a part of planning to meet the water needs of the member governments, it is important for Tampa Bay Water to consider existing and proposed regulations at the State and Federal levels. Drinking water standards are established at the Federal and State levels to protect human health. The Florida Department of Environmental Protection typically adopts drinking water standards as mandated at the federal level; however, State standards may be more stringent than the Federal standards. The Florida Department of Environmental Protection is also responsible for permitting water treatment facilities and distribution systems. Tampa Bay Water is required to provide water that meets all State and Federal drinking water standards as well as Exhibit D Standards, which are established in the Master Water Supply Contract to further refine the definition of a Quality Water to be provided to the member governments. Table ES-2 summarizes major water-related regulations under development at the Environmental Protection Agency. Tampa Bay Water Page ES-13

36 Long-Term Master Water Plan 2013 Executive Summary Table ES-2 Projected Environmental Protection Agency Regulations Regulation Proposal Final Notes Bisphenol A (BPA) TBD TBD Advanced Notice of Proposed Rulemaking published on July 26, EPA is considering environmental testing for BPA under the Toxic Substances Control Act (TSCA), including potential testing of drinking water and its sources. On February 2, 2011, EPA announced plans to develop a single National Drinking Water Regulation (NPDWR) Carcinogenic Volatile 2014 June 2015 covering up to 16 carcinogenic VOCs. EPA is conducting Organic Compounds (VOCs) (projected) (projected) evaluations and developing supporting materials for proposal. The Clean Water Protection Rule would codify requirements currently set forth in the EPA/Army Corps Clean Water Protection Rule TBD TBD of Engineers Draft Guidance on Identifying Waters Protected by the Clean Water Act. The guidance was submitted to the Office of Management and Budget for review on February 21, Lead and Copper Rule (LCR): Regulatory Revisions Perchlorate Radon Revised Total Coliform Rule (RTCR) RTCR - Finished Water Storage Facility Inspection Requirements Effluent Guidelines and Standards for Unconventional Oil and Gas Extraction Including Coalbed Methane and Shale Gas Extraction 2014 (projected) 2014 (projected) November 2, 1999 June 17, 2010 May 2014 (projected) August 2014 (statutory deadline) TBD February 13, 2013 EPA has announced its intention to engage in a series of public meetings/workshops to discuss potential rule revisions. EPA is awaiting the final Science Advisory Board report on setting a Maximum Contaminant Level Goal (MCLG) and continues to evaluate revised modeling approaches to set an MCLG. Long-term prospects for a radon rulemaking are uncertain. EPA's Spring 2011 Regulatory Agenda lists final action for this rule as "to be determined." However, it is not listed at all in the Fall 2012 Regulatory Agenda. The final RTCR was published in the Federal Register on February 13, Compliance begins on April 1, TBD TBD EPA is evaluating options for a potential regulation. October 2014 (projected) February 2016 (projected) Fluoride TBD TBD EPA has completed and peer-reviewed a quantitative dose-response assessment based on the available data for severe dental fluorosis as recommended by National Research Council (NRC). EPA has also completed and peer-reviewed a document on environmental exposure to fluoride and the relative source contribution (RSC) for water. The RSC is needed in order to derive the Maximum Contaminate Level Goal (MCLG) from the dose-response assessment. Tampa Bay Water Page ES-14

