1 FORM 1 (Submitted to SEIAA, Andhra Pradesh) By "A TREE desh. STOREY" POOJA CRAFTED HOMES PRIVATE LIMITED ( complex) NTS no: 143/3, Block no: 7 Revenue Ward. 11, , Patamata Village, Vijayawada (urban) Mandal Krishna District Andhra Pradesh Prepared by Flat # 7-3 Dhruvatara Apartments Amrutha Estates Erramanjil Somajiguda Hyderabad Phone: / 71 E mail: info@pioneerenvirolabs.com PEOPLE SAVE ENVIRONMENT

2 S. (I) Basic Information APPENDIX I (See paragraph 6) FORM Name of the project A TREE STORY Complex 2 S.. in the schedule 8(a) 3 Proposed capacity / area / length / tonnage to be handled / command area / lease area/number of wells to be drilled 4 New / Expansion / Modernization Expansion Enhancement of Built-up area from 17, Sq.m (2 basements + G + 4 floors) to 30, (2 basements + G + 15 floors) out of which G + 4 Floors will be Commercial and from 5 th floor to 15 th Floor will be Residential. Total area acquired 1.3 acres (5, Sq.m) 5 Existing capacity/area etc. Vijayawada Municipal Corporation has issued Building Permit order vide no / 0742 / B / VMC / PAT / 2016 for construction of Residential complex with built-up area 17, Sq.m (2 basements + Ground + 4 upper floors + terrace). Environmental clearance was not obtained for the above project as built-up area is below 20,000 Sq.m. w it is proposed to construct complex with built-up area of 30, Sq.m Building permit order is enclosed as Annexure II. 6 Category of project i.e. A or B. B 7 Does it attract the general condition? If yes, please specify. 8 Does it attract the specific condition? If yes, please specify. 9 Location Plot/Survey / Khasra. Village Tehsil / Mandal NTS no: 143/3, Block no: 7 Revenue Ward.11, Patamata Vijayawada (urban) 1

3 S. District State 10 Nearest railway station/airport along with distance in kms. 11 Nearest Town, city, District Headquarters along with distance in kms 12 Village Panchayats,Zilla Parishad, Municipal corporation, Local body(complete postal addresses with telephone no.s to be given) Krishna Andhra Pradesh Nearest Railway station: Madhuranagar ward (Vijayawada) Railway station 14.4 Kms. Nearest Airport Rajiv Gandhi International Airport 14.7 Kms The project site falls under Vijayawada Municipal Corporation The project site falls under Vijayawada Municipal Corporation 13 Name of the applicant Pooja Crafted Homes Private Limited 14 Registered Address H , Street no.12, Himayat Nagar, Hyderabad Address for correspondence: Name P. HEMA CHANDER REDDY Designation(owner/partner/CEO) Director - Operations Address H , Street no.12, Himayat Nagar, Hyderabad Pin code harikishore@poojacraftedhomes.in Telephone Fax Details of Alternative sites examined, if any. Location of these sites should be shown on a topo sheet alternate sites are considered 17. Interlinked Projects 18. Whether separate application of interlinked project has been submitted? 19. If yes, date of submission t applicable 20. If no, reason t applicable 21. Whether the proposal involves approval/clearance under; if yes, details of the same and their status to be given. (a) The Forest (conservation)act,1980 (b) The Wildlife(protection)Act,1972 (c) The C.R.Z tification,1991? Whether there is any a government 2

4 S. 22. order/policy relevant/relating to the site? 23. Forest land involved(hectares) 24. Whether there is any litigation pending against the project and/or land in which the project is propose to be set up? (a)name of the court (b)case. (c) Orders/directions of the court, if any and its relevance with the proposed project. 3

