1 FORM I FOR SUBMISSION OF APPLICATION FOR PRIOR CRZ CLEARANCE UNDER CRZ NOTIFICATION 2011 FOR CRZ CLEARANCE FOR PROPOSED MASS HOUSING SCHEME HAVING EWS & LIG TYPE TENEMENTS AT PLOT NO. 1, SECTOR NO. 10, GHANSOLI, NAVI MUMBAI BY SUBMITTED TO CITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LTD.

2 Form-I for seeking clearance for project attracting CRZ notification Basic information: CRZ Clearance for proposed Mass Housing Scheme having EWS & LIG type Tenements at Plot No. 1, Sector No. 10, Ghansoli, Navi Mumbai Name of the Project: CRZ Clearance for proposed Mass Housing Scheme having EWS & LIG type Tenements at Plot No. 1, Sector No. 10, Ghansoli, Navi Mumbai Location or site alternatives under consideration: NA Size of the project (in terms of total area): Total Plot Area: 7900 sq.m. Total Built up area: sq.m. CRZ classification of the area: CRZ II Expected cost of the project: INR Crores Contact Information:- Name of project proponent Mobile Number : for communication : kmgodbole64@gmail.com : Mr. M. Z. Godbole Superintendent Engineer City and Industrial Development Corporation Of Maharashtra Ltd. CIDCO Bhavan, CBD Belapur, Navi Mumbai

3 (II) Activity Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, and the like) S. No. Information/Checklist confirmation 1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) 1.2 Details of CRZ classification as per the approved Coastal Zone Management Plan? Yes/No No Yes Details thereof (with approximate quantities /rates, wherever possible) with source of information data Proposed development will be as per development plan of Maharashtra Proposed project falls within CRZ II area as per the approved CZMP Please find enclosed CRZ Map as Annexure I 1.3 Whether located in CRZ-I area? No 1.4 The distance from the CRZ-I No areas. 1.5 Whether located within the hazard No zone as mapped by Ministry of Environment and Forests/National Disaster Management Authority? 1.6 Whether the area is prone to No cyclone, tsunami, tidal surge, subduction, earthquake etc.? 1.7 Whether the area is prone for saltwater ingress? No 1.8 Clearance of existing land, No vegetation and buildings? 1.9 Creation of new land uses? Proposed project is pertains to development of residential at village Yes Ghansoli, Taluka-Rabale, Maharashtra Layout plan for proposed development enclosed as Annexure II 1.10 Pre-construction investigations Soil Investigation will be carried out for Yes e.g. bore hole, soil testing? proposed project site Construction works? Construction as per prevalent DCR Yes rules of Govt. of Maharashtra Demolition works? No 1.13 Temporary sites used for Yes Local workers will be employed during

4 S. No. Information/Checklist confirmation construction works or housing of construction workers? 1.14 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations 1.15 Underground works including mining or tunneling? Yes/No Yes No Details thereof (with approximate quantities /rates, wherever possible) with source of information data construction phase. About workers will be employed during construction phase During construction phase cut and fill or excavations will be reused for leveling. Other waste will be disposed off through authorized contractor Reclamation works? No 1.17 Dredging/reclamation/land filling/ disposal of dredged material etc.? No 1.18 Offshore structures? No 1.19 Production and manufacturing processes? No 1.20 Facilities for storage of goods or materials? No 1.21 Facilities for treatment or disposal of solid waste or liquid effluents? Solid Waste Management: Biodegradable Waste: 486 kg/day Non-biodegradable Waste: 402 kg/day Total Solid waste: 888 kg/day Yes Solid Waste Disposal: Biodegradable waste will be processed in the OWC for manure gardening. The non-biodegradable waste will be handed over to authorized facility recycling. The sludge generated will be used as manure. Solid Waste Management Plan details enclosed as Annexure III Wastewater Management Sewage Generation Total Sewage Generations = 193 KLD Treatment and disposal Sewage generated will be connected to

