1 (3) Indonesia EIA Projects List Category Type Conditions 1 Reclamation Region Coastal and island-small Island a. reclamation area >25ha b. The volume of material > 500,000m 3 c. Long reclamation >50m (perpendicular seaward of shoreline) 2 Cutting the hill and Volume > 500,000 m 3 pengurugan land A. Multi-sector 3 Intake of water from the lake, taking > 250/sec rivers, springs, or water source other surface discharge 4 Intake of water Underground (wells shallow soil, wells in >= 50 liters/sec (From one or some wells the regision <10 ha) the ground) 5 Development building The area of land > 5ha Building >10,000 m 2 1 Development Navy Base Class A and B B. Defense 2 Development Air Force Base Class A and B 3 Development Combat Training Area > 10,000 ha Centre 1 Cultivation of plants > 2,000 ha with food or without unit processing 2 Cultivation of plants > 5,000 ha horticulture with or without units processing 3 Cultivation of plants plantation a. Annuals with or without units C. Agriculture processing 1) In the region cultivation of nonforestry, extensive > 2,000 ha 2) In the region production forests which can converted (HPK) > 2,000 ha b. Annual with or without units processing:

2 1) In the region cultivation of nonforestry, extensive > 3,000 ha 2) In the region production forests which can converted (HPK) > 3,000 ha D. Fisheries and Maritime Affairs E. Forestry Sector F. Transportation Sector 1 Cultivation fishery a. Aquaculture shrimp / fish levels advanced technology and associate with or without unit processing > 50 ha b. Cultivation fishery Floating (net buoyancy and pen system): - In the freshwater (Lake) > 2.5 ha or 500 units - In the sea > 5 ha or 1,000 units 1 Utilization Forest Products a. Utilization Forest Timber (UPHHK) of Natural Forests (HA) : All scale b. Utilization Forest Timber (UPHHK) of Forest Plants > 5,000 ha 1 Development Path Railways, a. On the surface ground (at-grade) with or without station > 25 km b. Under ground : All scale c. Above ground > 5km 2 Development passenger >5 ha terminal and goods terminals road transport 3 Dredging a. Dredging waters with capital dredging > 500,000 m 3 b. Dredging river waters and / or sea with capital dredging the cut stone, is not including materials coral.> 250,000 m 3 or all magnitudes

3 use of materials Explosive c. placement results dredging at sea > 500,000m 3 or Placement area > 5ha G. Satellite Technology H. Field of Industry 4 Development port with one facility the following: a. Dock with form of construction sheet pile or open pile > 200m or > 6,000 m 2 b. Dock with Massive construction: All scale c. Barrier wave (embankments) and / or breaker wave (break water) > 200m d. Floating Facilities (Floating Facility) > 10,000 DWT 5 Development Airports to fixed wing and its trimmings Runway > 1,200 m or Terminal > 10,000 m 2 1 Development and Operation - All quantities Bandar Space - For the purpose of satellite launch can be addressed for commercial or not (Interest national). 2 Development Launch Facility - Range> 300 Km Rockets on land and other - Carrying capacity > 500 km purposes. - Speed > 1000 km / hour 3 Development manufacturing - Large-scale facilities propellant rocket - Aim For meet Airport needs space and blast-off which includes mandatory EIA. 4 Rocket Factory All scale 5 Development static test facility All scale and launch facilities rocket 1 Cement industry (which made All scale through clinker production)

4 2 Manufacture of pulp or pulp > 300,000 tons of pulp per year and papers integrated with Forest Plants Industry, 3 The petrochemical industry All scale headwaters 4 Industrial Area (Including All scale complex industry integrated) 5 Shipbuilding industry ship 50,000 DWT with the system graving dock 6 Industrial propellant, All scale ammunition and materials Explosive 7 Smelting industry plumbum All scale 8 Industrial activities which does not include numbers 1 through with the number 7 use area: a. Urban: - Metropolitan, broad > 5ha - Great town, spacious > 10 ha - City of medium, wide > 15 ha - The small town, spacious > 20 ha b. Rural / rural, - broad > 30 ha 1 Development Dam / Reservoir or Type Temporary Water other 1) high > 15 m, or 2) capacity reservoirs 500,000 m 3, or 3) extensive inundation > 200ha 2 Irrigated area a. new development with extensive 3,000 ha b. Enhancement with extensive I. Field of additional > 1,000 ha Public Works c. Printing fields, wide (per group) > 500 ha 3 Swamp Development: Of > 1,000 ha wetlands for the sake of irrigation 4 Development Coastal Safety and repair estuary river:

