1 PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: TPA and existing Stone Crusher Unit named M/s. Jyoti Stone Crushing Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village: Chhitoli, Tehsil: Virat Nagar, District: Jaipur (Rajasthan) of Shri Bhairu Lal Yadav S/o Shri Bhagwan Sahai Lal Yadav. (Copy of Consent to Operate of Mines & Stone Crusher Unit is enclosed herewith). The Environmental Clearance granted to the project by DEIAA, Jaipur vide letter No. DEIAA/JAIPUR/EC/2016/1490 Dated: 30/05/2016. The Simplified Mining Scheme with Progressive Mine Closure Plan, was approved by vide letter no. SME / JP / MP / 249 / 2017 on dated 29/12/2017. Now, as per the Rajasthan State Pollution Control Board office order no CD&SCMG(Gen- 03)/RSPCB/ 1235 to 1271 dated 24/1/2017, the amendment in the above stated Environmental Clearance for incorporation of Stone Crushing Unit located on mining lease is requested from DEIAA, Jaipur. 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION I. Identification of Project and Project Proponent Shri Bhairu Lal is lease holder and owner of the Stone Crusher Unit located on the mining lease named M/s. Jyoti Stone Crushing Company. II. Brief Description of the Nature of Project In the Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: TPA and existing Stone Crusher Unit named M/s. Jyoti Stone Crushing Company of production capacity: 14,40,000 CFT/ Year located at Khasra No

2 near Village: Chhitoli, Tehsil: Virat Nagar, District: Jaipur (Rajasthan) of Shri Bhairu Lal. The Environmental Clearance granted to the project by DEIAA, Jaipur vide letter No. DEIAA/JAIPUR/EC/2016/1490 Dated: 30/05/2016. The Simplified Mining Scheme with Progressive Mine Closure Plan, was approved by vide letter no. SME / JP / MP / 249 / 2017 on dated 29/12/2017. Now, as per the Rajasthan State Pollution Control Board office order no CD& SCMG(Gen- 03)/RSPCB/ 1235 to 1271 dated 24/1/2017, the amendment in the above stated Environmental Clearance for incorporation of Stone Crusher Unit named M/s. Jyoti Stone Crushing Company located on mining lease is requested from DEIAA, Jaipur III. Need for the Project & Its Importance to the Country/ Region The mined out/ processed mineral is required for construction & maintenances of building or other infrastructural/developmental activities. Our project will help to met out these kinds of requirements of nearby areas. IV. Demand Supply Gap Considering the demand of mineral as well as sufficient availability of the mineral in nearby area, it is essential to have Masonry Stone mine and Stone Crusher Unit to sustain the supply of mineral for various purposes. V. Imports vs. Indigenous Production Stone Crusher Unit is interlinked with our mining activities. VI. Export Possibility Mineral will be exported to nearby area. VII. Domestic/Export Markets The mineral Masonry Stone of this lease area for captive use which will be processed in the Stone Crusher Unit located on mining lease as shown in Surface Geological 7

3 Plan (Copy enclosed herewith) and the final product will be dispatched to nearby open market. VIII. Employment Generation (Direct and Indirect) due to the Project Activity provides direct employment will be provides to the locals based on their eligibility & skill or indirect employment will be generated. 3.0 PROJECT DESCRIPTION (i) Type of Project Including Interlinked And Independent Projects, If Any This is a site specific project. Interlinked Project: Stone Crusher Unit: M/s. Jyoti Stone Crushing Company. Production Capacity: 14,40,000 CFT/ Year (ii) Details of Alternate Sites Considered No alternative site has been taken into consideration due to availability of mineral resources in the area. (iii) Size and magnitude of operation Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: TPA and existing Stone Crusher Unit named M/s. Jyoti Stone Crushing Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village: Chhitoli, Tehsil: Virat Nagar, District: Jaipur (Rajasthan) of Shri Bhairu Lal Yadav S/o Shri Bhagwan Sahai Lal Yadav. (iv) Project Description with Process Detail (1) Salient features along with project vicinity details of the Mining project is given below: As above. 4.0 METHOD OF MINING The mining is being done by semi meachanized opencast method. The bench height & width is 6 meter. Mining is being/will be done as per approved mining scheme. 8