5 S. No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities /rates, wherever possible) with source of information data the nodal STP of CIDCO 1.22 Facilities for long term housing of operational workers? No 1.23 New road, rail or sea traffic during construction or operation? No 1.24 New road, rail, air waterborne or other transport infrastructure including new or altered routes No and stations, ports, airports etc? 1.25 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic No movements? 1.26 New or diverted transmission lines or pipelines? No 1.27 Impoundment, damming, culverting, realignment or other changes to the hydrology of No watercourses or aquifers? 1.28 Stream and river crossings? No 1.29 Abstraction or transfers of water from ground or surface waters? No 1.30 Changes in water bodies or the land surface affecting drainage or run-off? No 1.31 Transport of personnel or Project will be developed while materials for construction, adopting the best available and operation or decommissioning? environmentally sustainable technology and usage of raw materials with appropriate specifications. Also there will be transport of construction Yes materials. The existing road near by the site will be utilized for the transportation of material and personal. Proper mitigative measures shall be taken so as to reduce any kind of impact generated by the same Long-term dismantling or No

6 S. No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities /rates, wherever possible) with source of information data decommissioning or restoration works? 1.33 Ongoing activity during decommissioning which could have an impact on the No environment? 1.34 Influx of people to an area in either temporarily or permanently? Construction Phase During the construction phase about 150 Yes to 200 persons will be deployed on the site from nearby places. Influx of these people will be temporary in nature. Operation Phase On completion of the project, residents will occupy their property. Total residential population is expected to be 1340 nos Introduction of alien species? No 1.36 Loss of native species or genetic diversity? No 1.37 Any other actions? No 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): S. No. Information/checklist confirmation Yes/No Details thereof (with approximate quantities /rates, wherever possible) with source of information data 2.1 Land especially undeveloped or agricultural land (ha) No 2.2 Water (expected source & competing users) unit: KLD Construction phase: Total Water requirement : 50 KLD Source: Tanker Water supply Yes Operation phase: Total Water requirement: 252 KLD Source: NMMC Water Management details enclosed as Annexure IV 2.3 Minerals (MT) No 2.4 Construction material stone, Yes The constructional materials which will

7 aggregates, sand/soil (expected source MT) (source, competing users) Unit: fuel (MT), energy (MW) be used in the project site will be obtained from authorized local dealers. 2.5 Forests and timber (source MT) No 2.6 Energy including electricity and fuels Yes Constructional Phase: Power Requirement = 120 kw Power Supply 1 DG set of capacity 125 kva Operation Phase: Total Power Requirement Connected Load = 578 kw Demand Load =385 kw DG set = 125 KVA x 1 Nos Electrical power requirement and DG set details are enclosed as Annexure V 2.7 Any other natural resources (use appropriate standard units) No 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. Sr. No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data 3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) No 3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect No or water borne diseases) 3.3 Affect the welfare of people e.g. by changing living conditions? Yes Positive Impact 3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes No No Noise and air pollution control measures will be implemented so as to cause no harm to nearby residents. 4. Production of solid wastes during construction or operation or decommissioning (MT/month)

8 S. No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes. No 4.2 Municipal waste (domestic and or Construction phase: commercial wastes) Waste includes debris materials (rubble & soil). Part of the soil will be used for leveling if suitable and other waste will be disposed off with authorized contractor as per rules and debris management. Yes Solid Waste Generated Biodegradable Waste: 486 kg/day Non-biodegradable Waste: 268 kg/day Total Solid waste: 888 kg/day Solid Waste Disposal Biodegradable waste will be processed in the OWC for manure gardening. The non Biodegradable waste will be handed over to authorized facility for recycling. The sludge generated will be use as manure. Solid Waste Management Plan enclosed as Annexure III 4.3 Hazardous wastes (as per Hazardous Waste Management Rules) No 4.4 Other industrial process wastes. No 4.5 Surplus product No 4.6 Sewage sludge or other sludge from effluent treatment No 4.7 Construction or demolition wastes Solid waste generation during construction phase is debris in the form of rubble and soil. Part of this soil and Yes rubble will be used for leveling (if suitable) and remaining material will be disposed by authorized contractor as per rules and debris management 4.8 Redundant machinery or equipment No 4.9 Contaminated soils or other materials No

