1 FORM I [Vide M.o.E.F & C.C tification dated 14 th September, 2006] For Proposed Residential & Commercial Project ALCOVE At. 100/1, 100/2, 100/3, 100/4, 100/5, 100/6B, 101/1, 101/2, 101/3, 101/4, 101/5B, 101/6B, 101/6C, Village- Pimpale Saudagar, Tal. Haveli, Dist. Pune Of M/s. Atul Enterprises Name of Consultant: Sneha Hi-Tech Products

2 (I) BASIC INFORMATION Item Details. 1. Name of the project Proposed Residential & Commercial project Alcove 2. S.. in the schedule 8 (a)b2 3. Proposed capacity/area/length/tonnage Total Plot Area: 25,700 m 2 to handled/command area/lease Net Plot Area after Deductions: 21, m 2 area/number wells to be drilled Proposed FSI: 31, m 2 Proposed n FSI: 31, m 2 Construction BUA: 63, m 2 4. New/Expansion/Modernization Expansion in existing project 5. Existing Capacity/Area etc. Total 8 buildings having built-up area of 61, sq.mt. were constructed on site. 6. Category of Project i.e. 'A' or 'B' B2 Category 7. Does it attract the general condition? If yes, please specify. 8. Does it attract the specific condition If yes, please specify. 9. Location Plot/Survey/Khasra. Village Tehsil District State 10. Nearest railway station/airport along with distance in kms 11. Nearest Town, city, District Headquarters along with distance in kms. 12. Village Panchayat, Zilla Parishad, Municipal Corporation, Local body (complete postal addresses with telephone nos. to be given). 100/1, 100/2, 100/3, 100/4, 100/5, 100/6B, 101/1, 101/2, 101/3, 101/4, 101/5B, 101/6B, 101/6C Pimpale Saudagar Haveli Pune Maharashtra Nearest Railway Station: Pimpri (9 kms), Nearest Airport: Pune Airport (18.9 kms) Nearest City: Pimpri-Chinchwad (6.2 kms), Pune City (12.6 Km) Under the jurisdiction of Pimpri Chinchwad Municipal Corporation (PCMC) 13. Name of the applicant M/s. Atul Enterprises 14. Registered Address 16/1, Parvati chambers, Sangam press road, Kothrud, Pune Address for correspondence : Name Mr. Rahul Mundada 2

3 Designation (Owner/Partner/CEO) (M/s. Atul Enterprises) Director Address 16/1, Parvati chambers, Sangam press road, Kothrud, Pune Pin Code Telephone Fax Details of Alternative Sites examined, if t applicable any. Location of these sites should be shown on a topo sheet. 17. Interlinked Projects 18. Whether separate application of t applicable interlinked project has been submitted? 19. If yes, date of submission t applicable 20. If no, reason Because at this stage only one project is under consideration. 21. Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. (a) The forest (conservation) Act, 1980? (b) The wildlife (protection) Act, 1972? (c) C.R.Z tification, 1991? 22. Whether there is any government order / policy relevant/ relating to the site?, The proposal does not involve any of this approval/clearance. 23. Forest land involved (hectares), there will not be any forest land involved. 24. Whether there is any litigation pending against the project and/or land in which the project is propose to be set up? (a) Name of the Court (b) Case. (c) Orders/directions of the Court, if any and its relevance with the proposed project. 3

4 (II) ACTIVITY 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.). Information/Checklist confirmation 1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, vegetation and buildings? / quantities /rates, wherever possible) with There will be no significant changes in existing land use pattern by proposed project. The proposed project is in accordance with the residential zone of Pimpri Chinchwad Municipal Corporation (PCMC). The existing open land will be leveled and graded and site preparation shall involve clearing of shrubs and vegetation. 1.3 Creation of new land uses? The existing land use already has little Residential area in close vicinity to proposed site so there shall be no change in land use after proposed project. 1.4 Pre-construction investigations Soil investigation will be submitted. e.g. bore houses, soil testing? 1.5 Construction works? Proposed construction consists of- Building A,B,C,D Stilt + 12 Upper floors Building E,F,G,H Basement + Stilt + 12 Upper floors Convenient shopping- Basement + Ground/parking + 2 floors Covered Parking structure. Total s. of Buildings = 9 nos. 1.6 Demolition works? The project does not involve any demolition work. 1.7 Temporary sites used for construction works or housing of construction workers? 1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations. Temporary shelters and sanitation facilities for construction workers are required and the same shall be accommodated within the project site. Total excavation quantity will be used for refilling or foundation trenches and the balance shall be used for leveling of low lying areas within the plot premises. 4

