1 Monitoring report form (Version 05.1) MONITORING REPORT Title of the project activity UNFCCC reference number of the project activity Zhongshan County Micro Hydro Project Bundle No.2 GS1100 Version number of the monitoring report 2.0 Completion date of the monitoring report 20/12/2015 Monitoring period number and duration of this monitoring period Project participant(s) Host Party Sectoral scope(s) Selected methodology(ies) The second monitoring period 01/07/ /08/2015 (first and last days included) Baishijiao State I Hydropower Plant in Liang'an Township, Zhongshan County; Gongtan Hydropower Plant in Wenxu Township, Mengshan County; Aohua State I Hydropower Plant of Zhongshan County Swiss Carbon Value Ltd People s Republic of China Sectoral scope I: Energy Industries. (Renewable sources). Baseline methodology: AMS I.D. - Grid Connected Renewable Electricity Generation (version 17). Selected standardized baseline(s) - Estimated amount of GHG emission reductions or net GHG removals by sinks for this monitoring period in the registered PDD 8606 tco 2 e Total amount of GHG emission reductions or net GHG removals by sinks achieved in this monitoring period GHG emission reductions or net GHG removals by sinks reported up to 31 December tco 2 e GHG emission reductions or net GHG removals by sinks reported from 1 January 2013 onwards Version 05.1 Page 1 of 24

2 SECTION A. Description of project activity A.1. Purpose and general description of project activity Zhongshan County Micro Hydro Project Bundle No.2 (hereinafter referred to as the project ) consists of three small hydropower stations, i.e. Baishijiao stage I hydropower project, Gongtan hydropower project, and Aohua stage I hydropower project of Zhongshan County. All of three stations are located in Guangxi Province, Hezhou City Zhongshan County. The project utilises local hydropower resources to generate electricity to the local grid. The electricity generated is delivered to the local grid, and finally to the China Southern Power Grid, displacing the electricity generation from fossil fuel based power plants connected to the grid, thereby reducing the greenhouse gas (GHG) emissions. The total install capacity of the project is 2.57MW. This document reports the emission reductions of 7348 tco2e achieved by the project (GS registration on 30/04/2013 with reference number GS1100) during the following monitoring period: 01/07/ /08/2015, corresponding to the actual net electricity supplied to the grid of MWh. A.2. Location of project activity The project is located in the Guangxi Province, Zhongshan County. The geographic coordinates for each project is Project name Geographic coordinates Baishijiao stage I hydropower project '46"E; 24 41'17"N Gongtan hydropower project Aohua stage I hydropower project of Zhongshan county '49"E; 24 05'32"N '32"E; 24 41'32"N The stations are using local small streams as electricity generation resource: Baishijiao stage I hydropower project are using water from two streams named Jimuchong and Pinshachong; Gongtan hydropower project is built on branch of the Wenyu river; Aohua stage I hydropower project utilises water from Tangdushan river. A.3. Parties and project participant(s) Party involved ((host) indicates a host Party) Party A (host) Private and/or public entity(ies) project participants (as applicable) Baishijiao State I Hydropower Plant in Liang'an Township, Zhongshan County; Gongtan Hydropower Plant in Wenxu Township, Mengshan County; Aohua State I Hydropower Plant of Zhongshan County Indicate whether the Party involved wishes to be considered as project participant (yes/no) No Party B Swiss Carbon Value Ltd No A.4. Reference of applied methodology and standardized baseline Version 05.1 Page 2 of 24