5 - The distance calculated > 500 m upright straight beach 5 Normalization River (Including spatula) and Making Channel Flooding a. Large City: - Length > 5km / Volume dredging > 500,000 m 3 b. City: - Length > 10 miles / Volume dredging > 500,000 m 3 c. Rural: - Length > 15km / - Volume dredging > 500,000 m 3 6 Development and / or increase the motorway requiring land acquisition outside rumija (space right of way) with scale / magnitude length (km) and scale / broad scale acquisition of land (ha): a. in town metropolitan / large - Road 5 km and land acquisition > 10 ha - Land acquisition 30 ha b. The city - Road 5 km and land acquisition > 20 ha - Land acquisition 30 ha c. Countryside - Road 5 km and land acquisition > 30 ha - Land acquisition 40 ha 7 Development and / or road improvement with widening requiring land acquisition (in outside rumija): a. in town metropolitan / large - Road 5 km and land acquisition > 20 ha - Land acquisition 30 ha b. The city - Road 5 km and land acquisition > 30 ha - Land acquisition 40 ha

6 c. Countryside - Road 5 km and land acquisition > 40 ha - Land acquisition 50 ha 8 Tunnel, Bridge a. subway / underpasses, > 2 km tunnel / tunnel, road overpass / flyover b. bridge > 500m 9 Waste a. Construction of landfill domestic waste disposal the - Total area TPA, or > 10 ha - total capacity ton system controlled landfill / sanitary landfill including installation supporting b. Landfill in the area tides - Extensive landfill: All or - The total capacity c. Development transfer 500 ton/day station d. Development installation of 500 ton/day Integrated Waste Processing e. Treatment with Incinerator all capacity f. Composting Plant 500 ton/day 10 Domestic Wastewater a. Development installation processing Faecal Matter - Size, or 2 ha - The capacity 11 m 3 / Day (IPLT), including facilities supporting b. Development installation Water Treatment Plant (WWTP) domestic waste - The area 3 ha, or - Organic Load 2.4 ton/day including supporting facilities c. Development piping system wastewater, extensive - area of services 500 ha, or - Waste water discharge 16,000 m 3 / Day

7 11 Development drainage (primary and / or secondary ) in settlements a. big city / metropolitan, long 5 miles b. cities are, long 10 km 12 clean water network in major cities / metropolitan a. development of distribution networks - Extensive services> 500 ha b. development of transmission network - Length of > 10 km 1 Development of Housing and a. Metropolitan City, broad > 25 ha Settlements region with a b. Big city, area> 50 ha J. of Housing particular manager : c. Medium and small cities, area> and Settlement 100 ha Region d. For the purposes of transmigration settlement > 2,000 ha K. Energy and Mineral Resources 1 Exploitation ( Production Operations ) Minerals and Coal a. Extensive Licensing 200 ha b. The area is open for mining 50 ha ( cumulative per year ) 2 Exploitation ( Production Operations ) Coal a. Capacity 1,000,000 tons / year, and / or b. Cover the amount of material transferred 4,000,000 bank cubic K.1 MINERAL meters ( bcm ) / year COAL 3 Exploitation ( Production Operations ) Mineral metal a. Seed capacity 300,000 tons / year, and / or b. Cover the amount of material transferred 1,000,000 tons / year 4 Exploitation ( Production Operations ) nonmetallic minerals or mineral rock a. Capacity 500,000 m 3 / year, and / or

8 b. Cover the amount of material transferred 1,000,000 m 3 / Year K.2 OIL AND GAS EARTH 5 Processing and purification a. metallic minerals : All quantities b. minerals instead of metal 500,000 m 3 / Year c. rock 500,000 m 3 / Year d. coal 1,000,000 m 3 / Year e. radioactive minerals : All quantities 6 Exploitation ( Production Operations ) Radioactive Minerals All quantities ( tons / year ), except for the purpose of research and development 7 Mining at sea all scale 8 Perform submarine tailings placement all scale 1 Exploitation of Oil and Gas as well as the development of production a. a shore 1) petroleum pitch BOPD 2) gas field earth 30 MMSCFD b. at sea 1) petroleum pitch BOPD 2) gas field earth 90 MMSCFD The total number of field all well 2 Pipeline petroleum, natural gas a. length, or 100 km and fuel oil at sea b. pressure 16 bar 3 Construction of Refinery a. Liquefied Petroleum Gas (LPG) >=50 MMSCFD b. Liquefied Natural Gas (LNG) >= 550 MMSCFD c. Petroleum >= BOPD 4 LNG regasification terminal 550 MMSCFD ( land / sea ) 5 lubricating oil refinery >= ton/year ( including support)

