1 MINERALS NORTH 2009

2 Forward Looking Statements Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of Prize Mining Corp. and Eagle Plains Resources Ltd. to be materially different from any future results, performance or achievements expressed or implied by forward-looking statements. Such factors include, among others, general business, economic, competitive, political and social uncertainties; the anticipated benefits of the acquisition not occurring in the expected time frame or at all; the actual results of current exploration activities; actual results of reclamation activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of gold; possible variations of ore grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents, labor disputes and other risks of the mining industry; political instability, insurrection or war; delays in obtaining governmental approvals or financing or in the completion of development or construction activities. Although Prize Mining Corp. and Eagle Plains Resources Ltd. have attempted to identify important factors that could cause actual actions, events or results to differ materially ill from those described in forward-looking statements, there may be other factors that cause actions, events or results to differ from those anticipated, estimated or intended. Forward-looking statements contained herein are made as of the date of this presentation and Prize Mining Corp. and Eagle Plains Resources Ltd. disclaim any obligation to update any forward-looking statements, whether as a result of new information, future events or results or otherwise. There can be noassurancethat t forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Prize Mining Corp. and Eagle Plains Resources Ltd. undertake no obligation to update forward-looking statements if circumstances or managements estimates or opinions should change. Accordingly, the reader is cautioned not to place undue reliance on forward-looking statements. tt t

3 YELLOWJACKET GOLD PROJECT FROM GOLD RUSH TO GOLD BARS!

4 Location of the Atlin Gold Project Yellowjacket Zone Surprise Lake Atlin Gold Project Atlin Atlin Lake The project is located in nine (9) km east of Atlin BC

5 Mineral Claims Outline Placer Lease & Claims Outline TENURES PLACER AND MINERAL

6 Yellowjacket Zone History 1898 Placer gold first discovered on Pine Creek, with the richest section being located immediately downstream of the Yellowjacket 1903 Bedrock gold mineralization discovered d during placer mining i 1983 Canova - Drilled 5 holes and intersected rich gold mineralization 1984 to 1990 Homestake Mineral Development drill tests zone, completes preliminary i resource estimate t of 453, tonnes grading g/t gold (pre NI ) 2003 Prize Mining Corp. (formerly Muskox Minerals Corp.) options property, continues exploration 2009 Y ll j k t J i t V t (P i d 2009 Yellowjacket Joint Venture (Prize and Eagle Plains) applies for Small Mines Act Permit

7 After Ash, 2001 Atlin BC Location

8 After Ash (2004) and Ash (2001) ATLIN GEOLOGY

9 Q t b t lt d Quartz-carbonate altered ultramafic with free gold

10 LISTWANITES

11 Hard, competent rocks Andesite Diabase

12

13 ATLIN

14 DISCOVERY CLAIMS YELLOWJACKET ZONE

15 YJ ZONE PINE CREEK FAULT PINE CREEK VALLEY GOLD RUN

16 Homestake Drill Results HOMESTAKE RESOURCE The British Columbia Ministry of Energy and Mines Open File (T.G. Schroeter and HOLE # FROM (m) TO (m) WIDTH(m) GOLD(g/t) YJ and YJ YJ And YJ YJ YJ including and and YJ including YJ YJ and YJ YJ and including YJ YJ and including and and and And And including YJ R.H. Pinsent) entitled Gold YJ Production and Resources in British Columbia ( ) published the Yellowjacket Resource figure. 453,500 tonnes grading g/t gold. The resource calculation and set out in the file is pre-ni regulations.

17

18

19 HOLE # FROM (m) TO (m) WIDTH (m) GOLD (g/t) YJ YJ YJ YJ YJ YJ YJ YJ YJ YJ YJ YJ YJ HOLE # FROM (m) TO (m) WIDTH (m) GOLD (g/t) YJ05-42 YJ TW TW INCL INCL AND YJ INCL YJ INCL. YJ INCL INCL INCL YJ YJ YJ YJ YJ YJ YJ HIGH GRADE GOLD INTERSECTIONS YJ YJ YJ

20 ADDITIONAL GOLD VALUES FROM DRILL HOLES HOLE # FROM (m)to (m) WIDTH (m) GOLD (g/t) HOLE # FROM (m)to (m) WIDTH (m) GOLD (g/t) YJ YJ YJ YJ

21 PRIZE MINING CORP. YELLOWJACKET GOLD DEPOSIT ATLIN, BRITISH COLUMBIA LONG SECTION LOOKING NORTH

22 CONTRACTORS AND CONSULTANTS BGC Engineering Hydrogeological, Geotechnical Lorax Environmental Water Quality, Metal Leaching Snowden Mining Industry Consultants Mining, Processing Atlin Tlingit Development Corp. Water Quality Monitoring, Fish Salvage, Fuel Knelson Gravity Solutions Processing Plant P.E. Walcott & Associates Drafting, Geophysics Yukon Engineering Services Surveying ACME Analytical Laboratory - Assaying G&T Metallurgical Services Metallurgical Testing SGS Minerals Services - Processing Process Research Ortech Inc. Bench and Pilot Test work Chase River Contracting Milling, Plant Modifications Ruby Gold Enterprises Excavation Work Northwest Contracting Heavy Equipment Graff Engineering Permitting, Engineering

23 Pine Creek Baseline Water Quality Sampling Sites WATER QUALITY MONITORING CONTRACTED TO WATER QUALITY MONITORING CONTRACTED TO ATLIN TLINGIT DEVELOPMENT CORP.