37 Long-Term Master Water Plan 2013 Executive Summary In operating its facilities and planning for future supply sources, Tampa Bay Water should continue to participate in Federal and State regulatory policy initiatives in order to understand their effect on operations and future water supply development options. At the State level, Tampa Bay Water can provide constructive input on initiatives such as the Florida Department of Environmental Protection s Consumptive Use Permitting Consistency effort to help improve the permitting process. At the Federal level, things such as source water quality based upon established Maximum Contaminant Levels and Maximum Contaminant Guidance Levels, as well as potential emerging contaminants and Contaminant Candidate List constituents that might become regulated in the future will need to be followed. The research being performed on such constituents, their potential effects on public health, the environment, and related treatment aspects will continue to provide new information and a better understanding on how they might affect water supply. The research process is expected to occur over a long time span and thus will allow Tampa Bay Water time to adapt should any new regulatory limits be set. In the meantime, Tampa Bay Water can continue to participate in the regulatory development process to ensure that any proposed legislation is supportive of Tampa Bay Water s goal to provide safe clean drinking water. H. Section 8 - Source Water Protection Protecting the sources of drinking water supply in our region is essential to protecting the public health and maintaining a sustainable water supply in the future. Protecting the sources of the region s drinking water supplies also protects the water supply investment made by the board. Source water protection is the first step in a multi-barrier approach to drinking water protection. Tampa Bay Water has a diversified water supply portfolio, consisting of groundwater, surface water and desalinated water. The Agency relies on 13 consolidated wellfields, 2 isolated wells, the Hillsborough River, Alafia River, Tampa Bypass Canal, Regional Reservoir and the Seawater Desalination Plant to meet the daily demand for quality drinking water. During the 2008 Long-Term Master Water Plan update, the board approved the creation of a source water protection program. In , the agency undertook this effort and developed an Integrated Source Water Protection Program which was approved by the board in This Program contains several source water protection options. Detailed information regarding each of those options can be found in Appendix B. Tampa Bay Water s Integrated Source Water Protection Program employs a range of initiatives to prevent and reduce source water pollution, such as education and outreach programs, participation in regulatory initiatives as well as partnerships and monitoring programs. As a wholesale water provider, Tampa Bay Water does not have regulatory purview over the land areas that influence the sources of Tampa Bay Water Page ES-15

38 Long-Term Master Water Plan 2013 Executive Summary supply. Collaboration with member governments, regulatory agencies and stakeholders are important components of a successful source water protection program for Tampa Bay Water. Tampa Bay Water staff will continue to examine the Agency s source water protection needs and recommend to the board an annual budget for source water protection activities. This will help ensure that the efforts most beneficial to the Agency s program are funded and implemented each year. I. Section 9 - Climate Variability and Long-Term Climate Change Use of surface water supplies imposes a new level of uncertainty in our water supply system and makes the region more susceptible to extremes of weather and climate. Because Tampa Bay Water has become more reliant on surface water sources, it is important to examine the relationship between climate change and water quality and quantity issues. Important effects of climate change that will potentially affect Tampa Bay Water include: Impacts of increasing temperature on evapotranspiration and seasonal rainfall patterns; Increasing rainfall variability and frequency of extreme events (e.g. more hurricanes, more droughts); Source water quality changes due to temperature changes or increased runoff; and Changes in rainfall patterns and temperatures affecting water use patterns and future water needs. Risk-based decision making is one approach that can be used to balance risks and costs and incorporate the uncertainties associated with climate change. Risk assessment includes evaluating the likelihood of a climate change impact occurring. Adaptive management supports action in the face of uncertainty and limited scientific knowledge. Tampa Bay Water s current mix of supplies is diverse. This diversity offers opportunities for adaptive planning and adaptive management which can offset some of the effects associated with climate uncertainties. Tampa Bay Water s board has approved the incorporation of adaptive management into long-range planning activities. The key components of adaptive management are defined as follows: Implementation- water supply planning, construction programs and operations feedback Feedback- monitoring and review of economic and environmental outcomes of management actions Re-evaluation- conceive new strategies (planning and operational) as information accumulates and understanding improves Tampa Bay Water Page ES-16

39 Long-Term Master Water Plan 2013 Executive Summary Repeat Loop- continuous improvement process Tampa Bay Water is moving forward with its risk assessments to understand the uncertainties associated with climate change and variability and how this may affect long-term water supply planning activities and implementation of adaptive management strategies. J. Section 10 - Demand Management Through the six member governments, Tampa Bay Water meets the drinking water demands of more than 2.3 million people. According to member governments actual and projected 5-year water conservation plans, it is estimated that the member governments collectively saved approximately 26 million gallons per day (mgd) of potable water by the end of the water year 2011, and will save up to approximately 30 million gallons per day (mgd) by the end of water year The Demand Management Plan investigates the benefits and costs of water demand management as a quantifiable, alternative water supply source. The Demand Management Plan is one way to further the Agency s strategic goals to achieve reliability of its water supply and delivery system to its member governments. Demand Management Plan efforts are intended to serve as a complement to the traditional water supply planning process in meeting current and future water demands. Demand management encompasses a set of activities designed to: Provide a better understanding of how and why water is used Forecast human demands for water supplies Develop prospective water-using efficiency (demand reduction) measures Identify programmatic and project goals, evaluation criteria, performance measures and monitoring mechanisms Define and evaluate program effectiveness and goal achievement Evaluate the benefits and costs of efficiency measures as an alternative or a complement to supply development The demand management effort includes an analysis of past and present water savings, as well as an analysis of avoided supply costs related to improved water use efficiency. The Demand Management Plan examines things such as distribution of water use, an evaluation of achieved water savings from existing member governments programs, and the analysis of new and upcoming water technologies designated to lower water use. Tampa Bay Water Page ES-17