9 S. No. Information/Checklist confirmation Yes/No 4.10 Agricultural wastes No 4.11 Other solid wastes No Details thereof (with approximate quantities/rates, wherever possible) with source of information data 5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) S. No. Information/Checklist confirmation Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of information data 5.1 Emissions from combustion of fossil fuels from stationary or mobile No sources 5.2 Emissions from production processes No There is no production as the proposed development is residential project. 5.3 Emissions from materials handling including storage or transport 5.4 Emissions from construction activities including plant and equipment 5.5 Dust or odors from handling of materials including construction materials, sewage and waste Yes No Yes Very negligible impact will be there due to emissions from material handling, which will be taken care of with proper mitigative measures. Vehicles use will be with EURO engine whereas construction machinery use will be properly maintained. 5.6 Emissions from incineration of waste No 5.7 Emissions from burning of waste in open air (e.g. slash materials, No construction debris) Dust levels will be higher during the construction phase than operational phase. Proper measures such as sprinkling of water on the ground and construction will be done at regular intervals to reduce the spreading of the dust particles. Proper waste collection system will be provided, which will be disposed off as per solid waste management rule to avoid any adverse impact on the environment.

10 S. No. Information/Checklist confirmation Yes/No 5.8 Emissions from any other sources No 6. Generation of Noise and Vibration, and Emissions of Light and Heat: S. No. Information/checklist confirmation 6.1 From operation of equipment e.g. engines, ventilation plant, crushers Yes/No Yes Details thereof (with approximate quantities/rates, wherever possible) with source of information data Details thereof (with approximate quantities /rates, wherever possible) with source of information data All construction material & equipment will be well maintained in order to minimize noise level to the acceptable levels. 6.2 From industrial or similar processes No 6.3 From construction or demolition During construction phase, sources of noise pollution will be construction machinery and transportation vehicles. Proper mitigation measures will be taken in order to minimize the impact on noise level. Proper acoustic Yes enclosures will be provided to the heavy noise generating machinery and equipment with regular maintenance. Construction activities would be carried out during day time. Barriers will be provided around the construction site to reduce noise in the surrounding areas. 6.4 From blasting or piling No 6.5 From construction or operational traffic During construction phase, negligible impact is expected due to transport of materials for construction work. Precautions will be taken to reduce No the impact of the vehicular movement such as vehicular trips will not be at peak traffic hours. During Operation Phase, the source of air and noise pollution is vehicular noise only. The vehicular parking

11 will be restricted only in the adequate parking area provided, which would help in reducing noise and air pollution due to vehicular movement. 6.6 From lighting or cooling systems No 6.7 From any other sources No 7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: S. No. Information/checklist confirmation 7.1 From handling, storage, use or spillage of hazardous materials 7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) Yes/No No No Details thereof (with approximate quantities /rates, wherever possible) with source of information data Sewage generated (193 KLD) will be connected to the nodal STP of CIDCO. Water sprinkling will be done at regular intervals during construction phase to reduce spreading of dust particles. 7.3 By deposition of pollutants emitted to air into the land or into water No 7.4 From any other sources No 7.5 Is there a risk of long term build up of pollutants in the environment from these sources? 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment S. No. Information/checklist confirmation Yes/No 8.1 From explosions, spillages, fires etc from storage, handling, use or No production of hazardous substances 8.2 From any other causes No 8.3 Could the project be affected by natural disasters causing No environmental damage (e.g., floods, Details thereof (with approximate quantities /rates, wherever possible) with source of information data

12 earthquakes, landslides, cloudburst etc)? 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality S. No. Information/checklist confirmation 9.1 Lead to development of supporting. facilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.) housing development extractive industries supply industries other 9.2 Lead to after-use of the site, which could have an impact on the environment 9.3 Set a precedent for later developments 9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects Yes/No Yes Yes No No No Details thereof (with approximate quantities /rates, wherever possible) with source of information data Project is well planned with complete infrastructure of roads, SWD, water supply, solid waste, sewage disposal, and electricity and communication networks. This is Proposed housing scheme having EWS & LIG type Tenements.