5 (II) ACTIVITY 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S.. Information/Checklist / 1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, vegetation and buildings? quantities /rates, wherever possible) The proposed project site falls under Central Commercial zone as per Master plan of Vijayawada zonal development plan, vide G.O MS. 674 MA dated Hence there will not be any change in land use. Land use certificate has been issued by A.P. Capital Region Development Authority, Vijayawada vide no. L. Dis.. LUC / 17 / Jan 2016 dated 22/01/2016. Land use certificate is enclosed as Annexure I. Excavations have been carried out for construction of Residential complex as per the building permit order vide no / 0742 / B / VMC / PAT / w in the same area complex will be constructed instead of Residential complex. 10% of the total project site area will be developed with Greenbelt / greenery to maintain aesthetic environment. Hence there will not be any adverse impact as there will not be any change in land use pattern due to the proposed Commercial cum Residential complex Clearance of existing land has been done for construction of Residential complex as per building permit order obtained. w this will be converted to complex after obtaining Environmental clearance. 1.3 Creation of new land uses? other land use other than 4

6 S.. Information/Checklist / 1.4 Pre-construction investigations e.g. bore houses, soil testing? quantities /rates, wherever possible) Commercial cum residential will be created in the site Investigations have been carried out for soil and water at the site. 1.5 Construction works? Construction activities have been initiated as per the Building Permit order from Vijayawada Municipal Corporation. w this will be converted to Commercial cum Residential complex after obtaining Environmental clearance. Construction pertaining to proposed expansion will be taken up only after Environmental clearance from MOEF&CC. 1.6 Demolition works? Demolition works will be involved for converting Residential complex to complex after obtaining Environmental clearance 1.7 Temporary sites used for construction works or housing of construction workers? 1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations 1.9 Underground works including mining or tunneling? Construction workers will be from local area only. Temporary housing is proposed for construction workers. Excavations have been carried out for construction of Residential complex. w this will be continued for construction of Commercial cum Residential complex after obtaining Environmental clearance. mining and tunneling will be involved in the proposed construction activity Reclamation works? reclamation works are envisaged in proposed project Dredging? dredging activity will be involved Offshore structures? offshore structures are envisaged in the proposed project Production and manufacturing processes? t applicable as proposed project involves construction of Commercial cum Residential complex Facilities for storage of goods or Raw materials will be stored as per 5

7 S.. Information/Checklist / quantities /rates, wherever possible) materials? norms. The raw materials like Cement, Sand, Bricks, Steel, Wood, Paint & aggregates will be stored at site only. Cement & Paint will be stored at indoors & remaining will be at outdoors Facilities for treatment or disposal of solid waste or liquid Wastewater generated during the operation of the Commercial cum Residential complex will be treated in sewage treatment plant. Treated wastewater will be utilized for nonpotable purposes like Toilet flushing HVAC & Greenbelt development. Treatment and disposal of wastewater & solid waste will be in accordance with the CPCB/SPCB norms Facilities for long term housing of operational workers? 1.17 New road, rail or sea traffic during construction or operation? 1.18 New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic t applicable as the proposed project is construction of complex. There will be a slight increase in traffic volume during construction and operation of the proposed complex. The proposed Commercial cum Residential complex site is well connected by service road of NH # 16. Hence there will not be any adverse impact on road traffic / rail traffic / sea traffic due to the proposed complex. new road / rail / air transport infrastructure is proposed. closure or diversion of existing transport routes is envisaged. 6

8 S.. Information/Checklist / movements? 1.20 New or diverted transmission lines or pipelines? 1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? quantities /rates, wherever possible) Water required for the proposed complex will be sourced from ground water resources / Vijayawada Municipal Corporation. Due to the proposed project, there will not be any changes to the hydrology of watercourses or aquifers Stream crossings? stream crossings are passing in the project site area Abstraction or transfers of water form ground or surface waters? 1.24 Changes in water bodies or the land surface affecting drainage or run-off? 1.25 Transport of personnel or materials for construction, operation or decommissioning? 1.26 Long-term dismantling or decommissioning or restoration works? Water required for the proposed project will be sourced from ground water resources / Vijayawada Municipal Corporation changes in water bodies, drainage and land surface are anticipated as the site is more or less flat without many undulations. Separate storm water drains will be provided. There will be a slight increase in traffic volume during construction and operation of the proposed complex. The proposed Commercial cum Residential complex site is well connected by service road of NH # 16. The existing road can handle this additional increase in vehicular traffic. Hence there will not be any adverse impact on road traffic / rail traffic / sea traffic due to the proposed complex. such works are envisaged 1.27 Ongoing activity during such works are envisaged 7