5 1.9 Underground works including mining or tunneling? 1.10 Reclamation works? t Applicable underground works including mining or tunneling involved. Foundation for various structures will be provided as sub-structure based on load requirement Dredging? Dredging shall be required as no offshore area is involved Offshore structures? Offshore structures involved as no offshore area is involved Production and manufacturing processes? 1.14 Facilities for storage of goods or materials Facilities for treatment or disposal of solid waste or liquid effluents? such production or manufacturing processes will be carried out. Raw materials required for construction shall be stored at the camp-sites during construction phase. During Construction Phase During construction phase, construction materials will be sold to recyclers. Unusable, excess construction debris will be used within the site for backfilling and filling low lying areas. Domestic sewage generated in construction phase will be disposed off to septic tank followed by soak pit Facilities for long term housing of operational workers? During Operation Phase Total wastewater generation will be 288 m 3 /day. The proponent will provide separate 1 STP of 320 m 3 /day. 163 m 3 /day treated water will be recycled and used for flushing and gardening and remaining excess 111 m 3 /day water will be discharged in to PCMC drain. The solid waste generated both during construction and operational phase shall be segregated to biodegradable and nonbiodegradable waste. OWC shall be provided for converting bio-degradable waste to manure and non-biodegradable waste shall be handed over to authorized vendor for recycling or PCMC Ghantagaadi. Temporary camp shall be setup for operational workers. 5

6 1.17 New road, rail or sea traffic during construction or operation? A temporary increase in traffic may result during construction phase due to transport of personnel/ materials/ equipment. During operation, based on occupancy levels, road traffic will be additional New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or pipelines? 1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? It is intended to make maximum use of existing road network for mobilization of man and materials. There will not be any closure or diversion of existing transportation routes. New transmission as well as pipelines shall be required for facilitating various infrastructure utilities for the residential buildings with town houses and apartments. Based on recommendations of hydro geological survey, rainwater harvesting will be done to enhance the water capacity of aquifers Stream crossings? There are no stream crossings 1.23 Abstraction or transfers of water from ground or surface waters? 1.24 Changes in water bodies or the land surface affecting drainage or run-off? 1.25 Transport of personnel or materials for construction, operation or decommissioning? 1.26 Long-term dismantling or decommissioning or restoration works? 1.27 Ongoing activity during decommissioning which could have an Permission from Competent Authority will be obtained for bore well. The site shall be restored back to normal after construction and surface run off from site shall be channelized through storm water drains and utilized for ground water recharge hence no change in drainage pattern envisaged. Road transport will be used for transportation of materials for construction phase. During operation phase the road transport shall be utilized by the floating population for transportation. Proposed project does not involve any longterm dismantling or decommissioning or restoration works. There is no impact on environment during decommissioning since project does not 6

7 impact on the environment? involve any decommissioning Influx of people to an area in either temporarily or permanently? influx of people during construction phase since hutments are provided for the laborers employed during construction phase at the camp site itself. During operation phase influx of people from Residential and Commercial buildings shall be Total: 2,516, Residential: 2,350, Commercial: Introduction of alien species? The green belt as per the requirements of MoEF/CPCB will be developed. Only native species will be planted so no introduction of alien species is anticipated Loss of native species or genetic diversity? Deforestation is not involved, only site clearance shall be taken up to clear thorny bushes or surrounding vegetation and care shall be taken to avoid loss of any native species or genetic diversity Any other actions? other actions/activities envisaged 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Information/checklist confirmation. 2.1 Land especially undeveloped or agricultural land (ha) 2.2 Water (expected source & competing users) unit: m 3 /day / quantities /rates, wherever possible) with source of information data The land is under residential zone of the development plan of Pimpri Chinchwad Municipal Corporation (PCMC). CONSTRUCTION PHASE: Total work force: 100 workers Source: Pimpri Chinchwad Municipal Corporation (PCMC)/ Borewell/Tanker Drinking: 1.5 m 3 /day Domestic: 3 m 3 /day Construction purpose: 25 m 3 /day Total Demand = 29.5 m 3 /day OPERATION PHASE: Source: Pimpri Chinchwad Municipal Corporation (PCMC)/ Recycled 7