4 5.0 LOADING & TRANSPORT Excavated mineral is being/will be loaded into dumpers and transported to Stone Crushing unit. The mined out mineral will be dispatched to open market. 6.0 WASTE GENERATION & DISPOSAL At the conceptual stage, waste will be used as second grade mineral which will be sold out to nearby market by lessee. 7.0 Raw Material Required Along With Estimated Quantity, Likely Source, Marketing Area of Final Products, Mode of Transport of Raw Material and Finished Product No raw material will be required for mining operation. 8.0 Resources Optimization/ Recycling and Reuse Envisaged in the Project, if any, should be briefly Outlined No waste water will be generated from mining operation. Domestic sewage water generated from office toilet is being/ will be disposed in soak pits via septic tank. 9.0 Availability of Water Its Source, Energy /Power Requirement and Source A. Water requirement: Water requirement for the project will be 5.0 KLD which sourced from near by village. B. Power requirement: Mainly diesel is being/will be used to operate machinery and equipment. No Power will be required in mining operation Quantity of Waste to Be Generated (Liquid and Solid) And Scheme for Their Management/Disposal: Domestic sewage water generated from toilets is being/will be disposed in soak pits SITE ANALYSIS (i) Connectivity The lease area at a distance of ~0.5 km away from Village: Chhitoli from mining lease boundary. Nearest Railway Station at Jaipur Railway Station at a distance of ~70.0 km in South direction from mining lease boundary. Nearest Airport at Sanganer International 9

5 Airport, Jaipur at a distance of ~ 72.0 km. in South direction from mine lease boundary. Lease area is well connected through roads. (ii) Land Form, Land Use and Land Ownership The total area of 1.00 ha which is non- forest land. (iii) Topography The lease area consists of almost flat terrain with slight undulation. (iv) Existing Land Use Pattern {Agriculture, Non-Agriculture, Forest, Water Bodies (Including Area Under CRZ)}, Shortest Distances From The Periphery Of The Project To Periphery Of The Forests, National Park, Wild Life Sanctuary, Eco Sensitive Areas, Water Bodies (Distance From The HFL Of The River), CRZ. In Case Of Notified Industrial Area, A Copy Of The Gazette Notification (v) As above. Existing Infrastructure: There is no building & structure within mining lease area except some vegetation s existing on the lease area which will be cleared when required PROJECT SCHEDULE & COST ESTIMATES (i) Likely Date Of Start Of Construction And Likely Date Of Completion (Time Schedule For The Project To Be Given) This is a running mine & operation will be started after obtaining all statutory clearance from concern authority. (ii) Estimated Project Cost Along With Analysis In Terms Of Economic Viability of the Project Cost for mining activity will be as per EC letter ANALYSIS OF PROPOSAL Masonry Stone Mining Lease resulted in growth of the surrounding areas by increasing direct and indirect employment opportunities in the region including ancillary development and supporting infrastructure. Special emphasis on Financial and Social benefits will be given to the local people including tribal population, if any, in the area. Development of social amenities will be in the form of medical facilities, and providing books and school uniforms to the poor students of nearby schools. No major adverse effect on environment is envisaged as the required mitigation measures are inbuilt in the project. 10