9 S.. Information/Checklist / decommissioning which could have an impact on the environment? 1.28 Influx of people to the area either temporarily or permanently? quantities /rates, wherever possible) Temporary labour required for the construction activity will be met from the local places Introduction of alien species? such activity is envisaged 1.30 Loss of native species or genetic diversity? As a part of greenbelt / greenery development plan native species that are suitable to that soil condition will be developed Any other actions? Nil 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply) S.. Information/checklist 2.1 Land especially undeveloped or agricultural land (ha) / quantities /rates, wherever possible) The proposed project site falls under Central Commercial zone as per Master plan of Vijayawada zonal development plan, vide G.O MS. 674 MA dated Hence there will not be any change in land use. Land use certificate has been issued by A.P. Capital Region Development Authority, Vijayawada vide no. L. Dis.. LUC / 17 / Jan 2016 dated 22/01/2016. Total land acquired for the proposed complex is 5, Sq.m (1.3 acres). Vijayawada Municipal Corporation has issued Building Permit order vide no / 0742 / B / VMC / PAT / 2016 for construction of Residential complex of 8 floors with built-up area 17, Sq.m. Environmental clearance was not obtained for the above project as built-up area is below 20,000 Sq.m. w it is proposed to construct 8

10 S Information/checklist Water (expected source & competing users) unit: KLD / 2.3 Minerals (MT) Sand Cum 2.4 Construction material stone, aggregates, sand / soil (expected source MT) quantities /rates, wherever possible) complex with built-up area of 30, Sq.m Excavations have been carried out for construction of Residential complex as per the building permit order vide no / 0742 / B / VMC / PAT / w this will be converted to Commercial cum Residential complex after obtaining Environmental clearance. Water required for the proposed project will be sourced through ground water resources / Vijayawada Municipal Corporation during operation & ground water resources during construction of the Project. Total water demand is about 8 KLD during Construction of complex & 170 KLD during the operation of complex (Residential 64 KLD & Commercial 106 KLD) All construction materials such as Ready mix Concrete, Cement, Sand, Aggregate, Aerated Auto clave, Concrete Brick (nos.), Reinforcement Steel, Wood material, Painting material, Flooring Material, Sanitary Material, Electrical Material, Plumbing material are available locally. 2.5 Forests and timber (source MT) Wood material required for Windows & Doors of Imported Quality will be procured locally. 2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW) The total energy requirement for the proposed project is 2000 KVA (Maximum peak demand). It will be taken from APEPDCL. DG set will be provided for emergency Backup Power Supply. 9

11 S.. Information/checklist 2.7 Any other natural resources (use appropriate standard units) / quantities /rates, wherever possible) t applicable 10

12 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health S.. Information/Checklist 3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by changing living conditions? 3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc., / The hazardous wastes like empty containers of paints, petroleum products, thinners, adhesives will be given to authorized recyclers. All the hazardous materials will be stored as per HWM rules. t Applicable t Applicable as the proposed complex will create direct / indirect employment opportunities in the area and thereby contributing in the improvement of socio-economic status of people in the area. Land prices will increase substantially. Approach roads to the complex is already paved Speed of the vehicle will be reduced Greenbelt will be developed By following the above the dust generation will be minimized. The Solid waste in the form of garbage will be segregated at each section distinguishing Recyclable & n- recyclable garbage and will be taken away by Municipal Corporation. Vegetable waste and food waste generated will be bio composted within the complex premises and will be used as manure for greenbelt development. Wastewater generated from the complex will be treated in sewage treatment plant and treated waste water will be utilized for non-potable purposes like flushing and Green 11

13 S.. Information/Checklist / 3.5 Any other causes t Applicable belt development plan Hence there will not be any adverse impact on vulnerable groups. 4. Production of solid wastes during construction or operation or decommissioning (MT/month) S.. Information/Checklist / 4.1 Spoil, overburden or mine wastes The dug soil during excavation will be used for filling of low lying areas. 4.2 Municipal waste (domestic and or Residential wastes) 4.3 Hazardous wastes (as per Hazardous Waste Management Rules) Municipal solid waste generated during construction phase of the project will be given to the Municipal Corporation. The Solid waste generated during operation phase will be mainly in the form of garbage, paper waste, plastic waste and e-waste from the individual homes. The garbage will be segregated at each section distinguishing Recyclable & n- recyclable garbage and will be taken away by Municipal Corporation. Vegetable waste and food waste generated will be bio composted within the complex premises and will be as manure for greenbelt development. Used batteries & Waste oil will be given to SPCB approved vendors 4.4 Other industrial process wastes t Applicable as there will not be any industrial operations in the Complex 4.5 Surplus product Surplus raw materials after construction will be given to the suppliers. 12