3 The simplified baseline and monitoring methodology AMS I.D, version 17, became valid from 17 Jun 11 onwards. The approved Tool to calculate the emission factor for an electricity system, Version 2.2.1, was in effective as of EB 50, is applied to the project activity. For more information about the methodology, please refer to the following website: A.5. Crediting period of project activity The project activity employs renewable 7 year s crediting period, the first crediting period is from 01/05/2011 to 30/04/2018. The second monitoring period is from 29/07/ /08/2015. A.6. Contact information of responsible persons/entities Responsible persons/ entities: Ms. Fang Qun q.fang@thesouthpolegroup.com Swiss Carbon Value Ltd SECTION B. Implementation of project activity B.1. Description of implemented registered project activity The project consists of three sub-components hydropower stations: Baishijiao stage I hydropower project, Gongtan hydropower project and Aohua stage I hydropower project. All these stations are using hydropower resource to generate electricity. The types of three hydropower stations are all run-of-river project, these hydropower systems consist water retaining dike, water diversion tunnel, pressure tube and hydrologic turbines and generators. Water from the nearby river are diverted to each stations through water diversion tunnel, pressure tube and then flow over the hydrologic turbines of each station at a designed water head to produce an optimal electricity output. Electricity is step-upped using a transformer, and it flows to a substation, which are built close to the power plant house of each station, step-upping and transmitting the electricity via 10kV transmission lines. These transmission lines are connected to the local grid, which is delivering electricity to the China Southern Power Grid. Baishijiao stage I hydropower project Timeline of project implementation Construction start 10/01/2006 Completion of construction 12/2007 Commission 01/2008 Gongtan hydropower project Construction start 13/12/2006 Completion of construction 01/2009 Commission 02/2009 Aohua hydropower project Construction start 26/09/2008 Completion of construction 12/2009 Version 05.1 Page 3 of 24

4 Commission 01/2010 CDM-MR-FORM The main technical parameters for each station: Baishijiao stage I hydropower project Name Value Rated Water Head (m) 195 Length of water diversion tunnel (km) Hydro-turbines (set) 1 Model CJ22-W-55/1 7B Generator (set) 1 Model SFW-W320-6/850 Rated Capacity (kw) 320 Name Value Rated Water Head (m) 195 Length of water diversion tunnel (km) Hydro-turbines (set) 1 Model CJ22-W-70/1 9 Generator (set) 1 Model SFW-W400-8/850 Rated Capacity (kw) 400 Gongtan hydropower project Name Value Rated Water Head (m) 133 Length of water diversion tunnel (km) 3.3 Hydro-turbines (set) 2 Model XJA-W-50/ Generator (set) 2 Model SFW500-8/118 Rated Capacity (kw) 500kW*2 Name Value Rated Water Head (m) 133 Length of water diversion tunnel (km) 3.3 Hydro-turbines (set) 1 Model HL220-WJ-60 Generator (set) 1 Model SFW200-12/850 Rated Capacity (kw) 200kW Version 05.1 Page 4 of 24

5 Aohua stage I hydropower project of Zhongshan County Name Value Rated Water Head (m) 200 Length of water diversion tunnel (km) 0.2 Hydro-turbines (set) 1 Model CJA237-W-70/1 9 Generator (set) 1 Model SFW400-8/990 Rated Capacity (kw) 400 Name Value Rated Water Head (m) 200 Length of water diversion tunnel (km) 0.2 Hydro-turbines (set) 1 Model CJA237-W-55/1 55 Generator (set) 1 Model SFW250-6/740 Rated Capacity (kw) 250 B.2. Post-registration changes B.2.1. Temporary deviations from registered monitoring plan, applied methodology or applied standardized baseline N.A B.2.2. Corrections N.A B.2.3. Changes to start date of crediting period N.A B.2.4. Inclusion of a monitoring plan to the registered PDD that was not included at registration N.A Version 05.1 Page 5 of 24

6 B.2.5. Permanent changes from registered monitoring plan, applied methodology or applied standardized baseline N.A B.2.6. Changes to project design of registered project activity N.A B.2.7. Types of changes specific to afforestation or reforestation project activity Not applicable. SECTION C. 1. Monitoring Object Description of monitoring system The monitoring is to justify the realistic amount of emission reduction from the project. The owner of the proposed project use this document as guideline in monitoring of the project emission reduction performance and adhere to the guidelines set out in this monitoring plan to ensure that the monitoring is credible, transparent and conservative. The following data should be checked EG Exported, y EG imported, y Annual electricity delivered to the CSPG by the project Annual electricity imported from the CSPG to the project 2. Management Structure General Manager: To be responsible for supervising the whole monitoring procedure. CDM Project Manager is responsible for data management and compiling monitoring report. Operational and monitoring manager is responsible for collecting data and perform internal audit. Financial chief is responsible for collection of sales receipts. Technical chief is responsible for preparing operational reports of the project activity, recording the daily operation of the project, including operating periods, equipment defects, etc. 3. Monitoring Equipment The main meters M1 in Aohua Hydropower Project, M2 in Baishijiao Hydropower Project and M3 in Gongtan Hydropower Project in the diagram below are used to obtain the amount of net electricity supplied to the grid by the Project and all the meters are bi-directional. The accuracy of all the meters is not less than 1.0. The generated electricity of Baishijiao hydropower project is transferred via 10kV substation and finally to the China Southern Power Grid (CSPG). Gongtan hydropower station is transferred to via 10kV substation, and finally to the China Southern Power Grid (CSPG). The generated electricity of Aohua hydropower project is transferred to 10 kv substation, and finally to the China Southern Power Grid (CSPG). Version 05.1 Page 6 of 24