40 Long-Term Master Water Plan 2013 Executive Summary In February 2013, the Board adopted a Water Efficiency resolution, which gives Tampa Bay Water a direction on activities that need to be included in the Demand Management planning efforts. The Water Use Efficiency resolution incorporates water use efficiency evaluation efforts into the Agency long-term planning process. The resolution is based on the following findings: Develop and implement data collection, management and analysis protocols and procedures for the continued assessment of passive water use efficiency within Tampa Bay Water service area Integrate passive water-use efficiency into the Agency s Long-Term Demand Forecast and Future Needs Analysis Include the Water Use Efficiency Evaluation as an element of the Long-Term Master Water Plan Include an updated evaluation of potential active measures for implementing efficient water-use products as part of future options for the next Long-Term Master Water Plan update Incorporation of the effects of increased water-use efficiency into the Agency s long-term planning process provides the board with more supply policy options, affords Tampa Bay Water and its member governments a supply buffer, and allows Tampa Bay Water to prepare and plan for the effects due to changes in water use efficiency. K. Section 11 - Potential Future Water Supply Sources As required by the Interlocal Agreement, Tampa Bay Water must update its Long-Term Master Water Plan every five years to ensure that the Agency has adequate supply to meet the region s demand for quality drinking water. During the 2008 Long-Term Master Water Plan, Tampa Bay Water looked at approximately 300 potential water supply projects. The board approved seven project concepts for the Master Water Plan. Current demand projections show that the existing water supply facilities are sufficient to meet the demand for quality drinking water over the next decade. Due to the slow regional demand growth, no project has to be chosen from the Master Water Plan list for implementation during this plan update. The seven project concepts can be carried into the 2013 Long-Term Master Water Plan and included in a planning-feasibility program over the next five years. The seven project concepts approved by the board are: Small Footprint Reverse Osmosis Desalination Plant Expansion Gulf Coast Desalination Plant Tampa Bay Water Page ES-18

41 Long-Term Master Water Plan 2013 Executive Summary Additional Potable Groundwater from Existing Northern Wellfields Thonotosassa Wells Surface Water Expansion Aquifer Recharge The board s goals for Master Water Plan projects include: environmental stewardship, cost and reliability. These are described as follows: Environmental Stewardship: Tampa Bay Water delivers high quality drinking water in an environmentally responsible manner. The Partnership Plan and the Interlocal Agreement that drove the creation of Tampa Bay Water had environmental stewardship as one core motivation. Tampa Bay Water continues to monitor and optimize its operations to ensure that its water production operations incorporates the responsibility to develop and implement future sustainable water supplies, minimizing electrical power consumption, greenhouse gas production, chemical usage, and other factors involving environmental consequences. Cost: Balancing fiscal responsibility with reliability and environmental stewardship is also important in Tampa Bay Water s water supply approach. Minimizing the cost of all operations, from source to tap, helps minimize rate impacts, consistent with meeting reliability and environmental stewardship goals. This focus on efficiency helps fulfill Tampa Bay Water s mission of public service, ensuring the region s water needs are met in the most economical manner. Reliability: Because Tampa Bay Water is unequivocally committed to meeting the needs of its member governments continuously, reliability of its supply sources is of primary importance. Water supply source reliability addresses the challenges Tampa Bay Water faces in accomplishing its mission, including source water protection, drought resistance, diversification, adequate supply, source optimization, storage, and transmission flexibility. Furthermore, the potential impacts of future climate effects, particularly increased climatic variability, can affect source water quantity and quality. System reliability is also critical to ensure that the public health responsibility of water supply is continuously maintained, as well as providing the flexibility to maintain environmental stewardship. Figure ES-8 shows the location of the 7 project concepts: Tampa Bay Water Page ES-19