14 S.. Information/Checklist 4.6 Sewage sludge or other sludge from effluent treatment / Sewage sludge generated will be stored in HDPE bags and will be used as manure. 4.7 Construction or demolition wastes At the time of construction of the proposed project, there will be some recyclable material like Steel, metal, Plastic material, Wood etc., will be sent to reuse / recycle and other wastes like Bricks, cement waste will be used for leveling. There will be some demolition for converting the Residential complex to complex. 4.8 Redundant machinery or equipment redundant machinery will be kept in the premises after construction of the complex 4.9 Contaminated soils or other materials 4.10 Agricultural wastes t applicable During the construction phase of the Project, all precautionary measures will be taken to prevent the spillage of oil, paints on to the ground to prevent the contamination of soil Other solid wastes E-waste generated will be given Authorized recyclers approved by SPCB. 5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) S.. Information/Checklist 5.1 Emissions from combustion of fossil fuels from stationary or mobile sources / During the operation phase of the complex, emissions will be mainly PM, NMHC, NOx & CO due to vehicular traffic and from D.G. sets provided for Backup power supply. 13

15 S.. Information/Checklist 5.2 Emissions from production processes 5.3 Emissions from materials handling including storage or transport 5.4 Emissions from construction activities including plant and equipment / All the internal roads will be paved. Hence the dust emissions due to the vehicles will be very low Good greenbelt will be developed in the complex premises which will further help in mitigating the emission levels. Stack of adequate height will be provided to the DG set for effective dispersion of gases into the atmosphere. Hence there will not be any much impact on surrounding environment due to the proposed Residential complex. t applicable. As the proposed project is complex there will be bulk movement of Household articles and food items. For DG sets operation, low sulphur diesel will be stored in the site premises for which permission from Petroleum And Explosives Safety Organization will be obtained. During construction phase, there will be dust emissions during raw material handling and transportation of raw materials. To mitigate the dust emissions Raw materials will be brought to the site through covered trucks / Trolleys. Minimum water spraying will be done to mitigate the dust 14

16 S.. Information/Checklist 5.5 Dust or odours from handling of materials including construction materials, sewage and waste 5.6 Emissions from incineration of waste 5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris) / 5.8 Emissions from any other sources Nil emanation All the materials will be properly covered to prevent the dust emissions during high winds Hence there will not be any significant dust emissions due to raw material storage & transportation during construction phase of the project. Adequate precautionary measures will be taken up to control the Odour from the Construction materials like Paint material & Sewage. t applicable All such wastes will be disposed along with Municipal Solid Waste. 6.0 Generation of ise and Vibration, and Emissions of Light and Heat: S.. Information/Checklist 6.1 From operation of equipment e.g. engines, ventilation plant, crushers / with source of information data Main source of ise generation will be DG sets and Motor pumps for supply of water. The D.G. Sets & Motor pumps manufactured in accordance with the noise level standards stipulated by MOEF vide notification dated , only will be used in the Complex. Hence there will not be much increase in ise levels in the surrounding areas. 6.2 From industrial or similar processes The sources of noise generation in the proposed project will be DG set. 15

17 S.. Information/Checklist / with source of information data DG sets manufactured as per OSHA / MOEF guidelines will be procured. Ambient noise levels will be in accordance with MOEF notification dated i.e. noise levels will be <55 dba during daytime and < 45 dba during night time. 6.3 From construction or demolition Construction equipment will cause some noise. Ear plugs will be provided to construction workers who work near the noise generating equipment. 6.4 From blasting or piling such operations are involved. 6.5 From construction or operational traffic 6.6 From lighting or cooling systems t applicable 6.7 From any other sources t applicable There will be slight increase in traffic noise during construction and operation of the proposed Residential complex. Speed of the vehicles will be reduced Greenbelt will be developed By following above control measures noise levels will be minimized. 7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: S.. Information/Checklist 7.1 From handling, storage, use or spillage of hazardous materials 7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) / Good housekeeping practices will be followed to prevent any spillage of hazardous materials. Wastewater generated during the operation of the Commercial cum Residential complex will be treated in sewage treatment plant and treated wastewater will be utilized 16

