1 Infrastructure Project Facility IPF Prishtina, 24 th February creative minds safe hands

2 IPF Infrastructure Project Facilty is EC funded project, to support infrastructure development in seven Western Balkan countries - Albania, Bosnia and Herzegovina, Croatia, FYRMAC, Kosovo, Monte Negro and Serbia IPF is project to be implemented over 48 months ( June 2008-June 2012)

3 IPF Objectives To support infrastructure development creating the conditions for regional and national sustainable development in: transport, environment, energy and social sector To support preparation of projects that may be financed trough grants and loans provided by: IFIs, IPA resources, bilateral donors, beneficiaries countries

4 Expected results Quality investment proposals for infrastructure development, reconstruction and upgrade Transfer of know how and capacity building at local and international level Enhanced collaboration with IFIs

5 Selection Criteria (1/2) Eligibility Projects Criteria Part of the National Strategy Sectors - energy, transport,environment and social sector Complementarities with IPA Nacional Programs Level of readiness ( land permits, geotechnical studies,etc.), Impacts on economy, environment, human rights, society,...

6 Selection Criteria (2/2) Prioritisation Criteria Financing perspective ( loans, grants) Social,environment, regional/cross border impact, Economic and financial assesment Balanced use of resources among the sectors Geographical spread of resources Part of regional networks

7 Sectors Energy: renewable energy, interconnection systems, transmission, energy efficiency and savings, co-generation, hydro, gas pipelines, etc... Transport: roads, railways, inland waterways, airports,.. Social sector: schools, hospitals and health centers, housing, reclusion centers, etc..., Environment: water supply, waste water treatment, sewage systems, solid waste management, emission control, etc.

8 Sector Strategies Environment Projects in nacional sectors strategies In line with environmental acquis Inclusion in regional pipelines

9 Sector Strategies Energy In line with guidelines for trans-european networks Among priority projects of the Energy Community Preference accorded : - electricity interconnection - electricity generation with regional significance - gastransmission networks and LNG terminals

10 Sector Strategies Transport Focus on the SEE Core Regional Transport Network and SEETP MAP Priority to railways and inland waterways on regional corridors Social Projects in national sector strategies Full complementarities with IPA national programs

11 IPF governing Structure IPF Stearing Committee (EC,IFIs,beneficiaries) IPF Secreteriat Tehnical assistance Grants,... Beneficiaries Beneficiaries

12 TA Window process TA projects presented by beneficiaries and sponsors(ifis, others) NIPAC IPF Secreteriat IPF SC prioritisation of projects projects proposals DG projects approval WYG- Order of TA services -intern. consultants WYG- Order of TA services -intern. consultants WYG- Order of TA services -intern. consultants -local consultants -local consultants -local consultants

13 TA - Project Preparation Services TA to beneficiaries during project preparation and cycle: Pre-feasibility and Feasibility studies (pre- FS and FS) -Financial affordability analyses -Budgetary planning -Environmrntal and Social Impact Assessments Completed design (CD) with - technical specifications and bill of quantities Tender proces (TP), -tender documents - assistance to evaluation Supervision of implementation works (IW)

14 First round projects -Transport Sector TA-BIH-06 Corridor Vc: two sections Up-date of feasibility study and management consultancy TA-BIH-08 TA-ALB-06 TA-KOS-02 Construction of Foca-Hum road Improvements to the Albanian Rail Network Rehabilitation of railway route 10 Feasibility Study Feasibility Study Pre-Feasibility Study TA-SER-15 Railway reconstrction Nis- Presevo Feasibility Study

15 First round projects -Environment Sector TA-BIH-03 TA-KOS-01 TA-MON-05 TA-MON-07 Water Supply: Plava Voda BiH Water Supply: Pristina Kosovo Water Supply: Podgorica Montenegro Waste Water: Podgorica Montenegro Review of feasibility study and detailed design, management support FS, EIA FS, EIA FS, EIA TA-SER-17 Waste water: Vranje & Uzice,Serbia FS, EIA,

16 First round projects -Social Sector TA-ALB-04 TA-ALB-10 TA-BIH-01 TA-FYRMAC-01 Tirana Univ. Hospital Centre Albania Tirana Schools 2 nd Phase Albania State Prison BIH Idrizovo Prison fyr Macedonia Feasibility Study and Detailed Design Feasibility Study Feasibility Study and Detailed Design Pre-Feasibility Study and Detailed Design

17 First round projects - Energy Sector TA-ALB-11 TA-FYRMAC-02 Upgrade of transmission system Pilot project wind park development Preliminary design Feasibility Study TA-MON-05 Electricity network development program Pre-Feasibility Study TA-SER kv Serbia-Hungary transmission line Pre-Feasibility

18 Thank you for your attention Alush Grosha Country Manager Western Balkans Infrastructure Projects Facility WYG International, Prishtina Phone: Fax: alush59@yahoo.com