7 The following diagram demonstrates the location of meters and how the power plants connect with power grids. Aohua Hydropower Project Baishijiao Stage I Hydropower Project Version 05.1 Page 7 of 24

8 Gongtan Hydropower Project CDM-MR-FORM 4. Calibration of Meters & Metering The calibration frequency of the electricity meters is that it should meets requirements of JJG or DL/T or other relevant standards applicable in the local area. According to JJG , the calibration frequency is once a year. 5. Data Management The project owners keep the printout of the monthly records for the amount of supplied electricity to the grid company. At the end of crediting year, a monitoring report is compiled by the project owner. Hard copied documentation of relevant information subject to the monitoring process, such as paper-based maps and diagrams, are kept together with the monitoring plan. All hard-copied information is managed by the project owner. 6. QA&AC The meters are recorded every month. As mentioned above, the calibration of the meters is conducted in line with relevant standards. If the main meters are damaged, the amount of electricity supplied to and imported from the grid should be determined bilaterally with the grid company. Confirmation shall be provided by the grid company. Otherwise, no emission reduction is claimed until the calibrated meter replacement is installed. The project data is sent to GS VER South Pole project developer annually and cross checked by project developer experienced carbon experts. Data is input in the South Pole project developer online project management tool which functions as the online data storage. Monitoring data can be checked automatically and electronically. SECTION D. Data and parameters Version 05.1 Page 8 of 24

9 D.1. Data and parameters fixed ex ante or at renewal of crediting period CDM-MR-FORM Data / Parameter: Unit: Description: Source of data: EFgrid,CM,y tco2/mwh Value(s) applied): Purpose of data: Additional comment: Combined Margin Grid Emission Factor for the project electricity system in year y Calculated according to the procedure outlined in B.6.1 of the validated PDD Calculated ex-ante based on both the OM and the BM. For detail, Please refer to the validated PDD. D.2. Data and parameters monitored Data/parameter: Unit Description Measured/calculated/default Source of data Value(s) of monitored parameter Monitoring equipment EG Exported, y MWh Quantity of electricity delivered to the CSPG by the project in year y Measured Measured by electricity meters The electricity exported to the grid by the project is MWh during the monitoring period. The meters M1, M2 and M3 are employed to measure the electricity supplied to the grid by the project. The information for the meters is detailed in the following table: Meter Accuracy Type Serial number M1 (Aohua) M2 (Baishijiao stage I) M3 (Gongtan) Bidirection Bidirection Bidirection Calibration date 08/06/ /06/ /06/ /06/ /06/ /06/ /11/ /07/ /04/ /04/2015 Calibration validity 07/06/ /06/ /06/ /06/ /06/ /06/ /11/ /07/ /04/ /04/2016 Calibrated by Zhongshan County Electric Measurement and Testing Center Mengshan County Elecric Measurement and Center It could be confirmed that the calibration validity of the meters covered the second monitoring period. Testing Measuring/reading/recording frequency: Calculation method (if applicable): QA/QC procedures: Purpose of data: Additional comments: Measured continuously/recorded monthly / The data is monitored through the meter and checked by electricity sales records. The meter should be calibrated to ensure the accuracy. Baseline emission calculation Version 05.1 Page 9 of 24

