We are Manufacturing & Engineering for the Solutions

Size: px
Start display at page:

Download "We are Manufacturing & Engineering for the Solutions"

Transcription

1 We are Manufacturing & Engineering for the Solutions GFS tank Storage Solution Biogas Plant AD Solution WWTP Reactor Solution

2 01 About YHR Pa rt

3 About YHR YHR was established in 2005, a Chinese national high-tech enterprise. Leading company on recycling of the Agriculture organic waste. Biggest Biogas equipment manufacturer in China. Among the top 3 Biogas EPC contractors in China. First and biggest GFS tank manufacturer. We are expanding overseas market now, Our equipment has been delivered to more than 10 countries GFS Tanks installed globally Equipment supplied in Biogas industry Sewage treatment reactors supplied EPC more than 1 MW biogas plants in China

4 Professional Team YHR owns a high qualified professional team. The leader of the company graduate from EMBA of Renmin University of China, who has a wealth of industry experience and advanced business philosophy. YHR has currently more than 170 employees, with 3 EMBA, 2 PhD, 22 Master and more than 50 high qualified engineers.

5 Service Equipment manufacturing GFS tanks, Sewage Reactor, Biogas Digester, Membrane Biogas Holder. Biogas EPC YHR offers service from Consulting, Design, Installation Guidance, Commissioning,After-Sale Service, etc. Investment Investment in agricultural organic waste centralized treatment, including biogas power generation, organic fertilizer production. Operation Management Biogas Engineering cooperative operation, fully managed operation, leasing operation, etc. YHR safeguard the project benefits by our expertise.

6 关于盈和瑞 Global market distribution YHR s references distributed in Russia, Southeast Asia, Australia, Middle East, Africa, Greece, etc. countries and regions

7 02 Equipment Manufactuer Pa rt

8 装备制造篇 Core Equipment: GFS TANK Advanced tank manufacturing technology Higher anti-corrosion technology, Fast installation and value-added product In 1999,YHR has delivered the first Made-in-China GFS tank. We are the first GFS tank manufacturer in China. In 2005,the municipal wastewater treatment in Olympics park. We have shorten the construction time from 3 months to 30 days.

9 Modularized design and manufacture/factory quality control/fast Installation In 2005,Jiuquan satellite launch center 10,000t domestic wastewater/d treating plant. It is the first time GFS tank installed in Gobi Desert! The installation work is done within only two months. Dedication for China Space Industry!

10 Mink manure biogas plant In 2009,Greece Europe Our tank entered in European market.

11 GFS Tank Production Line-- Upgrading now! Production line with over 100,000 enameled steel plates capacity annually. A brand-new world leading production line on construction. Biggest GFS Production base in Asia.

12 7000+ GFS Tank have delivered worldwide! Application field Municipal wastewater, industrial wastewater, drinking water sludge disposal, livestock effluent Landfill leachate kitchen waste and Agricultural organic waste. Modularized IC reactor for a paper mill waste water treatment plant. YHR is a leading company drafting China GFS Tank Industry Standard.

13 Biggest waste landfill plant in Mentougou,Beijing Reported by CCTV in the documentary <China s Mega Project> UBF reactor We are more than a manufacturer. Biggest effluent unit supplier, serve for 300+ effluent project. Include: UASB/IC/EGSB/UBF/SBR/conta ct oxidation/sedimentation Tank.

14 YHR has proven himself in different conditions for global customers. Russia Philippines Indonesia Kuwait

15 We have designed and supplied Anaerobic Digester for 400+ biogas plant We continuously optimize our process design. Based on advanced microbial process control theory, we integrate the most advanced mixing system and control system, to provide our customers efficient and stable projects.

16 Worldwide Project References Vietnam Greece Singapore Russia Philippines Thailand

17 Project Reference - Industrial & Municipal Wastewater

18 Project Reference - Drinking Water Storage

19 Modularized Reactor - UASB Three phase separator - Modularized design & installation

20 Modularized Reactor IC / EGSB Three phase separator

21 03 Bioas plant AD solution Pa rt

22 We never simply reproduce our design, we tailor the solution for each customer. The substrate we could use: Livestock manure\straw MSW, kitchen waste, organic wastewater etc. POME EFB CAKE Napier grass cassava.

23 Semi-aerobic Hydrolysis Process Corn Straw + Cow manure 3.3MW. National Bio-Natural Gas Pilot project Sanhe City. Hebei Province

24 Core technology:abdp A patent process specially designed for low concertation Xinyu, Jiangxi Pig Manure 2MW CHP Guangshui,Hubei Pig Manure 2MW TS% 2%!

25 Pure Pig Manure Biogas Plant Core technology: ABDP Input material TS%=2% Capacity:2MW Hubei, Guangshui 一

26 Cow Manure Biogas Project Jialihe, Shandong Substrate:cow manure,1.5mw TS%4-5%, High gas yield rate 1.5m³/m³.d with short HRT, down to 12.5d SRT/MRT 25d;Gas yield 550Nm³/t VS

27 Chicken Manure Biogas Project Core Technology: SAHP Semi-Aerobic Hydrolysis Process Input material:chicken Manure+ Small Amount of Rice Straw Capacity:2MW Jiangsu, Haian

28 Semi-aerobic hydrolysis A high efficient pre-treatment technology for fibrous substrate Pure Corn Straw Biogas project First large-scale biogas plant for bio-methane from corn silage only without manure Scale: 5MW Shandong, Dezhou

29 Biological Desulfurization System Different patented process design for different biogas usage: Acid type biological desulfurization Alkali type biological desulfurization Chemical desulfurization Cases: Gas flow:1700m³/h, H2S: ppm,Alkali BDS H2S Reduction up to 99.5%.

30 Double membrane Gas storage system Chicken manure + wheat straw 2.2MW 4000m3 Ground gas holder Corn Straw + Cow manure 3.3MW 5000m3 Ground gas holder

31 THANKS Tel: +86 (010)