13 III. Environmental Sensitivity S. No. Areas 1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests 3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration Name/ Identity 4 Inland, coastal, marine or underground waters Yes Arabian sea No No No Aerial distance (within 15 km.) Proposed project location boundary No protected area within 10 km radius around the project site. No ecological important or sensitive areas within 10 km radius around the project site. No areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration within 10 km radius around the project site. 5 State, National boundaries No -- 6 Routes or facilities used by the public -- for access to recreation or other tourist, pilgrim areas No 7 Defense installations No -- 8 Densely populated or built-up area Yes the site is situated within the Yes densely populated area 9 Areas occupied by sensitive man-made There are schools, hospitals, land uses (hospitals, schools, places of worship, community facilities) Yes college, places of worship located within 10 km radius of the proposed site as project is located within well developed area. 10 Areas containing important, high quality or scarce resources (ground water resources, surface resources, No -- forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution or No

14 S. No. Areas environmental damage. (those where existing legal environmental standards are exceeded) Name/ Identity Aerial distance (within 15 km.) Proposed project location boundary Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) I hereby given undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance give, if any to the project will be revoked at our risk and cost. Date: Place: Signature of the Applicant (Project Proponent/ Authorized Signatory)

15 CHECKLIST FOR SUBMISSION OF APPLICATION FOR PRIOR CRZ CLEARANCE UNDER CRZ NOTIFICATION 2011 FOR CRZ CLEARANCE FOR PROPOSED MASS HOUSING SCHEME HAVING EWS & LIG TYPE TENEMENTS AT PLOT NO. 1, SECTOR NO. 10, GHANSOLI, NAVI MUMBAI BY CITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LTD. SUBMITTED TO MAHARASHTRA STATE COASTAL ZONE MANAGEMENT AUTHORITY

16 Checklist for Submission of Application for prior CRZ Clearance Under CRZ Notification 2011 PART A Sr. No. Details Page No. 1 Executive Summary of the project. Enclosed As Annexure V 2 Duly filled Form I as annexure IV of CRZ Notification (Compulsory for all Projects) 3 Whether proposed project covered under EIA Notification Enclosed above. Yes a b If yes, duly filled Form I & IA (As per provision 4(i) (d) and 4(ii)(a) of CRZ Notification, 2011) CRZ map indicating HTL & LTL demarcated by one of the authorized agency in 1:4000 scale (as per para (2) of CRZ Notification, 2011) / on the approved CZMP of the area showing the site under consideration. Yes refer to Form 1 & Form 1A Please refer enclosed herewith Annexure I for CRZ Map. 4 Introduction of the Project/ Background information indicating following: i Identification of the project & project proponent, land ownership indicating CTS No. / Survey Nos. etc. Name of Project: Proposed Mass Housing Scheme having EWS & LIG type Tenements at Plot No. 1, Sector No. 10, Ghansoli, Navi Mumbai For DP plan please refer Annexure-II Name of the Proponent:

17 Mr. M. Z. Godbole Superintendent Engineer City and Industrial Development Corporation Of Maharashtra Ltd. CIDCO Bhavan, CBD Belapur, Navi Mumbai Land Ownership: CIDCO Land Details:- Village: Ghansoli District: Raigad Taluka: Rabale ii Brief description of nature of the project with details including, Layout Plan, Building Floor Plan etc. Please find enclosed Executive Summary of the project as in Annexure VI and also Layout Plan: (Annexure II) iii Need for the project & its importance. iv Demand supply gap or information on similar projects in the region. 5 i Location of the project showing general location, specific location, Project boundary, project site approved layout with coordinates from competent Authority ii Details of the alternative sites considered from environmental point of view. N.A Please find enclosed layout as Annexure II N.A 6 Site Analysis i Area of the project site (in sq. m.) ii Connectivity Plot Area sq.mt Ghansoli and Rabale station iii Land form, land use, Land ownership Property registered card in the name of

18 iv Topography(along with map) CIDCO Please refer Annexure II for Google Image v Existing land use pattern (agriculture, non-agriculture, forest, water bodies shortest distances from the periphery of the project to periphery of the forest, national park, wild life sanctuary, ecosensitive area, water bodies (distance from the HFL of the river).in case of notified industrial area, a copy of the Gazette notification should be given vi Social Infrastructure available Existing land use is residential. Said property is situated in Residential Zone Social Infrastructure already available such as Bus Stops, Banks, Schools, Hospitals and Market. 7 i ii iii Planning Brief Planning concept (type of industries, facilities, transportation etc) Town & Country planning / Development Authority Classification. Population projection Land use planning (breakup along with green belt etc) Residential Project. 1. Proposed mass housing scheme having EWS and LIG types tenements Plot Area = Sq. mt. Total BUA = Sq. mt. R. G. Area = Sq. mt. iv Assessment of Infrastructure Demand (Physical & Social) v Amenities/Facilities(existing & proposed) vi Proposed use vii FSI proposed to be consumed viii Whether lift, lobby, staircase etc. are claimed free of FSI & if so whether they are permissible (if so mention the provision of DCR) --- Residential