10 Data/parameter: Unit Description Measured/calculated/default Source of data Value(s) of monitored parameter Monitoring equipment EG imported, y MWh Quantity of electricity imported by the project activity from the grid in the year y Measured Measured by electricity meters The electricity imported from the grid by the project is MWh during the monitoring period. The meters M1, M2 and M3 are employed to measure the electricity purchased from the grid by the project. The information for the meters is detailed in the following table: Calibration Calibration Meter Accuracy Type Serial number Calibrated by date validity M1 (Aohua) M2 (Baishijiao stage I) M3 (Gongtan) Bidirection Bidirection Bidirection /06/ /06/ /06/ /06/ /06/ /06/ /11/ /07/ /04/ /04/ /06/ /06/ /06/ /06/ /06/ /06/ /11/ /07/ /04/ /04/2016 Zhongshan County Electric Measurement and Testing Center Mengshan County Electric Measurement and Testing Center It could be confirmed that the calibration validity of the meters covered the second monitoring period. Measuring/reading/recording frequency: Calculation method (if applicable): QA/QC procedures: Purpose of data: Additional comments: Measured continuously/recorded monthly / The data is monitored through the meter and checked by electricity sales records. The meter should be calibrated to ensure the accuracy. Baseline emission calculation Data/parameter: Unit Description Measured/calculated/default Source of data Value(s) of monitored parameter Monitoring equipment / Measuring/reading/recording frequency: Calculation method (if applicable): EG facility,y MWh Amount of net electricity exported to the grid by the proposed project in the year y Calculated Calculated as EG facility,y = EG exported, y EG imported, y The net electricity exported to the grid by the project is MWh during the monitoring period. Reported on a monthly basis. EG facility,y = EG exported, y EG imported, y Version 05.1 Page 10 of 24

11 QA/QC procedures: / Purpose of data: Baseline emission calculation Additional comments: CDM-MR-FORM D.3. Sustainability Monitoring data and parameters No 1 Indicator Air Quality Chosen parameter The air quality compliance at the project site during construction Monitoring result/monitored data Since now no complaint have been received from nearby residents and workers, which shows that during construction period, the mitigation measures have been well implemented to avoid dust emission. During construction period, wet damping was applied after excavation work. Workers wear masks to prevent respiration discomfort. The notice of complaints has been displayed on the front wall of the projects. It was stated on the notice that if there was any complaints or comments for the air quality influence on local people by the hydro-stations during construction period and operation period, they can call the complaint telephone number to ask for improvement. The parameter was monitored during construction. And it has been verified in the 1 st verification. No 2 Indicator Soil condition & Biodiversity Chosen parameter Replantation Monitoring result/monitored data Aohua hydro station Re-plantation area surrounding the power house is 15.5m2=3.1m*5m; Re-plantation species includes reed, pepper, gardenia trees, loquat; Implementation entity is local villagers hired by Aohua hydropower station; Maintenance frequency is 3 months covering fertilize and pest inspection for gardenia trees and loquat, reed need no maintenance for its strong weeds vitality; Re-plantation period is 23/12/ /12/2010. Relevant photos are as follows: Version 05.1 Page 11 of 24

12 Re-plantation area around water diversion channel is 30.12m 2 ; Re-plantation species includes wild reeds, canola flower, the wild seeds sprinkled on both sides of the water diversion channel. Most of the weeds have good survival ability, they can restore vegetation naturally, which need no maintenance; Implementation entity is local villagers hired by Aohua hydropower station; Re-plantation period is 23/12/ /12/2010. High pressure pipe was built on the mountains with no damage to vegetation, so no re-plantation there. Relevant photo is as follows: Version 05.1 Page 12 of 24

13 Baishijiao stage I hydro station Re-plantation area around water diversion channel is 8.4m2; Re-plantation species includes reeds and bamboos; Reeds and bamboos are wild shrub which breed quickly and no requirement for maintenance. Implementation entity is local villagers hired by Baishijiao stage I hydropower station; Re-plantation period is 28/11/ /12/2007. Re-plantation area surrounding the power house is 6.8m2; There is little bare wasteland around the power house, because the power house was built among the mountain forests. Re-plantation adopt local plants such as bamboos, mulberry tree and torch tree, reeds seeds were also scattered surrounding the power house. All the green plants are local plants species, which adapt to local humid and warm climate, requiring no maintenance. Implementation members are local villagers hired by of Baishijiao stage I hydropower station. Re-plantation period is 28/11/ /12/2007. Gongtan hydropower station Re-plantation area surrounding the power house is 5.6m2; The power house was built on the hillside, bamboos, reeds and maples were planted surrounding the power house. With natural rain and sunshine, reeds and bamboos are growing flourished. Implementation member were local villagers hired by Gongtan hydropower station. Maintenance such as fertilizing and watering were implemented by employees of Gongtan hydropower station twice a month. Re-plantation period is 10/01/ /01/2009. High pressure pipe was built on the mountains with no damage to vegetation, so no re-plantation there. Version 05.1 Page 13 of 24