6 14.0 ENVIRONMENTAL MANAGEMENT PLAN AIR POLLUTION CONTROL FOR MINING PROJECT AND STONE CRUSHER LOCATED ON MINING LEASE: - AIR QUALITY MANAGEMENT ANTICIPATED SOURCE OF GASEOUS EMISSIONS MINING STONE CRUSHER ON MINING LEASE Engines of vehicles, Operation of mining machinery/ loading operations, drilling and blasting, Stone Crushing. Wet drilling and low charge blasting is being/will be done. Operators are skilled to operate excavators. Drill operator and his helper is being/will be equipped with personal protective equipment (ear plugs/ear muffs). Construction of metalled or hard surfaced roads within the premises. Construction of wind breaking walls. Dust contaminant cum suppression system for the equipment. Regular cleaning and wetting of the ground within the premises. All vibratory screens will be totally enclosed in rigid and reasonably dust tight housing. If containment of dust within the screen house structure is not satisfactory, then a dust extraction and collection system should be provided. All grizzlies shall be enclosed on top and from three sides and sufficient water sprayers shall be installed at their feeding and outlet areas. Dust remain confined within enclosures. All transfer points to and from conveyor have been enclosed. Free falling transfer points from conveyor to stockpiles should be fitted with flexible curtains or be enclosed with chutes designated to minimize the drop height. Water spraying arrangements has been installed and operated at all strategic locations such as, at the feeding inlet of stone crushers, at transfer points on surface of all surge, piles and stock piles of blasted rocks or aggregates, all open stockpiles for aggregates of size in excess of 5 mm, active haul roads inside the workers etc. Sign board showing the name, address and capacity of the crusher has been maintained at the entrance of the premises. Guidelines for Abatement of pollution in stone crusher industry issued by the Board vide letter no F.14(38) policy/rpcb/plg./ dated

7 TRANSPORTATION GREENBELT/PLANTATION PERSONAL PROTECTIVE EQUIPMENT MAINTENANCE OF VEHICLES PERIODIC AIR QUALITY MONITORING Haul roads are being/will be made wide, leveled, compacted and properly maintained and watered regularly. Operators will be provided with dust masks. Green Belt/ Plantation has been/ will be developed around the lease periphery or outside the lease area which will be equal to 33 % of the total lease area. Operators and other persons near loading area is being /will be use dust mask. Personal protective equipment is being/will be provided to all the employees. Machineries is being /will be properly maintained to minimize the generation of gaseous emissions. Vehicles are being used for transportation will be loaded as per their capacity Periodic air quality monitoring for PM10, NO2, SO2. as per the norms of State Pollution Control Board. Lessee is commits to minimize impacts of mining on air and to maintain it within the prescribed limits of CPCB/ SPCB WATER MANAGEMENT No waste water is being/will be generated from mining operation. Domestic sewage water generated from office toilet is being/will be disposed in soak pits via septic tank. The rain water collected in mining pit will be used in plantation and dust suppression NOISE POLLUTION CONTROL Machineries is being /will be properly maintained. Drill operator and his helper are being /will be equipped with personal protective equipment (ear plugs/ear muffs) Plantation has being /will be taken up along the approach roads. Greenbelt/ plantation has been/will be developed outside the lease area equal to 33 % of the total lease area. Periodic monitoring will be done. Effective steps are being/ will be taken to keep the noise level well below the DGMS prescribed limit. 12

8 LAND RECLAMATION Environmental friendly mining will be carried out as per Approved Mining Scheme. At the conceptual stage, total excavated area will be converted in to water reservoir. Sufficient safety barrier will be taken during mining operation SOLID WASTE MANAGEMENT Waste generated during excavation process is being/will be used in construction of roads. No overburden dump will remain at the end of life of mine. No external waste dump at the mine site. Top soil, if generated any, will be used for plantation purpose OCCUPATIONAL HEALTH & SAFETY First aid and medical facilities will be provided to workers employed. Dust masks are being/will be provided to the workers working in the dust prone areas as additional personal protective equipment. Contribution through health awareness programmes and camps will be organized. Any workers health related problem are being properly addressed. Periodical medical checkup be conducted GREENBELT/ PLANTATION DEVELOPMENT Plantation development will be carried out in the mine premises, along the approach roads, around Govt. buildings, schools and as per Approved Mining Scheme. Gazette Notification issued by MoEFCC, New Delhi dated 1 st July 2016 will be followed. The plant species will be selected in consultation with forest department. 13