19 8 i ii iii Proposed Infrastructure Industrial area (Processing Area) Residential Area (Non processing Area) Green Belt / Afforestation details N.A. Plot Area = 7900 Sq. mt. Total BUA = Sq. mt. R.G. admeasuring Sq. Mt. is proposed on to Ground level. iv Social Infrastructure v Connectivity (Traffic & Transportation Road / Rail /Metro /Water ways etc) vi Drinking Water Management (Source & supply of Water) vii Sewerage System. viii Industrial Waste Management ix Solid Waste Management Already available in the area Site under reference is well connected by Thane Belapur road, rail, network Source - NMMC Available on site. N.A. Provided & Existing on site. x Power requirement & Supply / Source 9 Rehabilitation & Resettlement (R & R)Plan i Policy to be adopted (central / state) in respect of the project affected persons including home oustees, land oustees & landless laborers (a brief out line to be given) ii Proposed detailed action plan for mangroves replantation (if any) 10 Project Schedule & Cost Estimates i Likely date of start of construction & likely date of completion (Time schedule for the project to be given) Power will be supplied by MSEDC N.A. N.A. ii Estimated project cost along with analysis in terms of economic viability of the project. iii Share holding of the developer --- Approx 3 Year

20 iv Share holding of the state government 11 Analysis of proposal (Final Recommendations) i Environmental cost benefit analysis including financial & social benefits with special emphasis on the benefit to the local people including tribal population, if any, in the area. 12 i Rapid EIA report including marine & terrestrial component except for construction projects listed under 4(c), 4(d) of CRZ Notification, (Not applicable for building proposal) ii Comprehensive EIA with cumulative studies for projects in the stretches classified as low & medium eroding by MoEF based on scientific studies & in consultation with the State Governments and Union Territory Administration(as per provision of 4.2 (c) of CRZ Notification, 2011) (Not applicable for building proposal) iii Disaster Management Report, Risk Assessment Report & Management Plan (As per provision of 4.2(d) of CRZ Notification, 2011) iv Photographs & Google images of the site indicating existing status & location of the site. v CRZ map indicating HTL and LTL and CRZ classification by one of the authorized agencies by MoEF in 1:4000 scales and project layout superimposed on the above map of CZMP (As per provision 4.2(e) and (f) of CRZ Notification, 2011) vi The CRZ map normally covering 7km radius around the project (for ports, harbours, jetties, infrastructure projects) (as per provision 4.2(g) of --- as it is a construction project having total BUA less than 20,000 sq. mt Please refer Annexure II for Google Image Please refer CRZ map enclosed herewith as Annexure I.

21 CRZ Notification, 2011) vii NOC from MPCB for projects involving significant discharge of effluents, solid wastes, sewage and the like (As per provision 4.2(i) of CRZ Notification, 2011) 13 Attached following No Objection Certificates (if applicable) i Heritage Conservation ii State Ground Water Board iii iv v vi Maharashtra Pollution Control Board High Court Maritime board Port Trust vii Civil Aviation ---- Not applicable Not applicable Not applicable Not applicable Not applicable viii High Rise Committee Not applicable Applicable for SRA / Cessed / Dilapidated /Unsafe Building 14 Undertaking of the Project proponent for the development through Slum Rehabilitation Scheme along with the state Government to ensure that all Not applicable legally regularized tenants are provided houses in situ or as per norms laid down by the State Government in this regard (as per the provision of 8 (V) (2) (iii) of CRZ Notification, 2011) 15 Undertaking of the Project proponent --- to agree to be covered under the Right to Information Act 2005 (as per the provision 8 (V) (c) (d) (v) of CRZ Notification, 2011) 16 Public consultation Report (As per ---- provision 8 (v) (4) of CRZ Notification, 2011) 17 Stake of the State Govt. or its ---