14 No 3 Indicator Quantitative employment and income generation Chosen parameter Number of employment generated from the proposed project Monitoring result/monitored data As for Aohua hydro station, there are totally 10 employees, and all of them are from nearby villages. Their average salary is CNY/y in 2013, CNY/y in 2014 and CNY/y in 2015, which shows the operation of the project offers jobs and income generation for the local villagers. As for Baishijiao stage I hydro station, there are totally 9 employees, and all of them were from nearby villages. Their average salary is CNY/y in 2013, CNY/y in 2014 and CNY/y in As for Gongtan hydro station, there are totally 13 employees, and all of them were from nearby villages. Their average salary is CNY/y in 2013, CNY/y in 2014 and CNY/y in All the Employees salary table have been provided. According to the 2016 Government Work Report 1 the Report to compare the economic and social development at Zhongshan County in 2014 and , the local average salary in 2013, 2014, 2015 is 6408 CNY/y, 7150 CNY/y, 8181 CNY/y, which is much lower than the lowest value of average salary in the proposed project ( CNY/y). And the proposed project is located at a remote and isolated mountain area. The project helps to offer the jobs for the local villagers and increase the income for the local villagers and farmers. No 4 Indicator Access to affordable and clean energy services Chosen parameter Net electricity generation by project activity Monitoring result/monitored data The project increases the renewable energy use as follows: As for Baishijiao stage I hydro station, the net electricity generation was kwh during this monitoring period. As for Gongtan hydro station, the net electricity generation was kwh during this monitoring period. As for Aohua hydro station, the net electricity generation was kwh during this monitoring period. Please refer to section E of this report for detail information of net electricity generation by the project Version 05.1 Page 14 of 24

15 No 5 Indicator Quality of employment Chosen parameter Work safety manual Monitoring result/monitored data The safety manual was displayed at the project site and always followed by staff, which can be shown in the photos of onsite displayed safety manual, and it would be checked by station manager every year to remind staff to ensure safety all the times. As for Baishijiao stage I hydropower station, the safe guarding manual was replaced yearly with new paper, and little change of content, just to prevent erosion damage. As for Gongtan hydropower station and Aohua hydropower station, the safeguarding manual has been displayed on the wall of hydro station since commission and no replacement till now. One photo sample of Gongtan safeguarding as follows: No 6 Indicator Water quality Chosen parameter Wastewater discharge compliance with regulations and rules Monitoring result/monitored data For the project, the wastewater during construction was mainly domestic wastewater. Due to micro-scale with little installed capacity, the 3 projects adopt septic tank as the same pretreatment method before discharge. There was an open toilet with a big hole at the project site, which formed a natural septic tank, where the domestic wastewater finally becomes fertilizers via fermentation. And the fertilizers would be collected and supplied to local farmers for agricultural usage. The wastewater discharge complies with Integrated wastewater discharge standard (GB ). No 7 Version 05.1 Page 15 of 24

