GEOTHERMAL UTILIZATIONG AND DEVELOPMENT IN HEBEI PROVINCE. Li Hongying Bureau of Land & Resources in Baoding City, Hebei Province, China
|
|
- Jordan Riley
- 5 years ago
- Views:
Transcription
1 GEOTHERMAL UTILIZATIONG AND DEVELOPMENT IN HEBEI PROVINCE Li Hongying Bureau of Land & Resources in Baoding City, Hebei Province, China
2 THREE PARTS: INTRODUCTION OF HEBEI GEOTHERMAL UTILIZATION AND DEVELOPMENT IN HEBEI CONCLUSION
3 FIRST PART: INTRODUCTION OF HEBEI
4 Hebei : located in North China, surround Beijing and Tianjin, the capital is Shijiazhuang E , N Total area : km2 Population : Million 11 cities, 173 counties, 910 towns
5 Hebei s Position in China Hebei
6 Beijing MAP OF HEBEI Shijiazhuang
7 Mineral resources in Hebei: 150 mineral resources,34 are of top 5 in China, 6290 mining enterprises Including metallurgic, coal, building material and oil-chemistry. COAL occupies 1/13 of the whole country Three oil fields,proved oil reserves are 2.7 billion tons, and natural gas reserves 180 billion m3.
8 Hebei s pressure? Severe environmental and social pressure:china s entry into WTO, 2008 Olympics holding in Beijing Hebei is heavy-industry province, serious pollution 2007, Hebei is one of 7 un-qualified provinces in total 30 during national environmental examination
9 What did Hebei do on renewable use? Solar energy:china Power Valley (Baoding City) Wind energy: China largest wind power plant base (Zhangjiakou City) Geothermal energy: three China Geothermal Towns(Xiong, Bazhou and Gu an County)
10 China Power Valley Low-C Baoding : (National Development and Reform Commission approved) Names:Renewable industry base, New energy industry high-tec base, Solar multi-application model, Low-C city 6 new industrial types on Photovoltaic, wind power, solar power,and autoelectronic production and study
11 Power Valley Hotel
12 Solar Street Lamp
13 Solar Traffic Light
14 Solar Police Box
15 Solar post magzine box
16 Solar bath heater
17 Solar centralized hot water heater Multicrystalline polysilicon battery
18 PV product manufacturer
19 Largest Wind Power Plant Base Zhangjiakou City: high plateau,population small in quantity Low ecnomic level Wind resources rich To 2015, predicted wind power capacity will be 3 MW
20 Yehuling wind power plant Zhangbei wind power plant
21 Fan production
22 Three China Geothermal Towns: Xiong, Bazhou and Gu an County (approved by China Mineral Industry Assosiation) Approve according to strict procedure from resources condition, utilization scale, development level, future scheme, management regulation, etc. Started from 2004, total 10 in China.
23
24 Field investigation
25 Discussing and evaluating
26 Naming ceremony in People s Hall in Beijing
27 Second part: GEOTHERMAL UTILIZATION AND DEVELOPMENT IN HEBEI
28 Characteristics of geothermal in Hebei (1) Deep bury but large reserves in plain, natural spring but small scale in mountain area Low-moderate temp, , some can be used directly 37 geothermal fields, include 19 large (>50MW), 16 midium (10-50MW), and 2 small (<10MW), most distribute in Hebei Plain, total area 16240km2
29 Characteristics of geothermal in Hebei (2) Total reserves equal to coal 41.9 billion tons, minable reserves equal to coal 9.4 billion tons. Main use: space heating, bathing, sanatoria, greenhouses, swimming pools, accommodation and recreation, chicken hatching and fish farming, etc.
30 Geothermal Distribution in Hebei Hot spring area China Geothermal town Main geothermal fields mount ai n ar ea pl ai n pl at eau
31 Pump station for a resident district heating in Bazhou
32 Pump station of Jinhai Villa
33 New facilities
34 Geothermal heating station of Century Town hot spring District in Xiong County
35 A resident district (400,000m2) in Xiong County, 4 wells heating
36 0203 Geothermal heating station In Xiong County (Bureau of Transportation District)
37 Outdoor discharge pool in Xiong County
38 Xiong County Government building, heating by heat pump, lighting by solar
39 New district is constructing, 440,000m2, heating by 6 wells(including 3 reinjection wells)
40 Greenhouse for flower planting
41 Greenhouse for flower planting
42 Greenhouse in Gu an County
43 Fish farming in Gu an
44 Fish farming in Zhongjie Farm
45 Animal feeding
46 Indoor recreation in Mingtang Holiday Recreation Center in Bazhou
47 Outdoor recreation and discharge feeding Chinese Sturgeon
48 Japanese style accommodation
49 Jinhai villa in Gu an County
50 Indoor swimming pool and Recreation in Jinhai Holiday Hotel
51 Zunhua hot spring sanitorium Chicheng natural hot spring
52 Foundation subsidence caused pump sank
53 Geothermal utilization status: In mountain area: 47 hot springs (31 are using), temp , production million m3/a.bathing tourists 3.27 million/a. Problems:spring disappear, waterflow reduce In Hebei Plain: Started use from 1980 s, mainly in rural area 37 fields, Main for space heating, fish farming, agricultrial use, in recent 10 years swimming pools, accommodation and recreation getting popular Heat pumps used widely in new buildings both in geothermal and nongeothermal area
54 Figure on geothermal production and heating area comparation: year production (million m3) Heating area(million m2) (not accurate) (4.42 space heating) (predict) 7.34(not include new 1 at the end of this year)
55 Opportunities for geothermal development Area vast,nearly 1/10 of the total area residents concentrated, long winter heating time need. Geothermal resources can be mined easily (3000m well drilling is accepted ) Compulsory policy requires all fossil fuel boilers must be demolished and replaced by new energy heat pump application successful and widely
56 Limitations to geothermal development Geological work not enough for understanding of geothermal resource over-mined and non-reinjection system caused serious effect for long-term conduction Rural areas are not satisfied on large-scale, concentrated and high-efficient geothermal utilization. laws and rules and policies are still short in some aspects
57 Management schedule and future scheme New situation need new mechanism. Basic and public energy supply strategy is setting, some studying subjects are on doing. New policy on prospecting and mining right will come out this year New develpoment model between government and social investment is on exploring. Reinjection will compelling, monitoring is forced Encouraging policy will tilt to cascading and reinjection systems
58 Third part: CONCLUSION
59 Hebei face great pressure, has to seek new ways to solve problems on energy supply and emission reduction. Geothermal rich and increases rapidly Heat pump use widely in both geo and nongeothermal area, can be used partly for geothermal cascading utilization. Prospecting and mining right policy can promote integrative step on investment, 300 rights are waiting for approval by government. Reinjection and monitoring must be carried out strictly especially in over-mined area.
60 THANK YOU FOR ATTENTION!