22 parastatal entities (which should not be less that 51%) in the project (As per provision 8 (V) (1) (ii) (b) (2) (i) of CRZ Notification, 2011) 18 Any other information relevant to the proposal No Checklist for Submission of Application for prior CRZ Clearance Under CRZ Notification 2011 PART B Particulars 1 a Whether the project site falls in CRZ-I, II, III & IV Page No. Yes proposed project lies in CRZ II as per CZMP b c d e CRZ map indicating HTL & LTL demarcated by one of the authorized agency in 1:4000 scale (as per para (2) of CRZ Notification, 2011)/ on the approved CZMP of the area showing the site under consideration. Project layout superimposed on the above map indicated at (b) above. CRZ map covering 7 Km radius around the project site & indicating CRZ-I, II, III & IV areas including other notified ecologically sensitive areas. If Project Site falls in CRZ-I A/CRZ-I B, then submit the following CRZ map is enclosed as Annexure I CRZ map is enclosed as Annexure I

23 i Distance of the project site from mangroves /HTL Distance of the project site from mangroves is 50 m ii Density of mangroves & extent of 50 meter zone from project site f If Project Site falls in CRZ-II i Whether project site is on seaward side of the existing road as on Yes ii Whether project site is on landward side of the existing road constructed prior to A If yes, certificate from Competent Authority indicating approval of road on development plan & date of construction B Width of road. 34 m wide road iii Whether project site is on seaward / landward side of the Hazard line. g If Project Site falls in CRZ III, distance of project site from HTL & mangroves, if any 2 Zoning, Land use & Development Plan remarks form the Competent Authority indicating the following details: (As per the provision 8(i) (I), (II) & (III) of CRZ Notification, 2011) Residential Zone. i Identification of the project & project proponent, landownership indicating CTS No. / Survey Nos. etc. Name of Project: Proposed Mass Housing Scheme having EWS & LIG type Tenements at Plot No. 1, Sector No. 10, Ghansoli, Navi Mumbai Name of the Proponent: Mr. Mr. M. Z. Godbole

24 ii iii iv Brief description of nature of the project with details including Layout Plan, Building Floor Plan etc. Information of the project site with respect to the CTS No., Survey No. total area etc. Copy of approved CTS plan from Land Records Department/ City Survey Office. Superintendent Engineer City and Industrial Development Corporation Of Maharashtra Ltd. CIDCO Bhavan, CBD Belapur, Navi Mumbai Land Ownership: CIDCO Land Details:- Village: Ghansoli District: Raigad Taluka: Rabale Please find the Executive Summary Annexure VI Same as above in item no i ---- v Status of land Freehold / Leasehold ---- vi Copy of Property Card -- vii Zoning remarks for the project site as per development plan existing & enforce as on It s a CRZ project as per the enclosed CRZ plan. viii Zoning remarks for the project site as per current / prevailing development plan as on today. It s a CRZ project as per the enclosed CRZ plan. ix Permissible height as per DCR enforce as on No restriction of height as per prevailing D.C.R. x Permissible height as per current No restriction of height as per current

25 xi prevailing DCR FSI calculated as permissible in DCR existing on indicating eligible FSI in the proposed project. prevailing D.C.R. Eligible FSI. = 1.0 a Proposed use Residential b FSI proposed to be consumed Proposed FSI. = 1.0 c xii Whether lift, lobby, staircase etc. are claimed free of FSI & if so whether they are permissible (If so mention the provision of DCR) Permissibility of proposed use as per development plan & DCR as on Residential xiii Development plan of the area indicating site under reference, zoning, reservation etc. xiv Land use change, if any, in the project. D.P. Remarks is attached herewith xv Designated reservations, if any, as per development plan/ Regional plan as on and as per current prevailing development plan of the area xvi Specific power of Authority enabling relaxation in height, use & another provision of D. C. Regulations. 3 Proposed project Detail including Layout Plan, Building Floor Plan etc. Please refer Annexure II (As per provision 8(II) & (III) of

26 CRZ Notification, 2011) 4 Details of Existing structure/ Infrastructure on site from Competent Authority indicating following details. (As per provision 8(II) & (III) of CRZ Notification, 2011) i Occupation certificate. ii Commencement certificate iii Authorized plinth map from land records/ city survey office. iv FSI consumed & approved building plan of the existing structure from Planning Authority. v Remarks indicating existing use of the structure. vi Details of court cases/legal matters if any with respect to proposed matter. vi Details of complaints, if any 5 Additional information for reconstruction of Houses in Koliwada (As per provision 8(V) (4) (g) of CRZ Notification, 2011) a Details of notified fishing settlement areas / Koliwadas as per development plan existing as on from competent