42 Long-Term Master Water Plan 2013 Executive Summary Figure ES-8 Project Concept Location Map Tampa Bay Water Page ES-20

43 Long-Term Master Water Plan 2013 Executive Summary Table ES-3 summarizes the seven project concept costs and yield information. Source Type Project Potential Annual Average Yield (million gallons per day) Capital Cost ($ million) Unit Cost ($ per 1,000 gallons) Brackish Groundwater Seawater ¹Small Footprint Reverse Osmosis- Pinellas County Tampa Bay Seawater Desalination Plant Expansion To be monitored To be monitored To be monitored 10 mgd $216,100,000 $8.11 Seawater Gulf Coast (Anclote) Seawater Desalination Plant 25mgd/9mgd(phase I)/21 mgd(phase II) $551,100,000/$262,000,000/ $252,200,000 $7.00/ $9.00/ $7.00 Fresh Groundwater Additional Potable Groundwater from Existing Northern Tampa Bay Wellfields 10mgd/15 mgd $21,784,000/$28,011,000 $0.58/ $0.52 Fresh Groundwater Surface Water Thonotosassa Wells 10 mgd $44,674,000 $0.98 ²Surface Water Expansion ³0.3 mgd-17.3 mgd $11,559,000-$612,514,000 $3.93- $12.85 Reclaimed Water Aquifer Recharge 22 mgd $234,348,000-rapid infiltration basin/ $2.41/ $5.58 $406,463,000-direct recharge wells ¹Tampa Bay Water will continue to monitor the efforts of the City of Clearwater as they expand their Brackish reverse osmosis plant. The City of Oldsmar has constructed the plant, which is operational and the City if Tarpon Springs is currently in construction; therefore, the costs and yields of the projects are not applicable at this time. ²This project was formerly known as the Alafia Expansion Project. ³ This project concept consists of 7 potential configurations Tampa Bay Water Page ES-21

44

45

46

47 Tampa Water Department Water Conservation Program Background and Introduction To provide a dependable alternative to a scattered system of poor quality wells, the City of Tampa constructed a dedicated water treatment facility adjacent to the Hillsborough River in The facility, which is a designated American Water Landmark, is currently known as the David L. Tippin Water Treatment Facility. The Water Treatment Facility produces around 90 percent of the 80 million gallons of water per day that is consumed by Tampa Water Department customers. In 2000, the plant was restored to its original Moorish-Spanish decor, and, while the architecture of Tampa's original water treatment plant has been preserved, the treatment process continues to change and improve as technology advances. The plant houses Florida's only municipally-owned, state-certified, complete drinking water laboratory. Throughout the treatment process, continuous and complete water analyses ensure that Tampa's water quality exceeds all State and Federal standards. The Tampa Water Department is the only Florida-located water utility and one of 13 water providers in the United States that was recognized in 2013 with a 15 Year Directors Award for delivering superior quality drinking water to customers. In 1989, in response to rapid population growth, record drought conditions and projected future water supply deficits, the Tampa Water Department (TWD) implemented a formal Water Conservation Program that has been consistently recognized around the nation for its leadership, innovation and achieved demand reductions. Since its inception, the program has grown to a multi-faceted effort that includes operational, programmatic and policy measures. Tampa s Water Conservation activities are part of a long-range water conservation planning process that incorporates the goals of responsible stewardship of Tampa s water supply, limited reliance on the regional water resources to augment Tampa s water needs during dry periods, and the use of appropriate business practices to safeguard the fiscal well-being of the Tampa Water Department while retaining already achieved water use efficiencies and contributing to: Future economic development and growth while protecting local and regional water resources, Reduction or deferral of costs associated with of maintaining and expanding water delivery, treatment, and disposal systems, and Reduction of energy and maintenance costs of TWD facilities. Potable Water Use The TWD water supply system provides water to industry, wholesale accounts and residential customers within Tampa s water service area. Tampa records and analyzes consumption data and reports the data to Tampa Bay Water and to the Southwest Florida Water Management District.

