4 Sr. Particulars Details No. 1. Proposal is for New Project 2. Type of Project Residential Flats and Shops 3. Project / Activity No. 8(a) [8(a) or 8(b)] 4. Name of the project Kaveri Soham Vistara 5. Name of Developer M/s S. S. Realty - a partnership firm 6. Estimated Project Cost (Rs. In Crores) 7. Whether construction work has been initiated at site? If yes, details thereof 54 Crore No construction activity started 8. Project Details Land / Plot Area (m 2 ): 5028 FSI area (m 2 ): Total BUA (m 2 ): Permissible Proposed FSI Area (m 2 ) [ (2.7 FSI) (TDR)] Ground Coverage (m 2 ) Common Plot Area (m 2 ) Max. building height (m) ( *14) 9. Building Details No. of Buildings: 3 (A, B C) No. of Blocks: 3 (A, B C) 10. No. of expected residents / users Scope of buildings/blocks: Basement + Ground floor (parking/ shops) + 14 floors No. & size of Residential Units: 164 residential flats No. & type of Commercial Units: 32 shops Details of amenities if any: -- Fixed population (164 flats x 5 persons / unit)= 820 persons and (32 shops x 3 persons /unit) = 96 persons for residential and shops respectively Floating population (164 flats x 3 persons / unit/ day)= 492 persons/day and (32 shops x 4 persons /unit/hr) = 128 persons/hr for residential and shops respectively 11. Water & waste water Water requirement (KL/day): 35 Page 1 of 7

5 Sr. No. Particulars details during construction phase 12. Water & waste water details during operation phase 13. Status of water supply and drainage line 14. Solid waste Management Details Source of water: AMC/ local water tanker suppliers Waste water generation quantity (KL/day): 4 Mode of disposal: Septic tank, soak pit / AMC drainage system Details of reuse of water, if any: None Total water requirement (KL/day): 133 Fresh water requirement (KL/day): 133 on first day and from 2 nd day onwards 87 Source of water: Water supply from Ahmedabad Municipal Corporation. Waste water generation quantity (KL/day): 106 Mode of disposal: Domestic wastewater (grey water) will be treated in the Grey Water Treatment Plant (GWTP) except toilet flushing water. Further, treated wastewater is to be reused for Toilet flushing and gardening purpose within the premises. Excess treated wastewater along with toilet flushing water will be discharged in AMC drainage network. In case of STP provision, capacity of STP: Grey Water Treatment Plant (GWTP) Capacity 61 KL/day STP Technology: Grey Water Treatment Plant (GWTP) facilities Purposes for treated sewage utilization: Treated sewage will be utilized for flushing and gardening. Quantity of treated water to be reused: 43 KL/day for Flushing and 3 KL/day for Gardening. Provision of dual plumbing system (Yes/No): Yes Quantity and type (treated/untreated) of sewage to be discharged: Domestic wastewater (grey water) will be treated in the Grey Water Treatment Plant (GWTP) except toilet flushing water. Further, treated wastewater is to be reused for Toilet flushing and gardening purpose within the premises. Excess treated wastewater along with toilet flushing water will be discharged in AMC drainage network. Mode of disposal: As above. Water supply and drainage lines already exist at the project site. Construction Phase: Generation (m 3 ) Quantity to be reused (m 3 ) Mode of Disposal / Reuse Top Soil 1,600 1,600 Development of greenbelt Other 25,900 25,900 Levelling low lying Page 2 of 7

6 Sr. No. Particulars Details excavated earth Construction debris areas & development of green belt area Levelling, roads, pavements, plot filling, plinth filling etc. Steel scrap 0.5 MT -- To be sold to scarp dealer Discarded packing materials 120,000 Bags Operation Phase: Type of waste Generation Quantity (Kg/day) -- To be sold to authorized vendor. Mode of waste collection Mode of Disposal/ Reuse Collection and final disposal through AMC Dry waste Dry & Wet waste will be collected Into Wet waste the separate Wet collection bins (biodegradable) of 10lit waste capacity. generated will Wet waste will be conveyed to common organic waste convertor provided in t be processed in a common inhouse Organic Waste Converter (OWC). he premises. The compost thus obtained will be used for soil conditioning for greenbelt development and left over quantity if any will be sold to end user or will be collected by Page 3 of 7

7 Sr. No. Particulars Details AMC. The dry waste will be collected by the AMC. Capacity and no. of community bins to be placed within premises: 21 nos. of bins of 80 Liter capacity Landfill site where waste will be ultimately disposed by local authority: At the nearest waste collection point of AMC 15. Parking Details Total parking area requirement for the project as per GDCR: m 2 Parking area requirement for residential units as per GDCR: m 2 Parking area requirement for Commercial units as per GDCR: m 2 Total number of CPS requirement for the project as per NBC : 136 CPS Number of CPS requirement for residential units as per NBC: 82 CPS Number of CPS requirement for commercial units as per NBC: 54 CPS Total Parking area provided (m 2 ) & No. of ECS: 6990 m 2 & 230 ECS Parking area provided in basement (m 2 ) & No. of ECS: Basement -2 : m 2 & 93 ECS, Basement -1: m 2 & 87 ECS Mechanical parking in basement (m 2 ) & No. of ECS: -- Parking area provided in hollow plinth (m 2 ) & No. of ECS: 495.8m 2 & 18 ECS Parking area provided as open surface (m 2 ) & No. of ECS: m 2 15 ECS Parking area provided in common open plot (m 2 ) & No. of ECS: (including 50% of common plot and open surface area)= 399.4m 2 & 17 ECS 16. Traffic Management Width of adjacent public roads: 80 m wide ring road & 18 m Number of Entry & Exit provided on approach road/s: Two entry/ exit will be provided. Width of Entry & Exit provided on approach road/s: 7.5 m Minimum width of open path all around the buildings for easy access of fire tender (excluding the width for the plantation): 3 m Page 4 of 7