18 S.. Information/Checklist 7.3 By deposition of pollutants emitted to air into the land or into water / for non-potable purposes like Toilet flushing, HVAC & Gardening During construction phase, there will be dust emissions during raw material handling and transportation of raw materials. To mitigate the dust emissions Raw materials will be brought to the site through covered trucks / Trolleys. Minimum water spraying will be done to mitigate the dust emanation All the materials will be properly covered to prevent the dust emissions during high winds Dust curtains will be provided around the project site Hence there will not be any significant dust emissions due to raw material storage & transportation during construction phase of the project. During the operation phase of the complex, emissions will be mainly PM, CO and NOx due to vehicular traffic and from D.G. sets provided for Backup power supply. All internal roads will be paved. Hence the dust emissions due to the vehicles will be very low Good greenbelt will be developed in the complex premises which will further help in mitigating the emission levels. Stack of adequate height will be 17

19 S.. Information/Checklist / provided to the DG set for effective dispersion of gases into the atmosphere. 7.4 From any other sources t applicable 7.5 Is there a risk of long term build up of pollutants in the environment from these sources? Hence there will not be any much impact on surrounding environment due to the proposed complex. t applicable 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment S.. Information/Checklist 8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances / Good housekeeping practices will be followed during Construction and Operation phase of the complex. All precautionary measures will be taken to prevent the spillage of oil, paint etc. D.G sets will be operated only during power failure. Hence storage of Diesel will be very low. Permission from Petroleum And Explosives Safety Organization will be obtained for storage of Diesel. Hence the occurrence of explosion due to the storage of Diesel will be low. 18

20 All the rules and regulations as per the A.P Fire & Safety Department, will be followed strictly to prevent the Fire accidents in the complex 8.2 From any other causes Earthquakes & Natural disasters 8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, lan dslides, cloudburst etc)? t applicable 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality S.. Information/Checklist 9.1 Lead to development of supporting utilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.) housing development extractive industries supply industries other 9.2 Lead to after-use of the site, which could have an impact on the environment 9.3 Set a precedent for later developments / such activities are envisaged t applicable With the improvement in the socioeconomic status of the people in the area, later developments are expected. 19

21 S.. Information/Checklist 9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects / t applicable 20

22 (III) Environmental Sensitivity S.. Areas 1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Name/ Identity Aerial distance (within 15 km.) proposed project location boundary Krishna river 0.6 Kms 3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or underground Underground Available at the site waters water 5 State, National boundaries ---- inter-state boundary, international boundary. 6 Routes or facilities used by the public for t applicable access to recreation or other tourist, pilgrim areas 7 Defense installations Densely populated or built-up area Project proposed comes under Vijayawada Municipal Corporation 9 Areas occupied by sensitive man-made Many schools & Within 15 Km radius land uses (hospitals, schools, places of Hospitals exits worship, community facilities 10 Areas containing important, high quality or scarce resources Krishna river 0.6 Kms (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution or --- t applicable environmental damage. (those where existing legal environmental standards 21

23 S.. Areas are exceeded) 12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) Name/ Identity Aerial distance (within 15 km.) proposed project location boundary --- Based on the historical data, the site is not likely to prone to earthquakes, floods, etc. 22

24 (IV). PROPOSED TERMS OF REFERENCE FOR EIA STUDIES As the proposed project is a construction project with built up area is below 1,50,000 Sq.m., no terms of reference for EIA studies is proposed. However we are here with enclosing Conceptual Management Plan for your kind reference. The Environmental Management Plan consists the following Air emission management Effluent treatment & disposal Solid waste generation, storage & disposal Greenbelt development plan Rain water harvesting I hereby given undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project may be rejected and clearance given, if any to the project will be revoked at our risk and cost. Date: Place: Hyderabad 23