48 Retail Customer Classifications Customer classifications differ in their characteristics relevant to water use. Single family (SF) and multi-family (MF) accounts reflect strictly residential water use. Single family homes typically have irrigated, individually landscaped yards, and those in deedrestricted or similar planned communities may also have any of a variety of observed irrigation configurations ranging from individually-metered, self-controlled to individuallymetered, association-controlled to association-metered and association-controlled. Deed restricted and similar planned communities within the Tampa service area also include irrigated landscape common areas similar to the common-area landscape found at multiple-family residential units and many business settings in our community, with water sourcing ranging from metered potable to pond and lake water to District permitted wells. Non-residential accounts include government/public water use in parks, prisons, government buildings, and medians; offices, businesses, shops, restaurants and hotels, and industrial use in production and manufacturing processes. System-Wide Historical Use Since 1989, when Tampa launched its formal water conservation program, the total population served by the TWD increased virtually every year until 2010, when the number declined. This drop in functional population served is believed to be due to economic pressures and revisions in methods of calculation. Revisions to methods of calculation, as required by our permitting agency, the Southwest Florida Water Management District, also resulted in a change in the per capita values. For the reporting year 2013, the TWD reported a compliance per capita of 106 gpcd. A history of average pumpage per capita and adjusted use per capita is shown in Table 1. Consumptive water use frequently is expressed in gallons per capita per day (GPCD) or the average gallons used per person per day. Per capita values shown in Table 1 are calculated for Tampa s functional population, which includes not only residential and business customers but commuters, tourists, and other non-residents who use water in Tampa while here temporarily for business or pleasure. Table 1 History of Average Pumpage Per Capita and Adjusted Use Per Capita Fiscal Year Average Pumpage (MGD) Population of Service Area Gross Use Per Capit a (GPD) Gallons Exported Water (GPD) Adjuste d Use Per Capita (GPD) , N/A2 N/A N/A , ,000 N/A , , , , , , , ,

49 , ,977, , ,661, , ,657, , ,148, , ,301, Not available Not available 139 Not available , ,714, , ,839, , ,382, , ,949, , ,804, , ,832, , ,772, , ,420, , ,164,138 N/A , ,338,712 N/A , ,324,294 N/A , ,301, Low rainfall years 2 Exported Water data and Significant Users data were not captured, nor did Tampa Water Department calculate an adjusted per capita prior to Estimated calculation of the population, which includes commuter work force entering the City. 4 This includes North Tampa interconnect, which started at the end of FY98. 5 Fluctuations in reported Adjusted GPCD may be attributed to periodic revisions to method of calculation for included variables. 6Method of calculation significantly revised for 2010 reporting year, which resulted in changes to reclaimed water and stormwater deductions. Those previously-included deductions affected the Adjusted GPCD. City of Tampa Monthly Demand Five-Year Perspective Within the past seven years, as reflected in the Figure 1 below, Tampa s month-bymonth water demand and its cumulative annual water demand continues seasonal fluctuations but remains below 2007 levels. The reduced demands are attributed, in part, to athe City s active, comprehensive approach to water conservation and efficiency. Figure 1. City of Tampa Monthly Demand FY 2007 FY 2014 Note: WY 2007 WY 2014 designation in legend is the equivalent of FY 2007 FY Values for April and May 2009 reflect demand during period when hand-watering only imposed to protect Tampa s primary source.

50 Water Conservation Goals and Objectives The overall goal of Tampa s water conservation efforts is to ensure a sustainable water supply to meet community demands during normal and emergency conditions. This section provides a brief description of water conservation activities and measures employed by the Tampa Water Department. Operational Measures Source and Finished Water, and Service Connection Metering All raw water flows and finished water flows are metered. All existing service connections are metered and the City requires meters for all new connections. TWD meters all treated water delivered to its wholesale customers. These meters are calibrated annually. The TWD monitors meter activity through its Supervisory Control and Data Acquisition (SCADA) system. Fixed-Interval Meter Reading Meters for all Tampa water customers are read monthly. Locations where the recorded meter reading is outside a normal range is scheduled for a re-read to verify or correct the read, as is appropriate. A self-help kit is available to locations with verified high reads to assist them in determining and addressing the possible causes of the high usage. Meter Testing, Calibrating, Repairing and Replacing The TWD Preventative Maintenance (PM) Team is responsible for performing all functions in respect to the operation and maintenance of Tampa s water meters. Tampa s policy is to replace residential meters after they have been in service for 10 years to ensure metering accuracy. To comply with that policy, approximately one-tenth of the residential meters in our system are replaced on an annual basis. All 2-inch and larger meters in the system are field tested annually, and those that are not metering to within a range of 98 percent to 101 percent accuracy are recalibrated or, if necessary, replaced. The TWD also reviews existing meters at commercial locations as part of a right-sizing initiative to ensure that the meters installed at those locations are capable of recording demand at those locations with the highest degree of accuracy possible. System Audit To ensure minimal real and apparent system loss, the TWD monthly compiles and reviews data related to water production and metered sales to identify and respond to factors contributing to water loss. Distribution System Pressure Control