16 Indicator Chosen parameter Monitoring result/monitored data CDM-MR-FORM Other pollutant Noise compliance with regulations and rules During the construction period, the main noise is from evacuation process. Due to the micro-scale and far away distance from nearby residents, there was no noise influence, as well as no complaint for noise from local sediments since construction. During the construction period, earplugs and helmets were provided to the workers. The construction machines were well maintained and kept lubrication to reduce operation noise. Some vibration equipment adopt damping base to reduce noise. Porous soundabsorbing material were used to establish sound barrier. Via the above implementation of mitigation measures, the noise was in compliance with Industrial enterprises of environmental noise emission standards (GB ). No 8 Indicator Quality of the employment Chosen parameter Staff Training Plan Monitoring result/monitored data The project trained the employees on correct operation of the power station to ensure safety of the workers and the normal operation at the site. Gongtan hydro station In 01/06/2014, 11 employees joined in the training. The content included work system, protection of turbine generator and operation system. In 15/06/2015, 11employees joined in the training with content including shift system, regular maintenance of equipment and management system. Aohua hydro station In 03/07/2014, 9employees joined in the training. The content included operation of boot and stop process onsite, work system and main transformer protection and work principle. In 09/06/2015, 9 employees joined in the training with transformer works principle, equipment inspection and regular trouble shooting and maintenance. Baishijiao stage I hydro station In 04/06/2014, 8 employees joined in the training. The content included management system, operation system and shift system. In 06/06/2015, 8 employees joined in the training with content including transformer works principle, protection of turbine generator and work system. One sample of training records as follows: Version 05.1 Page 16 of 24

17 And all the Training records have been provided. D.4. N.A Implementation of sampling plan SECTION E. Calculation of emission reductions or GHG removals by sinks E.1. Calculation of baseline emissions or baseline net GHG removals by sinks According to AMS-I.D (Version 17), the baseline emissions of the project are equal to: BE y = EG facility,y EF y Where: BE y : Baseline emissions in year y (tco 2 e /yr); EF y : The emission factor in year y, calculated according to the registered PDD; EG facility,y :Net electricity exported to the grid by the project in the year y (MWh). EG facility,y = EG Exported,y EG Imported,y Where: EG Exported,y : Quantity of electricity delivered to the CSPG by the project in year y EG Imported,y : Quantity of electricity imported by the project activity from the grid in the year y The emission factor has been determined ex-ante as tco 2 e/mwh. Therefore, baseline emission can be calculated with the formula: BE y = (EG Exported,y EG Imported,y ) EF y = (EG Exported,y EG Imported,y ) Version 05.1 Page 17 of 24

18 The following Tables provide the calculation of the baseline emissions during the monitoring period. For Aohua station and Baishijiao stage I station, the monitoring data were recorded on 28 th once a month. The second monitoring period of these 2 projects is specified to 29/06/ /08/2015. This is time sequential with the first monitoring period. For Gongtan station, the monitoring data was recorded on the last day once a month, so the monitoring data covers the calendar month. The second monitoring period of this project is 01/07/ /08/2015. This is time sequential with the first monitoring period. Baishijiao Stage I hydropower station Period Electricity exported(kwh) Electricity imported(kwh) Net Electricity exported(kwh) 29/06/ /07/ /07/ /08/ /08/ /09/ /09/ /10/ /10/ /11/ /11/ /12/ /12/ /01/ /01/ /02/ /02/ /03/ /03/ /04/ /04/ /05/ /05/ /06/ /06/ /07/ /07/ /08/ /08/ /09/ /09/ /10/ /10/ /11/ /11/ /12/ /12/ /01/ /01/ /02/ /02/ /03/ /03/ /04/ /04/ /05/ /05/ /06/ /06/ /07/ /07/ /08/ Total Period Gongtan hydropower station Electricity exported(k wh) Electricity imported(kwh) Net Electricity exported(kwh) 01/07/ /07/ /08/ /08/ /09/ /09/ /10/ /10/ /11/ /11/ /12/ /12/ /01/ /01/ /02/ /02/ /03/ /03/ /04/ /04/ Version 05.1 Page 18 of 24

19 01/05/ /05/ /06/ /06/ /07/ /07/ /08/ /08/ /09/ /09/ /10/ /10/ /11/ /11/ /12/ /12/ /01/ /01/ /02/ /02/ /03/ /03/ /04/ /03/ /05/ /05/ /06/ /06/ /07/ /07/ /08/ /08/ Total Aohua Stage I hydropower station Period Electricity Electricity Net Electricity exported(kwh) imported(kwh) exported(kwh) 29/06/ /07/ /07/ /08/ /08/ /09/ /09/ /10/ /10/ /11/ /11/ /12/ /12/ /01/ /01/ /02/ /02/ /03/ /03/ /04/ /04/ /05/ /05/ /06/ /06/ /07/ /07/ /08/ /08/ /09/ /09/ /10/ /10/ /11/ /11/ /12/ /12/ /01/ /01/ /02/ /02/ /03/ /03/ /04/ /04/ /05/ /05/ /06/ /06/ /07/ /07/ /08/ Total The baseline emission of the project in the monitoring period is 7348 tco2e. And the vintages are separately as follows: Version 05.1 Page 19 of 24