24 Habitat investigations indicate that Pine Creek in the area of the Yellowjacket Gold Project is of generally low habitat value and potential. Diversity of fish species is low in the Yellowjacket area of Pine Creek due to water-falls (fish barrier) located 4.8 kilometres downstream from the Project. Only slimy sculpin and one immature Arctic grayling were found in the Yellowjacket area of Pine Creek. Fish and Fish Habitat (Erhardt & Connor Review of Prize Mining Pine Creek Diversion Project, Sept 11, 2006)

25 Acid Base Accounting (ABA) ON-GOING WASTE CHARACTERIZATION WORK Paste ph values indicate material NOT actively producing ARD; Total sulphur concentrations from the area of the bulk sample pit are very low ranging from below detection (<0.02%) up to a maximum of 0.07%; All samples collected have net potential ratio (NPR) values > 4, with the majority between 100 and 1000 indicating non-acid generating (NAG). All samples are submitted for static characterization, including acid-base accounting (ABA), paste ph, total sulphur, sulphate sulphur, sulphide sulphur, total carbon, total inorganic carbon, siderite corrected Sobek neutralization potential (NP) and multi-element geochemistry (aqua-regia leach). As well, a suite of samples will be submitted for mineralogical investigation in order to more clearly determine the source and abundance of NP mineralization in Yellowjacket Zone materials. Field-based kinetic tests collect and monitor the quality of contact water draining from the waste stockpiles at the Yellowjacket site. Field leach bin experiments closely l resemble actual conditions present with natural waste piles, including site-specific climatic conditions, scale, grain size, and water-rock ratios.

26 Hydrogeological Test Wells Being Drilled Under Supervision of BGC Engineering

27 HOLE # FROM (m) TO (m) WIDTH (m) GOLD (g/t) TOTAL GOLD (g/t) +150 mesh GOLD (g/t) 150 mesh MET MET Drill Holes For Metallurgical Testing MET

28 Gn Py Au Gn Gn Au Yellowjacket Knelson Concentrate He High Grade Composite 1 G&T Metallurgical G&T Metallurgical Py He Gn Au Ma He Au Gn *Au-Gold, Py-Pyrite, P Ma-Magnetite, He- Hematite, G&T Metallurgical G&T Metallurgical Gn-GangueG Metallurgy Test Conclusions The most important conclusion obtained from the metallurgical test work conducted by G&T Metallurgical Services, was the fact that the high grade gold zones can be processed using gravity- only extraction methods. During the bulk sample test no chemicals or additives were used in the processing or extraction of the gold.

29 Prize Mining Corporation and the Taku River Tlingit First Nation (TRTFN) have built a relationship based on communication, respect and consultation during all phases of this project. The Yellowjacket Joint Venture is committed to continued open consultation throughout the life of fthe project. Consultation Project Approval For Excavation and Bulk Sampling

30 OVERBURDEN EXCAVATION FROM PIT AREA

31

32

33 CHANNEL SAMPLING OF BEDROCK SURFACE

34 SAMPLE # GOLD g/t (TOTAL) GOLD g/t (+150 MESH) GOLD g/t (-150 MESH) GOLD g/t (-150 MESH) DUPLICATE 2 METRE CHANNEL SAMPLE RESULTS FROM CENTRAL AREA CHANNEL SAMPLE RESULTS METRE CHANNEL SAMPLE RESULTS FROM WEST END METRE CHANNEL SAMPLE RESULTS FROM EAST END

35 CHANNEL SAMPLING OF BEDROCK SURFACE

36

37

38

39

40

41

42 Ramp to Process Plant 2007 Pit Plan View of 2007 Pit and 2009 Projected Pit Outlines

43 Future Mining Area Bulk Sample Pit Bulk Sample Stockpiles Current (Tailings) Settling Pond Diversion Channel Knelson Process Plant Pine Creek Future (Tailings) Settling Pond Access Road Looking south across the Atlin Gold Project Yellowjacket Zone 2008

44 KNELSON CONCENTRATOR Preliminary Flow Sheet

45

46

47

48

49

50 Pit and Plant Area Creek Diversion Route

51 PLANT SITE CREEK DIVERSION 250 TONNE STOCKPILES

52 UNIQUE? 1 - BC SMALL MINES ACT PERMIT APPLICATION - PROJECT SITE ALREADY DEVELOPED AND INFRASTRUCTURE IS IN PLACE - IN AN AREA WITH 110 YEARS OF HEAVY DISTURBANCE BY PLACER MINING (DE-REGULATED CREEK) - SIMPLE GRAVITY CONCENTRATING GOLD RECOVERY PLANT NO CHEMICALS OR ADDITIVES USED - ML/ARD STUDIES SHOW WASTE AND ORE ROCK ARE NON- ACID GENERATING - GOOD RELATIONSHIP WITH LOCAL FIRST NATIONS

53 2 OPERATIONAL COSTS UNIQUE? - MAJORITY OF CAPITAL COSTS ALREADY PAID - MILLING COSTS ARE ~1.5 g/t GOLD - MINING COSTS ARE OFFSET BY PLACER GOLD PRODUCTION - RECLAMATION COSTS ARE LOW (NO SOILS OR VEGETATION) ALONG DE-REGULATED PLACER CREEK - GOOD INFRASTRUCTURE INCLUDING POWER - LOCAL WORKFORCE AND SERVICE/SUPPLY CONTRACTORS

54 but the Gold helps! It s about the people