51 Tampa maintains 35 continuously-monitored pressure stations around the system, connected to SCADA, to maintain the distribution system. There also are several pump stations and elevated tanks in place to assist in meeting peak demands. Each monitored station is equipped with minimum- and maximum-alarmed limits for pressure to ensure that the system is maintained within the parameters established by the Health Department. Recycled Water for Filter Backwashing at Treatment Plants The TWD uses dual media filers at its water treatment plant that require routine backwashing. Air scouring is used to help dislodge material collected in the filter media, and backwash is then used to remove dislodged material to a thickener tank for reclamation. After settling in the thickener, the backwash water is recycled to the beginning of the treatment stream for reprocessing. Solids collected in the thickener are removed for dewatering and disposal, and water captured during the dewatering process also returns to the beginning of the treatment train for reuse. Customer Leak Notification The TWD completes re-reads for locations where usage exceeded prior history normal ranges for a location and leaves door tags at locations where re-reads confirmed high usage to alert customers of a possible leak on the customer side of the meter. Additionally, the TWD continues to explore the use of automated meter reading technology. It is anticipated that such a conversion would include the ability to establish earlier customer leak notification and high-use notification programs. Water Conservation Coordinator TWD maintains a staff of three full-time water conservation coordinator positions to plan, implement and evaluate its water conservation activities. The water conservation team is a part of the department s Distribution and Consumer Services Division, which includes customer service and billing functions. The Conservation Section's close alignment with the Department's distribution division activities ensure the conservation team s involvement in customer-focused and internal water demand reduction and loss control programs. Reuse Expansion The Tampa Water Department continues to explore opportunities to increase the availability of reclaimed water for irrigation and commercial application and indirect potable use. Aquifer Storage and Recovery With ever-increasing water demands and seasonal variations in surface supply, it is challenging at times to provide solely from the river source for Tampa s water demands. Tampa currently has eight Aquifer Storage and Recovery wells that store up to 1 billion gallons of water when excess surface water supply is available. The Tampa ASR system

52 is operated seasonally, storing water during rainy periods and recovering when supplies are short. Educational and Program Measures Informative Billing and Water Bill Inserts Each utility bill issued by the City of Tampa provide the customer with usage for the billing period. The usage is expressed in units and in gallons, rounded and expressed in 1,000 gallon increments, to assist the customer in comparing their most recent consumption with the information provided in the 13-month usage history included on the face of the bill. City of Tampa utility bills are mailed monthly to each customer to a mailing address designated by the customer. Additionally, customers may view and download current and past bills online for the 12 months prior to the current billing. In addition to the information routinely printed on Tampa s utility bills and the online bill view, the following information is featured on the water department s Web site: 1. Rate structures for each billing class, 2. An explanation of any water-related surcharges, including information about how the application of such surcharges is triggered, 3. Conversion information to assist customers in doing their own calculations to convert metered units to gallons, and 4. Three years of average use for all user classes to assist customers in comparing their water usage to other similar users in Tampa. Tampa s billing process accommodates billing inserts, which are used to advise customers of available water conservation programs and water use restrictions. The TWD also offers customers the opportunity to subscribe to an electronic newsletter that delivers direct-to-their- water conservation tips and information about available water conservation programs and water use restrictions. Retrofit Kit Give-Away Tampa water customers may request free Plumbing Retrofit Kits and Save Water Kits from the TWD. The Plumbing Retrofit Kit contains the following items: low flow showerhead, bathroom aerators, kitchen aerator, teflon tape, toilet leak detection dye tablets, installation instructions, the most recent Water Quality Report, and informational brochures. The Save Water Kits include toilet leak detection dye tablets, the most recent Water Quality Report, and informational materials on checking for leaks and conserving water. An average of kits are distributed annually to residential customers with an estimated 2,000 2,500 kit content items being distributed in bulk to multi-family and business locations. Rain Sensor Distribution Program The TWD provides rain sensors to customers on request at no charge to replace a nonworking sensor or to complete an initial installation. Commercial Pre-Rinse Spray-Value Retrofit Program