8 . Form I Information/checklist confirmation / 2.3 Minerals (MT) t applicable. 2.4 Construction material stone, aggregates, sand / soil (expected source MT) quantities /rates, wherever possible) with source of information data Fresh water: 251 m 3 / day Recycled water (flushing + gardening) = 163 m 3 / day Total water requirement: 396 m 3 /day The raw material required for construction purpose shall be cement, RMC, Sand, Aggregates, brick, Steel, Stone, etc. The exact quantities of each shall be furnished during detailed engineering. 2.5 Forests and timber (source MT) t applicable, since preference shall be given to recycled materials. 2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW) 2.7 Any other natural resources (use appropriate standard units) Source: MSEDCL Construction phase: Connected Load: 40 KVA DG Set: 1 nos. x 50 KVA Operation phase: Source : MSEDCL Demand Load: Residential bldgs.: 1768 KW, Commercial bldg.: KW Connected load: Residential bldgs.: 2210 KW, Commercial bldg.: KW Transformer capacity: 4 x 630 KVA, 1 x 100 KVA DG sets: Operation phase: 1 no of 125 KVA, 1 no. of 140 KVA, 1 no. of 30 KVA t Applicable 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. Information/Checklist confirmation. / quantities / rates, wherever possible) with 8

9 . Information/Checklist confirmation 3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna and water supplies) / quantities / rates, wherever possible) with t applicable 3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by changing living conditions? 3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc., t Applicable. Employment opportunities for the local people will increase. The living condition and welfare of the people will improve. t Applicable 3.5 Any other causes t Applicable 4. Production of solid wastes during construction or operation or decommissioning. Information/Checklist confirmation / 4.1 Spoil, overburden or mine wastes t Applicable. 4.2 Municipal waste (domestic and or commercial wastes) Construction Phase: Debris chute will be installed for each building to maintain cleanliness within the project site and to avoid spilling of construction waste beyond the battery limits of the building. This construction debris and other construction waste such as bags, broken tiles, PoP etc. shall be used for refilling low lying areas within the project site. Number of workers: 100 numbers Dry Waste: 15 kg/day Wet Waste:10 kg/day Total Solid Waste: 25 Kg /day Operation Phase: 9

10 . Information/Checklist confirmation 4.3 Hazardous wastes (as per Hazardous Waste Management Rules) /. Dry Waste: kg/day Wet Waste: kg/day Total Solid Waste: 1099 kg /day t Applicable 4.4 Other industrial process wastes t Applicable 4.5 Surplus product t Applicable 4.6 Sewage sludge or other sludge from effluent treatment About 28 kg/day dry sludge from STP will be generated which shall be used as fertilizer for landscaping after drying. 4.7 Construction or demolition wastes The debris generated from the Construction activities will be reused as sub base of internal road and drive ways. 4.8 Redundant machinery or equipment redundant machinery as the construction and other equipments involved shall be transported out of the project area once the construction work is over. 4.9 Contaminated soils or other materials t Applicable 4.10 Agricultural wastes t Applicable 4.11 Other solid wastes t Applicable 5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr). Information/Checklist confirmation / 5.1 Emissions from combustion of fossil fuels from stationary or mobile sources During Construction phase emission of Fossil fuels shall be from use of Construction machineries, vehicles and DG Sets only. During Operation phase emission will be from use of DG sets on power break down and vehicles for transportation. 5.2 Emissions from production processes processes involving production. 5.3 Emissions from materials handling including storage or transport Dusting may occur during loading and unloading of cement bags, sand etc. however suitable mitigation measures like sprinkling of water etc. may be carried out to control 10

11 . Information/Checklist confirmation / dusting. 5.4 Emissions from construction activities including plant and equipment. During Construction phase emission of Fossil fuels shall be from use of Construction machineries, vehicles and DG Sets. 5.5 Dust or odors from handling of materials including construction materials, sewage and waste. Dusting will occur during transportation and handling of construction materials however suitable mitigation measures like sprinkling of water etc may be carried out to control dusting. odor problem will occur from solid waste since proper segregation and treatment is proposed for the project. 5.6 Emissions from incineration of waste t applicable as incineration will not be involved. 5.7 Emissions from burning of waste in burning of debris shall be allowed. open air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources t envisaged 6. Generation of ise and Vibration, and Emissions of Light and Heat. Information/Checklist confirmation 6.1 From operation of equipment e.g. engines, ventilation plant, crushers / with source of information data. ise expected during operation of DG set shall be around 65 db (A) however DG sets shall be used only as backup in case of power failure. Further proper acoustic measures shall be provided along with DG sets to reduce the noise and vibrations. 6.2 From industrial or similar processes industrial or similar processes involved. 11

