2 Indicative Checklist for construction projects of EC [Category 8(a)]: Sr. Checklist point Remark Yes/No Pg. no./ annexure 1. Covering letter signed by the applicant Yes Form-1 Page 1 page Completed Application Form-I in all respect with each page signed by the applicant Yes Form-1 A Page 1 page Completed Form-IA duly signed by the Yes -- Applicant 4. Full size project plans showing plot area statement, layout plan, building wise & floor wise built up area table + FSI area table + floor area table Yes (Full size project plans copies are attached) Authentic land ownership documents showing ownership of the land by the applicant. Notarized consent of other land owners, (if required). 5(A): Consent of land owners other than the project proponent, if required. 6. of earlier Environmental Clearance obtained for the project site along with compliance report for the conditions stipulated in the earlier Environmental Clearance order. 6(A): Notarized undertaking for compliance of the stipulated terms & conditions in the EC order and for compliance of the Office Memorandum no. J-11011/618/2010-IA-II(I) dated 30/05/2012 and J-11013/41/2006- IA.II(I) dated 20/10/2009 published by MoEF&CC 7. on violation of EIA Notification 2006, if any, for the proposed project site, if yes, then details submitted or not. Yes 8. Project details [27 points format] Yes 9. Project details submitted by the project proponent. i. Water balance details ii. Management plan including storage, reuse & disposal of top soil, excavated earth, construction debris, steel scrap & packing material iii. Solid waste generation & mode of treatment, reuse & disposal iv. Parking area provision for the project Annexure- A To Annexure- B of Form 1 Not Applicable -- Not Applicable -- Yes Annexure- 1 To Annexure- 7 of Form 1 Annexure- A to Annexure- G of Form 1 A Page 1 of 2

3 Indicative Checklist for construction projects of EC [Category 8(a)]: Sr. Checklist point v. Typical floor plans vi. Energy & water conservation measures, details of green building measures proposed vii. Fire fighting measures proposed viii. Environmental Management Plan with budget allocation details & phase wise/year wise implementation details ix. Tree & lawn covered area with number & type of trees to be planted & year wise implementation details. x. Copy of permission obtained from the Airports Authority of India for the proposed building height xi. Permission or authentic supporting documents showing availability of the proposed FSI to the project. 10. Notarized undertaking stating that the details & facts submitted along with the application form are true and abiding to me/us. Remark Yes/No Yes Pg. no./ annexure And Form-1 & Form-1A (Signature of applicant / project proponent) Page 2 of 2

4 Sr. Particulars 1. Proposal is for New Project 2. Type of Project Residential Flats 3. Project / Activity [8(a) or 8(b)] 8(a) 4. Name of the project EWS-AMC (to be set-up at F.P. 98/2 of Preliminary T.P.S. 84/A (Makarba)) 5. Name of Developer AMC 6. Estimated Project Cost (Rs. In Crores) 7. Whether construction work has been initiated at site? If yes, details thereof 26 Crore Project Land / Plot Area (m 2 ): Total plot area of F.P. 98/2 (m 2 ): Open area (m 2 ): Plot area used for construction (m 2 ) : FSI area (m 2 ): Total BUA (m 2 ): Permissible Proposed FSI Area (m 2 ) Ground Coverage (m 2 ) Common Plot Area (m 2 ) Max. building height (m) ( *7) 9. Building of Buildings: 8 of Blocks: 8 Scope of buildings/blocks: Ground floor (parking) + 7 floors & size of Residential Units: 588 residential flats & type of Commercial Units: -- of amenities if any: of expected residents / users Fixed population (588 flats x 5 persons / unit)= 2940 persons Floating population (588 flats x 3 persons / unit/ day)= 1764 persons/day Page 1 of 7