53 The TWD offers free low-volume (1.28 gpm) pre-rinse spray valves to Tampa-located restaurans and locations with on-site commercial kitchens. Industrial, Commercial and Institutional Water-Use Efficiency Evaluation Program Since approximately 40 percent of Tampa s account base is non-residential, the TWD annually maintains an Industrial, Commercial, and Institutional Water-Use Efficiency Evaluation Program that offers both on-site assistance and a comprehensive self-guided evaluation template to help non-residential locations identify water efficiency measures and to incorporate them into a site-specific water conservation plan. The on-site portion of this program is structured in such a way that the customer is an active participant throughout the entire process to ensure that the customer gains not only the evaluation and an efficiency plan but also gains the ability to self-conduct on-going evaluations to ensure that gained efficiencies are maintained. This program also includes a series of industry-specific template documents to help industrial, commercial and institutional customers identify industry specific efficiency measures and options. As a part of its focus on these customer categories, the TWD supports the Southwest Florida Water Management District s Water C.H.A.M.P. and Water PRO programs. Water Use Surveys To assist its customer base, the TWD offers a customer care program that provides referred customers with an on-site water use survey to assist with identification of leaks and/or other conditions that may contribute to increased water use and increased water and wastewater utility costs. Public Information/Education The TWD purchases and publishes a variety of brochures and other literature promoting water conservation and water use efficiency. Brochures provide information on water conservation issues, such as efficient irrigation, irrigation with reclaimed water, leak detection and repair, and indoor water conservation. The TWD also maintains a 24- hour, 7-day-a-week water conservation hotline that provides customers with current information regarding water use restrictions. In addition to the available brochures, the TWD maintains a Web site presence that features more than 100 pages of water conservation and water efficiency information and access to partner-sponsored water conservation programs and materials and uses social marketing tools, such as Facebook and Twitter to reach the widest possible audience within its service area. The Web-located information is designed to provide customers with on-demand access to every brochure published by the Department in addition to water-conservation programs and tips. Details about TWD s water conservation and efficiency public information components are provided below: Pipeline (e-newsletter) WaterSense Rates, Fees and Billing Information Water Stewardship PSA Contest 7-Day Water Challenge

54 Community Water Wise Awards Water Use Calculator Water Use Restriction Information Brochures (conservation tips, rebate programs, rates, and more) Plumbing Retrofit Kits Do It Yourself Sprinkler Checkup Guide Do it Yourself Rain Sensor Checkup Guide 7-Day Drinking Water Challenge Put A Lid on Leaks Plumbing Workshops To assist in addressing concerns associated with residential account customer-side leaks, the TWD is partnering with Erwin Technical Education Center in Tampa to provide tuition-subsidized plumbing and general home maintenance workshops for residential and commercial account holders. This program launched immediately at the start of FY2014. Customer Surveys Tampa periodically talks with or contacts prior conservation program participants by mail to collect information that will assist in evaluating programs and activities. Workshops The TWD cooperates with a variety of partners to sponsor rain barrel, Florida-Friendly landscaping and other water-conservation workshops around the community. Wholesale Water Supplier Assistance Program Tampa cooperates and coordinates with its wholesale customers in developing their Water Use Efficiency Plans and will continue to participate in and support those efforts. Policy Measures Conservation Rate Structure The City of Tampa continues the use of an inclining tier rate structure, which is in place for all customer categories. In 2007, Tampa s City Council approved a five-year plan for annual rate increases, and, in accordance with that plan implemented increases for all customer classes in 2008, 2009 and Additionally, in FY 2010, the TWD expanded the tier structure for single-family residential customers from 5 to 7 usage ranges and adopted a sharply increasing rate structure for single family residential customers using the highest volumes of water. Tampa s FY2011 single family residential rate structure, with the additional of Tiers 5-7 was: Inside City of Tampa Outside City of Tampa