27 Authority. b Certificate from competent Authority indicating, traditional Fisherman communities / other local coastal communities as per the Govt. records if personal belongs to Koliwadas. 6 SRA/CESS/Dilapidated / Unsafe Building a (As per provision 8(V) of CRZ Notification, 2011) Slum area declaration Notification along with list of eligible tenants b Public consultation Report. c CESS/Dilapidated /dangerous / Unsafe building certificate from Competent Authority d Stake of the State Govt. or its parastatal entities (Which should not be less that 51% ) in the SRA scheme projects (As per provision 8(V) (1)(ii) (b)(2)(i) of CRZ Notification, 2011) 7 Detailed remarks of the Planning Authority on the proposed project. NMMC Date: Signature Place: Authorized Signatory,

28 ANNEXURE I CRZ MAP

29 ANNEXURE II GOOGLE MAP

30 LAYOUT PLAN

31 DP PLAN

32 ANNEXURE III SOLID WASTE MANAGEMENT PLAN Sr. No. Component Tenements (nos.) Occupant Load (nos.) Criteria For Solid Waste Generation (Kg/day) Solid Waste Generation (Kg/day) Wet Dry Wet Dry Total (Kg/day) 1 Residential Tenements Total Gardening Total During Operation Phase Biodegradable Waste Non Biodegradable Waste Biodegradable Non Biodegradable Other SOLID WASTE QUANTITY : 754 kg/day : 486 kg/day : 268 kg/day SOLID WASTE TYPE : Organic: Tea Leaves, Eggshells, Old Food and Vegetables peels. : Recyclable: Paper, bottles, glass, note books, safety pins, caps of mineral water bottles etc. : PET mineral water bottles, nitrogen sealed packaging for chips, tetra packs, thermocole, carbon paper, plastic coated visiting cards, sachets. SOLID WASTE COLLECTION, TREATMENT AND DISPOSAL Collection & Segregation : Provision will be made for segregation of the biodegradable and the non-biodegradable wastes and they will be stored in different colored bins.

33 Treatment and Disposal : Biodegradable waste will be process in the Mechanical Composter and manure will be used for gardening whereas other will be given to authorized agencies. ANNEXURE IV WATER MANAGEMENT Sr. No. Compone nt Teneme nts (nos.) Occupa nt Load (nos.) Criteria for Water Requirement (lit/day) Domest Flushi ic ng Total Water Requirement (lit/day) Total (lit/day ) Total (klpd ) Domest ic Flushi ng 1 Ghansoli Total Gardenin g sq.m. liter/sq.m Grand Total.1 5 Water Requirement CONSTRUCTION PHASE Total Water Requirement : 50 KLD Source : Tanker Water OPERATION PHASE During Dry Season : 252 KLD Total Fresh Water : 252 KLD Total Recycled Water : -- During Wet Season : 241 KLD Total Fresh Water : 241 KLD Total Recycled Water : -- Water Supply Source Total Fresh Water : NMMC Total Recycled Water : During construction- : Tanker Water Sewage Generation, Treatment and Disposal

34 Total Sewage Generation : 193 KLD STP Capacity : Sewage generated will be treated at the Nodal STP of CIDCO NOTE: Sewage generated will be treated at nodal STP of CIDCO ANNEXURE V ELECTRICAL POWER REQUIREMENT AND DG SET DETAILS ELECTRICAL POWER REQUIREMENT During Construction Phase : 120 kva During Operation Phase : 578 kw Demand Load 385 kw Power Supply Source : MSEDCL DG SET DETAILS Number and capacity of DG set : 1 DG sets of 125 kva capacity 1 X 630 Kva of transformer