8 Sr. No. Particulars 17. Details of Green Building measures proposed. 18. Energy Requirement, Source and Conservation 19. Fire and Life Safety Measures Details Width of all internal roads: 7.5 m Solar lights in common sunlit areas, maximum use of LED lights, use of variable frequency drive motors to optimize power consumption, use of fly ash paver blocks, most of the carpentry structures will be made up of processed engineering wood/ particle board instead of wood, maximum use of Portland Pozzolona Cement (PPC), PVC electrical boards, maximum use of Ready Mix Concrete (RMC), rainwater harvesting by recharging the ground water table with provision for 2 percolation wells etc. Power supply: Maximum demand: 1 MW during Operation Phase Connected load: 1 MW Source: M/s. U.G.V.C.L Energy saving measures: Solar lights in common sunlit areas, maximum use of LED lights, use of variable frequency drive motors to optimize power consumption, maximum use of light & silent colours in the building envelope so that UV absorption is reduced & associated cooling requirements are minimized. DG Sets: No. and capacity of the DG sets: one DG set of 30 KVA + another of 150 KVA capacity will be provided for emergency use / incase of main power failure. Stack height will be provided as per the requirement of CPCB. Fuel & its quantity: High Speed Diesel (40 lit/hr) Nearest fire station is Thaltej Fire Station (3 km) and Bodakdev Fire Station approx. (4 km). Time required for the fire tender to reach at the project site is minutes. During the construction phase: Fire extinguishers in common areas, personal protective equipments like earplugs, dust masks, safety shoes, helmets, hand gloves, etc will be provided to all workers, all workers will be trained to use welding shields and follow safer practice, provision of first aid facilities & related training to the construction workers, maintaining hoists and lifts, lifting machines, chains, ropes, and other lifting tackles in good condition, H frame scaffolds & ladders made of mild steel, completely concealed copper wiring, all electrical fittings / equipments used will meet the relevant IS standards etc. During the operation phase: Fire extinguishers of CO 2 type (4.5 kg) and DCP type (5 kg) will be provided on each floor, hose reels, wet risers, manually operated electric fire alarm system, Page 5 of 7

9 Sr. No. Particulars Details underground water tank of 100 KL capacity, automatic sprinkler system in basement, CO sensors in basements etc. 20. Details on staircase: Type & no. of buildings No. of floors Floor area (m 2 ) A+B B+G No. of staircase 2 (for resi.) 2 (for comm.) C B+G Width of the staircase Max. Travel distance (m) 2 m 16 m 21. Rain Water Harvesting (RWH) Level of the Ground water table: -- No. & dimensions of RWH tank(s) : --- No. and depth of percolations wells: 2 Nos. & 40 m Details on Pre-treatment facilities: Screen pit before the percolation well 22. Green area details Tree covered area (m 2 ) : 395 Area covered by shrubs and bushes (m 2 ): a part of lawn area 23. Budgetary allocation for Environmental Management Plan (Rs. in lacs) Lawn covered area (m 2 ): 399 Total Green Area (m 2 ): 794 Green area % of plot area: 15.8% No. of trees and species to be planted: 130 nos. Local flora species i.e. Neem, Gulmohar,Jambu, Ashok, Guava, Asopalav and Saptaparni etc will be preferred for plantation. Budget allocation of Rs. 4.5 lacs & Rs lacs will be made during the construction & operation phase respectively for air pollution control, waste management, green belt development etc. Description During Construction: Air pollution control Cost (Rs. in Lakh) Remarks 2 - Training of workers to use welding shields and follow safe practice - Service of vehicles and PUC certificate - Provision of tarpaulin sheet covers - Provision of PPE to workers 1 - Septic tank / soak pit system. Waste water management Solid waste 1 - Making Storage area, management collection and disposal Noise control Ear plugs to workers - Periodic checking of noisy Page 6 of 7

10 Sr. No. Particulars Details During Operation: Wastewater management Solid waste management Green belt development Ground water recharge machinery - Provision of sound enclosures 5 - AMC charges / management 15 - Grey water treatment plant 8 - Provision of collection bins, AMC charges - Provision of composter Approx. 130 nos. of trees to be planted 3 - Construction of 2 percolation wells, water pre-treatment arrangements Total Dust control measures Temporary windshield barriers, regular water sprinkling, tarpaulin sheet cover on the material during the transportation, maximum use of Ready Mix Concrete (RMC), uniform piling of sand and proper storage to avoid dusting. 25. Eco friendly building materials 26. Facilities to be provided to the construction workers 27. Documents related to land possession. Maximum use of Ready Mix Concrete (RMC), fly ash paver blocks for pavements/walkways, most of the carpentry structures will be made up of processed engineering wood instead of wood, maximum use of Portland Pozzolona Cement (PPC) containing high amount of fly ash. Sanitation facilities, drinking water, municipal solid waste collection facility etc. Copy of land possession documents/sale deed & N.A order submitted by them shows that the land for residential use is in the name of M/s S.S. Reality a partnership firm. Page 7 of 7