20 Year Year Year CDM-MR-FORM The project has not been registered as CDM project or under other voluntary carbon crediting scheme. There is no double counting for the emission reductions during this monitoring period. The Letter of Confirmation on avoiding double counting was offered. E.2. Calculation of project emissions or actual net GHG removals by sinks The project activity is a run-of-river hydropower project, and as per AMS-I.D, the GHGs emitted from such project activities are considered to be zero. Hence: PEy = 0. E.3. Calculation of leakage According to AMS.I.D (Version 17), no leakage emissions are considered. Version 05.1 Page 20 of 24

21 E.4. Summary of calculation of emission reductions or net GHG removals by sinks Item 01/07/ /12/ /01/ /12/ /01/ /08/2015 Baseline emissions or baseline net GHG removals by sinks (t CO 2 e) Project emissions or actual net GHG removals by sinks (t CO 2 e) Leakage (t CO 2 e) GHG emission reductions or net GHG removals by sinks (t CO 2 e) achieved in the monitoring period Up to 31/12/2012 From 01/01/ Total Total amount E.5. Comparison of actual emission reductions or net GHG removals by sinks with estimates in registered PDD Item Emission reductions or GHG removals by sinks (t CO 2 e) Values estimated in ex ante calculation of registered PDD Actual values achieved during this monitoring period The annual emission reduction estimated in ex-ante calculation of registered PDD is 3972 tco 2 e. And the monitoring period is 26 months. Thus, the value estimated in ex-ante calculation of registered PDD is 8606 tco 2 e (3972 tco 2 e/12*26). E.6. Remarks on difference from estimated value in registered PDD The actual amount of emission reductions in the second monitoring period is 85% of the estimated value in ex-ante calculation of the registered PDD, which is reasonable for the micro scale run-of-river hydropower project. Version 05.1 Page 21 of 24

22 Appendix 1. Contact information of project participants and responsible persons/entities Project participant and/or responsible person/ entity Project participant Person/entity responsible for completing the CDM-MR-FORM Organization name Baishijiao State I Hydropower Plant in Liang'an Township, Zhongshan County Street/P.O. Box Building City Hezhou City State/region Postcode Country China Telephone Fax bjhuangzhuo@sina.com Website Contact person Chen Xiang Title Mr Salutation Last name Chen Middle name First name Xiang Department Mobile Direct fax Direct tel. Personal Version 05.1 Page 22 of 24

23 Project participant and/or responsible person/ entity Project participant Person/entity responsible for completing the CDM-MR-FORM Organization name Aohua State I Hydropower Plant of Zhongshan County Street/P.O. Box Building City Hezhou City State/region Postcode Country China Telephone Fax bjhuangzhuo@sina.com Website Contact person Li Fuyuan Title Mr Salutation Last name Li Middle name First name Fuyuan Department Mobile Direct fax Direct tel. Personal Project participant and/or responsible person/ entity Project participant Person/entity responsible for completing the CDM-MR-FORM Organization name Gongtan Hydropower Plant in Wenxu Township, Mengshan County Street/P.O. Box Building City Hezhou City State/region Postcode Country China Telephone Fax bjhuangzhuo@sina.com Website Contact person Liu Yanzhi Title Mr Version 05.1 Page 23 of 24

24 Salutation Last name Middle name First name Department Mobile Direct fax Direct tel. Personal Liu Yanzhi CDM-MR-FORM Project participant and/or responsible person/ entity Project participant Person/entity responsible for completing the CDM-MR-FORM Organization name Swiss Carbon Value Ltd. Street/P.O. Box Technoparkstr. 1 Building City Zurich State/region Zurich Postcode 8005 Country Switzerland Telephone Fax info@southpolecarbon.com Website Contact person Renat Heuberger Title Mr Salutation Last name Heuberger Middle name First name Renat Department Mobile Direct fax Direct tel Personal r.heuberger@southpolecarbon.com Version 05.1 Page 24 of 24