1 SOBA Ayeyarwady State of the Basin Assessment Myanmar World Water Day 2018 Thursday, 22 February 2011, Nay Pyj Taw Tarek Ketelsen, SOBA Coordinator, Australian Water Partnership (AWP)

2 THE AYEYARWADY RIVER BASIN IS THE LIFE BLOOD OF ITS COMMUNITIES Conserve livelihood & environmental assets Manage issues, challenges & trade offs (flooding, drought, pollution, over-exploitation, competition) Optimise economic development potential (food-energy-water security, economic growth)

3 WHAT IS A RIVER BASIN DEVELOPMENT MASTER PLAN Rivers are connectors in the landscape. Investment priorities Objectives & strategy Road map for implementation, including safeguards If our river system is connected, then our planning process should also be connected. River basin planning is a process to integrate development and conservation planning into one process. Why integration? there will be trade-offs between different demands for water resources, which cannot be managed without considering the basin as one system. River basin master plans usually: Set objectives and strategies for how the basin and its resources should be developed and conserved Identify investment priorities for development and conservation of basin resources, in order to achieve these objectives. Include environmental and social safeguards to ensure implementation of planned investments is sustainable, equitable and inclusive.

4 AYEYARWADY INTEGRATED RIVER BASIN MANAGEMENT (AIRBM) PROJECT The project development objective of the AIRBM is to help Myanmar develop the Institutions and Tools needed to enable informed decision making in the management of Myanmar National Water Resources and contribute to implementation of Integrated Water Resources Management through empowerment of the National Water Resources Committee. C1 Water Resource Management institutions, DSS & capacity building C2 Hydro-met observations & information systems modernization C3 Navigation enhancement on the Ayeyarwady River

5

6 SOBA THE FIRST STEP IN THE AYEYARWADY RIVER BASIN PLANNING PROCESS SOBA BASIN SCOPING STUDY BASIN MASTERPLAN IMPLEMENTATION MONITORING OF IMPLEMENTATION Outcome sought: A path for Ayeyarwady River basin planning process that firmly links science and participatory consultation processes for inclusive evidence-based decision making.

7 SOBA INTEGRATED ENVIRONMENTAL, SOCIAL & ECONOMIC BASELINE OF THE AYEYARWADY RIVER BASIN SOBA packages Environmental 1 Surface water resources 2 Groundwater & WISDM Social 3 Geomorphology & Sediments 4 Biodiversity & Fisheries Economic 5 Socio-economics (demographics, sector development, macro economics) 6 Local Consultations

8 MAIN SOBA OUTPUTS SOBA REPORT Vol 1 Vol 2 Synthesis Report Technical Reports 1. Surface water resources & use 2. Groundwater resources & use 3. Water pollution 4. Eco-hydrology 5. Geomorphology & sediments 6. Biodiversity & fisheries 7. Socio-economics (demographics, sectoral development & macroeconomics) 8. Economic valuation of ecosystem services 9. Local consultations 10. WISDM

9 MAIN SOBA OUTPUTS WATER INFORMATION SYSTEM FOR DATA MANAGEMENT (WISDM) A web-based interactive information and mapping portal for exploring data, information and maps related to water resources Facilitate Data sharing Preserve data and ensure reuse Avoid data duplication/redundancy

10 MAIN SOBA6 OUTPUTS 3D PHYSICAL MAP Consultation tool for integrating local level issues and aspirations into the basin planning process

11 6 SOBA themes Myanmar and International organizations, universities, NGOs, companies and institutes Technical Specialists and Experts 82 Local communities consulted 1200 kms of river channel sampled 33 Expert Reviewers 3 Synthesis writers

12 THE SOBA TEAM IMPLEMENTERS

13 AIRBM C1 SOBA TEAM C1 Director C1 Advisor C1 Multistakeholder Forum Coordinator C1 Admin staff SOBA technical team Coordinator, GIS, Water resources engineer, economist, environmental scientist Junior Researchers Young Water Professionals (YWPs) SOBA National Team Composition (After May 3 rd, 2017) SOBA Packages Soba 1 surface water Soba 2 groundwater + WISDM Soba 3 geomorphology Soba 4 fish & biodiversity Soba 5 socioeconomics Soba 6 local consultations Total 14 C1 Team C1 Director Shwe Yee Mon Mon C1 Director Thiha Min Min Ye Thu Aung Phyu Thizar Kyaw (Ye Htet Aung) Aung Naing Myo Pann Ei Phyu U Sein Myint Nay Chi Ma Mya Win U Aung Thit Amanda

14 THANK YOU!

15

16 SOBA BASELINE ASSESSMENT PROCESS Baseline description of the environmentalsocial-economic themes: Processes Characteristics Trends Changes over time in processes and characteristics of the basin Spatial changes in processes and characteristics of the basin time