12 . Information/Checklist confirmation / with source of information data. 6.3 From construction or demolition There will be marginal increase in noise upto 65 db during construction work and it shall be localized to work site. The activities will be restricted to the daytime. Personnel protective equipment will be provided and their proper usage will be ensured for eardrum protection of the workers. 6.4 From blasting or piling blasting or piling involved. 6.5 From construction or operational traffic 6.6 From lighting or cooling systems t Applicable 6.7 From any other sources t Applicable There will be marginal noise generation from vehicle movement. However, the noise levels will be less than 65 db. Further suitable mitigation measures shall be proposed to reduce the noise generated as a result of construction or operation traffic. 7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:. Information/Checklist confirmation / 7.1 From handling, storage, use or spillage of hazardous materials 7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) The collection and treatment and disposal of hazardous waste will be as per hazardous waste (Management & Handling) amendment rule 2008 and hence no adverse impact on land environment is envisaged. The quantity of domestic waste water expected to be generated during construction phase is about 29.5 m 3 / day & shall be disposed off through septic tanks. For operation phase there will be provision of 1 STP of 320 m 3 /day. Treated sewage will be recycled and reused for flushing and landscaping purposes and remaining will be connected to existing sewer lines. 12

13 . Information/Checklist confirmation / 7.3 By deposition of pollutants emitted to air into the land or into water. 7.4 From any other sources t applicable Flue gas emissions from DG set will be within the prescribed limits. Adequate stack height shall be provided for dispersion of the pollutants/ emissions. The sewage will be treated and reused; hence no impact on land or water bodies is anticipated. Hence no deposition of pollutants in air, water or land is anticipated. 7.5 Is there a risk of long term build up of pollutants in the environment from these sources? The only emissions shall be from DG sets which shall be operated in case of power failure. Further adequate stack height shall facilitate dispersion of pollutants hence no risk of built of pollutants shall occur. The flue gas emissions from DG sets will be strictly in conformity to the limits stipulated by CPCB. Also the stack height will be in accordance with CPCB stipulations. The sewage will be treated and reused; hence no impact on land or water bodies is anticipated. Hence no long term build up risk of pollutants in the environment from these sources is anticipated. 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment. Information/Checklist confirmation / 8.1 From explosions, spillages, fires etc t Applicable from storage, handling, use or production of hazardous substances. 8.2 From any other causes t applicable 13

14 . Information/Checklist confirmation / 8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? Since the project falls under seismic zone III and the building will be designed as per seismic zone - III norms. 9. Factors which should be considered (such as consequential development) which could lead. to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality. Information/Checklist confirmation 9.1 Lead to development of supporting facilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.) housing development extractive industries supply industries other 9.2 Lead to after-use of the site, which could haven impact on the environment / The project will set precedents for development of transport, communication, infra-structure and other developments in the area. The proposed project will have marginal & negligible impact on the environment. 9.3 Set a precedent for later developments The project shall set precedents for further development of transport, communication, infra-structure and other developments in the area. 9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects As the environmental impact from the project is marginal, no cumulative effects are envisaged. (III) Environmental Sensitivity Areas. 1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value. Name/ Identity ne Aerial distance (within 15 km.) Proposed project location boundary t Applicable 14

15 . Areas Name/ Identity Aerial distance (within 15 km.) Proposed project location boundary 2 Areas which are important or sensitive ne t Applicable for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests. 3 Areas used by protected, important or ne t Applicable sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration. 4 Inland, coastal, marine or underground ne t Applicable waters. 5 State, National boundaries. ne t Applicable 6 Routes or facilities used by the public ne t Applicable for access to recreation or other tourist, pilgrim areas. 7 Defense installations. ne t Applicable 8 Densely populated or built-up area. t Applicable 9 Areas occupied by sensitive man-made ne t Applicable land uses (hospitals, schools, places of worship, community facilities) 10 Areas containing important, high quality ne t Applicable or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution or ne t Applicable environmental damage. (those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard which could cause the project to present environmental problems. (earthquakes, subsidence, landslides, erosion, flooding t Applicable or extreme or adverse climatic conditions) 15