2

3

4

5

6

7 Current Production sizes of natural Pozzolan: Light-weight Aggregate Sizes: 1. 0 to 4 mm to 8 mm to 12 mm. Milling Sizes: 40 & 30 micro and below

8 Scientific Studies to Develop the Base for a Number of Applications in Sustainability

9

10 Applications using Natural Pozzolan in Improving the Current Sustainability Level

11 Light-Weight Blocks with Insulative Properties Making - best in fire rating

12

13

14

15

16

17

18 Lightweight Pre-cast with Insulative Properties Using Pozzolan Light-Weight Aggregate

19

20 Retention wall system with no steel bars to protect against rust

21

22 Retention Wall and Geogrid Systems: A cooperative arrangement between Tensar International Technology and Pozzolan Product Factory, providing design recommendations by Tensar.

23 Natural looking walls: For insulation and to save on finishing costs

24 Water Retention Material Saves more than 50% of irrigation water.

25

26 Super Silicom Natural Pozzolan Concrete Protection Admixture Milling to the Size of 40, 30 Micron & below According to ASTM C 618 for both type N&F

27 Pantheon Coliseum Roman buildings that have been sustained for centuries partly due to the usage of natural pozzolan properties.

28 Dam application in Meccah, Saudi Arabia

29

30 Testing for natural Pozzolan Powder (40 & 30 microne)

31

32 Testing on Natural Powder Pozzolan University of California at Berkley and King Abdullah University for Science and technology in cooperation with the Polzzolan product company. Super Silicom NP has a Slow Healing Quality: Due to the fact that Natural Pozzolan is different form one location to another and from one site to another in the same location Pozzolan Product Factory needed to do its own test to make sure of the quality of the material from its own mine. In early 2008 and in collaboration with King Abdullah University of Science and Technology (KAUST,) Pozzolan Product Factory decided to send 3 tons of natural pozzolan material from its mine to university of California at Berkley to study how the material behaves in well known laboratories. Results from tests at the Univeristy of California at Berkley were excellent and beyond expectations.

33 Results: 1. The pozzolanic activity index (at 28 days) was 103%, and after 56 days the compressive strength of mix containing 20% Super Silicom NP was about 14% higher than the one with only portland cement. However, the pozzolanic activity index was 73% after 7 days. 2. All mortar mixes were demolded after 24h and cured at room temperature, without any alkali activation. After only seven days of curing, for instance, strength result for the 20% replacement was 63 MPa. Thus it seems quite feasible to produce high-volume concretes with high amounts of Super Silicom NP replacement, but the time factor must be taken into account.

34 World-wide application Profile using Natural Pozzolan Drainage dam project in the city of Mecca, Amba Company, Jeddah, Saudi Arabia Sacramento Wastewater Treatment Plant - California Southern Nevada Water Project - Nevada Tehama-Colusa Canal - California American River Falls Power Plant Idaho Helms Creek Powerhouse Pump Station - California Bechtel Engineering Center, UC Berkeley - California Pioneer Reservoir - California Golden Gate Bridge (1937) - California Graduate Theological Union Building, UC Berkeley - California San Francisco Wastewater Treatment Plant Project - California Piers of the San Francisco-Oakland Bay Bridge (1935) California Los Angeles Aqueduct ( ) California Los Angeles Flood Control District during the 1920's and 1930's

35 World-wide application Profile using Natural Pozzolan Port of Richmond - California Pacheco Pass Tunnel - California Idaho Falls Hydro Electric - Idaho Dumbarton Bridge - California Pyramid Lake Powerhouse - California North Point Seawall California Friant Dam (1942) Bonneville Dam (1935) Oregon Chabot Dam California Redding Airport Runway - California