35 ANNEXURE VI EXECUTIVE SUMMARY 1. INTRODUCTION The City and Industrial Development Corporation of Maharashtra (CIDCO) is a India's premier city planning and richest Government organisation/authority formed and controlled by the Government of Maharashtra. CIDCO have proposed Mass Housing Scheme having EWS & LIG type Tenements at Plot No. 1, Sector No. 10, Ghansoli, Navi Mumbai NEED OF THE PROJECT The proposed project is very essential due to following points, which are positive and favorable from various points of views: 1. The project will develop a Residential Buildings to provide well developed flats. 2. The project does not displace any population. 3. The project envisages temporary employment potential. 4. The land will be converted to evergreen piece of environment friendly settlement. 2. PROJECT LOCATION Proposed Project site is situated at Plot No. 1, Sector No. 10, Ghansoli, Navi Mumbai FIGURE 1: GOOGLE MAP

36 FIGURE 2: LOCATION PLAN

37 CRZ STATUS The proposed project passes through the CRZ II. 3. PROJECT DESCRIPTION Proposed building configuration: The total plot area of the project is 7900 sq.mt, whereas total built up area is sq. mt. The proposed project is planned with complete infrastructure of internal roads, parking, water supply, electricity and communication. 4.1 AREA STATEMENT The following table details the areas and other control parameter

38 TABLE 1: AREA STATEMENT

39 TABLE 2: PARKING STATEMENT 4.2 IMPORTANT FEATURES AND AMENITIES PROPOSED The following are the features and amenities envisaged for the proposed redevelopment project: Proper structured buildings with better facilities. Wide and properly surfaced internal and access roads network. Supply of electricity from MSEDCC Electricity Division. Water supply through Local Municipal Water Supply. Drainage system and Strom water drainage. Telecommunication system and Fire fighting system. Solid waste management. Passenger lifts etc. Proper Parking facilities and Service offices. 4. MAJOR COMPONENT OF THE PROJECT 4.1 ENERGY REQUIREMENT The power requirement during construction period will be about 120 kw. The total power consumption for the project after commissioning will be around 578 kw. D.G. Set will be used in case of Emergency.

40 5.2 WATER REQUIREMENT The total water required during Construction phase will be 50 m 3 /day. During Operation phase of project the requirement will be 253 m 3 /day. The water supply will depend on the local municipal supply for domestic and Flushing purpose. 5.3 SEWAGE GENERATION, TREATMENT AND REUSE TABLE 4: WATER BUDGET Sr. No. Component Tenement s (nos.) Occupant Load (nos.) Criteria for Water Requirement (lit/day) Total Water Requirement (lit/day) Domestic Flushing Domestic Flushin g Total (lit/day) Total (klpd) 1 Ghansoli Total Gardening sq.m. liter/sq.m Grand Total Water Requirement CONSTRUCTION PHASE Total Water Requirement : 50 KLD Source : Tanker Water OPERATION PHASE During Dry Season : 252 KLD Total Fresh Water : 252 KLD Total Recycled Water : -- During Wet Season : 241 KLD Total Fresh Water : 241 KLD Total Recycled Water : --

41 Water Supply Source Total Fresh Water : NMMC Total Recycled Water : During construction- : Tanker Water Sewage Generation, Treatment and Disposal Total Sewage Generation : 193 KLD STP Capacity : Sewage generated will be treated at the Nodal STP of CIDCO 5.4 SOLID WASTE GENERATION AND MANAGEMENT a.) During Construction Phase: The total solid waste generated during construction phase includes construction debris, demolition debris & excavated materials. The provision will be made for Segregation or sorting of waste at its source will be practiced. The debris material shall be used for backfilling and leveling. Other waste will be disposed off through authorized contractor. b.) During Operation Phase: The total quantity of solid waste generated will be 754 kg/day. The biodegradable waste will be 486 kg/day whereas non biodegradable waste will be 268 kg/day. The Biodegradable waste will be composted whereas other will be given to given to authorized agencies. TABLE 5: SOLID WASTE GENERATION Sr. No. Component Tenements (nos.) Occupant Load (nos.) Criteria For Solid Waste Generation (Kg/day) Solid Waste Generation (Kg/day) Total (Kg/day) 1 Residential Tenements Wet Dry Wet Dry Gardening

42 Total PROJECT COST The cost of this project will be around Rs Lakhs. The project proponents have proposed to set up a project by investing in proper budget and architectural intelligence. 6. CONCLUSION The proposed project will not have any adverse impact on the environment and surrounding areas of the project. All necessary pollution control measures will be planned for the proposed Building and these are expected to meet the requirement of environment authorities.