1 Bridgewater State College Energy and Water Conservation Project

2 EXECUTIVE SUMMARY The Massachusetts Division of Capital Asset Management (DCAM) and Bridgewater State College (BSC) selected Ameresco Select Inc. (ASI) to provide comprehensive energy and water conservation upgrades at Bridgewater State College, a state institution of higher Education located in Bridgewater, Massachusetts. The goal of this project is to reduce energy and water costs and provide capital improvements to the campus infrastructure. Following is a timeline of milestones achieved: RFP Issued April 2004 Contractor Selection March 2005 DEA Start March 2005 DEA Submittal January 2006 ESA Execution March 31, 2006 Contract Completion Date June 30, 2007 Actual Completion Date June 15, 2007 Final Project Notification August 28, 2007

3 EXECUTIVE SUMMARY (cont d) Of the five options presented, DCAM and BSC selected ASI based on Option 2A: 20 Year Central Utilities. This option includes a comprehensive package of measures that would deliver significant energy and water cost savings; provide valuable infrastructure improvements; improve reliability and occupant comfort; provide electric generation; and reduce the maintenance burden. The scope of work completed, comprises a project of $10.7 million to implement the 24 measures which deliver energy and water cost savings of $956,249. After debt service, the net annual savings to the College is $ 33,249. Table ES-1 summarizes the economics Total of Project Cost $ 10,442,355 the program recommended by ASI. Total Annual Savings $ 956,249 Table ES-1: Annual Lease Project Payments Economic Summary $ 923,000 Net Annual Savings to the Commonwealth $ 33,249

4 SAVINGS Baseline Consumption and Savings Baseline Guaranteed Savings #6 Oil (gals) 1,064, ,294 Natural Gas (ccf) 422,216 33,253 Electricity (kwh) 15,965,432 4,769,995 Water/Sewer (cf) 5,096,554 1,244,874

5 SAVINGS (cont d) ECM Description Contract Guaranteed Savings ECM-1 High-Efficiency Lighting $ 144,122 ECM-2 Lighting Controls $ 13,565 ECM-2A New Lighting Control Panels in Maxwell $ 2,053 ECM-3 High Efficiency Motors $ 2,227 ECM-4A Energy Management System Platinum $ 156,801 ECM-4D Option: Full DDC Control, Eliminate Pneumatics Campus Wide Electric and Steam - ECM-5 Metering Domestic Water Conservation $ 102,623 ECM-6B Replace All Steam Traps $ 167,545 ECM-7A Variable Frequency Drives on AHU s $ 124,121 ECM-7B Variable Frequency Drives on Pumps $ 8,025 ECM-9 Vending Machine Controllers $ 5,608 ECM- Hunt Hall Window Replacement $ 2,090 10C ECM- Distributed Cogeneration $ 7,875 11B ECM-12 New Boiler Controls at Central Plant $ 83,020

6 ECM ECM-14 SAVINGS (cont d) Description Underground Steam & Condensate Piping Replacements Contract Guaranteed Savings $ 14,404 ECM-21 Field House Laundering Improvements $ 718 ECM- Replace Kelly Gym Locker Room H&V Unit $ 18,171 15B ECM- Replace Kelly Gym Unit Ventilators - 15C ECM- Miscellaneous Work - 15D ECM-16 Repair Radiator Controls in Dormitories $ 38,360 ECM- Piping Insulation $ 25,727 17A ECM-19 Kitchen Hood Controls $ 42,690 ECM- New Air Conditioning Systems in $ (3,745) 23A ECM-25 Rondileau Steam Operated Condensate Pumps $ (1,565) ECM- New Boiler in Hunt Hall $ 1,816 28A TOTAL CONTRACT GUARANTEED SAVINGS $ 956,249

7 ECM-7A Variable Frequency Drives on AHU s Old Motor Starters New Variable Frequency Drives

8 ECM-12 New Boiler Controls at Central Plant New Control Panel Old Bailey Panel

9 ECM-28A New Boiler in Hunt Hall Old Boiler New Boiler

10 ECM-11B 75 KW Cogen at Tinsley

11 ECM-4A Energy Management System Platinum Option: Full DDC Control, Eliminate Pneumatics HVAC Control Room, Operations Center

12 Bridgewater State College Marshall Conant Math and Science Project

13 INTEGRATED PROJECT DESIGN TEAM Division of Capital Asset Management, Owner Payette & Associate, Designer Barr & Barr, Construction Manager (CM) Bridgewater State College, Agency

14 COMMITTEE STRUCTURE: USER GROUP CHEMISTRY BIOLOGY PHYSICS GEOGRAPHY EARTH SCIENCE COMP SCI TECHNOLOGY. PAT CRONIN USER GROUP MATH MIKE GOMES HOWARD LONDON PAI BARR & BARR DCAM

15 COMMITTEE STRUCTURE: BUILDING COMMITTEE KAREN JASON MIKE GOMES BARR & BARR BUILDING COMMITTEE PAI DCAM

16 COMMITTEE STRUCTURE: EXECUTIVE HOWARD LONDON DANA MOHLER-FARIA MIKE GOMES EXECUTIVE COMMITEE PAI DCAM BARR & BARR

17 DESIGN SCHEDULE: 3 mo SCHEMATIC DESIGN 1 mo Estimate/Reconciliation/Approval to Proceed 3 mo DESIGN DEVELOPMENT PHASE 1 mo Estimate/Reconciliation/Approval to Proceed 4 mo CONTRACT DOCUMENT PHASE 1 YEAR DESIGN PHASE DURATION

18 PHASING STRATEGY: PLANNING / PHASING & SECTIONAL SOLUTION PHASE 1 PHASE 1 PHASE 2 PHASE 1 DEMO 1 DEMO 2

19 BUILDING DESIGN:

20 GREEN STRATEGIES: MCSB LEED SILVER (min.) - High-Efficiency Lighting & Lighting Control - Reducing # Fume Hoods (Green Chemistry/ Green Science) - Use Atrium for Daylighting and Solar Chimney - Rain Garden - Green Roof + Greenhouse - Low-flow Fume Hoods, Enthalpy Wheels, Chilled Beams - Mechanical Zoning / Lower, appropriate levels of ventilation - Geothermal / Groundwater, Rainwater, AHU Condensate, RODI Reject water to be used for cooling tower make up - Photovoltaics