1 New Development Projects of Mongolia Ministry of Roads, Transportation, Construction & Urban Development of Mongolia

2 New infrastructure projects are linked to mining developments Coal Deposits Precious Metals Deposits Copper Deposits Oil Deposits 2

3 RAILWAY: State Policy on Railway Development, approved on June 24, 2010 Size 1,040 km Investment US$ 3.0 bn Time frame

4 RAILWAY: Access to seaports 4

5 RAILWAY: Shortest link between Asia & Europe 5

6 INDUSTRIAL PARK: Location Criteria of optimal industrial cluster location: Industrial industrial cluster should be formed on the basis of one of existent cities along TMR: Existent urban infrastructure Convenient transportation of people moving from Ulaanbaator and other regions of Mongolia Option of iron ore transportation from Tomortey mine Proximity to sales markets: Sainshand is closter to China, the main market, than other cities. Processing in Sainshand minimizes total logistics cost Proximity to Oyu Tolgoy and other mines: Most southern route would provide immediate proximity of the railway to other mines, such as Oyuu Tolgoy, Tsagaan Suvarga, Timurtein Ovoo, Tsagaan Tsav, which will reduce development costs Distance and cost of line construction: The line to Dzuunbayan reduces distance to be covered by the new railway which minimizes CAPEX

7 INDUSTRIAL PARK: Processing Units 7 3,512.5 ha 1 1. Cement Plant 2. Coke Plant 3. Iron Pellets Plant 4. HBI / DRI Plant 5. Coal Gasification Plant 6. Oil Refinery 7. Copper Smelter 8. Power Plant

8 INDUSTRIAL PARK: Adding Value & Creating Jobs Mining Exploration Transport Processing (7) Transport Diversified Exports Copper Power Coal Tavan Tolgoi Oyu Tolgoi Power Plant (4) 650 MW Coking Plant (1) ~$700 mln Copper Treament (5) ~$700 mln Metallurgical Facilities (2) ~$1,000 mln Power Plant (4) 800 MW Copper Smelter (6) ~$1,000 mln Coal Chemical Facilities (3) ~$1,000 mln Million tones Japan Korea China Source: BP, IEA, World Steel Association, SSY, WEC, Boston Consulting Group 1,151 1,558 1,504 Million tones 1,317 1,337 3, ,178 Japan China Korea India Copper concentrate import Copper cathodes import Domestic consumption supplied by domestic production Source: Boston Consulting Group 8

9 ROADS: Trans-Mongolian Highway Size km Investment US$ 1.9 bn Time frame

10 ROADS: Domestic Network ULAANBAATAR Size 5,571.9km Investment US$ 2.1 bn Time frame

11 Size 350 km road rehab 212 km new road 7 fly-over at key junctions Investment US$ 0.8 bn Time frame

12 HOUSING: Foremost Social Project 12

13 HOUSING:100,000 housing project ӨЛГИЙ BAYAN-ULGII ХОВД ULAANGOM KHOV UVS household housing in the western region ZAVKHA УЛИАСТА N Й АЛТАЙ GOBI-ALTAI KHUVSGUL МӨРӨ Н БАЯНХ ARKHANGAI BAYANKHONGOR UVURKHANGAI ДАЛАНЗАДГАД household housing in the Khangai region ЭРДЭНЭТ АРВАЙХЭЭР UMNUGOBI SELENG ДАРХАН МАНДАЛГОВЬ DUNDGOBI Size KHENTII БАÀТАР GOBISUMBER ЧОЙР ӨНДӨРХААН DORNOGOBI Investment household housing in Ulaanbaatar city САЙНШАНД БАРУУН-УРТ SUKHBAATAR БАЛСАН DORNOD household housing in the Eastern region household housing in the Central region 75,000 in Ulaanbaatar 25,000 in Provinces US$ 6.2 bn Time frame

14 HOUSING: Migration Map 14

15 SOUM CENTER PROJECT: Erdene Soum Size 11,700 m2 Investment US$ 9.7 m Time frame Mayors Office School Kindergarten Dormitory Hospital Sports & Cultural Center

16 SOUM CENTER PROJECT: Location Western Region 28 Soums Khangai Region 28 Soums Central Region 27 Soums Eastern Region 13 Soums Size Investment 96 Soum Centers US$ 0.7 bn Time frame

17 Required investment Project Name Project Description Estimated Investment Railway Industrial Roads Phase 1. Tavantolgoi-Tsagaansuvarga- Zuunbayan-Sainshand-Baruun urt-khuut- Choibalsan direction Sainshand Industrial Park, including 6 processing and manufacturing plants Total of km of new roads & highways US$ 3.0 billion US$ 13.9 billion US$ 4.8 billion Housing Construction of housing units US$ 6.2 billion Soum Center 96 Soum Centers US$ 0.7 billion 17

18 Contact address, telephone: Ministry of Road, Transportation, Construction and Urban Development of Mongolia Government Building XII Barilgachdyn Talbai Ulaanbaatar, Mongolia Telephone: Fax: Ministry of Roads, Transportation, Construction and Urban Development of Mongolia