5 Sr. Particulars 11. Water & waste water details during construction phase 12. Water & waste water details during operation phase 13. Status of water supply and drainage line 14. Solid waste Management Water requirement (KL/day): 40 Source of water: AMC/ local water tanker suppliers Waste water generation quantity (KL/day): 4 Mode of disposal: Septic tank, soak pit / AMC drainage system of reuse of water, if any: None Total water requirement (KL/day): 445 Fresh water requirement (KL/day): 445 on first day and from 2 nd day onwards 309 Source of water: Water supply from Ahmedabad Municipal Corporation. Waste water generation quantity (KL/day): 353 Mode of disposal: Domestic wastewater will be treated in the STP. Further, treated wastewater is to be reused for Toilet flushing and gardening purpose within the premises. Excess treated wastewater will be discharged in AMC drainage network. In case of STP provision, capacity of STP: 360 KL/day STP Technology: Primary, Secondary & Tertiary treatment units Purposes for treated sewage utilization: Treated sewage will be utilized for flushing and gardening. Quantity of treated water to be reused: 132 KL/day for Toilet Flushing and 4 KL/day for Gardening. Provision of dual plumbing system (Yes/No): Yes Quantity and type (treated/untreated) of sewage to be discharged: Domestic wastewater will be treated in the STP. Further, treated wastewater is to be reused for Toilet flushing and gardening purpose within the premises. Excess treated wastewater will be discharged in AMC drainage network. Mode of disposal: As above. Water supply and drainage lines already exist at the project site. Construction Phase: Generation (m 3 ) Quantity to be reused (m 3 ) Mode of Disposal / Reuse Top Soil Development of greenbelt Other excavated earth Levelling low lying areas & development of Construction debris green belt area Levelling, roads, pavements, plot filling, plinth filling Page 2 of 7

6 Sr. Particulars etc. Steel scrap 0.75 MT -- To be sold to scarp dealer Discarded packing materials Operation Phase: Type of waste Bags Generation Quantity (Kg/day) -- To be sold to authorized vendor. Mode of waste collection Dry waste Dry & Wet waste will be collected Into Wet waste the separate Wet collection bins of 10lit capacity. Wet waste will be conveyed to common organic waste convertor provided in the premises. The Mode of Disposal/ Reuse Collection and final disposal through AMC (biodegradable) waste generated will be processed in a common inhouse Organic Waste Converter (OWC). compost thus obtained will be used for soil conditioning for greenbelt development and left over quantity if any will be sold to end user or will be collected by AMC. The dry waste will be collected by the AMC. Capacity and no. of community bins to be placed within premises: 74 nos. of bins of 80 Liter capacity Landfill site where waste will be ultimately disposed by local Page 3 of 7

7 Sr. Particulars authority: At the nearest waste collection point of AMC 15. Parking Total parking area requirement for the project as per GDCR: m 2 Parking area requirement for residential units as per GDCR: m 2 Parking area requirement for Commercial units as per GDCR: -- Total number of CPS requirement for the project as per NBC : 294 CPS Number of CPS requirement for residential units as per NBC: 294 CPS Number of CPS requirement for commercial units as per NBC: -- Total Parking area provided (m 2 ) & of ECS: m 2 & 300 ECS Parking area provided in basement (m 2 ) & of ECS: -- Mechanical parking in basement (m 2 ) & of ECS: -- Parking area provided in hollow plinth (m 2 ) & of ECS: m 2 & 126 ECS Parking area provided as open surface (m 2 ) & of ECS: Parking area provided in common open plot (m 2 ) & of ECS: Open surface including 50% of common plot ( m 2 ) + open surface area= m 2 & 174 ECS 16. Traffic Management Width of adjacent public roads: 12 m wide & 9 m wide Number of Entry & Exit provided on approach road/s: Two entry/ exit will be provided. Width of Entry & Exit provided on approach road/s: 7.6 m Minimum width of open path all around the buildings for easy access of fire tender (excluding the width for the plantation): 3 m Width of all internal roads: 7.6 m 17. of Green Building measures proposed. 18. Energy Requirement, Source and Conservation Solar lights in common sunlit areas, maximum use of LED lights, use of variable frequency drive motors to optimize power consumption, use of fly ash paver blocks, most of the carpentry structures will be made up of processed engineering wood/ particle board instead of wood, maximum use of Portland Pozzolona Cement (PPC), PVC electrical boards, maximum use of Ready Mix Concrete (RMC), rainwater harvesting by recharging the ground water table with provision for 4 percolation wells etc. Power supply: Maximum demand: 1.5 MW during Operation Phase Connected load: 1.5 MW Page 4 of 7