9 6 Field Development of Coal Bed Methane ( CBM ) / Coal Bed Methane in the exploitation and development stage of production include: a. Drilling of production wells ; b. Development of production facilities and supporting facilities ; c. Production operations ; and d. postoperatively 1 Development of network transmission a. Air Line High Voltage > 150 kv b. Cable Channel High Voltage > 150 kv c. High Voltage submarine cables > 150 kv 2 Development a. Diesel / gas power plant / plant / 100 MW Combined Cycle Power Plant ( in one location ) b. 55 MW geothermal power plant development c. Development of hydropower by : K.3 - High- weir 15 m, or ELECTRICITY - Size puddle 200 ha, or - Capacity power ( direct stream ) 50 MW d. PLT Waste ( PLTSa ) with methane harvesting process 30 MW e. Development of other types of power plants ( among others : PLT Solar, Wind, Biomass PLT / Peat, PLT Wind ) 10 MW ( in one location ) 1 Stage Geothermal Exploitation : a. Wide licensing ( WKP Geothermal ) 200 ha, K.4 NEW AND RENEWABLE ENERGY b. Wide open areas for geothermal business 50 ha, or c. development of geothermal steam and / or development of

10 PLTP ( geothermal development ) 55 MW L. Tourism Sector M. field of Nuclear 2 Development of biofuel refinery ton/year 1 a. Region Tourism : All quantities b. Recreation, broad > 100 ha 2 Golf course ( excluding all quantities driving range ) 1 Construction and operation of a. Power Reactors : All Capacity nuclear reactors, which b. Non- Power Reactors > 100 kw include : thermal 2 Construction and operation of non-reactor nuclear plant, which includes the following activities: a. enrichment of nuclear All capacity ( except for research material, nuclear material and development purposes ) conversion, and / or purification of nuclear material b. reprocessing of spent all capacities nuclear fuel c. temporary storage of former > MW thermal nuclear fuel b. sustainable storage all capacities 3 Development and Operation Installation of Radioactive Waste Management, which includes the construction and operation phases : low-level radioactive waste All capacity ( except for research treatment and storage medium and development purposes ) and ( disposal ) of low-level radioactive waste and are

11 4 production of Radioisotopes All capacities are derived from fission 1 B3 waste management all quantities services industry who do a combination of two (2 ) or more of the activities include : utilization, processing, and / or landfill B3 2 Utilization B3 a. B3 utilization as synthetic all quantities fuel in cement kilns in the industry, except for utilization of B3 waste generated itself and comes from one (1) location of activities b. B3 utilization in the form of all quantities N. Field Management of Hazardous and making synthetic fuels (fuel blending ) of B3 c. B3 utilization as an all quantities Toxic Waste ( LB3 ) alternative material in the cement industry, which uses only unless utilization of fly ash d. B3 waste utilization of used all quantities oil as a raw material recycling industry lubricants ( lubricant ), including as a raw material base oil e. B3 utilization of used all quantities solvents ( solvents used ) for recycling industrial solvents ( solvents ) f. B3 waste utilization of used batteries through the process of smelting of lead ( Pb ) all quantities

12 g. B3 battery utilization and / all quantities or former dry battery with ingot formation h. B3 utilization spent catalysts in the form of recycling ( recycling) and / or recovery ( recovery ) all quantities 3 B3 waste treatment a. B3 waste treatment all quantities thermally using incinerators, except B3 waste processing itself and comes from one (1) location of activity b. B3 biological waste all quantities treatment (composting, biopile, landfarming, bioventing, biosparging, bioslurping, alternate electron acceptors, and / or itoremediasi ), as the main activity ( B3 waste treatment services ) c. Injection and / or all quantities Reinjection B3 into the formation 4 B3 waste landfilling with landfill class 1, class 2, and / or grade 3 all quantities (MoE Regulation No. 5/2012 Annex I)