55 Tier ccf $2.09 $2.61 Tier ccf Tier ccf Tier ccf Tier ccf First tier rates for non-residential customers are equivalent to the Tiers 1 4 and the usage in each tier is customer-class specific and based on threshold amounts established for specific types of use. For instance, the threshold rate for a hotel/motel customer is established based on the number of rental rooms the facility has. For a nonresidential customer whose usage does not exceed the assigned threshold for that location, each unit of water metered is billed at Tier 1 rates; consumption the exceeds the threshold but does not exceed twice the threshold level is billed at Tier 2 rates; consumption that exceeds twice the threshold but does not exceed 3.5 times the threshold level is billed at Tier 3 rates; and consumption that exceeds 3.5 times the threshold level is billed at Tier 4 rates. Landscape/Irrigation Ordinance Chapter 27 of the City of Tampa s Code of Ordinances requires the use of Florida- Friendly landscape principles for the design of new landscape and includes these measures: 1. An incrementally reduction to the amount of irrigable turf allowed that caps that landscape component at no more than 25 percent of the total irrigated area after 2011 for new landscape installation. 2. Landscaped areas shall consist of at least sixty (60) percent native plant material and/or plant material adapted to local climatic and edaphic conditions. 3. A layer of mulch to a minimum depth of three (3) inches shall be specified on the site plan in plant beds and around individual trees in turf areas. 4. Sprays and rotors are required to have matching application rates within each irrigation zone, and mixed zones are not permitted. 5. All irrigation systems are required to be designed to avoid over spray, runoff, low head drainage, or other similar conditions where water flows onto or over adjacent property, non-irrigated areas, walkways, roadways, structures, or water features. And, emitters and sprinkler heads are encouraged to be located at least two (2) feet from buildings and water should not hit the building while operating. Narrow areas (four (4) feet wide or less) are not to be irrigated unless low-volume irrigation is utilized. 6. Newly installed irrigation control equipment is required to include an automatic irrigation controller having program flexibility, such as repeat cycles and multiple program capabilities, a battery back-up or nonvolatile memory to retain the irrigation program(s), and an operable rain sensor or other device, such as soil moisture sensor, to prevent unnecessary irrigation. Stringent Restriction Enforcement and Reduced Irrigation Hours The City of Tampa stringently enforces all local and regional water use restrictions. In May 2006, the TWD moved to a citation on first observance of a violation policy in lieu of the issuance of warnings in an effort to increase restriction compliance and reinforce the message to Tampa water users that conservation is a year-round activity. Additionally,

56 within its local water use restriction ordinance, Tampa reduces the permitted hours allowed by the Southwest Florida Water Management District (before 10 a.m. and after 4 p.m.) by two hours per day on scheduled irrigation days. Tampa does not permit irrigation between 8 a.m. and 6 p.m. Low-Volume Fixture Ordinance In concert with the effective date of the U.S. Energy Policy Act of 1994 (EPACT), the City of Tampa established water conservation standards for plumbing fixtures installed in new construction, and initiated a first-of-its-kind toilet rebate program that has served as a model for subsequent programs for utilities, water authorities and water management agencies across the nation. The TWD routinely distributes replacement showerheads and faucet aerators with water use efficiencies exceeding the requirements of EPACT. The TWD also is enrolled as a WaterSense partner, promoting the installation and use of efficiency-tested and rated water appliances and fixtures. Rain Sensor Ordinance The City of Tampa s water use restriction ordinance includes language that requires the use of an automatic rain sensor or other rain sensing technology for all automatic irrigation system. Reclaimed Water Mandatory Hook-Up for Irrigation All newly installed irrigation systems in Tampa must connect to reclaimed water when they are in a location where reclaimed service is available. Conclusion Tampa is fully committed to maintaining a comprehensive water conservation program that addresses our community s on-going need to ensure a safe, reliable water supply that meets demands during normal and emergency conditions. This commitment is realized through operational, programmatic and policy-related activities, and is fully integrated throughout the Water Department s business activities. As a result of Tampa s long-term approach to water conservation and through engagement of Tampa s water users, since the inception of the program in 1989 total system demand and gpcd has declined significantly. The City remains committed to water conservation and the Tampa Water Department will build on its past conservation successes and continue to update and revise its programs in order to remain at the forefront in the implementation of water conservation programs.

57 DRAFT POPULATION & DEMAND PROJECTIONS Potable Water Master Plan B&V PROJECT NO Black & Veatch Holding Company All rights reserved. PREPARED FOR City of Tampa PICK A DATE.