8 Sr. Particulars 19. Fire and Life Safety Measures Source: M/s. GEB Energy saving measures: Solar lights in common sunlit areas, maximum use of LED lights, use of variable frequency drive motors to optimize power consumption, maximum use of light & silent colours in the building envelope so that UV absorption is reduced & associated cooling requirements are minimized. DG Sets: and capacity of the DG sets: Fuel & its quantity: Nearest fire station is Prahladnagar Fire Station (2 km) Time required for the fire tender to reach at the project site is minutes. 20. on staircase: Type & no. of buildings of floors During the construction phase: Fire extinguishers in common areas, personal protective equipments like earplugs, dust masks, safety shoes, helmets, hand gloves, etc will be provided to all workers, all workers will be trained to use welding shields and follow safer practice, provision of first aid facilities & related training to the construction workers, maintaining hoists and lifts, lifting machines, chains, ropes, and other lifting tackles in good condition, H frame scaffolds & ladders made of mild steel, completely concealed copper wiring, all electrical fittings / equipments used will meet the relevant IS standards etc. During the operation phase: Fire extinguishers of CO 2 type (4.5 kg) and DCP type (5 kg) will be provided on each floor, hose reels, wet risers, manually operated electric fire alarm system, underground water tank of 100 KL capacity, automatic sprinkler system in basement, CO sensors in basements etc. Floor area (m 2 ) 12 G Rain Water Harvesting (RWH) of staircase 1 staircase in each block Width of the staircase Max. Travel distance (m) 1.5 m 16 m Level of the Ground water table: -- & dimensions of RWH tank(s) : --- and depth of percolations wells:3 Nos. & 40 m on Pre-treatment facilities: Screen pit before the percolation well 22. Green area details Tree covered area (m 2 ) : 683 Area covered by shrubs and bushes (m 2 ): a part of lawn area Page 5 of 7

9 Sr. Particulars 23. Budgetary allocation for Environmental Management Plan (Rs. in lacs) Lawn covered area (m 2 ): 291 Total Green Area (m 2 ): 974 Green area % of plot area: 10% of trees and species to be planted: 138 nos. Local flora species i.e. Neem, Gulmohar,Jambu, Ashok, Guava, Asopalav and Saptaparni etc will be preferred for plantation. Budget allocation of Rs. 4.5 lacs & Rs lacs will be made during the construction & operation phase respectively for air pollution control, waste management, green belt development etc. Description Cost (Rs. in Lakh) Remarks - During Construction Phase: Air pollution control 2 - Training of workers to use welding shields and follow safe practice - Service of vehicles and PUC certificate - Provision of tarpaulin sheet covers - Provision of PPE to workers Waste water management 1 - Septic tank / soak pit system. Solid waste 1 - Making Storage area, management collection and disposal Noise control Ear plugs to workers - Periodic checking of noisy machinery - Provision of sound enclosures - During Operation Phase Wastewater management Solid waste management Green belt development Ground water recharge 5 - AMC charges / management 40 - STP installation / commissioning Provision of collection bins, AMC charges - Provision of Composting bins Approx. 138 nos. of trees to be planted Construction of 3 percolation wells, water pre-treatment arrangements Total Dust control measures Temporary windshield barriers, regular water sprinkling, tarpaulin sheet cover on the material during the transportation, maximum use Page 6 of 7

10 Sr. Particulars 25. Eco friendly building materials 26. Facilities to be provided to the construction workers 27. Documents related to land possession. of Ready Mix Concrete (RMC), uniform piling of sand and proper storage to avoid dusting. Maximum use of Ready Mix Concrete (RMC), fly ash paver blocks for pavements/walkways, most of the carpentry structures will be made up of processed engineering wood instead of wood, maximum use of Portland Pozzolona Cement (PPC) containing high amount of fly ash. Sanitation facilities, drinking water, municipal solid waste collection facility etc. Copy of land documents is attached with application. Page 7 of 7